PRACTICA CALIFICADA DE CONSTRUCCIONES I

1.- SE TIENE LOS SIGUIENTES MONTOS DE CADA MES QUE SON LOS SIGUIENTES: S/.150000 , S/.350000 Y S/.600000 , ESTOS VA
AL 100% DEL COSTO DIRECTO DEL PIE DE PRESUPUESTO, GASTOS GENERALES 8% Y UTILIDAD AL 10%, EL CONTRATISTA QUE GA
OFERTO AL 92% Y A LA FIRMA DEL CONTRATO SOLICITO EL 8% DE ADELANTO DIRECTO SE PIDE HALLAR LO NETO A PAGAR ( 07

PARA VALORIZACION 01
PIE DE PRESUPUESTO AL 100% PIE DE PRESUPUESTO AL 92%
CD(100%) 100 150,000.00 CD(92%)
GG(8%) 8 12,000.00 GG(8%)
UU(10%) 10 15,000.00 UU(10%)
SUB PRES 177,000.00 SUB PRES
IGV(18%) 18 31860.00 IGV(18%)
PRESUPUESTO 208,860.00 PRESUPUESTO

HALLANDO LO NETO A PAGAR:

#MONTO A PAGAR:
VB1= 162,840.00
#MONTO A AMORTIZAR:
AD(8%)= 13027.20
#SUB TOTAL AMORTIZADO
VB1-AD(8%) 149,812.80
IGV(18%) 26966.304
TOTAL 176,779.10

PARA VALORIZACION 02
PIE DE PRESUPUESTO AL 100% PIE DE PRESUPUESTO AL 92%
CD(100%) 100 350,000.00 CD(92%)
GG(8%) 8 28,000.00 GG(8%)
UU(10%) 10 35,000.00 UU(10%)
SUB PRES 413,000.00 SUB PRES
IGV(18%) 18 74340.00 IGV(18%)
PRESUPUESTO 487,340.00 PRESUPUESTO

HALLANDO LO NETO A PAGAR:

#MONTO A PAGAR:
VB1= 379,960.00
#MONTO A AMORTIZAR:
AD(8%)= 30396.80
#SUB TOTAL AMORTIZADO
VB1-AD(8%) 349,563.20
IGV(18%) 62921.376
TOTAL 412,484.58

PARA VALORIZACION 03
PIE DE PRESUPUESTO AL 100% PIE DE PRESUPUESTO AL 92%
CD(100%) 100 600,000.00 CD(92%)
GG(8%) 8 48,000.00 GG(8%)
UU(10%) 10 60,000.00 UU(10%)
SUB PRES 708,000.00 SUB PRES
IGV(18%) 18 127440.00 IGV(18%)
PRESUPUESTO 835,440.00 PRESUPUESTO

HALLANDO LO NETO A PAGAR:

#MONTO A PAGAR:
VB1= 651,360.00
#MONTO A AMORTIZAR:
AD(8%)= 52108.80
#SUB TOTAL AMORTIZADO
VB1-AD(8%) 599,251.20
IGV(18%) 107865.216
TOTAL 707,116.42

2.- SE LICITO UNA OBRA CUYO VALOR REFERENCIAL ES S/. 5000000. LA EMPRESA GANADORA DE LA BUENA PRO OFERTO S/.48
LA EMPRESA A LA FIRMA DEL CONTRATO SOLICITO UN ADELANTO DIRECTO DEL 8%, EL EXPEDIENTE TECNICO FUE ELABORADO
DE NOVIEMBRE 2018, EL INICIO DE OBRA FUE EN ENERO 2019, EL TIEMPO DE EJECUCION ES DE 03 MESES, EL EXPEDIENTE TEC
CON FORMULA POLINOMICA

K=0.45MOr/Moo+0.10CEMr/CEMo+0.20TUBr/TUBo+0.05MAQr/MAQo+0.20GGUUr/GGUUo.
TAMBIEN SE ADJUNTA EL AVANCE DE OBRA Y EL PRESUPUESTO

PRESUPUESTO AVANCES EJECU

item DESCRIP UNIDAD METRADO P.U TOTALES item


1.00 A M2 2,500.00 113.50 283,750.00 1.00
2.00 B M3 5,000.00 450.00 ### 2.00
3.00 C KG 15,000.00 10.55 158,250.00 3.00
4.00 D M3 3,278.29 265.00 868,746.85 4.00

MONTO COSTO DIRECTO ###


GASTO GENERALES 9% 0.09 320,467.22
UTILIDAD 10 % 0.10 356,074.69
SUB DEL PRESUPUESTO ###
IGV 18% 0.18 762,711.98
PRESUPUESTO TOTAL ###
val- anterior
PRESUPUESTO
metrado
item DESCRIP UNIDAD METRADO P.U TOTALES
1.00 A M2 2,500.00 113.50 283,750.00 0.00
2.00 B M3 5,000.00 450.00 ### 0.00
3.00 C KG 15,000.00 10.55 158,250.00 0.00
4.00 D M3 3,278.29 265.00 868,746.85 0.00
0.00 0 0 0.00 0.00 0.00

MONTO COSTO DIRECTO ###


GASTO GENERALES 9% 0.09 320,467.22
UTILIDAD 10 % 0.10 356,074.69
SUB DEL PRESUPUESTO ###
IGV 18% 0.18 762,711.98
PRESUPUESTO TOTAL ###

AVANCES EJECUTADOS % AVANCES EJECUTADOS REALES


item DESCRIP MES 1 MES 2 MES 3 MES 1 MES 2
1.00 A 20 40 40 500.00 1000.00
2.00 B 15 25 60 750.00 1250.00
3.00 C 8 22 70 1200.00 3300.00
4.00 D 25 37 38 819.57 1212.97

val- anterior
PRESUPUESTO
metrado
item DESCRIP UNIDAD METRADO P.U TOTALES
1.00 A M2 2,500.00 113.50 283,750.00 500.00
2.00 B M3 5,000.00 450.00 ### 750.00
3.00 C KG 15,000.00 10.55 158,250.00 1,200.00
4.00 D M3 3,278.29 265.00 868,746.85 819.57
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00

MONTO COSTO DIRECTO ###


GASTO GENERALES 9% 0.09 320,467.22
UTILIDAD 10 % 0.10 356,074.69
SUB DEL PRESUPUESTO 0.00 ###
IGV 18% 0.18 762,711.98
PRESUPUESTO TOTAL ###

val- anterior
PRESUPUESTO
metrado
item DESCRIP UNIDAD METRADO P.U TOTALES
1.00 A M2 2,500.00 113.50 283,750.00 1,500.00
2.00 B M3 5,000.00 450.00 ### 2,000.00
3.00 C KG 15,000.00 10.55 158,250.00 4,500.00
4.00 D M3 3,278.29 265.00 868,746.85 2,032.54
0.00 0 0 0.00 0.00 0.00 0.00
0.00 0 0 0.00 0.00 0.00 0.00

MONTO COSTO DIRECTO ###


GASTO GENERALES 9% 0.09 320,467.22
UTILIDAD 10 % 0.10 356,074.69
SUB DEL PRESUPUESTO 0.00 ###
IGV 18% 0.18 762,711.98
PRESUPUESTO TOTAL ###

RESUMEN PARA VALORIZACION 01

A) HALLANDO LO NETO A PAGAR: MONTO BASE


MONTO OFERTADO
#MONTO A PAGAR:
REINTEGRO ENERO 0
VB1= 712,968.08 FR(%)
#MONTO A AMORTIZAR:
AD(8%)= 57037.45
#SUB TOTAL AMORTIZADO
VB1-AD(8%) 655,930.64
IGV(18%) 118067.5148
TOTAL 773,998.15

B) REINTEGRO V(K-1)
# K enero 0.99542

# REINTEGRO enero 0

RESUMEN PARA VALORIZACION 02 - FEBRERO

A) HALLANDO LO NETO A PAGAR: MONTO BASE


MONTO OFERTADO
#MONTO A PAGAR:
REINTEGRO FEBRERO -82457.6796
VB2= 1,892,212.01 FR(%)
#MONTO A AMORTIZAR:
AD(8%)= 144780.35
#SUB TOTAL AMORTIZADO
VB1-AD(8%) 1,747,431.66
IGV(18%) 314537.6993
TOTAL 2,061,969.36

B) REINTEGRO V(K-1)
# K febrero 0.96307

K-1 -0.03693
V(K-1) -82457.68
RESUMEN PARA VALORIZACION 03 - MARZO

A) HALLANDO LO NETO A PAGAR: MONTO BASE


MONTO OFERTADO
#MONTO A PAGAR:
REINTEGRO MARZO -13344.0019
VB3= 732,203.50 FR(%)
#MONTO A AMORTIZAR:
AD(8%)= 57508.76
#SUB TOTAL AMORTIZADO
VB3-AD(8%) 674,694.74
IGV(18%) 121445.0526
TOTAL 796,139.79

B) REINTEGRO V(K-1)
# K enero 0.99722

K-1 -0.00278
V(K-1) -13344.002
ALIFICADA DE CONSTRUCCIONES II

S/.350000 Y S/.600000 , ESTOS VALORES ES


AL 10%, EL CONTRATISTA QUE GANO LA BUENA PRO
DE HALLAR LO NETO A PAGAR ( 07 PTOS)

