siete (#55) A
KKH Phase—-II (Havel ian-——Thakot)
SS ER AM BE RMD RR
Compression Strength Test Of Cement Concrete
RHI HET Section: MSMKT.A Section D
Tr 39 BAR(WAContractor: PALA wi ALAA COC
Nn ARB
tm {Numbers
154+600 cH
154-600 large bridge
Structure nase and chainage
wR
seat ee Concrete patie, ATA
Concrete curing Standard curing cube Wechanical mixing. tasping by hand
fabrication
lawem. 29. a9
apparatus nane\type\coder
ent Rte
Coapression-testing aachine. DYE~2000. KKIS~08
Uae ee
; wa] oun | ae ait
wi ‘“ |Coupression Strength)
tT atoate s wee | ete | ee fmm (Opa) compression] at
5 | portion of | ep jon _ GM __ | eoterete | onereve | xine of strength] Stl
seabe | Ptestruc, | HHEH HO" gout aate | "eae fool ere] load by | Concrete
Ca [am | cay | ma | FHM | conversion | arade
result| average | (WP)
MH 1006.20 | 44.7
on 1650%150
va | etme | mis.osat fancos.at] ae Tao" fore |e os | a6 | as
1 ieConclusion: The result meets the specification
ue
TechnicianCompression Strength Test Of Ce
$8299 MLA Section
TT 39 BiktuiliContracts
RBS
KKH 3H (doh LPB) wa
KKH Phase--II (Havel ian---Thakot)
a RBH
1, SISK L.AB Section D
, BLEUE MLO COOC
WR AR
oI
K166+665KF
ment Concrete
‘Numbers
K166+665 Large bridge
Structure name and chainage
Bia
APH te Concrete uate. ATH
Concrete curing Standard curing cube Wechanieal nixing. tamping by hand
fabrication|
sees. 0S. we
REAR
Coapression-testing sachine. DYE-2000. KKHS-08
epperatus nane\type\code
nam RE
‘ ci) att wa oupression Streng x ‘Bit
wn | ame | Oy we |] Re | ae (Gow #°H ccspression| NE
Cube Position of | eaprication aM concrete | Concrete | Damaging ‘of strength] at
eae | Mtns | MEEETN| cet aac | este fete era] lad by | concrete
ore | can | ea | psu | conversion | arade
result| average | (WP)
3-5 RUBITR
3-58 pre~
1-2 | fabrication T
girder
150X1
50
2019, 06.03 | 2019.07.01] 28 0x15) | oso | 58.9
58.6 58.6
0
i ieconclusion: The
result meets the specification,
et
Remarks
—
wRKKH IH (dob ASR AHS) H
KKH Phase--1.
eo
I (Havelian-—-Thakot)
RE RMWIORR
Compression Strength Test Of Cement Concrete
ORI MIM Section: MONE TA Se
sith ATES
jection D
Th 39 BARCGAMContractors PREMERA A COCC
$m _“GNunber:
KIT5+S66KHF
K175+566 Large bridge
Structure nane and chainage
a
Rea ate Concrete inate, AT
Concrete curing Standard curing cube Wechanical pixing. taping by hand
fabrication
AAO
result] average
Be. BS. ws
apparatus nae\type\codes conpression-testing aachine~ DYE-2000, KKHS-08
nue Re
sm | vcr | ote leoapression Stren] | ait
Be) ante ae we | eee | ee gar [OP pay |comoression] ime
Cube Position of | saprication ae concrete | Concrete | Damaging of strength]
eave | Mtntret | OEECAION) case date | cabe|snmle sree] ond by | conereve
Go [aw | cad | ana | pyar | conversion | erade
‘are?
4-68 ABT
4-68 pre~
fabrication 7
sirder
2019. 08. 03
2019.07.01
28
150x150
x150
1339.2 | 59.5
58.4
0
ka i2Conclusion; The result aeets the specification,
x
Technician
i: