Schedule of Quantities

NAME OF WORK :- Widening of Dallupura Road, at Mayur Vihar Phase- III (From DDA Chilla Sports
Dallupura) and Strenthening /Improvement of riding quality and construction of storm water drain at one side.

I No. Description of Item Qty Unit


Sub. Head: - Earth work
1 Disposal and carriage of excavated malba, lime,
moorum and earth etc by machenical transport
including loading, unloading and stacking for all leads
and lifts (Beyond initial lead of 50 m , lift upto 1.5 m
or as per direction of Engieer - in - Charge )

4512.00 Cu.m.

2 Earth work in excavation by mechanical means


(Hydraulic excavator) / mannual labour over areas
(exceeding 30cm in depth, 1.5m in width as well as 10
sq.m.on plan) i/c disposal of excavated earth lead upto
50m and lift upto 1.5m, .disposed earth to be levelled
and neatly dressed.

2670.00 Cu.m.

3 Earth work in excavation by mechanical means


(Hydraulic excavator) / mannual labour in foundation
trenches or drain (not exceeding 1.5 m in width or 10
sqm.on plan) including dressing of sides and ramming
of bottom lift up to 1.5 m including getting out the
excavated soil as directed with in a lead of 50m.

(a) All kinds of soil. 3992.00 Cu.m.

4 Filling available excavated earth (excluding rock) in


trenches, plinth sides of foundations etc. in layers not
execeding 20cm in depth: consolidating each
deposited layer by ramming and watering lead upto
50m and lift upto 1.5m.

2245.00 Cu.m.
5 Desilting of drains by getting out the manure/ sludge
rubbish etc in or under water or liquid mud in foul
position in restricted working condition i/c disposal of
excavated material by machenical transport including
loading, unloading and stacking for all leads and lifts
(Beyond initial lead of 50m, lift upto 1.5m or as per
direction of Engieer - in - Charge)

555 Cu.m.

Sub. Head: - Concrete Work


6 P/L in position cement concrete of specified grade
excluding the cost of centering and shuttering all work
upto plinth level.

(a) 1:5:10 ( 1 cement : 5 coarse sand : 10 graded stone


aggregate 40 mm nominal size).
260.00 Cu.m.

(b) 1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone


aggregate 20 mm nominal size).
32.00 Cu.m.

Sub. Head: - Reinforced Cement Concrete Work


7 Providing and laying in position ready mixed concrete
manufactured in fully automatic batching plant and
transported to site of work in transit mixer for a lead
up to 10kms having continuous agitated mixer, manuf
-actured as per mix design of specified grade for
reinforced cement concrete work including pumping
of R.M.C. from transit mixer to site of laying ,
excluding the cost of centering, shuttering finishing
and reinforcement including cost of admixtures in
recommended proportions as per IS : 9103 to
accelerate/ retard setting of concrete, improve
workability without impairing strength and durability
as per direction of the Engineer - in - charge. M-25
grade Reinforced cement concrete by using 410kg of
cement per cum of concrete.

1340.00 Cu.m.

8 Reinforcement for RCC work including straightening,


cutting, bending placing in position and binding all
complete.
(a) TMT bars. 100486 Kg.

9 Centring and shuttering including strutting, propping


etc. and removal of form for.

(a) Suspended floors, roofs, landings, balconies and


access platform.. 1949.00 Sqm

(b) Small lintels not exceeding 1.5m clear span, moulding


as in cornices, window sills, string courses, bands,
copings, bed plates, anchor blocks and the like.
250.00 Sqm

(c) Walls (any thickness) including attached pilasters,


butteresses, plinth and string courses etc.
5130.00 Sqm
(d) Walls (any thickness) including attached pilasters,
butteresses, plinth and string courses etc.( with shutter
finish surface for central verge kerbstones )

4222.00 Sqm

10 Providing and fixing in position precast RCC drain


cover of approved manufacturere i.e. KK. S&S or
equivalent make of size 1150 x 400 x 100mm
(thickness) or required size with ten hole by using M-
30 grade of concrete & reinforced of approved
manufacture with two layers of 8 mm dia of steel with
six nos along the length & 14 Nos along the width
each layer suitable distributed & manufactured by
vibrator compaction process using joint less FRP
moulds to active shuttering finish on five faces as top
face with have broom finish complete as per direction
of Engineer-in-Charge.

771.00 Sqm

Sub. Head: - Brick Work


11 Brick work with FPS bricks of class designation 75 in
foundation and plinth in cement mortar :-

(a) 1:6 (1 cement: 6 coarse sand). 145.00 Cu.m.

Sub. Head: - Finishing


12 12 mm cement plaster of mix.
(a) 1:4 ( 1 cement : 4 coarse sand ) 773.00 Sqm

13 Neat cement punning with OP Cement of approved


manufacture and grade 450.00 Sqm

14 Painting with synthetic enamel paint of approved


brand and manufacture of required colour to give an
even shade.
(a) Two or more coats on new work over an under coat of
suitable shade with ordinary paint of approved brand
and manufacture
3360.00 Sqm
15 Demolishing RCC work including stacking of steel
bars and disposal of unserviceable material within 50
metres lead.
116.00 Cu.m.

Sub. Head: - Road Work


16 Consolidation of subgrade with power road roller of 8
to 12 tonne capacity including making good the
undulations etc. with earth or quarry spoils etc. and
rerolling the subgrade

6375.00 Sqm

17 Supplying & Stacking of graded stone aggregate at


site of size range.
(a) 90mm to 45mm 772.00 Cu.m.

(b) 63mm to 45mm 579.00 Cu.m.

(c) 53mm to 22.4mm 1157.00 Cu.m.

18 Laying spreading and compacting stone aggregate of


specified sizes to WBM specifications including
spreading in uniform thickness, hand picking, rolling
with 3 wheeled road / vibratory roller 8-10 tonne in
stages to proper grade and camber, applying and
brooming requisite type of screening / binding
material to fill up interstices of coarse aggregate
watering and compacting to the required density .

2071.88 Cu.m.

19 Providing and applying tack coat using hot straight


run bitumen of grade 80/ 100 including heating the
bitumen, spraying the bitumen with mechanically
operated spray unit fitted on bitumen boiler, cleaning
and preparing the existing road surface as per
specifications :

(a) On bituminous surface @ 0.50 Kg / sqm.


99774.00 Sqm

(b) On W.B.M. @ 0.75 Kg / sqm. 6375.00 Sqm


20 Providing and laying Bituminous Macadam on
prepared surface with specified graded crushed stone
aggregate for profile corrective base/ binder course
including loading of aggregate with F.E. loader , hot
mixing of stone aggregates and bitumen in hot mix
plant, transporting the mixed material by tippers to
paver and laying the mixed material with paver finisher
fitted with electronic sensing device to the required
level and grade and rolling with road rollers, as per
MORTH specification to achieve the desired density
and compaction but excluding the cost of primer/ tack
coat.

(a) 80mm average compacted thickness with bitumen of


60/70 grade @ 3.5% (Percentage by weight of total
mix) 510.00 cum

21 Providing & laying dense bituminous macadam on


prepared surface with specified graded crushed stone
aggregate for profile corrective base/binding course
including loading of aggregate with FE loader and hot
mixing of stone aggregate, filler and bitumen in batch
type hot mix plant transporting the mixed material by
tipper to paver and laying the mixed material with
paver finisher fitted with electronic sensing device to
the required level and grade and rolling by road rollers
as per MORTH specifications to achieve the desired
density, but excluding cost of primer/tack coat.

(a) 50/75mm average compacted thickness with bitumen


of 60/70 grade @ 5% (percentage by weight of total
mix) and lime filler @ 2% (percentage by weight of
Aggregate).

2110.00 Cu.m.
22 Providing & laying dense bituminous concrete on
prepared surface with specified graded stone
aggregate for wearing course including loading of
aggregate with FE loader, hot mixing of bitumen filler
and aggregates in batch type hot mix plant
transporting the mixed material by tipper to paver and
laying the mixed material with mechanically paver
finisher fitted with electronic sensing device to the
required level and grade and rolling by road rollers as
per MORTH specifications to achieve the desired
density, but excluding cost of primer / tack coat.

(a) (a) 40/50 mm compacted thickness with bitumen of


grade 60/70 @ 5.50% and lime @ 3% (percentage by
weight of total mix ) and adding waste plastic additive
@ 8% weight of bitumen used. The plastic waste
powder shall be dust free and the partical size of
plastic waste powder should be less than 2 mm.

1376.00 Cu.m.

23 Providing & applying 2.5mm thick road marking


stripd (retro-reflective) of specified shades/colours
usisng hot tharmoplastic material by fully/semi
automatic thermo -plastic paint applicator machine
fitted with profile shoe,glass beads dispenser, propane
tank heater and profile shoe heater, driven by
experienced operator on road surface including cost of
material, labour, T & P, cleaning the road surface of
all dirt, seals oil, grease and foreign materials etc.
complete as per direction of Engineer-in-charge and
accoardance with applicable specifications.

754.00 Sqm
24 Providing and laying non-pressure NP2 class (light
duty) R.C.C. pipes with collars jointed with stiff
mixture of cement mortar in the proportion of 1:2
(1cement : 2 fine sand) including testing of joints etc.
complete :

(a) 250 mm dia. R.C.C. pipe 48.00 Metre

25 Taking out existing / old kerb stone and disposal with


all head and lift complete as per direction of Engineer-
in-charge. 2800.00 Metre

26 Providing & making 30cm wide channel 50mm Thick


of conc 1:3:6 (1 cement : 3 coarse sand : 6 graded
stone aggregate 20mm nominal size) over 75 mm bed
of dry bbrick ballast 40 mm nominal size well
ramamed and consolidated and grouted with fine sand
including finishing the top smooth etc. complete and
as per direction of Engineer-in-charge.

720.00 Sqm

27 Providing and laying 60mm thick factory made


cement concrete interlocking paver block of M-30
grade made by block making machine with strong
vibratory compaction and of approved size and
design/ shape laid in required colour and pattern over
and including 50mm thick compacted bed of course
sand, filling the joints with coarse sand etc. all
complete as per the direction of Engineer-in-charge.

600.00 Sqm

28 Providing and fixing post delineators (made of ABS


roundbody fitted with 2 nos 100mm dia) reflective
and reflectors and mounted on MS pipe of 65mm dia
dully powder coated anti-rust and anti theft steel to be
installed as per direction of Engineer-in-charge.

42.00 Each
29 Providing and fixing Glow studs of size 100x20 mm
made of heavy duty body shall be moulded ASA
(Acrylic styrene Acryloretrite) or HIP (High impact
polystyrene) or ABS having electronically welded
micro- prismatic lens with abrasion resistant coating
as approved by Engineer in charge. The Glow studs
shall support a load of 13635 kg tested in accordance
with ASTM D4280. The slope of retro- reflective
surface shall be 35 +/-5 degress to base .The reflective
panels on both sides with at least 12 cm of reflective
area up each side. The luminance intensity should be
as per the specification and shall be tested as
described in ASTM I: 809 as recommended in BS:
873 part 4 : 1973. The studs shall be fixed to the Road
surface using the adhesive conforming to IS, as per
procedure recommended by the manufacturer
complete and as per direction of Engineer-in-charge.

800.00 Each

30 Supplying and stacking of good earth at site including


royalty and carriage up to 1 km (earth measured in
stacks will be reduced by 20% for payment).
756.00 cum
31 Providing and placing barricading 2.00 metre high
consisting of 2.50x2.00m panels made of 1.63mm
thick M.S. sheet with frame of 40x40x6mm angle
iron horizontal & vertical braces of M.S. flat
30x5mm, 2 nos.MS Channel ISLC-75-500MM Long
at base as per appoved drawing including applying a
priming coat of approved steel primer and painting as
per direction of Engineer-in-charge. This item shall
also include arrangement for traffic diversion such as
traffic signals diversion signs, marking, flages etc. as
directed by the Engineer-in-charge. The barricading
provided shall be retained in position at site
continuously during the execution of the entire work
till its completion including its maintenance for
damages & painting & shall not be removed at any
stage prior approval of Engineer-in-charge., for the
shifting to the next location & shall include all
incidental, labour, material, equipment & works
required to execute the job.

NOTE:- One time payment shall be made for each


running meter of barricading, fabrication& provided
from start of work i/c its shifting from place to place
as also its maintenance, the barricading provided
shall remain to be property of the contractor on
completion of work.

400.00 Metre

32 Deduct on account of old C.T.D. bars received from


the demolishing of RCC work at site.(Credit to Work)
2900 Kg.

Total Of All Sub. Heads.

Assistant Engineer (P) Executive Engineer (P)


PWD Zone M-2 PWD Zone M-2
MSO Building New Delhi MSO Building New Delhi
ase- III (From DDA Chilla Sports Complex to
on of storm water drain at one side.

Rate Amount

50.66 228578

101.85 271940

103.40 412773

45.70 102597
210.92 117061
1132949

2237.75 581815

3257.45 104238
686053
4263.58 5713197

42.70 4290752

187.35 365145

119.25 29813

180.40 925452
270.60 1142473

3493.91 2693805
15160637

2121.75 307654
307654

82.55 63811

21.40 9630

51.30 172368
537.55 62356
308165

1.07 6821

742.30 573056

768.45 444933

810.55 937806

192.55 398940

17.15 1711124

23.90 152363
4,242.20 2163522

5366.50 11323315
6213.90 8550326

497.30 374964
258.20 12394

9.42 26376

198.80 143136
0

346.35 207810

786.35 33027
536.60 429280

144.05 108902
###

786.40 314560

-20.55 -59595
27853060
45448518
ABSTRACT OF COST- IInd R/A BILL

NAME OF WORK :- Widening of Dallupura Road, at Mayur Vihar Phase- III (From DDA Chilla Sp
Dallupura) and Strenthening /Improvement of riding quality and construction of storm water drain at one side.

SITUATION :- Mayur vihar Phase- III. Delhi

AGENCY :- Sh. Mahavir Prasad Gupta

AGGREMENT NO :- 32 / EE / PWD / M-212 / 2009- 2010

DATE OF START :- 8/12/2009

D.O.C. (Stipulated) 7/6/2010

D. O. C.(Actual) :- Work in Progress

DATE OF ABSTRACT :- 11/5/2010


I. No. Description of Item Quantity Unit Rate
Sub. Head: - Earth work FR
1 Disposal and carriage of excavated malba,
lime, moorum and earth etc by machenical
transport including loading, unloading and
stacking for all leads and lifts (Beyond
initial lead of 50 m , lift upto 1.5 m or as
per direction of Engieer - in - Charge )

Qty B/F from EMB-27 / P-49 1316.63


Qty B/F from TEMB / P-3 227.77
Qty B/F from TEMB / P-9 265.13
Qty B/F from TEMB / P-15 292.68
2102.21 Cu.m. 50.66
2 Earth work in excavation by mechanical
means (Hydraulic excavator) / mannual
labour over areas (exceeding 30cm in
depth, 1.5m in width as well as 10 sq.m.on
plan) i/c disposal of excavated earth lead
upto 50m and lift upto 1.5m, .disposed
earth to be levelled and neatly dressed.

Qty B/F from EMB-27 / P-49 1880.92


Qty B/F from TEMB / P-5 7.92
1888.84 Cu.m. 101.85
I. No. Description of Item Quantity Unit Rate
3 Earth work in excavation by mechanical
means (Hydraulic excavator) / mannual
labour in foundation trenches or drain (not
exceeding 1.5 m in width or 10 sqm.on
plan) including dressing of sides and
ramming of bottom lift up to 1.5 m
including getting out the excavated soil as
directed with in a lead of 50m.

(a) All kinds of soil.


Qty B/F from EMB-27 / P-50 956.71
Qty B/F from TEMB / P-1 325.39
Qty B/F from TEMB / P-5 378.76
Qty B/F from TEMB / P-12 418.11
2078.97 Cu.m. 103.40
Sub. Head: - Concrete Work
6 P/L in position cement concrete of
specified grade excluding the cost of
centering and shuttering all work upto
plinth level.

(a) 1:5:10 ( 1 cement : 5 coarse sand : 10


graded stone aggregate 40 mm nominal
size).

Qty B/F from EMB-27 / P-50 22.87


Qty B/F from TEMB / P-2 1.36
Qty B/F from TEMB / P-3 9.87
Qty B/F from TEMB / P-10 14.70
Qty B/F from TEMB / P-17 22.20
71.00 Cu.m. 2237.75
I. No. Description of Item Quantity Unit Rate
Sub. Head: - Reinforced Cement
Concrete Work
7 Providing and laying in position ready
mixed concrete manufactured in fully
automatic batching plant and transported to
site of work in transit mixer for a lead up to
10kms having continuous agitated mixer,
manuf -actured as per mix design of
specified grade for reinforced cement
concrete work including pumping of
R.M.C. from transit mixer to site of laying ,
excluding the cost of centering, shuttering
finishing and reinforcement including cost
of admixtures in recommended proportions
as per IS : 9103 to accelerate/ retard setting
of concrete, improve workability without
impairing strength and durability as per
direction of the Engineer - in - charge. M-
25 grade Reinforced cement concrete by
using 410kg of cement per cum of
concrete.

Qty B/F from EMB-27 / P-49 46.83


Qty B/F from TEMB / P-11 38.92
Qty B/F from TEMB / P-22 107.66
Qty B/F from TEMB / P-37 64.13
257.54 Cu.m. 4263.58

8 Reinforcement for RCC work including


straightening, cutting, bending placing in
position and binding all complete.

(a) TMT bars.


Qty B/F from EMB-27 / P-51 10103.99
Qty B/F from TEMB / P-3 298.22
Qty B/F from TEMB / P-6 222.38
Qty B/F from TEMB / P-7 1531.19
Qty B/F from TEMB / P-13 3716.20
Qty B/F from TEMB / P-16 3763.29
Qty B/F from TEMB / P-19 1962.15
Qty B/F from TEMB / P-21 4069.12
Qty B/F from TEMB / P-22 3126.25
Qty B/F from TEMB / P-27 1478.80
Qty B/F from TEMB / P-31 3032.91
I. No. Description of Item Quantity Unit Rate
33304.50 Kg. 42.70
9 Centring and shuttering including strutting,
propping etc. and removal of form for.

(b) Small lintels not exceeding 1.5m clear


span, moulding as in cornices, window
sills, string courses, bands, copings, bed
plates, anchor blocks and the like.

Qty B/F from EMB-27 / P-52 89.03


Qty B/F from TEMB / P-2 1.93
Qty B/F from TEMB / P-4 5.08
Qty B/F from TEMB / P-10 10.50
Qty B/F from TEMB / P-14 18.64
Qty B/F from TEMB / P-17 15.00
Qty B/F from TEMB / P-20 15.75
Qty B/F from TEMB / P-25 15.75
Qty B/F from TEMB / P-34 4.50
176.18 Sqm 119.25
(c) Walls (any thickness) including attached
pilasters, butteresses, plinth and string
courses etc.
Qty B/F from EMB-27 / P-52 199.68
Qty B/F from TEMB / P-4 493.92
Qty B/F from TEMB / P-9 136.80
Qty B/F from TEMB / P-13 122.40
Qty B/F from TEMB / P-16 250.20
Qty B/F from TEMB / P-19 216.00
Qty B/F from TEMB / P-21 108.00
Qty B/F from TEMB / P-25 216.00
Qty B/F from TEMB / P-34 162.00
1905.00 Sqm 180.40
I. No. Description of Item Quantity Unit Rate
10 Providing and fixing in position precast
RCC drain cover of approved
manufacturere i.e. KK. S&S or equivalent
make of size 1150 x 400 x 100mm
(thickness) or required size with ten hole
by using M-30 grade of concrete &
reinforced of approved manufacture with
two layers of 8 mm dia of steel with six nos
along the length & 14 Nos along the width
each layer suitable distributed &
manufactured by vibrator compaction
process using joint less FRP moulds to
active shuttering finish on five faces as top
face with have broom finish complete as
per direction of Engineer-in-Charge.

Qty B/F from TEMB / P-37 189.06


189.06 Sqm 3493.91

11 Brick work with FPS bricks of class


designation 75 in foundation and plinth in
cement mortar :-

(a) 1:6 (1 cement: 6 coarse sand).


Qty B/F from TEMB / P-37 17.80
17.80 Cu.m. 2121.75

Sub. Head: - Road Work


16 Consolidation of subgrade with power road
roller of 8 to 12 tonne capacity including
making good the undulations etc. with
earth or quarry spoils etc. and rerolling the
subgrade

Qty B/F from EMB-27 / P-52 4286.18


Qty B/F from TEMB / P-8 18.09
4304.27 Sqm 1.07
17 Supplying & Stacking of graded stone
aggregate at site of size range.

(a) 90mm to 45mm


Qty B/F from EMB-27 / P-53 518.71
Qty B/F from TEMB / P-9 192.15
710.86 Cu.m. 742.30
(b) 63mm to 45mm
Qty B/F from EMB-27 / P-53 390.09
I. No. Description of Item Quantity Unit Rate
Qty B/F from TEMB / P-10 12.67
402.76 Cu.m. 768.45
(c) 53mm to 22.4mm
Qty B/F from EMB-27 / P-53 777.82
Qty B/F from TEMB / P-12 12.25
790.07 Cu.m. 810.55
18 Laying spreading and compacting stone
aggregate of specified sizes to WBM
specifications including spreading in
uniform thickness, hand picking, rolling
with 3 wheeled road / vibratory roller 8-10
tonne in stages to proper grade and camber,
applying and brooming requisite type of
screening / binding material to fill up
interstices of coarse aggregate watering and
compacting to the required density .

Qty B/F from EMB-27 / P-54 1314.46


Qty B/F from TEMB / P-10 1.81
Qty B/F from TEMB / P-12 1.36
Qty B/F from TEMB / P-15 26.81
Qty B/F from TEMB / P-18 26.81
1371.25 Cu.m. 192.55

19 Providing and applying tack coat using hot


straight run bitumen of grade 80/ 100
including heating the bitumen, spraying the
bitumen with mechanically operated spray
unit fitted on bitumen boiler, cleaning and
preparing the existing road surface as per
specifications :

(a) On bituminous surface @ 0.50 Kg / sqm.

Qty B/F from TEMB / P-28 2683.59


Qty B/F from TEMB / P-29 3280.13
Qty B/F from TEMB / P-30 3478.32
Qty B/F from TEMB / P-32 2607.55
Qty B/F from TEMB / P-33 3038.55
Qty B/F from TEMB / P-34 2999.31
Qty B/F from TEMB / P-35 2721.06
Qty B/F from TEMB / P-36 3512.45
24320.96 Sqm 17.15

(b) On W.B.M. @ 0.75 Kg / sqm.


I. No. Description of Item Quantity Unit Rate
Qty B/F from TEMB / P-23 1114.43
Qty B/F from TEMB / P-24 1469.42
Qty B/F from TEMB / P-26 1465.43
4049.28 Sqm 23.90

20 Providing and laying Bituminous Macadam


on prepared surface with specified graded
crushed stone aggregate for profile
corrective base/ binder course including
loading of aggregate with F.E. loader , hot
mixing of stone aggregates and bitumen in
hot mix plant, transporting the mixed
material by tippers to paver and laying the
mixed material with paver finisher fitted
with electronic sensing device to the
required level and grade and rolling with
road rollers, as per MORTH specification
to achieve the desired density and
compaction but excluding the cost of
primer/ tack coat.

(a) 80mm average compacted thickness with


bitumen of 60/70 grade @ 3.5%
(Percentage by weight of total mix)

Qty B/F from TEMB / P-38 307.75


307.75 cum 4,242.20
I. No. Description of Item Quantity Unit Rate
21 Providing & laying dense bituminous
macadam on prepared surface with
specified graded crushed stone aggregate
for profile corrective base/binding course
including loading of aggregate with FE
loader and hot mixing of stone aggregate,
filler and bitumen in batch type hot mix
plant transporting the mixed material by
tipper to paver and laying the mixed
material with paver finisher fitted with
electronic sensing device to the required
level and grade and rolling by road rollers
as per MORTH specifications to achieve
the desired density, but excluding cost of
primer/tack coat.

(a) 50/75mm average compacted thickness


with bitumen of 60/70 grade @ 5%
(percentage by weight of total mix) and
lime filler @ 2% (percentage by weight of
Aggregate).

Qty B/F from TEMB / P-38 1732.87


1732.87 Cu.m. 5366.50
I. No. Description of Item Quantity Unit Rate
31 Providing and placing barricading 2.00
metre high consisting of 2.50x2.00m
panels made of 1.63mm thick M.S. sheet
with frame of 40x40x6mm angle iron
horizontal & vertical braces of M.S. flat
30x5mm, 2 nos.MS Channel ISLC-75-
500MM Long at base as per appoved
drawing including applying a priming coat
of approved steel primer and painting as
per direction of Engineer-in-charge. This
item shall also include arrangement for
traffic diversion such as traffic signals
diversion signs, marking, flages etc. as
directed by the Engineer-in-charge. The
barricading provided shall be retained in
position at site continuously during the
execution of the entire work till its
completion including its maintenance for
damages & painting & shall not be
removed at any stage prior approval of
Engineer-in-charge., for the shifting to the
next location & shall include all incidental,
labour, material, equipment & works
required to execute the job.

NOTE:- One time payment shall be made


for each running meter of barricading,
fabrication& provided from start of work
i/c its shifting from place to place as also
its maintenance, the barricading provided
shall remain to be property of the
contractor on completion of work.

Qty B/F from EMB-27 / P-55 37.50


37.50 Metre 786.40

Add Contractors Enhancement @ 7.25 %


above

Gross of Agmt. Items


Less already paid vide Ist R/A Bill
Net Gross of Agmt. Items
I. No. Description of Item Quantity Unit Rate
Secured Advance
Quantity fresh brought at site NIL kg
Qty. consumed at site -20000.00 "
Quantity outstanding in this bill -20000.00 kg
Amount of this Bill -20000.00 kg 37.00
Marked as 'B' Total=
RECOVERIES
1 Security deposited @ 5 % on Rs 18118975
Less already recovered as EMD
Now recovered

2 Income Tax @ 2% on Rs 18118975


Less already recovered in Ist R/A Bill

Now recovered

3 Surcharge @ 10% on Rs 362380


Less already recovered in Ist R/A Bill

Now recovered

4 Education Cess @ 3% on Rs 335367


Less already recovered in Ist R/A Bill

Now recovered

5 Sale Tax / vat @ 3 % on Rs 18118975


Less already recovered in Ist R/A Bill

Now recovered

6 Labour Cess @ 1% on Rs 18118975


Less already recovered in Ist R/A Bill

Now recovered

7 Amount Withheld for Not achieving Ist ,


IInd & IIIrd milestone @ 3%
3 % on Rs 48743536
Less already recovered in Ist R/A Bill

Now recovered
Total recoveries ,Marked as 'C' Rs.
Net Payable A + B-C
Net Payable 15243952 -620000 -1440724

CERTIFIED THAT:-
1.The work has been executed as per C.P.W.D. Specification.
2.Necessary Recoveries has been made in this Bill.
3.Contractor has made his own arrangement of water.
4.No labour complaints have been received so far.
5.Contractor has appointed Engineers as per Clause-36
Bill Accepted:
I. No. Description of Item Quantity Unit Rate
Sh.Mahavir Prasad Gupta A.E.
(Contractor) SubDiv.M-2122
d R/A BILL

ase- III (From DDA Chilla Sports Complex to


of storm water drain at one side.

lhi

009- 2010

Rate Amount
PR

- 106498.06

- 192377.90
Rate Amount

- 214965.50

- 158880.25
Rate Amount

4100.00 1055914.00
Rate Amount
- 1422101.99

- 21009.47

- 343662.00
Rate Amount

3200.00 604992.00

- 37767.15

- 4605.57

- 527674.58
Rate Amount

- 309502.27

- 640394.80

- 264033.56

- 417104.46
Rate Amount

- 96777.79

- 1305517.03
Rate Amount

5275.00 9140880.81
Rate Amount

- 29490.00
16894149.19

1224825.82
18118975.01
Say 18118975
-2875023
A 15243952
Rate Amount

31.00 -620000
-620000

905949
-974871
0

362380

-57500
304880

36238

-5750
30488

10061

-1898
8163

543569

-86251
457318

181190

-28750
152440

1462306

-974871
487435
as 'C' Rs. 1440724

13183228
Rate Amount

SubDiv.M-2122
I.No. Description No. L B D or H
18 Laying spreading and compacting stone aggregate of specified
sizes to WBM specifications including spreading in uniform
thickness, hand picking, rolling with 3 wheeled road /
Noida Bound
vibratory roller 8-10 tonne in stages to proper grade and
Ist layer,applying
camber, 90- 45mmand brooming requisite type of screening /
RD- 1215.00
binding to1225.00
material to fill up interstices of coarse aggregate
watering and compacting to the required density . 1 10.00 (3.70+3.60)/2 0.10
Dallupura Bound
Deduction for bus stand 1 9.40 0.35 0.10
Deduction for chamber 1 3.00 1.20 0.10
Deduction for bus stand 1 7.00 0.90 0.10
Deduction for bus stand 1 6.90 0.60 0.10
Deduction for trees 3 0.60 0.60 0.10
Total=

18 Laying spreading and compacting stone aggregate of specified


sizes to WBM specifications including spreading in uniform
thickness, hand picking, rolling with 3 wheeled road /
Noida Bound
vibratory roller 8-10 tonne in stages to proper grade and
IInd layer,
camber, 63-45mm
applying and brooming requisite type of screening /
binding material
RD- 1215.00 to fill up interstices of coarse aggregate
to1225.00
watering and compacting to the required density . 1 10.00 (3.70+3.60)/2 0.075
Dallupura Bound
Deduction for bus stand 1 9.40 0.35 0.075
Deduction for chamber 1 3.00 1.20 0.075
Deduction for bus stand 1 7.00 0.90 0.075
Deduction for bus stand 1 6.90 0.60 0.075
Deduction for trees 3 0.60 0.60 0.075
Total=

18 Laying spreading and compacting stone aggregate of specified


sizes to WBM specifications including spreading in uniform
thickness, hand picking, rolling with 3 wheeled road /
Noida Bound
vibratory roller 8-10 tonne in stages to proper grade and
IIIrd layer,
camber, 53-22.50mm
applying and brooming requisite type of screening /
RD- 1215.00
binding to1225.00
material to fill up interstices of coarse aggregate
watering and compacting to the required density . 1 10.00 (3.70+3.60)/2 0.075
Budh Singh Marg,Vasundhara Enclave Bound
1 15.00 (2.00+1.90)/2 0.075
1 15.00 (1.90+1.65)/2 0.075
1 15.00 (1.65+1.60)/2 0.075
1 15.00 (1.60+1.60)/2 0.075
1 15.00 (1.60+1.40)/2 0.075
1 15.00 (1.40+1.55)/2 0.075
1 15.00 (1.55+1.60)/2 0.075
1 15.00 (1.60+1.90)/2 0.075
1 15.00 (1.90+1.25)/2 0.075
1 15.00 (1.25+1.45)/2 0.075
1 15.00 (1.45+1.35)/2 0.075
1 15.00 (1.35+1.30)/2 0.075
1 15.00 (1.30+1.22)/2 0.075
1 15.00 (1.22+1.35)/2 0.075
1 13.00 (1.35+1.34)/2 0.075
Dallupura Bound
Deduction for bus stand 1 9.40 0.35 0.075
Deduction for chamber 1 3.00 1.20 0.075
Deduction for bus stand 1 7.00 0.90 0.075
Deduction for bus stand 1 6.90 0.60 0.075
Deduction for trees 3 0.60 0.60 0.075
Total=

18 Laying spreading and compacting stone aggregate of specified


sizes to WBM specifications including spreading in uniform
thickness, hand picking, rolling with 3 wheeled road /
Noida Bound
vibratory roller 8-10 tonne in stages to proper grade and
VIth layer,
camber, 53-22.50mm
applying and brooming requisite type of screening /
RD- 1215.00
binding to1225.00
material to fill up interstices of coarse aggregate
watering and compacting to the required density . 1 10.00 (3.70+3.60)/2 0.075
Budh Singh Marg,Vasundhara Enclave Bound
1 15.00 (2.00+1.90)/2 0.075
1 15.00 (1.90+1.65)/2 0.075
1 15.00 (1.65+1.60)/2 0.075
1 15.00 (1.60+1.60)/2 0.075
1 15.00 (1.60+1.40)/2 0.075
1 15.00 (1.40+1.55)/2 0.075
1 15.00 (1.55+1.60)/2 0.075
1 15.00 (1.60+1.90)/2 0.075
1 15.00 (1.90+1.25)/2 0.075
1 15.00 (1.25+1.45)/2 0.075
1 15.00 (1.45+1.35)/2 0.075
1 15.00 (1.35+1.30)/2 0.075
1 15.00 (1.30+1.22)/2 0.075
1 15.00 (1.22+1.35)/2 0.075
1 13.00 (1.35+1.34)/2 0.075
Dallupura Bound
Deduction for bus stand 1 9.40 0.35 0.075
Deduction for chamber 1 3.00 1.20 0.075
Deduction for bus stand 1 7.00 0.90 0.075
Deduction for bus stand 1 6.90 0.60 0.075
Deduction for trees 3 0.60 0.60 0.075
Total=
Quantity Unit

3.65 Cum ###

-0.33 "
-0.36 "
-0.63 "
-0.41 "
-0.11 "
1.81 Cum

2.74 Cum ###

-0.25 "
-0.27 "
-0.47 "
-0.31 "
-0.08 "
1.36 Cum

2.74 Cum ###

2.19 " ###


2.00 " ###
1.83 " ###
1.80 " ###
1.69 " ###
1.66 " ###
1.77 " ###
1.97 " ###
1.77 " ###
1.52 " ###
1.58 " ###
1.49 " ###
1.42 " ###
1.45 " ###
1.31 " ###

-0.25 "
-0.27 "
-0.47 "
-0.31 "
-0.08 "
26.81 Cum

2.74 Cum ###

2.19 " ###


2.00 " ###
1.83 " ###
1.80 " ###
1.69 " ###
1.66 " ###
1.77 " ###
1.97 " ###
1.77 " ###
1.52 " ###
1.58 " ###
1.49 " ###
1.42 " ###
1.45 " ###
1.31 " ###

-0.25 "
-0.27 "
-0.47 "
-0.31 "
-0.08 "
26.81 Cum
DATE OF MEASUREMENTS :-
I.No Description No L B

2 Earth work in excavation by mechanical means


(Hydraulic excavator) / mannual labour over areas
(exceeding 30cm in depth, 1.5m in width as well as 10
Noida Bound
sq.m.on plan) i/c disposal of excavated earth lead upto
Near RD(-12.30)
50m and lift upto to Drain
1.5m, Edge RD199.50
.disposed earth to be levelled and 1 12.30 (0.80+0.90)/2
neatly dressed. 1 9.40 (3.40+2.80)/2
1 15.00 (2.80+1.60)/2
1 15.00 (1.60+2.10)/2
1 15.00 (2.10+1.60)/2
1 15.00 (1.60+1.50)/2
1 15.00 (1.50+1.40)/2
1 15.00 (1.40+1.40)/2
1 15.00 (1.40+1.25)/2
1 15.00 (1.25+1.20)/2
1 9.60 (1.20+1.10)/2
1 13.50 (1.20+1.10)/2
1 12.00 (4.08+4.55)/2
1 15.00 (4.55+5.30)/2
1 15.00 (5.30+4.25)/2
1 5.00 (4.25+4.20)/2
Deduction 1 13.50 (0.80+0.90)/2
After BudhSingh Marg Cut RD-283.50 to 309.00
1 15.00 (2.40+1.95)/2
1 1.50 (1.95+2.00)/2
1 1.30 (2.00+1.50)/2
1 7.70 (4.35+4.90)/2
Deduction for chamber Edge 1 1.70 (1.10+1.20)/2

Noida Bound R.D 293.70 to R.D-350.00 1 6.30 (2.90+2.85)/2


1 15.00 (2.85+3.45)/2
1 15.00 (3.45+2.55)/2
1 15.00 (2.55+3.10)/2
1 5.00 (3.10+3.16)/2
Noida Bound R.D 390.00 to R.D-480.00 1 15.00 (2.87+3.00)/2
1 15.00 (3.00+2.60)/2
1 15.00 (2.60+2.70)/2
1 15.00 (2.70+2.95)/2
1 15.00 (2.95+2.80)/2
1 15.00 (2.80+3.00)/2
Deduction For slab 1 1.15 2.85

Noida Bound R.D 505.00 to R.D 780.00 1 5.00 (2.95+2.95)/2


1 15.00 (2.95+2.65)/2
1 15.00 (2.65+2.80)/2
1 15.00 (2.80+2.75)/2
1 15.00 (2.75+2.50)/2
1 15.00 (2.50+2.90)/2
1 15.00 (2.90+3.40)/2
1 15.00 (3.40+3.85)/2
1 15.00 (3.85+4.60)/2
1 15.00 (4.60+5.45)/2
1 15.00 (5.45+5.70)/2
1 15.00 (5.70+5.93)/2
1 15.00 (5.93+6.05)/2
1 15.00 (6.05+6.00)/2
1 15.00 (6.00+5.55)/2
1 15.00 (5.55+5.05)/2
1 15.00 (5.05+5.25)/2
1 15.00 (5.25+5.40)/2
1 15.00 (5.40+5.50)/2
Deduction For M.H. 2 3.14./4 0.85
Deduction For M.H. 1 1.50 1.70

Noida Bound R.D 780.00 to R.D-905.50 1 15.00 (5.50+5.90)/2


1 15.00 (5.90+6.20)/2
1 15.00 (6.20+6.80)/2
1 15.00 (6.80+7.15)/2
1 15.00 (7.15+7.22)/2
1 15.00 (7.22+7.45)/2
1 15.00 (7.45+7.82)/2
1 15.00 (7.82+7.90)/2
1 5.50 (7.90+7.90)/2

Noida Bound R.D 922.00 to R.D-1023.40 1 8.00 (4.95+4.75)/2


1 15.00 (4.75+4.75)/2
1 15.00 (4.75+4.90)/2
1 15.00 (4.90+4.90)/2
1 15.00 (4.90+5.00)/2
1 15.00 (5.00+5.35)/2
1 13.20 (5.35+5.80)/2
Flair 2./3 5.20 5.8
Budhsingh Marg Cut C/v 1 10.55 (1.80+1.80)/2
Noida Bound R.D.96.00 to R.D 117.00 1 15.00 (1.80+2.20)/2
1 6.00 (2.20+2.50)/2
BudhSingh Marg Vasundhara Bound 1 15.00 (2.30+2.50)/2
1 9.10 (2.50+2.95)/2
1 5.40 (2.95+3.20)/2
1 22.00 (1.35+1.20)/2
C/V Budh singh Marg Cut 1 10.55 (1.80+1.80)/2

Cutting By Jalboard 1 6.70 (2.00+2.00)/2


1 9.45 (2.25+2.30)/2
1 4.30 (2.65+2.62)/2
1 5.10 (2.75+2.80)/2
Vasundhara Cut 1 14.00 (3.55+3.50)/2
1 2.20 (1.20+1.20)/2
Noida Bound R.D 350.00 to R.D-390.00 1 10.00 (3.16+3.22)/2
1 15.00 (3.22+3.05)/2
1 15.00 (3.05+2.87)/2
Noida Bound R.D 480.00 to R.D-505.00 1 15.00 (3.00+3.00)/2
1 10.00 (3.00+2.95)/2
Noida Bound R.D 905.50 to R.D-922.00 1 9.50 (5.25+5.25)/2
1 7.00 (5.25+4.95)/2
D or H Quantity Unit

0.45 4.70 Cum.


0.45 13.11 "
0.45 14.85 "
0.43 11.93 "
0.43 11.93 "
0.43 10.00 "
0.43 9.35 "
0.43 9.03 "
0.43 8.55 "
0.43 7.90 "
0.43 4.75 "
0.43 6.68 "
0.43 22.27 "
0.43 31.77 "
0.43 30.80 "
0.43 9.08 "
0.43 -4.93 "

0.43 14.03 "


0.43 1.27 "
0.43 0.98 "
0.43 15.31 "
0.43 -0.84 "
232.52 Cum.

0.43 7.79 Cum.


0.43 20.32 "
0.45 20.25 "
0.45 19.07 "
0.45 7.04 "
0.45 19.81 "
0.45 18.90 "
0.45 17.89 "
0.45 19.07 "
0.45 19.41 "
0.45 19.58 "
0.45 -1.47 "
187.66 Cum.

0.46 6.79 Cum.


0.46 19.32 "
0.46 18.80 "
0.46 19.15 "
0.46 18.11 "
0.44 17.82 "
0.41 19.37 "
0.43 23.38 "
0.45 28.52 "
0.45 33.92 "
0.45 37.63 "
0.45 39.25 "
0.45 40.43 "
0.45 40.67 "
0.45 38.98 "
0.45 35.78 "
0.45 34.76 "
0.43 34.35 "
0.43 35.15 "
0.43 -0.57 "
0.43 -1.10 "
540.51 "

0.40 34.20 "


0.42 38.12 "
0.44 42.90 "
0.45 47.08 "
0.43 46.34 "
0.43 47.31 "
0.43 49.25 "
0.45 53.06 "
0.45 19.55 "
377.81 "

0.42 16.80 "


0.44 31.35 "
0.45 32.57 "
0.43 31.61 "
0.43 31.93 "
0.43 33.38 "
0.45 33.12 "
0.49 9.75 "
0.50 9.50 "
0.47 14.10 "
0.45 6.35 "
0.45 16.20 "
0.42 10.41 "
0.45 7.47 "
0.45 12.62 "
0.45 8.55 "
305.71 "

0.43 5.76 Cum.


0.44 9.46 "
0.41 4.65 "
0.43 6.09 "
0.45 22.21 "
0.45 1.19 "
0.45 14.36 "
0.45 21.16 "
0.45 19.98 "
0.45 20.25 "
0.45 13.39 "
0.45 22.44 "
0.45 15.75 "
176.69 "
I.No Description No L B
Measurement on dated:-
3 Earth work in excavation by mechanical means
(Hydraulic excavator) / mannual labour in foundation
trenches or drain (not exceeding 1.5 m in width or 10
(a) All kinds of soil.
sqm.on plan) including dressing of sides and ramming
Noida
of Bound
bottom lift up to 1.5 m including getting out the
R.D 930.00 to 1019.20
excavated soil as directed with in a lead of 50m.
1 15.00 (2.05+2.10)/2
1 15.00 (2.10+2.20)/2
1 15.00 (2.20+2.25)/2
1 15.00 (2.25+2.25)/2
1 15.00 (2.25+2.20)/2
1 14.20 (2.20+2.15)/2

Measurement on dated:-
3 Earth work in excavation by mechanical means
(Hydraulic excavator) / mannual labour in foundation
trenches or drain (not exceeding 1.5 m in width or 10
(a) All kinds of soil.
sqm.on plan) including dressing of sides and ramming
Noida Bound
of bottom lift up to 1.5 m including getting out the
R.D 351.00soil
excavated to 387.00
as directed with in a lead of 50m. 1 15.00 (2.40+2.30)/2
1 15.00 (2.30+2.40)/2
1 6.00 (2.40+2.40)/2
Deduction, Pipe Line 1 36.00 1.20
R.D 483.50 to 501.00 1 15.00 (2.10+2.10)/2
1 2.50 (2.10+2.00)/2
R.D 900.00 to 930.00 1 15.00 (1.85+1.95)/2
1 15.00 (2.30+2.05)/2
At Dallupura Road & Rd No. 102 T-Point, R.D
1019.20 to 1039.20 1 20.00 (2.10+2.05)/2

At Dallupura Road & Rd No. 102 T-Point, R.D


1039.20 to 1056.10 1 16.90 (2.05+2.05)/2
D or H Quantity Unit

2.20 68.48 Cum.


2.20 70.95 "
2.20 73.43 "
2.20 74.25 "
2.20 73.43 "
2.20 67.95 "
428.49 "

1.48 52.17 "


1.48 52.17 "
1.48 21.31 "
0.90 -38.88 "
1.42 44.73 "
1.42 7.28 "
1.48 42.18 "
1.48 48.29 "

2.00 83.00 "

2.00 70.14 "


I.No. Description No. L B D or H
18 Laying spreading and compacting stone aggregate of specified
sizes to WBM specifications including spreading in uniform
thickness, hand picking, rolling with 3 wheeled road /
Noida Bound
vibratory roller 8-10 tonne in stages to proper grade and
Ist layer,applying
camber, 90- 45mmand brooming requisite type of screening /
RD- 1215.00
binding to1225.00
material to fill up interstices of coarse aggregate
watering and compacting to the required density . 1 10.00 (3.70+3.60)/2 0.10
Dallupura Bound
Deduction for bus stand 1 9.40 0.35 0.10
Deduction for chamber 1 3.00 1.20 0.10
Deduction for bus stand 1 7.00 0.90 0.10
Deduction for bus stand 1 6.90 0.60 0.10
Deduction for trees 3 0.60 0.60 0.10
Total=

18 Laying spreading and compacting stone aggregate of specified


sizes to WBM specifications including spreading in uniform
thickness, hand picking, rolling with 3 wheeled road /
Noida Bound
vibratory roller 8-10 tonne in stages to proper grade and
IInd layer,
camber, 63-45mm
applying and brooming requisite type of screening /
binding material
RD- 1215.00 to fill up interstices of coarse aggregate
to1225.00
watering and compacting to the required density . 1 10.00 (3.70+3.60)/2 0.075
Dallupura Bound
Deduction for bus stand 1 9.40 0.35 0.075
Deduction for chamber 1 3.00 1.20 0.075
Deduction for bus stand 1 7.00 0.90 0.075
Deduction for bus stand 1 6.90 0.60 0.075
Deduction for trees 3 0.60 0.60 0.075
Total=

18 Laying spreading and compacting stone aggregate of specified


sizes to WBM specifications including spreading in uniform
thickness, hand picking, rolling with 3 wheeled road /
Noida Bound
vibratory roller 8-10 tonne in stages to proper grade and
IIIrd layer,
camber, 53-22.50mm
applying and brooming requisite type of screening /
RD- 1215.00
binding to1225.00
material to fill up interstices of coarse aggregate
watering and compacting to the required density . 1 10.00 (3.70+3.60)/2 0.075
Budh Singh Marg,Vasundhara Enclave Bound
1 15.00 (2.00+1.90)/2 0.075
1 15.00 (1.90+1.65)/2 0.075
1 15.00 (1.65+1.60)/2 0.075
1 15.00 (1.60+1.60)/2 0.075
1 15.00 (1.60+1.40)/2 0.075
1 15.00 (1.40+1.55)/2 0.075
1 15.00 (1.55+1.60)/2 0.075
1 15.00 (1.60+1.90)/2 0.075
1 15.00 (1.90+1.25)/2 0.075
1 15.00 (1.25+1.45)/2 0.075
1 15.00 (1.45+1.35)/2 0.075
1 15.00 (1.35+1.30)/2 0.075
1 15.00 (1.30+1.22)/2 0.075
1 15.00 (1.22+1.35)/2 0.075
1 13.00 (1.35+1.34)/2 0.075
Dallupura Bound
Deduction for bus stand 1 9.40 0.35 0.075
Deduction for chamber 1 3.00 1.20 0.075
Deduction for bus stand 1 7.00 0.90 0.075
Deduction for bus stand 1 6.90 0.60 0.075
Deduction for trees 3 0.60 0.60 0.075
Total=

18 Laying spreading and compacting stone aggregate of specified


sizes to WBM specifications including spreading in uniform
thickness, hand picking, rolling with 3 wheeled road /
Noida Bound
vibratory roller 8-10 tonne in stages to proper grade and
VIth layer,
camber, 53-22.50mm
applying and brooming requisite type of screening /
RD- 1215.00
binding to1225.00
material to fill up interstices of coarse aggregate
watering and compacting to the required density . 1 10.00 (3.70+3.60)/2 0.075
Budh Singh Marg,Vasundhara Enclave Bound
1 15.00 (2.00+1.90)/2 0.075
1 15.00 (1.90+1.65)/2 0.075
1 15.00 (1.65+1.60)/2 0.075
1 15.00 (1.60+1.60)/2 0.075
1 15.00 (1.60+1.40)/2 0.075
1 15.00 (1.40+1.55)/2 0.075
1 15.00 (1.55+1.60)/2 0.075
1 15.00 (1.60+1.90)/2 0.075
1 15.00 (1.90+1.25)/2 0.075
1 15.00 (1.25+1.45)/2 0.075
1 15.00 (1.45+1.35)/2 0.075
1 15.00 (1.35+1.30)/2 0.075
1 15.00 (1.30+1.22)/2 0.075
1 15.00 (1.22+1.35)/2 0.075
1 13.00 (1.35+1.34)/2 0.075
Dallupura Bound
Deduction for bus stand 1 9.40 0.35 0.075
Deduction for chamber 1 3.00 1.20 0.075
Deduction for bus stand 1 7.00 0.90 0.075
Deduction for bus stand 1 6.90 0.60 0.075
Deduction for trees 3 0.60 0.60 0.075
Total=
Quantity Unit

3.65 Cum ###

-0.33 "
-0.36 "
-0.63 "
-0.41 "
-0.11 "
1.81 Cum

2.74 Cum ###

-0.25 "
-0.27 "
-0.47 "
-0.31 "
-0.08 "
1.36 Cum

2.74 Cum ###

2.19 " ###


2.00 " ###
1.83 " ###
1.80 " ###
1.69 " ###
1.66 " ###
1.77 " ###
1.97 " ###
1.77 " ###
1.52 " ###
1.58 " ###
1.49 " ###
1.42 " ###
1.45 " ###
1.31 " ###

-0.25 "
-0.27 "
-0.47 "
-0.31 "
-0.08 "
26.81 Cum

2.74 Cum ###

2.19 " ###


2.00 " ###
1.83 " ###
1.80 " ###
1.69 " ###
1.66 " ###
1.77 " ###
1.97 " ###
1.77 " ###
1.52 " ###
1.58 " ###
1.49 " ###
1.42 " ###
1.45 " ###
1.31 " ###

-0.25 "
-0.27 "
-0.47 "
-0.31 "
-0.08 "
26.81 Cum
I.No Description No. L B
5 Desilting of drains by getting out the manure/ sludge
rubbish etc in or under water or liquid mud in foul position
in restricted working condition i/c disposal of excavated
material by machenical transport including loading,
unloading and stacking for all leads and lifts (Beyond initial
Dallupura Bound,
lead of 50m, DDA1.5m
lift upto Drain
or as per direction of Engieer -
in - Charge)
Start from R.D 607.50
Ist cut, RD 607.50 to 683.00 2 30.00 2.40
1 16.65 2.40
IInd cut, RD- 1215.00 to1225.00 3 30.00 2.40
1 7.60 2.40
IIInd cut, RD- 1215.00 to1225.00 3 30.00 2.40
1 12.85 2.40
IVth cut, RD- 1215.00 to1225.00 4 30.00 2.40
1 7.75 2.40
D or H Quantity Unit

0.50 72.00 Cum.


0.50 19.98 "
0.50 108.00 "
0.50 9.12 "
0.50 108.00 "
0.50 15.42 "
0.50 144.00 "
0.50 9.30 "
485.82 "
I.No Description No L B
6 P/L in position cement concrete of specified grade
excluding the cost of centering and shuttering all work
upto plinth level.
(a) 1:5:10 ( 1 cement : 5 coarse sand : 10 graded stone
aggregate 40 mm nominal size).
Noida Bound, Box Drain
R.D 930.00 to 1019.20 2 30.00 1.40
1 29.20 1.40

6 P/L in position cement concrete of specified grade


excluding the cost of centering and shuttering all work
upto plinth level.
(a) 1:5:10 (1 cement : 5 coarse sand : 10 graded stone
aggregate 40 mm nominal size).
Noida Bound
R.D 351.00 to 387.00 1 15.00 (1.40+1.25)/2
1 15.00 (1.25+0.85)/2
1 6.00 (0.85+1.40)/2
R.D 483.50 to 501.00 1 15.00 1.40
1 2.50 1.40
R.D 900.00 to 930.00 1 15.00 1.40
1 15.00 1.40
At Dallupura Road & Rd No. 102 T-Point, R.D
1019.20 to 1039.20 1 20.00 1.70

At Dallupura Road & Rd No. 102 T-Point, R.D


1039.20 to 1056.10 1 16.90 1.70

6 P/L in position cement concrete of specified grade


excluding the cost of centering and shuttering all work
(a) upto plinth
1:5:10 ( 1level.
cement : 5 coarse sand : 10 graded stone
aggregate 40 mm nominal size).
Budh Singh Marg, Dallupura bound 1 15.00 (1.16+1.37)/2
Ist Cut 1 15.00 (1.37+1.58)/2
1 15.00 (1.58+2.04)/2
1 10.20 (2.04+2.38)/2
flair 1./3 0.60 2.38
IIIrd Cut 2./3 1.57 2.50
1 15.00 (2.50+2.65)/2
1 4.25 (2.65+2.63)/2
IVth Cut 1 5.00 (2.65+2.63)/2
Budh Singh Marg, Vasundhara bound 1 15.00 (2.20+2.67)/2
1 15.00 (2.67+2.45)/2
1 15.00 (2.45+2.55)/2
1 15.00 (2.55+2.45)/2
1 15.00 (2.45+2.42)/2
1 15.00 (2.68+2.58)/2
1 6.65 (2.58+2.60)/2
1 17.50 (2.55+2.45)/2
Ramp Dustbin, (10.70+10.75+12.15/3=11.20)
1 11.20 (3.45+4.00+4.65)/3
1./3 10.70 0.40
D or H Quantity Unit

0.10 8.40 Cum.


0.10 4.09 "
12.49 "

0.10 1.99 Cum.


0.10 1.58 "
0.10 0.68 "
0.10 2.10 "
0.10 0.35 "
0.10 2.10 "
0.10 2.10 "

0.10 4.15 "

0.10 3.51 "

0.08 1.42 Cum.


0.08 1.66 "
0.08 2.04 "
0.08 1.69 "
0.08 0.04 "
0.08 0.2 "
0.08 2.9 "
0.08 0.84 "
0.08 0.99 "
0.08 2.74 "
0.08 2.88 "
0.08 2.81 "
0.08 2.81 "
0.08 2.74 "
0.08 2.96 "
0.08 1.29 "
0.08 3.28 "

0.08 3.39 "


0.08 0.11 "
"
I.No Description No L B
7 Providing and laying in position ready mixed
concrete manufactured in fully automatic batching
plant and transported to site of work in transit
Dallupura
mixer for Bound, DDA
a lead up to Drain
10kms having continuous
Start from
agitated R.D 607.50
mixer, manuf -actured as per mix design
of specified grade for reinforced cement concrete
work including
Top Slab, Panelpumping
No 1 of R.M.C. from transit 1 5.20 2.88
mixer to site of laying , excluding the cost of
centering, shuttering finishing and reinforcement 2 2.88 0.10
including cost of admixtures in recommended
proportions as per
Top Slab, Panel NoIS2 : 9103 to accelerate/ retard 1 5.20 2.80
setting of concrete, improve workability without 2 2.80 0.10
impairing strength and durability as per direction
of the Engineer - in - charge. M-25 grade
Top Slab, Panel
Reinforced No concrete
cement 3 by using 410kg of 1 5.20 2.83
cement per cum of concrete. 2 2.83 0.10

Top Slab, Panel No 4 1 5.20 2.82


2 2.82 0.10

Top Slab, Panel No 5 1 5.20 2.83


2 2.83 0.10

Top Slab, Panel No 6 1 5.20 2.82


2 2.82 0.10

Top Slab, Panel No 7 1 5.20 2.83


2 2.83 0.10

Top Slab, Panel No 8 1 5.20 2.83


2 2.83 0.10

Top Slab, Panel No 9 1 5.20 2.84


2 2.84 0.10

Top Slab, Panel No 10 1 5.20 2.84


2 2.84 0.10

Top Slab, Panel No 11 1 5.20 2.84


2 2.84 0.10

Top Slab, Panel No 12 1 5.20 2.85


2 2.85 0.10

Top Slab, Panel No 13, culvert


(3.16+2.90)/2 1 0.95 3.03
1 2.90 0.10

Top Slab, Panel No 14 1 5.20 2.85


2 2.85 0.10

Top Slab, Panel No 15 1 5.20 2.85


2 2.85 0.10
Top Slab, Panel No 16 1 5.20 2.83
2 2.83 0.10

Top Slab, Panel No 17 1 5.20 2.84


2 2.84 0.10

Top Slab, Panel No 18 1 5.20 2.83


2 2.83 0.10

Top Slab, Panel No 19 1 5.20 2.83


2 2.83 0.10

Top Slab, Panel No 20 1 5.20 2.87


2 2.87 0.10

Top Slab, Panel No 21 1 5.20 2.85


2 2.85 0.10

Top Slab, Panel No 22 1 5.20 2.83


2 2.83 0.10

Top Slab, Panel No 23 1 5.20 2.82


2 2.82 0.10

Top Slab, Panel No 24 1 5.20 2.83


2 2.83 0.10

Top Slab, Panel No 25 1 5.20 2.84


2 2.84 0.10

Top Slab, Panel No 26 1 5.20 2.82


2 2.82 0.10

Top Slab, Panel No 27 1 5.20 2.84


2 2.84 0.10

Top Slab, Panel No 28 1 3.08 2.84


2 2.84 0.10

Top Slab, Panel No 29, culvert 1 3.08 2.90


1 2.90 0.10

Top Slab, Panel No 30 1 5.20 2.88


2 2.88 0.10

Top Slab, Panel No 31 1 5.20 2.86


2 2.86 0.10

Top Slab, Panel No 32 1 5.20 2.84


2 2.84 0.10
Top Slab, Panel No 33 1 5.20 2.87
2 2.87 0.10

Top Slab, Panel No 34 1 5.20 2.84


2 2.84 0.10

Top Slab, Panel No 35 1 5.20 2.84


2 2.84 0.10

Top Slab, Panel No 36 1 5.20 2.80


2 2.80 0.10

Top Slab, Panel No 37 1 5.20 2.86


2 2.86 0.10

Top Slab, Panel No 38 1 5.20 2.87


2 2.87 0.10

Top Slab, Panel No 39 1 5.20 2.84


2 2.84 0.10

Top Slab, Panel No 40 1 5.20 2.85


2 2.85 0.10

Top Slab, Panel No 41 1 5.20 2.86


2 2.86 0.10

Top Slab, Panel No 42 1 5.20 2.84


2 2.84 0.10

Top Slab, Panel No 43 1 5.20 2.87


2 2.87 0.10

Top Slab, Panel No 44 1 5.20 2.85


2 2.85 0.10

Top Slab, Panel No 45 1 2.28 2.76


2 2.76 0.10

Top Slab, Panel No 46 1 2.74 1.36


1 1.36 0.10

Top Slab, Panel No 47 1 3.84 2.83


2 2.83 0.10

Top Slab, Panel No 48 1 5.20 2.81


2 2.81 0.10

Top Slab, Panel No 49 1 5.20 2.81


2 2.81 0.10

Top Slab, Panel No 50 1 5.20 2.81


2 2.81 0.10
Top Slab, Panel No 51 1 5.20 2.82
2 2.82 0.10

Top Slab, Panel No 52 1 5.20 2.82


2 2.82 0.10

Top Slab, Panel No 53 1 5.20 2.81


2 2.81 0.10

Top Slab, Panel No 54 1 5.20 2.85


2 2.85 0.10

Top Slab, Panel No 55 1 5.20 2.82


2 2.82 0.10

Top Slab, Panel No 56 1 5.20 2.80


2 2.80 0.10

Top Slab, Panel No 57 1 5.20 2.85


2 2.85 0.10

Top Slab, Panel No 58 1 0.95 2.80


1 2.80 0.10

Top Slab, Panel No 59 1 5.20 2.78


2 2.78 0.10

Top Slab, Panel No 60 1 5.20 2.82


2 2.82 0.10

Top Slab, Panel No 61 1 5.20 2.81


2 2.81 0.10

Top Slab, Panel No 62 1 5.20 2.83


2 2.83 0.10

Top Slab, Panel No 63 1 5.20 2.80


2 2.80 0.10

Top Slab, Panel No 64 1 5.20 2.81


2 2.81 0.10

Top Slab, Panel No 65 1 5.20 2.80


2 2.80 0.10

Top Slab, Panel No 66 1 4.10 2.82


1 2.82 0.10

7 Providing and laying in position ready mixed


concrete manufactured in fully automatic batching
plant and transported to site of work in transit
Noida
mixer Bound, BoxupDrain
for a lead to 10kms having continuous
agitated mixer, manuf -actured as per mix design
of specified grade for reinforced cement concrete
Raft.
Noida Bound, Box Drain
R.D 840.00 to 900.00 2 30.00 1.30
Wall
R.D 810.00 to 900.00 2x2 30.00 0.15

7 Providing and laying in position ready mixed


concrete manufactured in fully automatic batching
plant and transported to site of work in transit
Noida
mixer Bound, BoxupDrain
for a lead to 10kms having continuous
Raft.
agitated mixer, manuf -actured as per mix design
of specified
Noida Bound,grade
Box for reinforced cement concrete
Drain
work including pumping
R.D 930.00 to 1019.20 of R.M.C. from transit 2 30.00 1.30
mixer to site of laying , excluding the cost of
1 29.20 1.30
centering, shuttering finishing and reinforcement
Wall
including cost of admixtures in recommended
proportions
R.D 930.00 to as 1019.20
per IS : 9103 to accelerate/ retard 2x2 30.00 0.15
setting of concrete, improve workability without 1x2 29.20 0.15
impairing strength and durability as per direction
of the Engineer - in - charge. M-25 grade
Reinforced cement concrete by using 410kg of
7 cement per and
Providing cum of concrete.
laying in position ready mixed
concrete manufactured in fully automatic batching
plant and transported to site of work in transit
Raft.
mixer for a lead up to 10kms having continuous
Noida
agitatedBound,
mixer,Box Drain
manuf -actured as per mix design
of
R.Dspecified
351.00 tograde for reinforced cement concrete 1
387.00 5.00 (1.27+1.08)/2
work including pumping of R.M.C. from transit 1 5.00 (1.08+0.95)/2
mixer to site of laying , excluding the cost of
1 5.00 (0.95+0.93)/2
centering, shuttering finishing and reinforcement
including cost of admixtures in recommended 1 5.00 (0.93+1.15)/2
proportions as per IS : 9103 to accelerate/ retard 1 5.00 (1.15+1.28)/2
setting of concrete, improve workability without 1 5.00 (1.28+1.30)/2
impairing strength and durability as per direction 1 6.00 (1.30+1.30)/2
of the Engineer - in - charge. M-25 grade
R.D 483.50 to
Reinforced 501.00concrete by using 410kg of 1
cement 15.00 1.30
cement per cum of concrete. 1 2.50 1.30
R.D 900.00 to 930.00 1 15.00 1.30
1 15.00 1.30
R.D 1019.20 to .00

Wall
Noida Bound, Box Drain
R.D 351.00 to 387.00 1x2 15.00 0.15
1x2 15.00 0.15
1x2 6.00 0.15
R.D 483.50 to 501.00 1x2 15.00 0.15
1x2 2.50 0.15
R.D 900.00 to 930.00 1x2 15.00 0.15
1x2 15.00 0.15
R.D 1019.20 to .00

Wall
R.D 348.00 to R.D 1019.20 2 12.00 (0.05+0.05)/2
2 15.00 (0.05+0.10)/2
2 15.00 (0.10+0.18)/2
2 15.00 (0.18+0.17)/2
2 15.00 (0.17+0.21)/2
2 15.00 (0.21+0.21)/2
2 15.00 (0.21+0.28)/2
2 15.00 (0.28+0.25)/2
2 15.00 (0.25+0.25)/2
2 15.00 (0.25+0.21)/2
2 15.00 (0.21+0.22)/2
2 15.00 (0.22+0.22)/2
2 15.00 (0.22+0.20)/2
2 15.00 (0.20+0.27)/2
2 15.00 (0.27+0.23)/2
2 15.00 (0.23+0.22)/2
2 15.00 (0.22+0.24)/2
2 15.00 (0.24+0.23)/2
2 15.00 (0.23+0.24)/2
2 15.00 (0.24+0.21)/2
2 15.00 (0.21+0.25)/2
2 15.00 (0.25+0.32)/2
2 15.00 (0.32+0.33)/2
2 15.00 (0.33+0.45)/2
2 15.00 (0.45+0.43)/2
2 15.00 (0.43+0.45)/2
2 15.00 (0.45+0.45)/2
2 15.00 (0.45+0.52)/2
2 15.00 (0.52+0.50)/2
2 15.00 (0.50+0.54)/2
2 12.00 (0.54+0.57)/2
2 3.00 (0.57+0.58)/2
2 15.00 (0.58+0.60)/2
2 15.00 (0.60+0.66)/2
2 15.00 (0.66+0.75)/2
2 15.00 (0.75+0.77)/2
2 15.00 (0.77+0.78)/2
2 15.00 (0.78+0.75)/2
2 15.00 (0.75+0.70)/2
2 15.00 (0.70+0.67)/2
2 15.00 (0.67+0.72)/2
2 15.00 (0.72+0.77)/2
2 15.00 (0.77+0.85)/2
2 15.00 (0.85+0.87)/2
2 15.00 (0.87+0.85)/2
2 14.20 (0.85+0.83)/2

7 Providing and laying in position ready mixed


concrete manufactured in fully automatic batching
plant and transported to site of work in transit
Slab
mixer for a lead up to 10kms having continuous
R.D 303.80
agitated to R.D
mixer, 967.00
manuf -actured as per mix design 1 11.20 (1.30+1.30)/2
of specified grade for reinforced cement concrete 1 15.00 (1.30+1.30)/2
work including pumping of R.M.C. from transit 1 15.00 (1.30+1.30)/2
mixer to site of laying , excluding the cost of
1 15.00 (1.30+1.30)/2
centering, shuttering finishing and reinforcement
including cost of admixtures in recommended 1 15.00 (1.30+1.20)/2
proportions as per IS : 9103 to accelerate/ retard
setting of concrete, improve workability without
1 15.00 (1.20+1.26)/2
1 15.00 (1.26+1.29)/2
1 15.00 (1.29+1.25)/2
1 15.00 (1.25+1.26)/2
1 15.00 (1.26+1.27)/2
1 15.00 (1.27+1.28)/2
1 15.00 (1.28+1.22)/2
1 15.00 (1.22+1.26)/2
1 15.00 (1.26+1.28)/2
1 15.00 (1.28+1.26)/2
1 15.00 (1.26+1.29)/2
1 15.00 (1.29+1.28)/2
1 15.00 (1.28+1.24)/2
1 15.00 (1.24+1.33)/2
1 15.00 (1.33+1.32)/2
1 15.00 (1.32+1.32)/2
1 15.00 (1.32+1.25)/2
1 15.00 (1.25+1.24)/2
1 15.00 (1.24+1.29)/2
1 15.00 (1.29+1.30)/2
1 15.00 (1.30+1.26)/2
1 15.00 (1.26+1.35)/2
1 15.00 (1.35+1.29)/2
1 15.00 (1.29+1.29)/2
1 15.00 (1.29+1.34)/2
1 15.00 (1.34+1.38)/2
1 15.00 (1.38+1.36)/2
1 15.00 (1.36+1.30)/2
1 15.00 (1.30+1.28)/2
1 15.00 (1.28+1.27)/2
1 15.00 (1.27+1.28)/2
1 15.00 (1.28+1.23)/2
1 15.00 (1.23+1.31)/2
1 15.00 (1.31+1.31)/2
1 15.00 (1.31+1.27)/2
1 15.00 (1.27+1.29)/2
1 15.00 (1.29+1.32)/2
1 15.00 (1.32+1.29)/2
1 15.00 (1.29+1.33)/2
1 7.00 (1.33+1.30)/2
R.D 967.00 to R.D 974.10,Culvert 1 7.10 (1.30+1.28)/2
R.D 974.10 to R.D 1019.20 1 0.90 (1.28+1.28)/2
1 15.00 (1.28+1.22)/2
1 15.00 (1.22+1.34)/2
1 14.20 (1.34+1.35)/2
Less for openings 126 1.22 1.17

Culvert at Dallupura Mkt. 1 5.70 1.20


Culvert at Bhudh Singh Chowk 1 4.00 1.40

At Dallupura Road & Rd No. 102 T-Point


2 12.00 1.70
Less for pipe, (3.14/4)x1.40x1.40=1.54 2 12.00 1.54
7 Providing and laying in position ready mixed
concrete manufactured in fully automatic batching
plant and transported to site of work in transit
mixer for a lead up to 10kms having continuous
Budh Singh
agitated Marg
mixer, Dallupura
manuf -acturedbound
as per mix design 1 7.50 (1.10+1.20)/2
Ist Cut
of specified grade for reinforced cement concrete 1 7.50 (1.20+1.35)/2
work including pumping of R.M.C. from transit 1 7.50 (1.35+1.43)/2
mixer to site of laying , excluding the cost of 1 7.50 (1.43+1.61)/2
centering, shuttering finishing and reinforcement
including cost of admixtures in recommended 1 6.35 (1.61+1.84)/2
proportions as per IS : 9103 to accelerate/ retard 1 7.50 (1.84+2.17)/2
setting of concrete, improve workability without 1 7.50 (2.17+2.34)/2
impairing strength and durability as per direction 1 1.30 (2.34+2.40)/2
of the Engineer - in - charge. M-25 grade
1./3 1.00 2.40
Reinforced cement concrete by using 410kg of
Deduction
cement perFor
cumI.Tiles
of concrete.
Deduction For Tree 1 0.40 0.40
IInd Cut 2./3 1.43 2.80
1 5.40 (2.80+2.98)/2
1 15.00 (2.98+2.80)/2
1 15.00 (2.80+2.80)/2
1 15.00 (2.80+2.80)/2
1 4.15 (2.80+2.82)/2
2./3 1.35 2.82

IIIrd Cut 2./3 1.57 2.5


1 15.00 (2.50+2.65)/2
1 4.25 (2.65+2.63)/2
Deduction For Block Area
IVth Cut 1 1.33 (2.52+2.60)/2
1 15.00 (2.60+2.60)/2
1 15.00 (2.60+2.55)/2
1 15.00 (2.55+2.65)/2
1 15.00 (2.65+2.63)/2
1 15.00 (2.63+2.55)/2
1 15.00 (2.55+2.60)/2
1 15.00 (2.60+2.40)/2
1 3.50 (2.40+2.32)/2
Deduction For Block Area
Deduction For Tree 6 0.40 0.4
1 1.44 1.4
Budh Singh Marg Vasundhara Bound 1 10.00 (1.90+2.24)/2
1 10.00 (2.24+2.23)/2
1 6.05 (2.23+2.23)/2
Deduction For Block Area

Budh Singh Marg Vasundhara Bound 1 15.00 (2.20+2.67)/2


1 15.00 (2.67+2.45)/2
1 15.00 (2.45+2.55)/2
1 15.00 (2.55+2.45)/2
1 15.00 (2.45+2.42)/2
1 15.00 (2.42+2.48)/2
1 15.00 (2.48+2.55)/2
1 15.00 (2.55+2.55)/2
1 15.00 (2.55+2.50)/2
1 15.00 (2.50+2.58)/2
1 15.00 (2.58+2.58)/2
1 15.00 (2.58+2.68)/2
1 15.00 (2.68+2.58)/2
1 6.65 (2.58+2.60)/2
Deduction For Block Area
Deduction For Tree 9 0.40 0.40
Ramp Dustbin 1 (10.70+10.75+12.15)/3 (3.05+3.90+4.55)/3
1./3 10.70 0.40
D or H Quantity Unit

0.20 3.00 Cum.


0.10 0.06 "

0.20 2.91 Cum.


0.10 0.06 "

0.20 2.94 Cum.


0.10 0.06 "

0.20 2.93 Cum.


0.10 0.06 "

0.20 2.94 Cum.


0.10 0.06 "

0.20 2.93 Cum.


0.10 0.06 "

0.20 2.94 Cum.


0.10 0.06 "

0.20 2.94 Cum.


0.10 0.06 "

0.20 2.95 Cum.


0.10 0.06 "

0.20 2.95 Cum.


0.10 0.06 "

0.20 2.95 Cum.


0.10 0.06 "

0.20 2.96 Cum.


0.10 0.06 "

0.20 0.58 Cum.


0.10 0.03 "

0.20 2.96 Cum.


0.10 0.06 "

0.20 2.96 Cum.


0.10 0.06 "
0.20 2.94 Cum.
0.10 0.06 "

0.20 2.95 Cum.


0.10 0.06 "

0.20 2.94 Cum.


0.10 0.06 "

0.20 2.94 Cum.


0.10 0.06 "

0.20 2.98 Cum.


0.10 0.06 "

0.20 2.96 Cum.


0.10 0.06 "

0.20 2.94 Cum.


0.10 0.06 "

0.20 2.93 Cum.


0.10 0.06 "

0.20 2.94 Cum.


0.10 0.06 "

0.20 2.95 Cum.


0.10 0.06 "

0.20 2.93 Cum.


0.10 0.06 "

0.20 2.95 Cum.


0.10 0.06 "

0.20 1.75 Cum.


0.10 0.06 "

0.20 1.79 Cum.


0.10 0.03 "

0.20 3.00 Cum.


0.10 0.06 "

0.20 2.97 Cum.


0.10 0.06 "

0.20 2.95 Cum.


0.10 0.06 "
0.20 2.98 Cum.
0.10 0.06 "

0.20 2.95 Cum.


0.10 0.06 "

0.20 2.95 Cum.


0.10 0.06 "

0.20 2.91 Cum.


0.10 0.06 "

0.20 2.97 Cum.


0.10 0.06 "

0.20 2.98 Cum.


0.10 0.06 "

0.20 2.95 Cum.


0.10 0.06 "

0.20 2.96 Cum.


0.10 0.06 "

0.20 2.97 Cum.


0.10 0.06 "

0.20 2.95 Cum.


0.10 0.06 "

0.20 2.98 Cum.


0.10 0.06 "

0.20 2.96 Cum.


0.10 0.06 "

0.20 1.26 Cum.


0.10 0.06 "

0.20 0.75 Cum.


0.10 0.01 "

0.20 2.17 Cum.


0.10 0.06 "

0.20 2.92 Cum.


0.10 0.06 "

0.20 2.92 Cum.


0.10 0.06 "

0.20 2.92 Cum.


0.10 0.06 "
0.20 2.93 Cum.
0.10 0.06 "

0.20 2.93 Cum.


0.10 0.06 "

0.20 2.92 Cum.


0.10 0.06 "

0.20 2.96 Cum.


0.10 0.06 "

0.20 2.93 Cum.


0.10 0.06 "

0.20 2.91 Cum.


0.10 0.06 "

0.20 2.96 Cum.


0.10 0.06 "

0.20 0.53 Cum.


0.10 0.03 "

0.20 2.89 Cum.


0.10 0.06 "

0.20 2.93 Cum.


0.10 0.06 "

0.20 2.92 Cum.


0.10 0.06 "

0.20 2.94 Cum.


0.10 0.06 "

0.20 2.91 Cum.


0.10 0.06 "

0.20 2.92 Cum.


0.10 0.06 "

0.20 2.91 Cum.


0.10 0.06 "

0.20 2.31 Cum.


0.10 0.03 "
185.69
0.15 11.70 Cum.

1.20 21.60 "


Total= 33.30 Cum.

0.15 11.70 Cum.


0.15 5.69 "

1.20 21.60 "


1.20 10.51 "
Total= 49.50 Cum.

0.15 0.88 Cum.


0.15 0.76 "
0.15 0.71 "
0.15 0.78 "
0.15 0.91 "
0.15 0.97 "
0.15 1.17 "
0.15 2.93 "
0.15 0.49 "
0.15 2.93 "
0.15 2.93 "

1.20 5.40 Cum.


1.20 5.40 "
1.20 2.16 "
1.20 5.40 "
1.20 0.90 "
1.20 5.40 "
1.20 5.40 "

0.15 0.18 Cum.


0.15 0.34 "
0.15 0.63 "
0.15 0.79 "
0.15 0.86 "
0.15 0.95 "
0.15 1.10 "
0.15 1.19 "
0.15 1.13 "
0.15 1.04 "
0.15 0.97 "
0.15 0.99 "
0.15 0.95 "
0.15 1.06 "
0.15 1.13 "
0.15 1.01 "
0.15 1.04 "
0.15 1.06 "
0.15 1.06 "
0.15 1.01 "
0.15 1.04 "
0.15 1.28 "
0.15 1.46 "
0.15 1.76 "
0.15 1.98 "
0.15 1.98 "
0.15 2.03 "
0.15 2.18 "
0.15 2.30 "
0.15 2.34 "
0.15 2.00 "
0.15 0.52 "
0.15 2.66 "
0.15 2.84 "
0.15 3.17 "
0.15 3.42 "
0.15 3.49 "
0.15 3.44 "
0.15 3.26 "
0.15 3.08 "
0.15 3.13 "
0.15 3.35 "
0.15 3.65 "
0.15 3.87 "
0.15 3.87 "
0.15 3.58 "
131.69 "
"

0.15 2.18 Cum.


0.15 2.93 "
0.15 2.93 "
0.15 2.93 "
0.15 2.81 "
0.15 2.77 "
0.15 2.87 "
0.15 2.86 "
0.15 2.82 "
0.15 2.85 "
0.15 2.87 "
0.15 2.81 "
0.15 2.79 "
0.15 2.86 "
0.15 2.86 "
0.15 2.87 "
0.15 2.89 "
0.15 2.84 "
0.15 2.89 "
0.15 2.98 "
0.15 2.97 "
0.15 2.89 "
0.15 2.80 "
0.15 2.85 "
0.15 2.91 "
0.15 2.88 "
0.15 2.94 "
0.15 2.97 "
0.15 2.90 "
0.15 2.96 "
0.15 3.06 "
0.15 3.08 "
0.15 2.99 "
0.15 2.90 "
0.15 2.87 "
0.15 2.87 "
0.15 2.82 "
0.15 2.86 "
0.15 2.95 "
0.15 2.90 "
0.15 2.88 "
0.15 2.94 "
0.15 2.94 "
0.15 2.95 "
0.15 1.38 "
0.15 1.37 "
0.15 0.17 "
0.15 2.81 "
0.15 2.88 "
0.15 2.86 "
0.15 -26.98 "
111.18 "
0.20 1.37 "
0.20 1.12 "

1.70 69.36 "


- -36.96 "
32.40 "

0.08 0.65
0.08 0.72
0.08 0.78
0.08 0.86
0.08 0.82
0.08 1.13
0.08 1.27
0.08 0.23
0.08 0.06

0.08 -0.01
0.08 0.2
0.08 1.17
0.08 3.25
0.08 3.15
0.08 3.15
0.08 0.87
0.08 0.19

0.08 0.2
0.08 2.9
0.08 0.84

0.08 0.26
0.08 2.93
0.08 2.9
0.08 2.93
0.08 2.97
0.08 2.91
0.08 2.9
0.08 2.81
0.08 0.62

0.08 -0.07
0.08 -0.15
0.08 1.55
0.08 1.68
0.08 1.03

0.08 2.74
0.08 2.88
0.08 2.81
0.08 2.81
0.08 2.74
0.08 2.76
0.08 2.83
0.08 2.87
0.08 2.84
0.08 2.86
0.08 2.9
0.08 2.96
0.08 2.96
0.08 1.29

0.08 -0.11
0.13 5.37
0.08 0.11
91.32
I.No Description No L B
8 Reinforcement for RCC work including straightening, cutting,
(a) bending placing in position and binding all complete.
TMT bars.
Dallupura Bound, DDA Drain
Start from R.D 607.50
Top Slab, Panel No 1 to 4
16mm Dia.
Bottom main, crank 4x35 2.83
Bottom main,straight, at both ends 4x2 2.78
Top, Extra 4x35 0.75

@ 1.579 kg/m, 523.44 x1.579=


Marked……[A]
Top Slab
10mm Dia.
Bottom, Distribution 4x19 5.35
Top, Distribution 4x10 5.15
Bottom, Chair 4x6 1.05

@ 0.617 kg/m, 637.80 x 0.617=


Marked……[B]
Total Weight [A] + [B] =

8 Reinforcement for RCC work including straightening, cutting,


(a) bending placing in position and binding all complete.
TMT bars.
Dallupura Bound, DDA Drain
Start from R.D 607.50
Top Slab, Panel No 5 to 8
16mm Dia.
Bottom main, crank 4x35 2.83
Bottom main,straight, at both ends 4x2 2.78
Top, Extra 4x35 0.75

@ 1.579 kg/m, 523.44 x1.579=


Marked……[A]
Top Slab
10mm Dia.
Bottom, Distribution 4x19 5.35
Top, Distribution 4x10 5.15
Bottom, Chair 4x6 1.05

@ 0.617 kg/m, 637.8 x 0.617=


Marked……[B]
Total Weight [A] + [B] =

8 Reinforcement for RCC work including straightening, cutting,


(a) bending placing in position and binding all complete.
TMT bars.
Dallupura Bound, DDA Drain
Start from R.D 607.50
Top Slab, Panel No 9 to 12
16mm Dia.
Bottom main, crank 4x35 2.83
Bottom main,straight, at both ends 4x2 2.78
Top, Extra 4x35 0.75

@ 1.579 kg/m, 523.44 x1.579=


Marked……[A]
Top Slab
10mm Dia.
Bottom, Distribution 4x19 5.35
Top, Distribution 4x10 5.15
Bottom, Chair 4x6 1.05

@ 0.617 kg/m, 637.8 x 0.617=


Marked……[B]
Total Weight [A] + [B] =

8 Reinforcement for RCC work including straightening, cutting,


bending placing in position and binding all complete.
(a) TMT bars.
Noida Bound, Box Drain
Between R.D.407 to R.D.410(3m)

Top Slab, Culvert Panel No. 13


16mm Dia.
Top & Bottom, main 2x2 3.10
2x2 3.00
2x3 2.85
Top Slab, Panel No 14 to 16
Bottom main, crank 3x35 2.83
Bottom main,straight, at both ends 3x2 2.78
Top, Extra 3x35 0.75

@ 1.579 kg/m, 434.08 x1.579=


Marked……[A]
Top Slab, Culvert Panel No. 13
10mm Dia.
Top & Bottom, Distribution 2x19 1.00
Chair 2x2 1.05
Top Slab, Panel No 14 to 16
Bottom, Distribution 3x19 5.35
Top, Distribution 3x10 5.15
Bottom, Chair 3x6 1.05

@ 0.617 kg/m, 520.55 x 0.617=


Marked……[B]
Total Weight [A] + [B] =

8 Reinforcement for RCC work including straightening, cutting,


(a) bending placing in position and binding all complete.
TMT bars.
Dallupura Bound, DDA Drain
Start from R.D 607.50
Top Slab, Panel No 17 to 20
16mm Dia.
Bottom main, crank 4x35 2.83
Bottom main,straight, at both ends 4x2 2.78
Top, Extra 4x35 0.75

@ 1.579 kg/m, 523.44 x1.579=


Marked……[A]
Top Slab
10mm Dia.
Bottom, Distribution 4x19 5.35
Top, Distribution 4x10 5.15
Bottom, Chair 4x6 1.05