PIE DE PRESUPUESTO AL 92%


100 138,000.00
8 11,040.00
10 13,800.00
162,840.00
18 29311.20
ESUPUESTO 192,151.20

PIE DE PRESUPUESTO AL 92%


100 322,000.00
8 25,760.00
10 32,200.00
379,960.00
18 68392.80
ESUPUESTO 448,352.80
PIE DE PRESUPUESTO AL 92%
100 552,000.00
8 44,160.00
10 55,200.00
651,360.00
18 117244.80
ESUPUESTO 768,604.80

A DE LA BUENA PRO OFERTO S/.4800000 ,


DIENTE TECNICO FUE ELABORADO EN EL MES
DE 03 MESES, EL EXPEDIENTE TECNICO CUENTA

TUB= TUBERIA PVC

AVANCES EJECUTADOS %

DESCRIP MES 1 MES 2 MES 3


A 20 40 40
B 15 25 60
C 8 22 70
D 25 37 38
VALORIZACION N° 01
val- anterior val- actual val- acumulada saldo a valorizar % AVANCE
OBRA
monto val. metrado monto val. metrado monto val.acum- metrado saldo a val.a
17.53
0.00 500.00 56,750.00 500.00 56,750.00 2,000.00 227,000.00
0.00 750.00 337,500.00 750.00 337,500.00 4,250.00 ###
% RESTA
0.00 1200.00 12,660.00 1,200.00 12,660.00 13,800.00 145,590.00 AVANCE
0.00 819.57 217,186.71 819.57 217,186.71 2,458.72 651,560.14 OBRA
82.47

624,096.71 624,096.71 ###


56,168.70 56,168.70 264,298.51
62409.6713 62,409.67 293,665.01
742,675.09 742,675.09 ###
133,681.52 133,681.52 629,030.46
876,356.60 876,356.60 ###

JECUTADOS REALES
MES 3
1000.00
3000.00
10500.00
1245.75

VALORIZACION N° 02
val- anterior val- actual val- acumulada saldo a valorizar % AVANCE
OBRA
monto val. metrado monto val. metrado monto val.acum- metrado saldo a val.a
46.52
56,750.00 1000 113,500.00 1,500.00 170,250.00 1,000.00 113,500.00
337,500.00 1250 562,500.00 2,000.00 900,000.00 3,000.00 ###
% RESTA
12,660.00 3300 34,815.00 4,500.00 47,475.00 10,500.00 110,775.00 AVANCE
217,186.71 1212.97 321,436.33 2,032.54 538,623.05 1,245.75 330,123.80 OBRA
0.00 0 0.00 0.00 0.00 0.00 0.00 53.48
0.00 0 0.00 0.00 0.00 0.00 0.00

### ### ###


92,902.62 149,071.32 171,395.89
103225.13 165,634.80 190,439.88
### ### ###
221,108.24 354,789.75 407,922.22
### ### ###

VALORIZACION N° 03
val- anterior val- actual val- acumulada saldo a valorizar % AVANCE
OBRA
monto val. metrado monto val. metrado monto val.acum- metrado saldo a val.a
100.00
170,250.00 1000 113,500.00 2,500.00 283,750.00 0.00 0.00
900,000.00 3000 ### 5,000.00 ### 0.00 0.00
% RESTA
47,475.00 10500 110,775.00 15,000.00 158,250.00 0.00 0.00 AVANCE
538,623.05 1245.7502 330,123.80 3,278.29 868,746.85 0.00 0.00 OBRA
0.00 0 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0 0.00 0.00 0.00 0.00 0.00

### ### 0.00


171,395.89 320,467.22 0.00
190439.88 356,074.69 0.00
### ### 0.00
407,922.22 762,711.98 0.00
### ### 0.00

5000000
4800000

96
0.96

RO

5000000
4800000
96
0.96

5000000
4800000

96
0.96
57
1.-SE TIENE UN PRESUPUESTO ELABORADO EN EL MES DE ENERO 2018, SE DIO INICIO DE ABRIL 2018 , SE TIENE LOS SIGUIENT
PAGAR Y SUS REINTEGROS DE CADA VALORIZACION .(12PTOS), K=0.35466MOr/Moo+0.15230Co/Cr+0.134

COSTO DIRECTO

item DESCRIP UNIDAD METRADO P.U TOTALES


1.00 AB M3 1,650.00 350.00 577,500.00 item
2.00 ABC M2 3,500.00 150.00 525,000.00 1.00
3.00 ABCD UNIDAD 35,000.00 7.50 262,500.00 2.00
4.00 ABCDE KG 95,000.00 9.50 902,500.00 3.00
4.00
MONTO COSTO DIRECTO ###
GASTO GENERALES 10% 0.10 226,750.00
UTILIDAD 9.73 % 0.10 220,627.75
SUB DEL PRESUPUESTO ###
IGV 18% 0.18 488,678.00
PRESUPUESTO TOTAL ###

