COMMENT REPLY SHEET

TITLE: Switchyard Fence & Gate Details


S.No. SAICON Comments Dt: 18.11.16

1 Pillar post / intermediate post shall be provided between every 2


mtrs

2 All corner straining post shall have two stay posts and every 10th
post shall have a transverse post

3 8 nos 12 dia. Longitudinal reinforcement and 8 dia 150mm c/c


stirupus
COMMENT REPLY SHEET

KSA Reply Dt: 21.11.16


In normal practice, it shall be between for every 2.5 Mtrs. The cost implication
will be there to proceed with 2 mtrs.

It is not possible. Shall be done as per the earlier drawing submitted.

Ok Noted. Will be revised and resubmitted accordingly.


S.No. Drawing/Document Title Drawing/Document No.

CIVIL DRAWINGS

1 Design Basis Report Civil and Structural INOX-KSA-SADLA-CVL-DOC-DBR-001

2 General Arrangement of 33 kV Girder Type - 3GB INOX-KSA-SADLA-CVL-DRG-STR-3GB-052

General Arrangement of 33 kV Potential Transformer


3 -3PT INOX-KSA-SADLA-CVL-DRG-STR-3PT-057

General Arrangement of 33 kV Post Insulator 1 Phase


4 -3LBPI INOX-KSA-SADLA-CVL-DRG-STR-3LBPI-060

5 220/33 kV SS Foundation layout INOX-KSA-SADLA-CVL-DRG-FL-065

INOX-KSA-SADLA-CVL-DSN-FDN-TRAFO-066
6 Design calculation of 125MVA Transformer Foundation A

INOX-KSA-SADLA-CVL-DRG-FDN-TRAFO
7 Details of 125MVA Transformer Foundation -101A

8 Detail of Foundation for 220 kV Tower - Type - 2T2 INOX-KSA-SADLA-CVL-DRG-FDN-2T2-104

9 Detail of Foundation for 33 kV LPI 1 PHASE INOX-KSA-SADLA-CVL-DRG-FDN-LPI-126 B

RC details of Septic Tank and Soak Pit for Control Room


10 Building INOX-KSA-SADLA-CVL-DRG-CRB-SPT-141

11 Details of Sanitation for Control Room Building INOX-KSA-SADLA-CVL-DRG-CRB-SND-142

12 Architectural Plan and Section for Security Cabin INOX-KSA-SADLA-CVL-DRG-SC-ARCH-151

Details of Footing,Column,Plinth Beam,Roof Beam and


13 Slab for Security Cabin INOX-KSA-SADLA-CVL-DRG-SC-152

14 Cable trench section details drawing - Switchyard INOX-KSA-SADLA-CVL-DRG-CTSO-159

220/33 kV Switchyard Cable Trench Road Crossing


15 Details INOX-KSA-SADLA-CVL-DRG-RC-161

16 220/33 kV Switchyard Road Section details INOX-KSA-SADLA-CVL-DRG-RD-162

17 Storm Water Drain Layout & Section INOX-KSA-SADLA-CVL-DRG-DRN-164


18 Details of Rain Water Harvesting System INOX-KSA-SADLA-CVL-DRG-RWH-166
Revision Status
Latest Submission Date

04.07.16 R1 Documents Approved in the Mumbai Visit

30.09.16 R0 Approved on 24.11.16

03.11.16 R1 Approved on 16.11.16

05.10.16 R0 Approved on 12.11.16

21.11.16 R1 Commented

21.11.16 R0

21.11.16 R0

29.07.16 / 16.09.16 R1

05.10.16 R0 Approved

23.07.16 R0 Approved

23.07.16 R0 Approved

15.10.16 R0 Approved

15.10.16 R0 Approved

12.10.16 / 28.10.16 Approved in cat B-Dated-24oct-revised Documents


('C) R0 Not recevied

15.10.16 R0

13.10.16 R0 requiested For the Design calculation

09.11.16 R0 Mail Send


20.10.16 R0 Approved on 27.11.16
1
2
3
Please Locate the Location of Oil Sump pit
Please provide the rail cum road for the Removal of the Transformer
125 Foundation Plan in the Layout and as per the drawings provided are not matching