@ 0.617 kg/m, 637.8 x 0.617=


Marked……[B]
Total Weight [A] + [B] =

8 Reinforcement for RCC work including straightening, cutting,


(a) bending placing in position and binding all complete.
TMT bars.
Dallupura Bound, DDA Drain
Start from R.D 607.50
Top Slab, Panel No 21 to 24
16mm Dia.
Bottom main, crank 4x35 2.83
Bottom main,straight, at both ends 4x2 2.78
Top, Extra 4x35 0.75

@ 1.579 kg/m, 523.44 x1.579=


Marked……[A]
Top Slab
10mm Dia.
Bottom, Distribution 4x19 5.35
Top, Distribution 4x10 5.15
Bottom, Chair 4x6 1.05

@ 0.617 kg/m, 637.8 x 0.617=


Marked……[B]
Total Weight [A] + [B] =

8 Reinforcement for RCC work including straightening, cutting,


(a) bending placing in position and binding all complete.
TMT bars.
Dallupura Bound, DDA Drain
Start from R.D 607.50
Top Slab, Panel No 25 to 28
16mm Dia.
Bottom main, crank 4x35 2.83
Bottom main,straight, at both ends 4x2 2.78
Top, Extra 4x35 0.75

@ 1.579 kg/m, 523.44 x1.579=


Marked……[A]
Top Slab
10mm Dia.
Bottom, Distribution 4x19 5.35
Top, Distribution 4x10 5.15
Bottom, Chair 4x6 1.05
@ 0.617 kg/m, 637.8 x 0.617=
Marked……[B]
Total Weight [A] + [B] =

8 Reinforcement for RCC work including straightening, cutting,


bending placing in position and binding all complete.
(a) TMT bars.
Noida Bound, Box Drain
Top Slab, Culvert Panel No. 29
16mm Dia.
Top & Bottom, main 2x20 2.82
Top Slab, Panel No 30 to 32
Bottom main, crank 3x35 2.83
Bottom main,straight, at both ends 3x2 2.78
Top, Extra 3x35 0.75

@ 1.579 kg/m, 505.38 x1.579=


Marked……[A]
Top Slab, Culvert Panel No. 29
10mm Dia.
Top & Bottom, Distribution 2x19 3.02
Chair 2x2 1.05
Top Slab, Panel No 30 to 32
Bottom, Distribution 3x19 5.35
Top, Distribution 3x10 5.15
Bottom, Chair 3x6 1.05

@ 0.617 kg/m, 597.31 x 0.617=


Marked……[B]
Total Weight [A] + [B] =

8 Reinforcement for RCC work including straightening, cutting,


(a) bending placing in position and binding all complete.
TMT bars.
Dallupura Bound, DDA Drain
Start from R.D 607.50
Top Slab, Panel No 33 to 36
16mm Dia.
Bottom main, crank 4x35 2.83
Bottom main,straight, at both ends 4x2 2.78
Top, Extra 4x35 0.75

@ 1.579 kg/m, 523.44 x1.579=


Marked……[A]
Top Slab
10mm Dia.
Bottom, Distribution 4x19 5.35
Top, Distribution 4x10 5.15
Bottom, Chair 4x6 1.05

@ 0.617 kg/m, 637.8 x 0.617=


Marked……[B]
Total Weight [A] + [B] =
8 Reinforcement for RCC work including straightening, cutting,
(a) bending placing in position and binding all complete.
TMT bars.
Dallupura Bound, DDA Drain
Start from R.D 607.50
Top Slab, Panel No 37 to 40
16mm Dia.
Bottom main, crank 4x35 2.83
Bottom main,straight, at both ends 4x2 2.78
Top, Extra 4x35 0.75

@ 1.579 kg/m, 523.44 x1.579=


Marked……[A]
Top Slab
10mm Dia.
Bottom, Distribution 4x19 5.35
Top, Distribution 4x10 5.15
Bottom, Chair 4x6 1.05

@ 0.617 kg/m, 637.8 x 0.617=


Marked……[B]
Total Weight [A] + [B] =

8 Reinforcement for RCC work including straightening, cutting,


(a) bending placing in position and binding all complete.
TMT bars.
Dallupura Bound, DDA Drain
Start from R.D 607.50
Top Slab, Panel No 41 to 44
16mm Dia.
Bottom main, crank 4x35 2.83
Bottom main,straight, at both ends 4x2 2.78
Top, Extra 4x35 0.75

@ 1.579 kg/m, 523.44 x1.579=


Marked……[A]
Top Slab
10mm Dia.
Bottom, Distribution 4x19 5.35
Top, Distribution 4x10 5.15
Bottom, Chair 4x6 1.05

@ 0.617 kg/m, 637.8 x 0.617=


Marked……[B]
Total Weight [A] + [B] =

8 Reinforcement for RCC work including straightening, cutting,


(a) bending placing in position and binding all complete.
TMT bars.
Dallupura Bound, DDA Drain
Start from R.D 607.50
Top Slab, Panel No 45
16mm Dia.
Bottom main, crank 13 2.80
Bottom main,straight, at both ends 2 2.71
Top, Extra 13 0.75
Top Slab, Panel No 46
Bottom main, crank 8 2.75
Bottom main,straight, at both ends 2 2.70
Top, Extra 8 0.75
Top Slab, Panel No 47 to 48
Bottom main, crank 2x35 2.80
Bottom main,straight, at both ends 2x2 2.75
Top, Extra 2x35 0.75

@ 1.579 kg/m, 345.00 x1.579=


Marked……[A]
Top Slab, Panel No 45
10mm Dia.
Bottom, Distribution 19 2.20
Top, Distribution 10 2.20
Chair 2x2 1.05
Top Slab, Panel No 46
Bottom, Distribution 19 1.31
Top, Distribution 10 1.31
Chair 2x2 1.05
Top Slab, Panel No 47 to 48
Bottom, Distribution 2x19 5.35
Top, Distribution 2x10 5.15
Bottom, Chair 2x2 1.05

@ 0.617 kg/m, 420.69 x 0.617=


Marked……[B]
Total Weight [A] + [B] =

8 Reinforcement for RCC work including straightening, cutting,


(a) bending placing in position and binding all complete.
TMT bars.
Dallupura Bound, DDA Drain
Start from R.D 607.50
Top Slab, Panel No 49 to 52
16mm Dia.
Bottom main, crank 4x35 2.80
Bottom main,straight, at both ends 4x2 2.75
Top, Extra 4x35 0.75

@ 1.579 kg/m, 519.00 x1.579=


Marked……[A]
10mm Dia.
Bottom, Distribution 4x19 5.35
Top, Distribution 4x10 5.15
Bottom, Chair 4x6 1.05

@ 0.617 kg/m, 637.8 x 0.617=


Marked……[B]
Total Weight [A] + [B] =

8 Reinforcement for RCC work including straightening, cutting,


(a) bending placing in position and binding all complete.
TMT bars.
Dallupura Bound, DDA Drain
Start from R.D 607.50
Top Slab, Panel No 53 to 56
16mm Dia.
Bottom main, crank 4x35 2.80
Bottom main,straight, at both ends 4x2 2.75
Top, Extra 4x35 0.75

@ 1.579 kg/m, 519.00 x1.579=


Marked……[A]
10mm Dia.
Bottom, Distribution 4x19 5.35
Top, Distribution 4x10 5.15
Bottom, Chair 4x6 1.05

@ 0.617 kg/m, 637.8 x 0.617=


Marked……[B]
Total Weight [A] + [B] =

8 Reinforcement for RCC work including straightening, cutting,


(a) bending placing in position and binding all complete.
TMT bars.
Dallupura Bound, DDA Drain
Start from R.D 607.50
Top Slab, Panel No 57 to 60
16mm Dia.
Bottom main, crank 4x35 2.80
Bottom main,straight, at both ends 4x2 2.75
Top, Extra 4x35 0.75

@ 1.579 kg/m, 519.00 x1.579=


Marked……[A]
10mm Dia.
Bottom, Distribution 4x19 5.35
Top, Distribution 4x10 5.15
Bottom, Chair 4x6 1.05

@ 0.617 kg/m, 637.8 x 0.617=


Marked……[B]
Total Weight [A] + [B] =

8 Reinforcement for RCC work including straightening, cutting,


(a) bending placing in position and binding all complete.
TMT bars.
Dallupura Bound, DDA Drain
Start from R.D 607.50
Top Slab, Panel No 61 to 64
16mm Dia.
Bottom main, crank 4x35 2.80
Bottom main,straight, at both ends 4x2 2.75
Top, Extra 4x35 0.75

@ 1.579 kg/m, 519.00 x1.579=


Marked……[A]
10mm Dia.
Bottom, Distribution 4x19 5.35
Top, Distribution 4x10 5.15
Bottom, Chair 4x6 1.05

@ 0.617 kg/m, 637.8 x 0.617=


Marked……[B]
Total Weight [A] + [B] =

8 Reinforcement for RCC work including straightening, cutting,


(a) bending placing in position and binding all complete.
TMT bars.
Dallupura Bound, DDA Drain
Start from R.D 607.50
16mm Dia.
Top Slab, Panel No 65
Bottom main, crank 35 2.80
Bottom main,straight, at both ends 2 2.75
Top, Extra 35 0.75
Top Slab, Panel No 66
Bottom main, crank 27 2.80
Bottom main,straight, at both ends 1 2.75
Top, Extra 27 0.75

@ 1.579 kg/m, 228.35 x1.579=


Marked……[A]
10mm Dia.
Top Slab, Panel No 65
Bottom, Distribution 19 5.35
Top, Distribution 10 5.15
Bottom, Chair 6 1.05
Top Slab, Panel No 66.
Bottom, Distribution 19 4.05
Top, Distribution 10 3.90
Bottom, Chair 5 1.05

@ 0.617 kg/m, 280.65 x 0.617=


Marked……[B]

Total Weight [A] + [B] =

8 Reinforcement for RCC work including straightening, cutting,


bending placing in position and binding all complete.
(a) TMT bars.
Noida Bound, Box Drain
Between RD.825 to 870(45m)
Raft & Wall
10mm Dia.
Bottom, main 300 6.15
Top, main 300 5.55
Bottom, Chair 150 1.00
Wall, U- Chair 44 0.60

@ 0.617 kg/m, 3686.40 x 0.617=


Marked……[A]
Raft & Wall
8mm Dia.
Bottom, Distribution 8 15.00
Top, Distribution 7 15.00
Over Lap 45 0.50
Road side wall, Distribution ,(9+9) 18 45.00
STP Boundary Side Wall, Distribution,(9+9)
18 45.00
Over Lap 105 0.50

@ 0.395 kg/m, 1920.00 x 0.395=


Marked……[B]
Total Weight [A] + [B] =

8 Reinforcement for RCC work including straightening, cutting,


bending placing in position and binding all complete.
(a) TMT bars.
Noida Bound, Box Drain
Between RD.870 to 900(30m)
Raft & Wall
10mm Dia.
Bottom, main 200 6.20
Top, main 200 5.60
Bottom, Chair 100 1.00
Wall, U- Chair 30 0.60

@ 0.617 kg/m, 2478.00 x 0.617=


Marked……[A]
Raft & Wall
8mm Dia.
Bottom, Distribution 8 30.00
Top, Distribution 7 30.00
Over Lap 30 0.50
Road side wall, Distribution ,(9+9) 18 30.00
STP Boundary Side Wall, Distribution,(9+9)
18 30.00
Over Lap 72 0.50

@ 0.395 kg/m, 1581.00 x 0.395=


Marked……[B]

Total Weight [A] + [B] =

8 Reinforcement for RCC work including straightening, cutting,


bending placing in position and binding all complete.
(a) TMT bars.
Noida Bound, Box Drain
Between RD.900 to 930(30m)
Raft & Wall
10mm Dia.
Bottom, main 200 6.10
Top, main 200 5.50
Bottom, Chair 100 1.00
Wall, U- Chair 30 0.60
@ 0.617 kg/m, 2438.00 x 0.617=
Marked……[A]
Raft & Wall
8mm Dia.
Bottom, Distribution 8 30.00
Top, Distribution 7 30.00
Over Lap 30 0.50
Road side wall, Distribution ,(9+9) 18 30.00
STP Boundary Side Wall, Distribution,(9+9)
18 30.00
Over Lap 72 0.50

@ 0.395 kg/m, 1581.00 x 0.395=


Marked……[B]
Total Weight [A] + [B] =

8 Reinforcement for RCC work including straightening, cutting,


bending placing in position and binding all complete.
(a) TMT bars.
Noida Bound, Box Drain
Between RD.930 to 975.00(45m)
Raft & Wall
10mm Dia.
Bottom, main 300 6.20
Top, main 300 5.60
Bottom, Chair 150 1.00
Wall, U- Chair 44 0.60

@ 0.617 kg/m, 3716.40 x 0.617=


Marked……[A]
Raft & Wall
8mm Dia.
Bottom, Distribution 8 45.00
Top, Distribution 7 45.00
Over Lap 45 0.50
Road side wall, Distribution ,(9+9) 18 45.00
STP Boundary Side Wall, Distribution,(9+9)
18 45.00
Over Lap 105 0.50

@ 0.395 kg/m, 2370.00 x 0.395=


Marked……[B]
Total Weight [A] + [B] =

8 Reinforcement for RCC work including straightening, cutting,


bending placing in position and binding all complete.
(a) TMT bars.
Noida Bound, Box Drain
Between RD.975.00 to 1019.20 (44.20m)

Raft & Wall


10mm Dia.
Bottom, main 295 6.35
Top, main 295 5.75
Bottom, Chair 145 1.00
Wall, U- Chair 44 0.60

@ 0.617 kg/m, 3740.90 x 0.617=


Marked……[A]
Raft & Wall
8mm Dia.
Bottom, Distribution 8 44.20
Top, Distribution 7 44.20
Over Lap 43 0.50
Road side wall, Distribution ,(9+9) 18 44.20
STP Boundary Side Wall, Distribution,(9+9)
18 44.20
Over Lap 105 0.50

@ 0.395 kg/m, 2328.20 x 0.395=


Marked……[B]
Total Weight [A] + [B] =

8 Reinforcement for RCC work including straightening, cutting,


bending placing in position and binding all complete.
(a) TMT bars.
Noida Bound, Box Drain
Between RD.303.80 to 382.00
Slab (13+1 Nos.)
10mm Dia.
Bottom, main 13x30 1.25
Top, main 13x30 1.25
Bottom, Chair 13x7 0.90
Bottom, main 24 1.25
Top, main 24 1.25
Bottom, Chair 6 0.90

@ 0.617 kg/m, 1056.90 x 0.617=


Marked……[A]
Slab
8mm Dia.
Bottom, Distribution 13x8 4.35
Top, Distribution 13x8 4.35
Bottom, Distribution 8 3.62
Top, Distribution 8 3.62

@ 0.395 kg/m, 962.72 x 0.395=


Marked……[B]
Total Weight [A] + [B] =

8 Reinforcement for RCC work including straightening, cutting,


bending placing in position and binding all complete.
(a) TMT bars.
Noida Bound, Box Drain
Between RD.382.00 to 460.00
Slab (14 Nos.)
10mm Dia.
Bottom, main 14x30 1.25
Top, main 14x30 1.25
Bottom, Chair 14x7 0.90
@ 0.617 kg/m, 1138.20 x 0.617=
Marked……[A]
Slab
8mm Dia.
Bottom, Distribution 14x8 4.35
Top, Distribution 14x8 4.35

@ 0.395 kg/m, 974.40 x 0.395=


Marked……[B]
Total Weight [A] + [B] =

8 Reinforcement for RCC work including straightening, cutting,


bending placing in position and binding all complete.
(a) TMT bars.
Noida Bound, Box Drain
Between RD.460. to 540.00
Slab (14 Nos.)
10mm Dia.
Bottom, main 14x30 1.25
Top, main 14x30 1.25
Bottom, Chair 14x7 0.90

@ 0.617 kg/m, 1138.20 x 0.617=


Marked……[A]
Slab
8mm Dia.
Bottom, Distribution 14x8 4.35
Top, Distribution 14x8 4.35

@ 0.395 kg/m, 974.40 x 0.395=


Marked……[B]
Total Weight [A] + [B] =

8 Reinforcement for RCC work including straightening, cutting,


bending placing in position and binding all complete.
(a) TMT bars.
Noida Bound, Box Drain
Between RD.540.00 to 617.00
Slab (14 Nos.)
10mm Dia.
Bottom, main 14x30 1.25
Top, main 14x30 1.25
Bottom, Chair 14x7 0.90

@ 0.617 kg/m, 1138.20 x 0.617=


Marked……[A]
Slab
8mm Dia.
Bottom, Distribution 14x8 4.35
Top, Distribution 14x8 4.35

@ 0.395 kg/m, 974.40 x 0.395=


Marked……[B]
Total Weight [A] + [B] =
8 Reinforcement for RCC work including straightening, cutting,
bending placing in position and binding all complete.
(a) TMT bars.
Noida Bound, Box Drain
Between RD.617.00 to 695.00
Slab (14 Nos.)
10mm Dia.
Bottom, main 14x30 1.25
Top, main 14x30 1.25
Bottom, Chair 14x7 0.90

@ 0.617 kg/m, 1138.20 x 0.617=


Marked……[A]
Slab
8mm Dia.
Bottom, Distribution 14x8 4.35
Top, Distribution 14x8 4.35
Wall
Road side wall, Distribution ,(1+1) 2 20.00
STP Boundary Side Wall, Distribution,(1+1)
2 20.00
Over Lap 4 0.50

@ 0.395 kg/m, 1056.40 x 0.395=


Marked……[B]
Total Weight [A] + [B] =

8 Reinforcement for RCC work including straightening, cutting,


bending placing in position and binding all complete.
(a) TMT bars.
Noida Bound, Box Drain
Between RD.695.00 to 775.00
Slab (14 Nos.)
10mm Dia.
Bottom, main 14x30 1.25
Top, main 14x30 1.25
Bottom, Chair 14x7 0.90

@ 0.617 kg/m, 1138.20 x 0.617=


Marked……[A]
Slab
8mm Dia.
Bottom, Distribution 14x8 4.35
Top, Distribution 14x8 4.35
Wall
Road side wall, Distribution ,(1+1) 2 80.00
STP Boundary Side Wall, Distribution,(1+1)
2 80.00
Over Lap 24 0.50

@ 0.395 kg/m, 1306.40 x 0.395=


Marked……[B]
Total Weight [A] + [B] =
8 Reinforcement for RCC work including straightening, cutting,
bending placing in position and binding all complete.
(a) TMT bars.
Noida Bound, Box Drain
Between RD.775.00 to 850.00
Slab (14 Nos.)
10mm Dia.
Bottom, main 14x30 1.25
Top, main 14x30 1.25
Bottom, Chair 14x7 0.90

@ 0.617 kg/m, 1138.20 x 0.617=


Marked……[A]
Slab
8mm Dia.
Bottom, Distribution 14x8 4.35
Top, Distribution 14x8 4.35
Wall
Road side wall, Distribution ,(2+2) 4 75.00
STP Boundary Side Wall, Distribution,(2+2)
4 75.00
Over Lap 40 0.50

@ 0.395 kg/m, 1594.40 x 0.395=


Marked……[B]
Total Weight [A] + [B] =

8 Reinforcement for RCC work including straightening, cutting,


bending placing in position and binding all complete.
(a) TMT bars.
Noida Bound, Box Drain
Between RD.850.00 to 930.00
Slab (13+1 Nos.)
10mm Dia.
Bottom, main 13x30 1.25
Top, main 13x30 1.25
Bottom, Chair 13x7 0.90
Bottom, main 19 1.25
Top, main 19 1.25
Bottom, Chair 5 0.90

@ 0.617 kg/m, 1108.90 x 0.617=


Marked……[A]
Slab
8mm Dia.
Bottom, Distribution 13x8 4.35
Top, Distribution 13x8 4.35
Bottom, Distribution 8 2.88
Top, Distribution 8 2.88
Wall
Road side wall, Distribution ,(2+2) 4 80.00
STP Boundary Side Wall, Distribution,(2+2)
4 80.00
Over Lap 48 0.50
@ 0.395 kg/m, 1614.88 x 0.395=
Marked……[B]
Total Weight [A] + [B] =

8 Reinforcement for RCC work including straightening, cutting,


bending placing in position and binding all complete.
(a) TMT bars.
Noida Bound, Box Drain
Between RD.930.00 to 967.00
Slab (6 Nos.+1 Nos. Culvert)
10mm Dia.
Bottom, main 6x30 1.25
Top, main 6x30 1.25
Bottom, Chair 6x7 0.90
Bottom, Distribution, Culvert 7 7.05
Top, Distribution, Culvert 7 7.05
Bottom, Chair, Culvert 7 1.00