SOLUCION

val- anterior
PRESUPUESTO
metrado monto val.
item DESCRIP UNIDAD METRADO P.U TOTALES
1.00 AB M3 1,650.00 350.00 577,500.00 0.00 0.00
2.00 ABC M2 3,500.00 150.00 525,000.00 0.00 0.00
3.00 ABCD UNIDAD 35,000.00 7.50 262,500.00 0.00 0.00
4.00 ABCDE KG 95,000.00 9.50 902,500.00 0.00 0.00

MONTO COSTO DIRECTO ###


GASTO GENERALES 9% 0.10 226,750.00
UTILIDAD 10 % 0.10 220,627.75
SUB DEL PRESUPUESTO ###
IGV 18% 0.18 488,678.00
PRESUPUESTO TOTAL ###

AVANCES EJECUTADOS % AVANCES EJECUTADOS REALES


item DESC MES 1 MES 2 MES 3 MES 1 MES 2 MES 3
1.00 AB 44.5 55.5 734.25 915.75
2.00 ABC 35.25 64.75 1233.75 2266.25
3.00 ABCD 48 52 16800.00 18200.00
4.00 ABCDE 55 45 52250.00 42750.00
val- anterior
PRESUPUESTO
metrado monto val.
item DESCRIP UNIDAD METRADO P.U TOTALES
1.00 AB M3 1,650.00 350.00 577,500.00 734.25 256,987.50
2.00 ABC M2 3,500.00 150.00 525,000.00 1,233.75 185,062.50
3.00 ABCD UNIDAD 35,000.00 7.50 262,500.00 16,800.00 126,000.00
4.00 ABCDE KG 95,000.00 9.50 902,500.00 52,250.00 496,375.00

MONTO COSTO DIRECTO ###


GASTO GENERALES 9% 0.10 226,750.00
UTILIDAD 10 % 0.10 220,627.75
SUB DEL PRESUPUESTO ###
IGV 18% 0.18 488,678.00
PRESUPUESTO TOTAL ###

RESUMEN PARA VALORIZACION 01 - ABRIL 2018

A) HALLANDO LO NETO A PAGAR:

#MONTO A PAGAR: 1,274,436.05


REINTEGRO
ENERO 0
VB1= 1,274,436.05
#MONTO A AMORTIZAR:
AD(8%)= 101954.8842
#SUB TOTAL AMORTIZADO
VB1-AD(8%) 1,172,481.17
IGV(18%) 211046.6103
TOTAL 1,383,527.78

B) REINTEGRO V(K-1)
# K enero 1.00875

# REINTEGRO enero 0

RESUMEN PARA VALORIZACION 01 - ABRIL 2018

A) HALLANDO LO NETO A PAGAR:


#MONTO A PAGAR: 2,714,877.75
REINTEGRO
ENERO 28031.11277
VB1= 2,742,908.86
#MONTO A AMORTIZAR:
AD(8%)= 219432.709
#SUB TOTAL AMORTIZADO
VB1-AD(8%) 2,523,476.15
IGV(18%) 454225.7077
TOTAL 2,977,701.86

B) REINTEGRO V(K-1)
# K enero 1.00875

# REINTEGRO enero 28031.11277


18 , SE TIENE LOS SIGUIENTES AVANCES DE CADA MES, SE PIDE HALLAR LAS VALORIZACIONES NETAS A
/Moo+0.15230Co/Cr+0.13481EQo/EQr+0.19346AGo/AGr+0.16478GGUUr/GGUUo.

AVANCES EJECUTADOS %
DESCRIP UNIDAD MES 1 MES 2
AB M3 44.5 55.5
ABC M2 35.25 64.75
ABCD UNIDAD 48 52
ABCDE KG 55 45

VALORIZACION N° 01
val- actual val- acumulada saldo a valorizar % AVANCE
OBRA
metrado monto val. metrado monto val.acum- metrado saldo a val.a
46.94
734.25 256,987.50 734.25 256,987.50 915.75 320,512.50
1233.75 185,062.50 1,233.75 185,062.50 2,266.25 339,937.50
% RESTA
16800.00 126,000.00 16,800.00 126,000.00 18,200.00 136,500.00 AVANCE
52250.00 496,375.00 52,250.00 496,375.00 42,750.00 406,125.00 OBRA
53.06

### ### ###


106,442.50 106,442.50 120,307.50
103568.553 103,568.55 117,059.20
### ### ###
229,398.49 229,398.49 259,279.51
### ### ###
VALORIZACION N° 02
val- actual val- acumulada saldo a valorizar % AVANCE
OBRA
metrado monto val. metrado monto val.acum- metrado saldo a val.a
100.00
915.75 320,512.50 1,650.00 577,500.00 0.00 0.00
2266.25 339,937.50 3,500.00 525,000.00 0.00 0.00
% RESTA
18200 136,500.00 35,000.00 262,500.00 0.00 0.00 AVANCE
42750 406,125.00 95,000.00 902,500.00 0.00 0.00 OBRA
0.00

