You are on page 1of 2
contact ne: RTGIO4N2012 Desi end Variation Corsten 1 A GREEN LINE UNDERGROUND Dosign and Verification Certificate To: Qatar Railways Company 231 Suhaim Bin Hamad Street A\Saad Area 38 Doha, Qatar 4. We certify that ell necessary professional skill and care required of a professionally qualified and competent designer experienced in work of similar nature and scope as the work under the Contract in the performance of his duties has been used in the preparation and verification Of the design (Including specification) for M008-RGL-PUH-MAR-00020 - Plumbing Valves ( Crane Fluid Systems) being part of the Contractors Design for Contract No: RTCI041/2012 Design and Build Package 4 - Green Line Underground, and are satisfied that: ‘The Design (2) The Design complies with the Employer's Requirements end design criteria for the work under the Contract (6) The Contractor's Design has been accurately translated into documents, drawings and schedules, which have been checked. The unique numbers of these documents, drawings and schedules, are: Desurent Revision Tie ‘Mooe-RGL-PUH-MAR-00020 2 Plumbing Valves (Crane Fluid Systems) 2. We further certify that we have verified and agreed with the designer of the Contractor's Design for M008-RGL-PUH-MAR-00020 - Plumbing Valves ( Crane Fluid Systems) Contracto’s Design detailed in paragraph 1 above can be carried out and will meet the requirements of the Contract. Gree uneunderround contrat na: RTCD/20"2 Dovign an Vareton e as-bull Drawings and docurnentallon are accurate a eon a er fey a John Quon BE MEP a Manager donathan Bayiiss- Enzineering Manager « ORR Seu Binladin HBK Joint Verture Rambol Switchbox M30/91 Building No.2 Commer of Jassim Bin Hamad Steet Beeet aaa &AlRayaan Road Free] Bin Moh P.0. Box 207471 See Doha, State of Qatar : Pe Nn ie Pave 2092

You might also like