@ 0.617 kg/m, 593.50 x 0.617=


Marked……[A]
Slab
8mm Dia.
Bottom, Distribution 6x8 4.35
Top, Distribution 6x8 4.35
Wall
Road side wall, Distribution ,(3+3) 6 37.00
STP Boundary Side Wall, Distribution,(3+3)
6 37.00
Over Lap 36 0.50

@ 0.395 kg/m, 879.60 x 0.395=


Marked……[B]
Culvert
16mm Dia.
Bottom, main 45 1.20
Top, main 45 1.20

@ 0.617 kg/m, 108.00 x 1.579=


Marked……[C]
Total Weight [A] + [B] +[C] =

8 Reinforcement for RCC work including straightening, cutting,


bending placing in position and binding all complete.
(a) TMT bars.
Noida Bound, Box Drain
Between RD.974.10 to 1019.20
Slab (8 Nos.)
10mm Dia.
Bottom, main 8x30 1.25
Top, main 8x30 1.25
Bottom, Chair 8x7 0.90

@ 0.617 kg/m, 1138.20 x 0.617=


Marked……[A]
Slab
8mm Dia.
Bottom, Distribution 8x8 4.35
Top, Distribution 8x8 4.35
Wall
Road side wall, Distribution ,(3+3) 6 45.10
STP Boundary Side Wall, Distribution,(3+3)
6 45.10
Over Lap 36 0.50

@ 0.395 kg/m, 1116.0 x 0.395=


Marked……[B]
Total Weight [A] + [B] =

8 Reinforcement for RCC work including straightening, cutting,


bending placing in position and binding all complete.
(a) TMT bars.
Noida Bound, Box Drain
Between RD.974.10 to 1019.20
Slab (8 Nos.)
10mm Dia.
Bottom, main 8x30 1.25
Top, main 8x30 1.25
Bottom, Chair 8x7 0.90

@ 0.617 kg/m, 1138.20 x 0.617=


Marked……[A]
Slab
8mm Dia.
Bottom, Distribution 8x8 4.35
Top, Distribution 8x8 4.35
Wall
Road side wall, Distribution ,(3+3) 6 45.10
STP Boundary Side Wall, Distribution,(3+3)
6 45.10
Over Lap 36 0.50

@ 0.395 kg/m, 1116.0 x 0.395=


Marked……[B]
Total Weight [A] + [B] =

8 Reinforcement for RCC work including straightening, cutting,


bending placing in position and binding all complete.
(a) TMT bars.
16mm Dia.
Culvert at Dallupura Mkt.
Bottom, main 39 1.15
Top, main 39 1.15
Culvert at Bhudh Singh Chowk
Bottom, main 36 1.34
Top, main 36 1.34

@ 1.579 kg/m, 118.18 x 1.579=


Marked……[A]
10mm Dia.
Culvert at Dallupura Mkt.
Bottom, Distribution 7 5.65
Top, Distribution 7 5.65
Bottom, Chair 8 1.05
Culvert at Bhudh Singh Chowk
Bottom, Distribution 8 3.75
Top, Distribution 8 3.75
Bottom, Chair 6 1.05

@ 0.617 kg/m, 61.58 x 0.617=


Marked……[B]
Total Weight [A] + [B] =
D or H Quantity Unit

R.D.343.50 to R.D.345

R.D.407 to R.D.410

396.20 m
22.24 "
105.00 "
Total 523.44 m
.579 kg/m, 523.44 x1.579= 826.51 kg.
Marked……[A] 826.51 kg.

406.60 m
206.00 "
25.20 "
Total 637.80 m
617 kg/m, 637.80 x 0.617= 393.52 kg.
Marked……[B] 393.52 kg.
1220.03 kg.

R.D.343.50 to R.D.345

R.D.407 to R.D.410

396.20 m
22.24 "
105.00 "
Total 523.44 m
.579 kg/m, 523.44 x1.579= 826.51 kg.
Marked……[A] 826.51 kg.

406.60 m
206.00 "
25.20 "
Total 637.80 m
.617 kg/m, 637.8 x 0.617= 393.52 kg.
Marked……[B] 393.52 kg.
1220.03 kg.

R.D.343.50 to R.D.345

R.D.407 to R.D.410

396.20 m
22.24 "
105.00 "
Total 523.44 m
.579 kg/m, 523.44 x1.579= 826.51 kg.
Marked……[A] 826.51 kg.

406.60 m
206.00 "
25.20 "
Total 637.80 m
.617 kg/m, 637.8 x 0.617= 393.52 kg.
Marked……[B] 393.52 kg.
1220.03 kg.

R.D.407 to R.D.410

12.40 m
12.00 "
17.10 "
R.D.407 to R.D.410
297.15 m
16.68 "
78.75 "
Total 434.08 "
1.579 kg/m, 434.08 x1.579= 685.41 kg.
Marked……[A] 685.41 kg.

38.00 m
4.20 "
R.D.407 to R.D.410
304.95 m
154.50 "
18.90 "
Total 520.55 m
617 kg/m, 520.55 x 0.617= 321.18 kg.
Marked……[B] 321.18 kg.
1006.59 kg.

R.D.343.50 to R.D.345

R.D.407 to R.D.410

396.20 m
22.24 "
105.00 "
Total 523.44 m
.579 kg/m, 523.44 x1.579= 826.51 kg.
Marked……[A] 826.51 kg.

406.60 m
206.00 "
25.20 "
Total 637.80 m
.617 kg/m, 637.8 x 0.617= 393.52 kg.
Marked……[B] 393.52 kg.
1220.03 kg.

R.D.343.50 to R.D.345

R.D.407 to R.D.410

396.20 m
22.24 "
105.00 "
Total 523.44 m
.579 kg/m, 523.44 x1.579= 826.51 kg.
Marked……[A] 826.51 kg.

406.60 m
206.00 "
25.20 "
Total 637.80 m
.617 kg/m, 637.8 x 0.617= 393.52 kg.
Marked……[B] 393.52 kg.
1220.03 kg.

R.D.343.50 to R.D.345

R.D.407 to R.D.410

396.20 m
22.24 "
105.00 "
Total 523.44 m
.579 kg/m, 523.44 x1.579= 826.51 kg.
Marked……[A] 826.51 kg.

406.60 m
206.00 "
25.20 "
Total 637.80 m
.617 kg/m, 637.8 x 0.617= 393.52 kg.
Marked……[B] 393.52 kg.
1220.03 kg.

R.D.407 to R.D.410

112.80 m
R.D.407 to R.D.410
297.15 m
16.68 "
78.75 "
Total 505.38 "
1.579 kg/m, 505.38 x1.579= 798.00 kg.
Marked……[A] 798.00 kg.

114.76 m
4.20 "
R.D.407 to R.D.410
304.95 m
154.50 "
18.90 "
Total 597.31 m
617 kg/m, 597.31 x 0.617= 368.54 kg.
Marked……[B] 368.54 kg.
1166.54 kg.

R.D.343.50 to R.D.345

R.D.407 to R.D.410

396.20 m
22.24 "
105.00 "
Total 523.44 m
.579 kg/m, 523.44 x1.579= 826.51 kg.
Marked……[A] 826.51 kg.

406.60 m
206.00 "
25.20 "
Total 637.80 m
.617 kg/m, 637.8 x 0.617= 393.52 kg.
Marked……[B] 393.52 kg.
1220.03 kg.
R.D.343.50 to R.D.345

R.D.407 to R.D.410

396.20 m
22.24 "
105.00 "
Total 523.44 m
.579 kg/m, 523.44 x1.579= 826.51 kg.
Marked……[A] 826.51 kg.

406.60 m
206.00 "
25.20 "
Total 637.80 m
.617 kg/m, 637.8 x 0.617= 393.52 kg.
Marked……[B] 393.52 kg.
1220.03 kg.

R.D.343.50 to R.D.345

R.D.407 to R.D.410

396.20 m
22.24 "
105.00 "
Total 523.44 m
.579 kg/m, 523.44 x1.579= 826.51 kg.
Marked……[A] 826.51 kg.

406.60 m
206.00 "
25.20 "
Total 637.80 m
.617 kg/m, 637.8 x 0.617= 393.52 kg.
Marked……[B] 393.52 kg.
1220.03 kg.

R.D.343.50 to R.D.345

R.D.407 to R.D.410

36.40 m
5.42 "
9.75 "

22.00 m
5.40 "
6.00 "

196.00 m
11.00 "
52.50 "
Total 344.47 m
.579 kg/m, 345.00 x1.579= 543.92 kg.
Marked……[A] 543.92 kg.

41.80 m
22.00 "
4.20 "

24.89 m
13.10 "
4.20 "

203.30 m
103.00 "
4.20 "
Total 420.69 m
617 kg/m, 420.69 x 0.617= 259.57 kg.
Marked……[B] 259.57 kg.
803.48 kg.

R.D.343.50 to R.D.345

R.D.407 to R.D.410

392.00 m
22.00 "
105.00 "
Total 519.00 m
.579 kg/m, 519.00 x1.579= 819.50 kg.
Marked……[A] 819.50 kg.

406.60 m
206.00 "
25.20 "
Total 637.80 m
.617 kg/m, 637.8 x 0.617= 393.52 kg.
Marked……[B] 393.52 kg.
1213.02 kg.
R.D.343.50 to R.D.345

R.D.407 to R.D.410

392.00 m
22.00 "
105.00 "
Total 519.00 m
.579 kg/m, 519.00 x1.579= 819.50 kg.
Marked……[A] 819.50 kg.

406.60 m
206.00 "
25.20 "
Total 637.80 m
.617 kg/m, 637.8 x 0.617= 393.52 kg.
Marked……[B] 393.52 kg.
1213.02 kg.

R.D.343.50 to R.D.345

R.D.407 to R.D.410

392.00 m
22.00 "
105.00 "
Total 519.00 m
.579 kg/m, 519.00 x1.579= 819.50 kg.
Marked……[A] 819.50 kg.

406.60 m
206.00 "
25.20 "
Total 637.80 m
.617 kg/m, 637.8 x 0.617= 393.52 kg.
Marked……[B] 393.52 kg.
1213.02 kg.

R.D.343.50 to R.D.345

R.D.407 to R.D.410

392.00 m
22.00 "
105.00 "
Total 519.00 m
.579 kg/m, 519.00 x1.579= 819.50 kg.
Marked……[A] 819.50 kg.
406.60 m
206.00 "
25.20 "
Total 637.80 m
.617 kg/m, 637.8 x 0.617= 393.52 kg.
Marked……[B] 393.52 kg.
1213.02 kg.

R.D.343.50 to R.D.345

R.D.407 to R.D.410
98.00 m
5.50 "
26.25 "

75.60 m
2.75 "
20.25 "
Total 228.35 m
.579 kg/m, 228.35 x1.579= 360.56 kg.
Marked……[A] 360.56 kg.

101.65 m
51.50 "
6.30 "

76.95 m
39.00 "
5.25 "
Total 280.65 m
617 kg/m, 280.65 x 0.617= 173.16 kg.
Marked……[B] 173.16 kg.

533.73 kg.

1845.00 m
1665.00 m
150.00 m
26.40 m
Total 3686.40 m
17 kg/m, 3686.40 x 0.617= 2274.51 kg.
Marked……[A] 2274.51 kg.
120.00 m
105.00 m
22.50 m
810.00 m

810.00 m
Total 52.50 m
1920.00 m
95 kg/m, 1920.00 x 0.395= 758.40 kg.
Marked……[B] 758.40 kg.
3032.91 kg.

1240.00 m
1120.00 m
100.00 m
18.00 m
Total 2478.00 m
17 kg/m, 2478.00 x 0.617= 1528.93 kg.
Marked……[A] 1528.93 kg.

240.00 m
210.00 m
15.00 m
540.00 m

540.00 m
36.00 m
Total 1581.00 m
95 kg/m, 1581.00 x 0.395= 624.50 kg.
Marked……[B] 624.50 kg.

2153.42 kg.

1220.00 m
1100.00 m
100.00 m
18.00 m
Total 2438.00 m
17 kg/m, 2438.00 x 0.617= 1504.25 kg.
Marked……[A] 1504.25 kg.

240.00 m
210.00 m
15.00 m
540.00 m

540.00 m
36.00 m
Total 1581.00 m
95 kg/m, 1581.00 x 0.395= 624.50 kg.
Marked……[B] 624.50 kg.
2128.74 kg.

1860.00 m
1680.00 m
150.00 m
26.40 m
Total 3716.40 m
17 kg/m, 3716.40 x 0.617= 2293.02 kg.
Marked……[A] 2293.02 kg.

360.00 m
315.00 m
22.50 m
810.00 m

810.00 m
52.50 m
Total 2370.00 m
95 kg/m, 2370.00 x 0.395= 936.15 kg.
Marked……[B] 936.15 kg.
3229.17 kg.

1873.25 m
1696.25 m
145.00 m
26.40 m
Total 3740.90 m
17 kg/m, 3740.90 x 0.617= 2308.14 kg.
Marked……[A] 2308.14 kg.

353.60 m
309.40 m
21.50 m
795.60 m

795.60 m
52.50 m
Total 2328.20 m
95 kg/m, 2328.20 x 0.395= 919.64 kg.
Marked……[B] 919.64 kg.
3227.77 kg

487.50 m
487.50 m
81.90 m
30.00 m
30.00 m
5.40 m
Total 1056.90 m
17 kg/m, 1056.90 x 0.617= 652.11 kg.
Marked……[A] 652.11 kg.

452.40 m
452.40 m
28.96 m
28.96 m
Total 962.72 m
395 kg/m, 962.72 x 0.395= 380.27 kg.
Marked……[B] 380.27 kg.
1032.38 kg

525.00 m
525.00 m
88.20 m
Total 1138.20 m
17 kg/m, 1138.20 x 0.617= 702.27 kg.
Marked……[A] 702.27 kg.

487.20 m
487.20 m
Total 974.40 m
395 kg/m, 974.40 x 0.395= 384.89 kg.
Marked……[B] 384.89 kg.
1087.16 kg

525.00 m
525.00 m
88.20 m
Total 1138.20 m
17 kg/m, 1138.20 x 0.617= 702.27 kg.
Marked……[A] 702.27 kg.

487.20 m
487.20 m
Total 974.40 m
395 kg/m, 974.40 x 0.395= 384.89 kg.
Marked……[B] 384.89 kg.
1087.16 kg

525.00 m
525.00 m
88.20 m
Total 1138.20 m
17 kg/m, 1138.20 x 0.617= 702.27 kg.
Marked……[A] 702.27 kg.

487.20 m
487.20 m
Total 974.40 m
395 kg/m, 974.40 x 0.395= 384.89 kg.
Marked……[B] 384.89 kg.
1087.16 kg
525.00 m
525.00 m
88.20 m
Total 1138.20 m
17 kg/m, 1138.20 x 0.617= 702.27 kg.
Marked……[A] 702.27 kg.

487.20 m
487.20 m

40.00 m

40.00 m
2.00 m
Total 1056.40 m
95 kg/m, 1056.40 x 0.395= 417.28 kg.
Marked……[B] 417.28 kg.
1119.55 kg

525.00 m
525.00 m
88.20 m
Total 1138.20 m
17 kg/m, 1138.20 x 0.617= 702.27 kg.
Marked……[A] 702.27 kg.

487.20 m
487.20 m

160.00 m

160.00 m
12.00 m
Total 1306.40 m
95 kg/m, 1306.40 x 0.395= 516.03 kg.
Marked……[B] 516.03 kg.
1218.30 kg
525.00 m
525.00 m
88.20 m
Total 1138.20 m
17 kg/m, 1138.20 x 0.617= 702.27 kg.
Marked……[A] 702.27 kg.

487.20 m
487.20 m

300.00 m

300.00 m
20.00 m
Total 1594.40 m
95 kg/m, 1594.40 x 0.395= 629.79 kg.
Marked……[B] 629.79 kg.
1332.06 kg

487.50 m
487.50 m
81.90 m
23.75 m
23.75 m
4.50 m
Total 1108.90 m
17 kg/m, 1108.90 x 0.617= 684.19 kg.
Marked……[A] 684.19 kg.

452.40 m
452.40 m
23.04 m
23.04 m

320.00 m

320.00 m
24.00 m
Total 1614.88 m
95 kg/m, 1614.88 x 0.395= 637.88 kg.
Marked……[B] 637.88 kg.
1322.07 kg

225.00 m
225.00 m
37.80 m
49.35 m
49.35 m
7.00 m
Total 593.50 m
617 kg/m, 593.50 x 0.617= 366.19 kg.
Marked……[A] 366.19 kg.

208.80 m
208.80 m

222.00 m

222.00 m
18.00 m
Total 879.60 m
395 kg/m, 879.60 x 0.395= 347.44 kg.
Marked……[B] 347.44 kg.

54.00 m
54.00 m
Total 108.00 m
617 kg/m, 108.00 x 1.579= 170.53 kg.
Marked……[C] 170.53 kg.
884.16 kg

300.00 m
300.00 m
50.40 m
Total 650.40 m
17 kg/m, 1138.20 x 0.617= 401.30 kg.
Marked……[A] 401.30 kg.
278.40 m
278.40 m

270.60 m

270.60 m
18.00 m
Total 1116.00 m
395 kg/m, 1116.0 x 0.395= 440.82 kg.
Marked……[B] 440.82 kg.
842.12 kg

300.00 m
300.00 m
50.40 m
Total 650.40 m
17 kg/m, 1138.20 x 0.617= 401.30 kg.
Marked……[A] 401.30 kg.

278.40 m
278.40 m

270.60 m

270.60 m
18.00 m
Total 1116.00 m
395 kg/m, 1116.0 x 0.395= 440.82 kg.
Marked……[B] 440.82 kg.
842.12 kg

44.85 m
44.85 m

48.24 m
48.24 m
Total 186.18 m
579 kg/m, 118.18 x 1.579= 293.98 kg.
Marked……[A] 293.98 kg.
39.55 m
39.55 m
8.40 m

30.00 m
30.00 m
6.30 m
Total 153.80 m
0.617 kg/m, 61.58 x 0.617= 94.89 kg.
Marked……[B] 94.89 kg.
388.87 kg
I.No Description No. L B

9 Centring and shuttering including strutting, propping etc. and


(b) removal of form
Small lintels not for.
exceeding 1.5m clear span, moulding as in cornices,
window sills, string courses, bands, copings, bed plates, anchor
Noida Bound, Box Drain (1:5:10)
blocks and the like.
R.D 930.00 to 1019.20 2 30.00
1 29.20

9 Centring and shuttering including strutting, propping etc. and


(b) removal of form
Small lintels not for.
exceeding 1.5m clear span, moulding as in cornices,
window sills, string courses, bands, copings, bed plates, anchor
Noida Bound, Box Drain (1:5:10)
blocks and the like.
R.D 483.50 to 501.00 2 15.00
2 2.50
R.D 900.00 to 930.00 1 15.00
1 15.00
R.D 1019.20 to .00

9 Centring and shuttering including strutting, propping etc. and


(b) removal of form
Small lintels not for.
exceeding 1.5m clear span, moulding as in cornices,
window sills, string courses, bands, copings, bed plates, anchor
Noida Bound, Box Drain
blocks and the like.
Raft.
Noida Bound, Box Drain
R.D 840.00 to 900.00 1x2 30.00

9 Centring and shuttering including strutting, propping etc. and


(b) removal of form
Small lintels not for.
exceeding 1.5m clear span, moulding as in cornices,
window sills, string courses, bands, copings, bed plates, anchor
Noida Bound, Box Drain (Raft)
blocks and the like.
R.D 930.00 to 1019.20 2 30.00
1 29.20

9 Centring and shuttering including strutting, propping etc. and


(b) removal of form
Small lintels not for.
exceeding 1.5m clear span, moulding as in cornices,
window sills, string courses, bands, copings, bed plates, anchor
Noida Bound, Box Drain (Raft)
blocks and the like.
R.D 483.50 to 501.00 2 15.00
2 2.50
R.D 900.00 to 930.00 1 15.00
1 15.00
At Dallupura Road & Rd No. 102 T-Point, R.D 1019.20 to
1039.20 2 20.00

At Dallupura Road & Rd No. 102 T-Point, R.D 1039.20 to


1056.10 2 16.90
At Dallupura Road & Rd No. 102 T-Point, Long Sides
4 12.00
Ends 4 1.70
Less for pipe, (3.14/4)x1.40x1.40=1.54 4 1.54
D or H Quantity Unit

0.10 6.00 Sqm


0.10 2.92 "
8.92 "

0.10 3.00 "


0.10 0.50 "
0.10 1.50 "
0.10 1.50 "

0.15 9.00 Sqm

Total= 9.00 Sqm

0.15 9.00 Sqm


0.15 4.38 "
13.38 "

0.15 4.50 "


0.15 0.75 "
0.15 2.25 "
0.15 2.25 "

0.10 8.30 "

0.10 7.01 "

1.70 81.60 "


1.70 11.56 "
- -6.16 "
I.No Description No. L B
9 Centring and shuttering including strutting, propping etc. and
(a) removal
Suspendedof form for. roofs, landings, balconies and access
floors,
platform..
Dallupura Bound, DDA Drain
Start from R.D 607.50
Top Slab, Panel No 1
Bottom 1 5.40 2.40
Sides 2 5.40
Sides 2 5.20
Ends 2 2.88