### ### 0.00


120,307.50 226,750.00 0.00
117059.20 220,627.75 0.00
### ### 0.00
259,279.51 488,678.00 0.00
### ### 0.00
VALORIZACION N° 0
val- anterior val- actual val- acumulada
PRESUPUESTO
metrado monto val. metrado monto val. metrado monto val.acum-
item DESCRIP UNIDAD METRADO P.U TOTALES
1.00 AD ML 496.90 2.50 1,242.25 0.00 0.00 124.23 310.56 124.23 310.56
2.00 CD M3 2,780.00 250.00 695,000.00 0.00 0.00 417.00 104,250.00 417.00 104,250.00
3.00 DC M2 1,500.00 350.00 525,000.00 0.00 0.00 150.00 52,500.00 150.00 52,500.00
4.00 EF M2 720.00 450.00 324,000.00 0.00 0.00 36.00 16,200.00 36.00 16,200.00
5.00 RF ML 1,500.00 177.04 265,560.00 0.00 0.00 225.00 39,834.00 225.00 39,834.00
6.00 DR GLB 1.00 4.65 4.65 0.00 0.00 1.00 4.65 1.00 4.65

TO COSTO DIRECTO 1,810,806.90 213,099.21 213,099.21


TO GENERALES 9% 0.09 162,972.62 19,178.93 19,178.93
UTILIDAD 10 % 0.08 144,864.55 17047.937 17,047.94
DEL PRESUPUESTO 2,118,644.07 249,326.08 249,326.08
IGV 18% 0.18 381,355.93 44,878.69 44,878.69
SUPUESTO TOTAL 2,500,000.01 294,204.77 294,204.77

AVANCES EJECUTADOS % AVANCES EJECUTADOS REALES


item DESC MES 1 MES 2 MES 3 MES 1 MES 2 MES 3
1.00 AD 25 45 30 124.23 223.61 149.07
2.00 CD 15 35 50 417.00 973.00 1390.00
3.00 DC 10 45 45 150.00 675.00 675.00
4.00 EF 5 55 40 36.00 396.00 288.00
5.00 RF 15 65 20 225.00 975.00 300.00
6.00 DR 100 0 0 1.00 0.00 0.00

VALORIZACION N° 0
val- anterior val- actual val- acumulada
PRESUPUESTO
metrado monto val. metrado monto val. metrado monto val.acum-
item DESCRIP UNIDAD METRADO P.U TOTALES
1.00 AD ML 496.90 2.50 1,242.25 124.23 310.56 223.605 559.01 347.83 869.58
2.00 CD M3 2,780.00 250.00 695,000.00 417.00 104,250.00 973 243,250.00 1,390.00 347,500.00
3.00 DC M2 1,500.00 350.00 525,000.00 150.00 52,500.00 675 236,250.00 825.00 288,750.00
4.00 EF M2 720.00 450.00 324,000.00 36.00 16,200.00 396 178,200.00 432.00 194,400.00
5.00 RF ML 1,500.00 177.04 265,560.00 225.00 39,834.00 975 172,614.00 1,200.00 212,448.00
6.00 DR GLB 1.00 4.65 4.65 1.00 4.65 0 0.00 1.00 4.65

TO COSTO DIRECTO 1,810,806.90 830,873.01 1,043,972.23


TO GENERALES 9% 0.09 162,972.62 74,778.57 93,957.50
UTILIDAD 10 % 0.08 144,864.55 66469.84 83,517.78
DEL PRESUPUESTO 0.00 2,118,644.07 972,121.42 1,221,447.50
IGV 18% 0.18 381,355.93 174,981.86 219,860.55
SUPUESTO TOTAL 2,500,000.01 1,147,103.28 1,441,308.05

VALORIZACION N° 0
val- anterior val- actual val- acumulada
PRESUPUESTO
metrado monto val. metrado monto val. metrado monto val.acum-
item DESCRIP UNIDAD METRADO P.U TOTALES
1.00 AD ML 496.90 2.50 1,242.25 347.83 869.58 149.07 372.68 496.90 1,242.25
2.00 CD M3 2,780.00 250.00 695,000.00 1,390.00 347,500.00 1390 347,500.00 2,780.00 695,000.00
3.00 DC M2 1,500.00 350.00 525,000.00 825.00 288,750.00 675 236,250.00 1,500.00 525,000.00
4.00 EF M2 720.00 450.00 324,000.00 432.00 194,400.00 288 129,600.00 720.00 324,000.00
5.00 RF ML 1,500.00 177.04 265,560.00 1,200.00 212,448.00 300 53,112.00 1,500.00 265,560.00
6.00 DR GLB 1.00 4.65 4.65 1.00 4.65 0 0.00 1.00 4.65

