JOB TITLE / AIM: Concrete Pouring With concrete Pump

JSA DATE: 07-05-2014 JSA NO./ REVISION:


SUPERVISOR/ JSA LEADER: Zakir Ali/Jabir Khan SCRIBE: Azeem Aslam
PARTICIPANTS : Asif Ali, Muhammad Ramzan, Muhammad Asif , Noor Hassan
LIST ASSOCIATED PROCEDURES/WORK INSTRUCTIONS OR TEMPORARY WIs:
Attach copies of any relevant documentation/ drawings.
Part 2: Job Safety Analysis
Job Steps:
1. Mobilization of People, Equipment & Materials
2. Working in Live areas
3. Concrete Poring with Concrete Pump
4. Working at night shift hours
5. Demobilization

Part 3: Equipments / Tools to be used: Transit Mixture, Loader, concrete pump, Vibrator, wheel barrows & Hand Tools,
Part 4: Contingency Plans. Standard PPE’s: First aid kit must be present at work site and the HSE personnel will be the first response in case of
emergency, ERPs & Emergency contact numbers to be in placed at job location

Part 5:JSA Review Process. After the job has been completed, JSA leader should note: any hazards, which were identified in the original JSA? In
case of any new hazard indentified by any of the working team member during the job, JSA review process should be carried on.
JSA No: JOB TITLE: Concrete Poring With concrete Pump at construction site
Step Describe Job Step Potential Hazards Hazard Controls
No
1 Movement of Heavy  Work started without permit  Obtain work permit & follow the
Vehicles/Equipments  Unskilled operator instructions defined on permit
 Personnel/Structures hit by  Ensure JSA briefing to all workforce prior
Equipment/Heavy Vehicle to commence activity
 Striking of vehicles with  Deliver tool box talk to all of vehicles
structures/overhead live lines drivers & operators
 Over speeding  Be careful of nearby structures/lines
 Banks men should be available at site
 Keep away all unauthorized people during
movement of heavy vehicle/equipments
 Follow ARL defined speed Limits for all
Heavy Vehicles/Equipments speed limit is
10Km/hour
 Ensure Close HSE monitoring /supervision
 Ensure availability of fire extinguisher at
site & perform explosive test (if needed)
 Flame arrestor should be installed in all
Vehicles/equipments
 Use of appropriate PPE’s
JSA No: JOB TITLE: Concrete Poring With concrete Pump at construction site
Step Describe Job Step Potential Hazards Hazard Controls
No
2 Working in Live areas  Vehicles/equipments striking/hit with  Obtain relevant permit before commencing
Structure/live lines of any work
 Work in live area  Ensure vehicles/equipment movement only
 Unaware about hazards of live areas on designated/defined routes
 Traffic movement on authorized routes  Be highly careful while crossing over the
at plan site culverts/drains
 Damaged to underground utilities  Avoid sharp turnings of vehicles
(Drains, Culverts, electrical cable ,pipe  Banks man should be at site while
lines etc) movement of vehicles/equipments
 Ensure use of appropriate PPE’s
 Ensure close safety supervision of all work
 Deliver TBT & awareness to all of
workforce about area/activity hazards
 Mishandling with live  Do not mishandle or operate any of live
instruments/valves equipment/valve in the area
 Movement of people in unauthorized  Unauthorized movement of workers to be
areas restricted in live areas
 Fumes of Hydrocarbons in live areas  Gas test to be performed in live areas
 Flammable ,toxic gases  Remove any of combustible material from
 Fire/explosion site
 Slip , trip & fall  Don’t switch off engine once started to
avoid sparking from battery terminals
 Maintain good housekeeping at site
 Don not left any vehicle/equipment/tool un
attendant in running condition
JSA No: JOB TITLE: Concrete Poring With concrete Pump at construction site
Step Describe Job Step Potential Hazards Hazard Controls
No
3 Concrete Poring with Concrete  Personnel injury during movement of  Involvement of skilled labour
Pump heavy vehicles  Ensure use of proper PPE’s
 Manual handling  Deliver daily TBT before commencing
 Vehicles collisions work
 Ensure use of inspected & colour coded
hand tools
 Careful handling of steel & other materials
 Slip ,trip & fall  Ensure proper stacking of all materials
 Maintain good housekeeping all the time
 Inappropriate PPE’s/Tools during  Use of appropriate PPE’s during concrete
concrete work works (Eye protection, rubber gloves, gum
shoes)
 Ensure use of inspected tools for the right
job
 Skin contact with concrete or other
 Availability of fresh water at site
chemicals
 First aid box should be in place at site
4 Working at night shift hours Poor visibility at night hours  Ensure proper lighting arrangement for
late night working hours
Vehicles/equipments hit with people,  Careful movement of vehicles in night
equipment or structure hours
 Place refection tapes at hard barriers,
structures
 Banks men should worn high visibility
reflection vests
Slip , trip & fall  No working should be allowed in poor
lighting conditions
 Ensure proper housekeeping to avoid
tripping
JSA No: JOB TITLE: Concrete Poring With concrete Pump at construction site
Step Describe Job Step Potential Hazards Hazard Controls
No
5 Demobilization Same as item one Same as item one

Prepared By: Hafeez Ullah Khan Approved By: _____________________