Top Slab, Panel No 2


Bottom 1 5.40 2.40
Sides 2 5.40
Sides 2 5.20
Ends 2 2.80

Top Slab, Panel No 3


Bottom 1 5.40 2.40
Sides 2 5.40
Sides 2 5.20
Ends 2 2.83

Top Slab, Panel No 4


Bottom 1 5.40 2.40
Sides 2 5.40
Sides 2 5.20
Ends 2 2.82

Top Slab, Panel No 5


Bottom 1 5.40 2.40
Sides 2 5.40
Sides 2 5.20
Ends 2 2.83

Top Slab, Panel No 6


Bottom 1 5.40 2.40
Sides 2 5.40
Sides 2 5.20
Ends 2 2.82

Top Slab, Panel No 7


Bottom 1 5.40 2.40
Sides 2 5.40
Sides 2 5.20
Ends 2 2.83

Top Slab, Panel No 8


Bottom 1 5.40 2.40
Sides 2 5.40
Sides 2 5.20
Ends 2 2.83

Top Slab, Panel No 9


Bottom 1 5.40 2.40
Sides 2 5.40
Sides 2 5.20
Ends 2 2.84

Top Slab, Panel No 10


Bottom 1 5.40 2.40
Sides 2 5.40
Sides 2 5.20
Ends 2 2.84

Top Slab, Panel No 11


Bottom 1 5.40 2.40
Sides 2 5.40
Sides 2 5.20
Ends 2 2.84

Top Slab, Panel No 12


Bottom 1 5.40 2.40
Sides 2 5.40
Sides 2 5.20
Ends 2 2.85

Top Slab, Panel No 13


Bottom 1 5.40 2.40
Sides 2 5.40
Sides 2 5.20
Ends 1 2.90

Top Slab, Panel No 14


Bottom 1 5.40 2.40
Sides 2 5.40
Sides 2 5.20
Ends 2 2.85

Top Slab, Panel No 15


Bottom 1 5.40 2.40
Sides 2 5.40
Sides 2 5.20
Ends 2 2.85

Top Slab, Panel No 16


Bottom 1 5.40 2.40
Sides 2 5.40
Sides 2 5.20
Ends 2 2.83

Top Slab, Panel No 17


Bottom 1 5.40 2.40
Sides 2 5.40
Sides 2 5.20
Ends 2 2.84

Top Slab, Panel No 18


Bottom 1 5.40 2.40
Sides 2 5.40
Sides 2 5.20
Ends 2 2.83

Top Slab, Panel No 19


Bottom 1 5.40 2.40
Sides 2 5.40
Sides 2 5.20
Ends 2 2.83

Top Slab, Panel No 20


Bottom 1 5.40 2.40
Sides 2 5.40
Sides 2 5.20
Ends 2 2.87

Top Slab, Panel No 21


Bottom 1 5.40 2.40
Sides 2 5.40
Sides 2 5.20
Ends 2 2.85

Top Slab, Panel No 22


Bottom 1 5.40 2.40
Sides 2 5.40
Sides 2 5.20
Ends 2 2.83

Top Slab, Panel No 23


Bottom 1 5.40 2.40
Sides 2 5.40
Sides 2 5.20
Ends 2 2.82

Top Slab, Panel No 24


Bottom 1 5.40 2.40
Sides 2 5.40
Sides 2 5.20
Ends 2 2.84

Top Slab, Panel No 25


Bottom 1 5.40 2.40
Sides 2 5.40
Sides 2 5.20
Ends 2 2.84

Top Slab, Panel No 26


Bottom 1 5.40 2.40
Sides 2 5.40
Sides 2 5.20
Ends 2 2.82

Top Slab, Panel No 27


Bottom 1 5.40 2.40
Sides 2 5.40
Sides 2 5.20
Ends 2 2.84
Top Slab, Panel No 28
Bottom 1 5.40 2.40
Sides 2 5.40
Sides 2 5.20
Ends 2 2.84

Top Slab, Panel No 29


Bottom 1 5.40 2.40
Sides 2 5.40
Sides 2 5.20
Ends 2 2.90

Top Slab, Panel No 30


Bottom 1 5.40 2.40
Sides 2 5.40
Sides 2 5.20
Ends 2 2.88

Top Slab, Panel No 31


Bottom 1 5.40 2.40
Sides 2 5.40
Sides 2 5.20
Ends 2 2.86

Top Slab, Panel No 32


Bottom 1 5.40 2.40
Sides 2 5.40
Sides 2 5.20
Ends 2 2.84

Top Slab, Panel No 33


Bottom 1 5.40 2.40
Sides 2 5.40
Sides 2 5.20
Ends 2 2.87

Top Slab, Panel No 34


Bottom 1 5.40 2.40
Sides 2 5.40
Sides 2 5.20
Ends 2 2.84

Top Slab, Panel No 35


Bottom 1 5.40 2.40
Sides 2 5.40
Sides 2 5.20
Ends 2 2.84

Top Slab, Panel No 36


Bottom 1 5.40 2.40
Sides 2 5.40
Sides 2 5.20
Ends 2 2.80

Top Slab, Panel No 37


Bottom 1 5.40 2.40
Sides 2 5.40
Sides 2 5.20
Ends 2 2.86

Top Slab, Panel No 38


Bottom 1 5.40 2.40
Sides 2 5.40
Sides 2 5.20
Ends 2 2.87

Top Slab, Panel No 39


Bottom 1 5.40 2.40
Sides 2 5.40
Sides 2 5.20
Ends 2 2.84

Top Slab, Panel No 40


Bottom 1 5.40 2.40
Sides 2 5.40
Sides 2 5.20
Ends 2 2.85

Top Slab, Panel No 41


Bottom 1 5.40 2.40
Sides 2 5.40
Sides 2 5.20
Ends 2 2.86

Top Slab, Panel No 42


Bottom 1 5.40 2.40
Sides 2 5.40
Sides 2 5.20
Ends 2 2.84

Top Slab, Panel No 43


Bottom 1 5.40 2.40
Sides 2 5.40
Sides 2 5.20
Ends 2 2.87

Top Slab, Panel No 44


Bottom 1 5.40 2.40
Sides 2 5.40
Sides 2 5.20
Ends 2 2.85

Top Slab, Panel No 45


Bottom 1 5.40 2.40
Sides 2 5.40
Sides 2 5.20
Ends 2 2.76

Top Slab, Panel No 46


Bottom 1 5.40 2.40
Sides 2 5.40
Sides 2 5.20
Ends 2 2.74

Top Slab, Panel No 47


Bottom 1 4.04 2.40
Sides 2 4.04
Sides 2 3.84
Ends 2 2.83

Top Slab, Panel No 48


Bottom 1 5.40 2.40
Sides 2 5.40
Sides 2 5.20
Ends 2 2.81

Top Slab, Panel No 49


Bottom 1 5.40 2.40
Sides 2 5.40
Sides 2 5.20
Ends 2 2.81

Top Slab, Panel No 50


Bottom 1 5.40 2.40
Sides 2 5.40
Sides 2 5.20
Ends 2 2.81

Top Slab, Panel No 51


Bottom 1 5.40 2.40
Sides 2 5.40
Sides 2 5.20
Ends 2 2.82

Top Slab, Panel No 52


Bottom 1 5.40 2.40
Sides 2 5.40
Sides 2 5.20
Ends 2 2.82

Top Slab, Panel No 53


Bottom 1 5.40 2.40
Sides 2 5.40
Sides 2 5.20
Ends 2 2.81

Top Slab, Panel No 54


Bottom 1 5.40 2.40
Sides 2 5.40
Sides 2 5.20
Ends 2 2.85

Top Slab, Panel No 55


Bottom 1 5.40 2.40
Sides 2 5.40
Sides 2 5.20
Ends 2 2.82
Top Slab, Panel No 56
Bottom 1 5.40 2.40
Sides 2 5.40
Sides 2 5.20
Ends 2 2.80

Top Slab, Panel No 57


Bottom 1 5.40 2.40
Sides 2 5.40
Sides 2 5.20
Ends 2 2.85

Top Slab, Panel No 58


Bottom 1 5.40 2.40
Sides 2 5.40
Sides 2 5.20
Ends 2 2.80

Top Slab, Panel No 59


Bottom 1 5.40 2.40
Sides 2 5.40
Sides 2 5.20
Ends 2 2.78

Top Slab, Panel No 60


Bottom 1 5.40 2.40
Sides 2 5.40
Sides 2 5.20
Ends 2 2.82

Top Slab, Panel No 61


Bottom 1 5.40 2.40
Sides 2 5.40
Sides 2 5.20
Ends 2 2.81

Top Slab, Panel No 62


Bottom 1 5.40 2.40
Sides 2 5.40
Sides 2 5.20
Ends 2 2.83

Top Slab, Panel No 63


Bottom 1 5.40 2.40
Sides 2 5.40
Sides 2 5.20
Ends 2 2.80

Top Slab, Panel No 64


Bottom 1 5.40 2.40
Sides 2 5.40
Sides 2 5.20
Ends 2 2.81

Top Slab, Panel No 65


Bottom 1 5.40 2.40
Sides 2 5.40
Sides 2 5.20
Ends 2 2.80

Top Slab, Panel No 66


Bottom 1 4.10 2.40
Sides 2 4.10
Sides 2 3.90
Ends 2 2.82

Dallupura Bound, DDA Drain Culvert


Top Slab
Bottom 1 1.05 2.40
Sides 2 1.05
Sides 2 1.05
Sides 1 2.90

Dallupura Bound, DDA Drain Culvert


Top Slab
Bottom 1 3.08 2.40
Sides 2 3.08
Sides 2 3.08
Sides 1 2.90

Culvert at Dallupura Mkt.


Bottom 1 5.70 0.70
Sides 2 5.70
Ends 2 1.20

Culvert at Dallupura Mkt.


Bottom 1 4.00 0.90
Sides 2 4.00
Ends 2 1.40

9 Centring and shuttering including strutting, propping etc. and


(c) removal of form
Walls (any for. including attached pilasters, butteresses,
thickness)
plinth and string courses etc.
Noida Bound, Box Drain
R.D 810.00 to 900.00 3x3 30.00

9 Centring and shuttering including strutting, propping etc. and


(c) removal of form
Walls (any for. including attached pilasters, butteresses,
thickness)
plinth
Noida and string
Bound, courses
Box Drain etc.
R.D 930.00 to 1019.20 3x2 30.00
3x1 29.20

9 Centring and shuttering including strutting, propping etc. and


(c) removal of form
Walls (any for. including attached pilasters, butteresses,
thickness)
plinth
Noida and string
Bound, courses
Box Drain etc.
R.D 351.00 to 387.00 3x1 15.00
3x1 15.00
3x1 6.00
R.D 483.50 to 501.00 4x1 15.00
4x1 2.50
R.D 900.00 to 930.00 3x1 15.00
3x1 15.00
R.D 1019.20 to .00

Wall
R.D 348.00 to R.D 427.05 3x1 12.00
3x1 15.00
3x1 15.00
3x1 15.00
3x1 15.00
3x1 7.05
R.D 427.05 to R.D 708.05 4x1 7.95
4x1 15.00
4x1 15.00
4x1 15.00
4x1 15.00
4x1 15.00
4x1 15.00
4x1 15.00
4x1 15.00
4x1 15.00
4x1 15.00
4x1 15.00
4x1 15.00
4x1 15.00
4x1 15.00
4x1 15.00
4x1 15.00
4x1 15.00
4x1 15.00
4x1 3.05
R.D 708.05 to R.D 1019.20 3x1 11.95
3x1 15.00
3x1 15.00
3x1 15.00
3x1 15.00
3x1 15.00
3x1 15.00
3x1 15.00
3x1 15.00
3x1 15.00
3x1 15.00
3x1 15.00
3x1 15.00
3x1 15.00
3x1 15.00
3x1 15.00
3x1 15.00
3x1 15.00
3x1 15.00
3x1 15.00
3x1 14.20
D or H Quantity Unit

12.96 Sqm
0.10 1.08 "
0.10 1.04 "
0.20 1.15 "
16.23 Sqm

12.96 Sqm
0.10 1.08 "
0.10 1.04 "
0.20 1.12 "
16.20 Sqm

12.96 Sqm
0.10 1.08 "
0.10 1.04 "
0.20 1.13 "
16.21 Sqm

12.96 Sqm
0.10 1.08 "
0.10 1.04 "
0.20 1.13 "
16.21 Sqm

12.96 Sqm
0.10 1.08 "
0.10 1.04 "
0.20 1.13 "
16.21 Sqm

12.96 Sqm
0.10 1.08 "
0.10 1.04 "
0.20 1.13 "
16.21 Sqm

12.96 Sqm
0.10 1.08 "
0.10 1.04 "
0.20 1.13 "
16.21 Sqm

12.96 Sqm
0.10 1.08 "
0.10 1.04 "
0.20 1.13 "
16.21 Sqm

12.96 Sqm
0.10 1.08 "
0.10 1.04 "
0.20 1.14 "
16.22 Sqm

12.96 Sqm
0.10 1.08 "
0.10 1.04 "
0.20 1.14 "
16.22 Sqm

12.96 Sqm
0.10 1.08 "
0.10 1.04 "
0.20 1.14 "
16.22 Sqm

12.96 Sqm
0.10 1.08 "
0.10 1.04 "
0.20 1.14 "
16.22 Sqm

12.96 Sqm
0.10 1.08 "
0.10 1.04 "
0.20 0.58 "
15.66 Sqm

12.96 Sqm
0.10 1.08 "
0.10 1.04 "
0.20 1.14 "
16.22 Sqm

12.96 Sqm
0.10 1.08 "
0.10 1.04 "
0.20 1.14 "
16.22 Sqm

12.96 Sqm
0.10 1.08 "
0.10 1.04 "
0.20 1.13 "
16.21 Sqm

12.96 Sqm
0.10 1.08 "
0.10 1.04 "
0.20 1.14 "
16.22 Sqm

12.96 Sqm
0.10 1.08 "
0.10 1.04 "
0.20 1.13 "
16.21 Sqm

12.96 Sqm
0.10 1.08 "
0.10 1.04 "
0.20 1.13 "
16.21 Sqm

12.96 Sqm
0.10 1.08 "
0.10 1.04 "
0.20 1.15 "
16.23 Sqm

12.96 Sqm
0.10 1.08 "
0.10 1.04 "
0.20 1.14 "
16.22 Sqm

12.96 Sqm
0.10 1.08 "
0.10 1.04 "
0.20 1.13 "
16.21 Sqm

12.96 Sqm
0.10 1.08 "
0.10 1.04 "
0.20 1.13 "
16.21 Sqm

12.96 Sqm
0.10 1.08 "
0.10 1.04 "
0.20 1.14 "
16.22 Sqm

12.96 Sqm
0.10 1.08 "
0.10 1.04 "
0.20 1.14 "
16.22 Sqm

12.96 Sqm
0.10 1.08 "
0.10 1.04 "
0.20 1.13 "
16.21 Sqm

12.96 Sqm
0.10 1.08 "
0.10 1.04 "
0.20 1.14 "
16.22 Sqm
12.96 Sqm
0.10 1.08 "
0.10 1.04 "
0.20 1.14 "
16.22 Sqm

12.96 Sqm
0.10 1.08 "
0.10 1.04 "
0.20 1.16 "
16.24 Sqm

12.96 Sqm
0.10 1.08 "
0.10 1.04 "
0.20 1.15 "
16.23 Sqm

12.96 Sqm
0.10 1.08 "
0.10 1.04 "
0.20 1.14 "
16.22 Sqm

12.96 Sqm
0.10 1.08 "
0.10 1.04 "
0.20 1.14 "
16.22 Sqm

12.96 Sqm
0.10 1.08 "
0.10 1.04 "
0.20 1.15 "
16.23 Sqm

12.96 Sqm
0.10 1.08 "
0.10 1.04 "
0.20 1.14 "
16.22 Sqm

12.96 Sqm
0.10 1.08 "
0.10 1.04 "
0.20 1.14 "
16.22 Sqm

12.96 Sqm
0.10 1.08 "
0.10 1.04 "
0.20 1.12 "
16.20 Sqm

12.96 Sqm
0.10 1.08 "
0.10 1.04 "
0.20 1.14 "
16.22 Sqm

12.96 Sqm
0.10 1.08 "
0.10 1.04 "
0.20 1.15 "
16.23 Sqm

12.96 Sqm
0.10 1.08 "
0.10 1.04 "
0.20 1.14 "
16.22 Sqm

12.96 Sqm
0.10 1.08 "
0.10 1.04 "
0.20 1.14 "
16.22 Sqm

12.96 Sqm
0.10 1.08 "
0.10 1.04 "
0.20 1.14 "
16.22 Sqm

12.96 Sqm
0.10 1.08 "
0.10 1.04 "
0.20 1.14 "
16.22 Sqm

12.96 Sqm
0.10 1.08 "
0.10 1.04 "
0.20 1.15 "
16.23 Sqm

12.96 Sqm
0.10 1.08 "
0.10 1.04 "
0.20 1.14 "
16.22 Sqm

12.96 Sqm
0.10 1.08 "
0.10 1.04 "
0.20 1.10 "
16.18 Sqm

12.96 Sqm
0.10 1.08 "
0.10 1.04 "
0.20 1.10 "
16.18 Sqm

9.70 Sqm
0.10 0.81 "
0.10 0.77 "
0.20 1.13 "
12.41 Sqm

12.96 Sqm
0.10 1.08 "
0.10 1.04 "
0.20 1.12 "
16.20 Sqm

12.96 Sqm
0.10 1.08 "
0.10 1.04 "
0.20 1.12 "
16.20 Sqm

12.96 Sqm
0.10 1.08 "
0.10 1.04 "
0.20 1.12 "
16.20 Sqm

12.96 Sqm
0.10 1.08 "
0.10 1.04 "
0.20 1.13 "
16.21 Sqm

12.96 Sqm
0.10 1.08 "
0.10 1.04 "
0.20 1.13 "
16.21 Sqm

12.96 Sqm
0.10 1.08 "
0.10 1.04 "
0.20 1.12 "
16.20 Sqm

12.96 Sqm
0.10 1.08 "
0.10 1.04 "
0.20 1.14 "
16.22 Sqm

12.96 Sqm
0.10 1.08 "
0.10 1.04 "
0.20 1.13 "
16.21 Sqm
12.96 Sqm
0.10 1.08 "
0.10 1.04 "
0.20 1.12 "
16.20 Sqm

12.96 Sqm
0.10 1.08 "
0.10 1.04 "
0.20 1.14 "
16.22 Sqm

12.96 Sqm
0.10 1.08 "
0.10 1.04 "
0.20 1.12 "
16.20 Sqm

12.96 Sqm
0.10 1.08 "
0.10 1.04 "
0.20 1.11 "
16.19 Sqm

12.96 Sqm
0.10 1.08 "
0.10 1.04 "
0.20 1.13 "
16.21 Sqm

12.96 Sqm
0.10 1.08 "
0.10 1.04 "
0.20 1.12 "
16.20 Sqm

12.96 Sqm
0.10 1.08 "
0.10 1.04 "
0.20 1.13 "
16.21 Sqm

12.96 Sqm
0.10 1.08 "
0.10 1.04 "
0.20 1.12 "
16.20 Sqm

12.96 Sqm
0.10 1.08 "
0.10 1.04 "
0.20 1.12 "
16.20 Sqm

12.96 Sqm
0.10 1.08 "
0.10 1.04 "
0.20 1.12 "
16.20 Sqm

9.84 Sqm
0.10 0.82 "
0.10 0.78 "
0.20 1.13 "
12.57 Sqm

2.52 Sqm
0.10 0.21 "
0.10 0.21 "
0.20 0.58 "
3.52 Sqm

7.39 Sqm
0.10 0.62 "
0.10 0.62 "
0.20 0.58 "
9.21 Sqm

3.99 Sqm
0.20 2.28 "
0.20 0.48 "
6.75 Sqm

3.60 Sqm
0.20 1.60 "
0.20 0.56 "
5.76 Sqm

1.20 324.00 Sqm

1.20 216.00 Sqm


1.20 105.12 "

1.20 54.00 Sqm


1.20 54.00 "
1.20 21.60 "
1.20 72.00 "
1.20 12.00 "
1.20 54.00 "
1.20 54.00 "