TO COSTO DIRECTO 1,810,806.90 766,834.68 1,810,806.90


TO GENERALES 9% 0.09 162,972.62 69,015.12 162,972.62
UTILIDAD 10 % 0.08 144,864.55 61346.77 144,864.55
DEL PRESUPUESTO 0.00 2,118,644.07 897,196.57 2,118,644.07
IGV 18% 0.18 381,355.93 161,495.38 381,355.93
SUPUESTO TOTAL 2,500,000.01 1,058,691.95 2,500,000.01

SUB PRES AL 100% AL 97% AD SUB PRES IGV TOTA


0.1 0.97 0.08 0.18
M1 1,228,377.92
M2
M3
saldo a valorizar % AVANCE
OBRA
metrado saldo a val.a
11.77
372.68 931.69
2,363.00 590,750.00
% RESTA
1,350.00 472,500.00 AVANCE
684.00 307,800.00 OBRA
1,275.00 225,726.00 88.23
0.00 0.00

1,597,707.69
143,793.69
127,816.62
1,869,317.99
336,477.24
2,205,795.23

saldo a valorizar % AVANCE


OBRA
metrado saldo a val.a
57.65
149.07 372.68
1,390.00 347,500.00
% RESTA
675.00 236,250.00 AVANCE
288.00 129,600.00 OBRA
300.00 53,112.00 42.35
0.00 0.00

766,834.68
69,015.12
61,346.77
897,196.57
161,495.38
1,058,691.95

saldo a valorizar % AVANCE


OBRA
metrado saldo a val.a
100.00
0.00 0.00
0.00 0.00
% RESTA
0.00 0.00 AVANCE
0.00 0.00 OBRA
0.00 0.00 0.00
0.00 0.00

0.00
0.00
0.00
0.00
0.00
0.00
val- anterior
PRESUPUESTO
metrado monto val.
item DESCRIP UNIDAD METRADO P.U TOTALES
1.00 AD ML 2,500.00 113.50 283,750.00 0.00 0.00
2.00 CD M3 5,000.00 450.00 ### 0.00 0.00
3.00 DC M2 15,000.00 10.55 158,250.00 0.00 0.00
4.00 EF M2 3,278.28 265.00 868,744.20 0.00 0.00

MONTO COSTO DIRECTO ###


GASTO GENERALES 9% 0.09 320,466.98
UTILIDAD 10 % 0.10 356,074.42
SUB DEL PRESUPUESTO ###
IGV 18% 0.18 762,711.41
PRESUPUESTO TOTAL ###

AVANCES EJECUTADOS % AVANCES EJECUTADOS REALES


item DESC MES 1 MES 2 MES 3 MES 1 MES 2 MES 3
1.00 AD 20 40 40 500.00 1000 1000
2.00 CD 15 25 60 750.00 1250 3000
3.00 DC 8 22 70 1200.00 3300 10500
4.00 EF 25 37 38 819.57 1212.96 1245.75

val- anterior
PRESUPUESTO
metrado monto val.
item DESCRIP UNIDAD METRADO P.U TOTALES
1.00 AD ML 2,500.00 113.50 283,750.00 500.00 56,750.00
2.00 CD M3 5,000.00 450.00 ### 750.00 337,500.00
3.00 DC M2 15,000.00 10.55 158,250.00 1,200.00 12,660.00
4.00 EF M2 3,278.28 265.00 868,744.20 819.57 217,186.05
5.00 RF ML 0.00 0.00 0.00 0.00 0.00
6.00 DR GLB 0.00 0.00 0.00 0.00 0.00

MONTO COSTO DIRECTO ###


GASTO GENERALES 9% 0.09 320,466.98
UTILIDAD 10 % 0.10 356,074.42
SUB DEL PRESUPUESTO 0.00 ###
IGV 18% 0.18 762,711.41
PRESUPUESTO TOTAL ###
val- anterior
PRESUPUESTO
metrado monto val.
item DESCRIP UNIDAD METRADO P.U TOTALES
1.00 AD ML 2,500.00 113.50 283,750.00 1,500.00 170,250.00
2.00 CD M3 5,000.00 450.00 ### 2,000.00 900,000.00
3.00 DC M2 15,000.00 10.55 158,250.00 4,500.00 47,475.00
4.00 EF M2 3,278.28 265.00 868,744.20 2,032.53 538,621.40
5.00 RF ML 0.00 0.00 0.00 0.00 0.00
6.00 DR GLB 0.00 0.00 0.00 0.00 0.00

MONTO COSTO DIRECTO ###


GASTO GENERALES 9% 0.09 320,466.98
UTILIDAD 10 % 0.10 356,074.42
SUB DEL PRESUPUESTO 0.00 ###
IGV 18% 0.18 762,711.41
PRESUPUESTO TOTAL ###

SUB PRES AL 100% AL 97% AD SUB PRES


0.1 0.97 0.08
M1 ###
M2
M3
VALORIZACION N° 0
val- actual val- acumulada saldo a valorizar % AVANCE
OBRA
metrado monto val. metrado monto val.acum- metrado saldo a val.a

500.00 56,750.00 500.00 56,750.00 2,000.00 227,000.00


750.00 337,500.00 750.00 337,500.00 4,250.00 ###
1200.00 12,660.00 1,200.00 12,660.00 13,800.00 145,590.00
819.57 217,186.05 819.57 217,186.05 2,458.71 651,558.15

624,096.05 624,096.05 ###


56,168.64 56,168.64 264,298.33
62409.61 62,409.61 293,664.82
742,674.30 742,674.30 ###
133,681.37 133,681.37 629,030.03
876,355.67 876,355.67 ### 82.47
17.53

VALORIZACION N° 0
val- actual val- acumulada saldo a valorizar %
sal a valorizar
metrado monto val. metrado monto val.acum- metrado saldo a val.a

1000 113,500.00 1,500.00 170,250.00 1,000.00 113,500.00


1250 562,500.00 2,000.00 900,000.00 3,000.00 ###
3300 34,815.00 4,500.00 47,475.00 10,500.00 110,775.00
1212.9636 321,435.35 2,032.53 538,621.40 1,245.75 330,122.80
0 0.00 0.00 0.00 0.00 0.00
0 0.00 0.00 0.00 0.00 0.00

### ### ###


92,902.53 149,071.18 171,395.80
103225.04 165,634.64 190,439.78
### ### ###
221,108.03 354,789.40 407,922.01
### ### ### 53.4831397
46.5168603
VALORIZACION N° 0
val- actual val- acumulada saldo a valorizar %
sal a valorizar
metrado monto val. metrado monto val.acum- metrado saldo a val.a

1000 113,500.00 2,500.00 283,750.00 0.00 0.00


3000 ### 5,000.00 ### 0.00 0.00
10500 110,775.00 15,000.00 158,250.00 0.00 0.00
1245.7464 330,122.80 3,278.28 868,744.20 0.00 0.00
0 0.00 0.00 0.00 0.00 0.00
0 0.00 0.00 0.00 0.00 0.00

### ### 0.00


171,395.80 320,466.98 0.00
190439.78 356,074.42 0.00
### ### 0.00
407,922.01 762,711.41 0.00
### ### 0.00 0

IGV TOTA
0.18
val- anterior
PRESUPUESTO
metrado
item DESCRIP UNIDAD METRADO P.U TOTALES
1.00 A M2 2,500.00 113.50 283,750.00 0.00
1.00 B M3 5,000.00 450.00 2,250,000.00 0.00
1.00 C KG 15,000.00 10.55 158,250.00 0.00
1.00 D M3 3,278.28 265.00 868,744.20 0.00
1.00
1.00

MONTO COSTO DIRECTO 3,560,744.20


GASTO GENERALES 9% 0.09 320,466.98
UTILIDAD 10 % 0.10 356,074.42
SUB DEL PRESUPUESTO 4,237,285.60
IGV 18% 0.18 762,711.41
PRESUPUESTO TOTAL 4,999,997.01

AVANCES EJECUTADOS % AVANCES EJECUTADOS REALES


item DESC MES 1 MES 2 MES 3 MES 1 MES 2
1.00 A 20 40 40 500.00 1000
2.00 B 15 25 60 750.00 1250
3.00 C 8 22 70 1200.00 3300
4.00 D 25 37 38 819.57 1212.96

val- anterior
PRESUPUESTO
metrado
item DESCRIP UNIDAD METRADO P.U TOTALES
1.00 A M2 2,500.00 113.50 283,750.00 500.00
2.00 B M3 5,000.00 450.00 2,250,000.00 750.00
3.00 C KG 15,000.00 10.55 158,250.00 1,200.00
4.00 D M3 3,278.28 265.00 868,744.20 819.57
5.00 0 0 0.00 0.00 0.00 0.00
6.00 0 0 0.00 0.00 0.00 0.00

MONTO COSTO DIRECTO 3,560,744.20


GASTO GENERALES 9% 0.09 320,466.98
UTILIDAD 10 % 0.10 356,074.42
SUB DEL PRESUPUESTO 0.00 4,237,285.60
IGV 18% 0.18 762,711.41
PRESUPUESTO TOTAL 4,999,997.01
val- anterior
PRESUPUESTO
metrado
item DESCRIP UNIDAD METRADO P.U TOTALES
1.00 AD ML 2,500.00 113.50 283,750.00 1,500.00
2.00 CD M3 5,000.00 450.00 2,250,000.00 2,000.00
3.00 DC M2 15,000.00 10.55 158,250.00 4,500.00
4.00 EF M2 3,278.28 265.00 868,744.20 2,032.53
5.00 RF ML 0.00 0.00 0.00 0.00
6.00 DR GLB 0.00 0.00 0.00 0.00

MONTO COSTO DIRECTO 3,560,744.20


GASTO GENERALES 9% 0.09 320,466.98
UTILIDAD 10 % 0.10 356,074.42
SUB DEL PRESUPUESTO 0.00 4,237,285.60
IGV 18% 0.18 762,711.41
PRESUPUESTO TOTAL 4,999,997.01

SUB PRES AL 100% AL 97%


0.1 0.97
M1 742,674.30 720394.07
M2 1228377.92126 1191526.58
M3 2266233.37724 2198246.38
VALORIZACION N° 0
val- anterior val- actual val- acumulada saldo a valorizar
monto val. metrado monto val. metrado monto val.acum- metrado saldo a val.a

0.00 500.00 56,750.00 500.00 56,750.00 2,000.00 227,000.00


0.00 750.00 337,500.00 750.00 337,500.00 4,250.00 1,912,500.00
0.00 1200.00 12,660.00 1,200.00 12,660.00 13,800.00 145,590.00
0.00 819.57 217,186.05 819.57 217,186.05 2,458.71 651,558.15

624,096.05 624,096.05 2,936,648.15


56,168.64 56,168.64 264,298.33
62409.605 62,409.61 293,664.82
742,674.30 742,674.30 3,494,611.30
133,681.37 133,681.37 629,030.03
876,355.67 876,355.67 4,123,641.33

CUTADOS REALES
MES 3
1000
3000
10500
1245.75

VALORIZACION N° 0
val- anterior val- actual val- acumulada saldo a valorizar
monto val. metrado monto val. metrado monto val.acum- metrado saldo a val.a

56,750.00 1000 113,500.00 1,500.00 170,250.00 1,000.00 113,500.00


337,500.00 1250 562,500.00 2,000.00 900,000.00 3,000.00 1,350,000.00
12,660.00 3300 34,815.00 4,500.00 47,475.00 10,500.00 110,775.00
217,186.05 1212.9636 321,435.35 2,032.53 538,621.40 1,245.75 330,122.80
0.00 0 0.00 0.00 0.00 0.00 0.00
0.00 0 0.00 0.00 0.00 0.00 0.00

1,032,250.35 1,656,346.40 1,904,397.80


92,902.53 149,071.18 171,395.80
103225.04 165,634.64 190,439.78
1,228,377.92 1,971,052.22 2,266,233.38
221,108.03 354,789.40 407,922.01
1,449,485.95 2,325,841.62 2,674,155.39
VALORIZACION N° 0
val- anterior val- actual val- acumulada saldo a valorizar
monto val. metrado monto val. metrado monto val.acum- metrado saldo a val.a

170,250.00 1000 113,500.00 2,500.00 283,750.00 0.00 0.00


900,000.00 3000 1,350,000.00 5,000.00 2,250,000.00 0.00 0.00
47,475.00 10500 110,775.00 15,000.00 158,250.00 0.00 0.00
538,621.40 1245.7464 330,122.80 3,278.28 868,744.20 0.00 0.00
0.00 0 0.00 0.00 0.00 0.00 0.00
0.00 0 0.00 0.00 0.00 0.00 0.00

1,904,397.80 3,560,744.20 0.00


171,395.80 320,466.98 0.00
190439.78 356,074.42 0.00
2,266,233.38 4,237,285.60 0.00
407,922.01 762,711.41 0.00
2,674,155.39 4,999,997.01 0.00

AD SUB PRES IGV TOTA


0.08 0.18
57631.53 662762.54 119297.26 782059.80
95322.13 1096204.46 197316.80 1293521.26
175859.71 2022386.67 364029.60 2386416.27
% AVANCE
OBRA

82.47
17.53

%
sal a valorizar

53.4831397
46.5168603

%
sal a valorizar

0
100% 110% SUB PRES(/18%)
V1 352632.25 387895.48 328724.98
V2 574231.50 631654.65 535300.55
V3 758754.95 834630.45 707313.94
V4 854951.23 940446.35 796988.43

2540569.93
AD(7.5%) AM SUB PRES IGV VALORIZACION
24654.37 16949.15 287121.45 51681.86 338803.31
40147.54 66101.69 429051.31 77229.24 506280.55
53048.55 163135.59 491129.80 88403.36 579533.16
59774.13 108643.25 628571.05 113142.79 741713.84