(0.05+0.05)/2 1.80 Sqm,


(0.05+0.10)/2 3.38 "
(0.10+0.18)/2 6.30 "
(0.18+0.17)/2 7.88 "
(0.17+0.21)/2 8.55 "
(0.21+0.21)/2 4.44
(0.21+0.21)/2 6.68 "
(0.21+0.28)/2 14.70 "
(0.28+0.25)/2 15.90 "
(0.25+0.25)/2 15.00 "
(0.25+0.21)/2 13.80 "
(0.21+0.22)/2 12.90 "
(0.22+0.22)/2 13.20 "
(0.22+0.20)/2 12.60 "
(0.20+0.27)/2 14.10 "
(0.27+0.23)/2 15.00 "
(0.23+0.22)/2 13.50 "
(0.22+0.24)/2 13.80 "
(0.24+0.23)/2 14.10 "
(0.23+0.24)/2 14.10 "
(0.24+0.21)/2 13.50 "
(0.21+0.25)/2 13.80 "
(0.25+0.32)/2 17.10 "
(0.32+0.33)/2 19.50 "
(0.33+0.45)/2 23.40 "
(0.45+0.45)/2 5.49
(0.45+0.43)/2 15.77 "
(0.43+0.45)/2 19.80 "
(0.45+0.45)/2 20.25 "
(0.45+0.52)/2 21.83 "
(0.52+0.50)/2 22.95 "
(0.50+0.54)/2 23.40 "
(0.54+0.58)/2 25.20 "
(0.58+0.60)/2 26.55 "
(0.60+0.66)/2 28.35 "
(0.66+0.75)/2 31.73 "
(0.75+0.77)/2 34.20 "
(0.77+0.78)/2 34.88 "
(0.78+0.75)/2 34.43 "
(0.75+0.70)/2 32.63 "
(0.70+0.67)/2 30.83 "
(0.67+0.72)/2 31.28 "
(0.72+0.77)/2 33.53 "
(0.77+0.85)/2 36.45 "
(0.85+0.87)/2 38.70 "
(0.87+0.85)/2 38.70 "
(0.85+0.83)/2 35.78 "
10 Providing and fixing in position precast RCC drain
cover of approved manufacturere i.e. KK. S&S or
equivalent make of size 1150 x 400 x 100mm
(thickness) or required size with ten hole by using M-30
grade of concrete & reinforced of approved manufacture
with two layers of 8 mm dia of steel with six nos along
the length
Noida & 14 Nos along the width each layer suitable
Bound 411 1.15 0.4
distributed & manufactured by vibrator compaction
process using joint less FRP moulds to active shuttering
finish on five faces as top face with have broom finish
complete as per direction of Engineer-in-Charge.
189.06 sqm.
189.06 sqm.
I.No Description No L B
Measurement on dated:-
11 Brick work with FPS bricks of class designation 75 in
(a) foundation and plinth
1:6 (1 cement: in sand).
6 coarse cement mortar :-

Noida Bound
Road Side, RD 0.00 to 117.55 1 15.00 0.23
1 15.00 0.23
1 15.00 0.23
1 15.00 0.23
1 15.00 0.23
1 15.00 0.23
1 5.70 0.23
1 15.00 0.23
1 6.40 0.23
Other Side 1 15.00 0.23
1 8.50 0.23
1 9.40 0.23
1 15.00 0.23
1 15.00 0.23
1 15.00 0.23
1 15.00 0.23
1 15.00 0.23
1 15.00 0.23
1 5.70 0.23
1 15.00 0.23
1 6.40 0.23
RD 120.00 to 301.20 1 2.45 0.23
Road Side 1 11.10 0.23
1 10.00 0.23
1 7.00 0.23
1 10.40 0.23
1 7.00 0.23
1 13.80 0.23
1 13.85 0.35
1 13.85 0.23
1 8.40 0.35
1 8.40 0.23
1 2.90 0.23
1 4.30 0.23
1 5.90 0.35
1 5.90 0.23
1 18.50 0.35
1 18.50 0.23
2 1.20 0.23
Raising height old drain, Road Side 6 30.00 0.23
Other Side 6 30.00 0.23

Dallupura Bound Drain


Road side, RD 5.70 to 127.00 1 7.65 0.23
1 6.70 0.23
1 12.20 0.35
1 12.20 0.23
1 15.00 0.23
1 15.00 0.23
1 7.50 0.23
1 7.50 0.23
1 3.20 0.23
1 10.70 0.23
1 15.00 0.23
1 10.80 0.23
Other Side 1 7.65 0.23
1 6.70 0.23
1 12.20 0.35
1 12.20 0.23
1 15.00 0.23
1 15.00 0.23
1 7.50 0.23
1 7.50 0.23
1 3.20 0.23
1 10.70 0.23
1 7.50 0.23
1 7.50 0.23
1 10.80 0.23
RD 145.60 to 199.50,Box Drain Edge 2 15.00 0.35
2 15.00 0.23
2 10.00 0.35
2 10.00 0.23
2 15.00 0.35
2 15.00 0.23
2 10.90 0.35
2 10.90 0.23
Old DDA Drain,Start from RD 608.00 1 7.00 0.23
1 15.00 0.23
1 15.00 0.23
1 15.00 0.23
1 15.00 0.23
1 8.50 0.23
Other Side 1 7.00 0.23
1 15.00 0.23
1 15.00 0.23
1 15.00 0.23
1 15.00 0.23
1 8.50 0.23
R.D 700.00 to 797.40
Road side 1 15.00 0.23
1 15.00 0.23
1 6.00 0.23
1 9.00 0.23
1 15.00 0.23
1 15.00 0.23
1 1.15 0.23
1 13.85 0.23
1 7.40 0.23
Other Side 1 15.00 0.23
1 15.00 0.23
1 15.00 0.23
1 15.00 0.23
1 15.00 0.23
1 15.00 0.23
1 7.40 0.23
R.D 810.00 to 913.00
Road Side 1 15.00 0.23
1 15.00 0.23
1 15.00 0.23
1 15.00 0.23
1 15.00 0.23
1 15.00 0.23
1 9.60 0.23
Other Side 1 15.00 0.23
1 15.00 0.23
1 15.00 0.23
1 15.00 0.23
1 15.00 0.23
1 15.00 0.23
1 9.60 0.23
Dallupura Bound 1 3.20 0.23
R.D 931.00 to 1059.00 1 3.00 0.23
Road side 1 3.00 0.23
1 5.80 0.23
1 15.00 0.23
1 15.00 0.23
1 15.00 0.23
1 15.00 0.23
1 15.00 0.23
1 15.00 0.23
1 15.00 0.23
1 6.65 0.23
Other Side 1 0.76 0.23
1 2.00 0.23
1 3.00 0.23
1 7.79 0.23
1 15.00 0.23
1 15.00 0.23
1 15.00 0.23
1 15.00 0.23
1 15.00 0.23
1 1.70 0.23
1 2.00 0.23
1 11.30 0.23
1 2.00 0.23
1 2.00 0.23
1 3.00 0.23
1 8.00 0.23
1 7.60 0.23
Budh singh marg Foot path 1 6.20 0.23
Dallupura bound, Road side 1 7.00 0.23
First Cut 1 15.00 0.23
1 15.00 0.23
1 13.50 0.23
Other Side 1 7.50 0.23
1 7.50 0.23
1 6.00 0.23
1 9.00 0.23
1 15.00 0.23
1 9.96 0.23
Secound cut 1 5.10 0.23
1 18.00 0.23

Third cut Road Side 1 7.50 0.23


1 17.70 0.23
Drain Side 1 21.80 0.23
Last cut Road side 1 7.00 0.23
1 30.00 0.23
1 12.00 0.23
1 11.00 0.23
1 18.60 0.23
1 30.00 0.23
1 4.50 0.23
Other Side 1 30.00 0.23
1 30.00 0.23
1 30.00 0.23
1 30.00 0.23
1 30.00 0.23
1 10.00 0.23
Vasundhara Bound, Road Side 1 10.40 0.23
1 7.50 0.23
1 9.00 0.23
1 11.00 0.23
1 17.50 0.23
1 4.40 0.23
1 15.00 0.23
1 15.00 0.23
1 18.00 0.23
1 11.40 0.23
1 15.00 0.23
1 17.50 0.23
Other Side 1 13.60 0.23
1 20.00 0.23
1 17.50 0.23
1 15.00 0.23
1 15.00 0.23
1 15.00 0.23
1 14.05 0.23
1 17.50 0.23
Start From RD 11.20 1 4.00 0.23
1 3.50 0.23
1 7.50 0.23
1 11.75 0.23
Other Side 1 4.00 0.23
1 3.50 0.23
1 7.50 0.23
1 6.40 0.23
1 4.00 0.23
Boundray wall
Ist Step 1 15.00 0.69
IInd Step 1 15.00 0.58
IIIrd Step 1 15.00 0.46
IVth Step 1 15.00 0.35
Ist Step 1 15.00 0.69
IInd Step 1 15.00 0.58
IIIrd Step 1 15.00 0.46
IVth Step 1 15.00 0.35
Ist Step 1 15.00 0.69
IInd Step 1 15.00 0.58
IIIrd Step 1 15.00 0.46
IVth Step 1 15.00 0.35
Ist Step 1 15.00 0.69
IInd Step 1 15.00 0.58
IIIrd Step 1 15.00 0.46
IVth Step 1 15.00 0.35
Ist Step 1 15.00 0.69
IInd Step 1 15.00 0.58
IIIrd Step 1 15.00 0.46
IVth Step 1 15.00 0.35
Ist Step 1 15.00 0.69
IInd Step 1 15.00 0.58
IIIrd Step 1 15.00 0.46
IVth Step 1 15.00 0.35
Ist Step 1 15.00 0.69
IInd Step 1 15.00 0.58
IIIrd Step 1 15.00 0.46
IVth Step 1 15.00 0.35
Ist Step 1 15.00 0.69
IInd Step 1 15.00 0.58
IIIrd Step 1 15.00 0.46
IVth Step 1 15.00 0.35
Ist Step 1 8.00 0.69
IInd Step 1 8.00 0.58
IIIrd Step 1 8.00 0.46
IVth Step 1 8.00 0.35
Ist Step 1 3.70 0.69
IInd Step 1 3.70 0.58
IIIrd Step 1 3.70 0.46
IVth Step 1 3.70 0.35
Ist Step 1 15.00 0.69
IInd Step 1 15.00 0.58
IIIrd Step 1 15.00 0.46
IVth Step 1 15.00 0.35
Ist Step 1 9.30 0.69
IInd Step 1 9.30 0.58
IIIrd Step 1 9.30 0.46
IVth Step 1 9.30 0.35
Upper panel 1 15.00 0.23
1 15.00 0.23
1 15.00 0.23
1 15.00 0.23
1 15.00 0.23
1 15.00 0.23
1 15.00 0.23
1 15.00 0.23
1 8.00 0.23
1 15.00 0.23
1 9.30 0.23
Pillar 48 0.345 0.12
Drain connecting Box drain to Pipe 1 4.88 0.46
1 4.88 0.35
1 4.88 0.23
1 3.85 0.46
1 3.85 0.35
1 3.85 0.23
On pipe 1 1.34 0.23
1 1.30 0.23
1 0.80 0.23
Chamber at C/V 2 1.51 0.35
2 1.51 0.23
On pipe 2 1.02 0.23
Chamber 2 3.38 0.46
2 3.38 0.35
2 3.38 0.23
On pipe 2 1.25 0.23
Chamber 2 1.12 0.35
2 1.12 0.23
On pipe 2 0.92 0.23
D or H Quantity Unit

(0.72+0.82)/2 2.66 ''


((0.82+0.80)/2 2.79 ''
(0.80+0.80)/2 2.76 ''
(0.80+0.80)/2 2.76 ''
(0.80+0.75)/2 2.67 ''
(0.75+0.75)/2 2.59 ''
(0.68+0.68)/2 0.89 ''
(0.78+0.78)/2 2.69 ''
(0.78+0.78)/2 1.15 ''
(0.28+0.32)/2 1.04 Cum.
(0.32+0.32)/2 0.63 ''
(0.72+0.72)/2 1.56 ''
(0.80+0.80)/2 2.76 ''
(0.80+0.80)/2 2.76 ''
(0.80+0.80)/2 2.76 ''
(0.80+0.80)/2 2.76 ''
(0.80+0.75)/2 2.67 ''
(0.75+0.75)/2 2.59 ''
(0.68+0.68)/2 0.89 ''
(0.78+0.78)/2 2.69 ''
(0.78+0.78)/2 1.15 ''
(0.56+0.56)/2 0.32 Cum.
(0.80+0.80)/2 2.04 ''
(0.56+0.56)/2 1.29 ''
(0.56+0.56)/2 0.90 ''
(0.28+0.28)/2 0.67 ''
(0.40+0.42)/2 0.66 ''
(0.65+0.68)/2 2.11 ''
(0.24+0.24)/2 1.15 ''
(0.82+0.86)/2 2.68 ''
(0.24+0.24)/2 0.70 ''
(0.60+0.60)/2 1.16 ''
(0.76+0.76)/2 0.51 ''
(0.68+0.68)/2 0.67 ''
(0.24+0.24)/2 0.49 ''
(0.40+0.40)/2 0.54 ''
(0.24+0.24)/2 1.53 ''
(0.60+0.60)/2 2.55 ''
0.96 0.53 ''
0.20 8.28 ''
0.20 8.28 ''

(0.56+0.56)/2 0.99 Cum.


(0.56+0.56)/2 0.86 ''
(0.32+0.32)/2 1.35 ''
0.76+0.76)/2 2.13 ''
(0.64+0.64)/2 2.21 ''
(0.56+0.56)/2 1.93 ''
(0.40+0.50)/2 0.78 ''
(0.50+0.44)/2 0.81 ''
(0.44+0.44)/2 0.32 ''
(0.60+0.60)/2 1.48 ''
(0.60+0.56)/2 2.00 ''
(0.56+0.56)/2 1.39 ''
(0.32+0.32)/2 0.56 Cum.
(0.56+0.56)/2 0.86 ''
(0.32+0.32)/2 1.35 ''
(0.76+0.76)2 2.13 ''
(0.64+0.64)/2 2.21 ''
(0.56+0.56)2 1.93 ''
(0.40+0.50)/2 0.78 ''
(0.50+0.40)/2 0.78 ''
(0.44+0.40)/2 0.31 ''
(0.60+0.60)/2 1.48 ''
(0.60+0.56)/2 1.00 ''
(0.56+0.50)/2 0.91 ''
(0.50+0.50)/2 1.24 ''
(0.24+0.24)/2 2.48 Cum.
(0.30+0.30)/2 2.07 ''
(0.24+0.24)/2 1.66 ''
(0.40+0.40)/2 1.84 ''
(0.32+0.32)/2 3.31 ''
(0.40+0.40)/2 2.76 ''
(0.32+0.32)/2 2.41 ''
(0.40+0.40)/2 2.01 ''
(0.28+0.28)/2 0.45 ''
(0.28+0.30)/2 1.00 ''
(0.30+0.30)/2 1.04 ''
(0.30+0.32)/2 1.07 ''
(0.32+0.32)/2 1.10 ''
(0.32+0.16)/2 0.47 ''
(0.28+0.30)/2 0.47 ''
(0.30+0.30)/2 1.04 ''
(0.30+0.32)/2 1.07 ''
(0.32+0.32)/2 1.10 ''
(0.32+0.30)/2 1.07 ''
(0.32+0.24)/2 0.55 ''

(0.20+0.12)/2 0.55 Cum.


(0.12+0.16)/2 0.48 ''
(0.16+0.23)/2 0.27 ''
(0.23+0.20)/2 0.45 ''
(0.20+0.16)/2 0.62 ''
(0.16+0.08)/2 0.41 ''
(0.08+0.20)/2 0.04 ''
(0.20+0.16)/2 0.57 ''
(0.16+0.20)/2 0.31 ''
(0.16+0.24)/2 0.69 ''
(0.24+0.32)/2 0.97 ''
(0.32+0.28)/2 1.04 ''
(0.28+0.28)/2 0.97 ''
(0.28+0.24)/2 0.90 ''
(0.24+0.32)/2 0.97 ''
(0.32+0.32)/2 0.54 ''

(0.16+0.20)/2 0.62 Cum.


(0.20+0.20)/2 0.69 ''
(0.20+0.24)/2 0.76 ''
(0.24+0.16)/2 0.69 ''
(0.16+0.20)/2 0.62 ''
(0.20+0.12)/2 0.55 ''
(0.12+0.20)/2 0.35 ''
(0.12+0.20)/2 0.55 ''
(0.20+0.12)/2 0.55 ''
(0.12+0.20)/2 0.55 ''
(0.20+0.12)/2 0.55 ''
(0.12+0.20)/2 0.55 ''
(0.20+0.20)/2 0.69 ''
(0.20+0.12)/2 0.35 ''
(0.44+0.44)/2 0.32
(0.44+0.15)/2 0.20
(0.15+0.72)/2 0.30
(0.72+0.15)/2 0.58
(0.15+0.20)/2 0.60
(0.20+0.20)/2 0.69
(0.20+0.30)/2 0.86
(0.30+0.30)/2 1.04
(0.30+0.20)/2 0.86
(0.20+0.20)/2 0.69
(0.20+0.20)/2 0.69
(0.20+0.20)/2 0.31
(0.86+0.86)/2 0.15
(0.90+0.75)/2 0.38
(0.75+0.24)/2 0.34
(0.24+0.24)/2 0.43
(0.24+0.08)/2 0.55
(0.08+0.20)/2 0.48
(0.20+0.20)/2 0.69
(0.20+0.20)/2 0.69
(0.20+0.20)/2 0.69
(0.20+0.40)/2 0.12
(0.40+0.30)/2 0.16
(0.30+0.20)/2 0.65
(0.20+0.40)/2 0.14
(0.40+0.40)/2 0.18
(0.40+0.15)/2 0.19
(0.54+0.90)/2 1.32
(0.90+0.40)/2 1.14
(0.18+0.35)/2 0.38 Cum.
(0.35+0.35)/2 0.56 ''
(0.35+0.32)/2 1.16 ''
(0.32+0.24)/2 0.97 ''
(0.24+0.16)/2 0.62 ''
(0.48+0.48)/2 0.83 ''
(0.48+0.38)/2 0.74 ''
(0.38+0.30)/2 0.47 ''
(0.30+0.16)/2 0.48 ''
(0.16+0.12)/2 0.48 ''
(0.12+0.12)/2 0.27 ''
(0.12+0.16)/2 0.16 ''
(0.16+0.16)/2 0.66 ''

(0.30+0.30)/2 0.52 Cum.


(0.15+0.15)/2 0.61 ''
(0.08+0.08)/2 0.40 ''
(0.15+0.15)/2 0.24 ''
(0.15+0.30)/2 1.55 ''
(0.30+0.30)/2 0.83 ''
(0.30+0.16)/2 0.58 ''
(0.16+0.16)/2 0.68 ''
(0.16+0.15)/2 1.07 ''
(0.15+0.24)/2 0.20 ''
(0.08+0.08)/2 0.55 ''
(0.08+0.08)/2 0.55 ''
(0.08+0.08)/2 0.55 ''
(0.08+0.08)/2 0.55 ''
(0.08+0.08)/2 0.55 ''
(0.08+0.08)/2 0.18 ''
(0.42+0.42)/2 1.00 ''
(0.42+0.28)/2 0.60 ''
(0.28+0.22)/2 0.52 ''
(0.22+0.28)/2 0.63 ''
(0.28+0.18)/2 0.93 ''
(0.18+0.15)/2 0.17 ''
(0.15+0.15)/2 0.52 ''
(0.15+0.15)/2 0.52 ''
(0.40+0.35)/2 1.55 ''
(0.18+0.18)/2 0.47 ''
(0.18+0.12)/2 0.52 ''
(0.12+0.12)/2 0.48 ''
(0.30+0.30)/2 0.94 ''
(0.12+0.12)/2 0.55 ''
(0.40+0.40)/2 1.61 ''
(0.25+0.35)/2 1.04 ''
(0.24+0.30)/2 0.93 ''
(0.30+0.15)/2 0.78 ''
(0.15+0.12)/2 0.44 ''
(0.16+0.20)/2 0.72 ''
(0.48+0.54)/2 0.47 ''
(0.54+0.45)/2 0.40 ''
(0.45+0.40)/2 0.73 ''
(0.40+0.32)/2 0.97 ''
(0.60+0.60)/2 0.55 ''
(0.60+0.44)/2 0.42 ''
(0.44+0.30)/2 0.64 ''
(0.30+0.30)/2 0.44 ''
(0.30+0.23)/2 0.24 ''

(0.16+0.16)/2 1.66 Cum.


(0.16+0.16)/2 1.38 ''
(0.16+0.16)/2 1.10 ''
(0.92+0.85)/2 4.58 ''
(0.16+0.16)/2 1.66 ''
(0.16+0.16)/2 1.38 ''
(0.16+0.16)/2 1.10 ''
(0.85+0.85)/2 4.40 ''
(0.16+0.16)/2 1.66 ''
(0.16+0.16)/2 1.38 ''
(0.16+0.16)/2 1.10 ''
(0.85+0.76)/2 4.17 ''
(0.16+0.16)/2 1.66 ''
(0.16+0.16)/2 1.38 ''
(0.16+0.16)/2 1.10 ''
(0.76+0.72)/2 3.83 ''
(0.16+0.16)/2 1.66 ''
(0.16+0.16)/2 1.38 ''
(0.16+0.16)/2 1.10 ''
(0.72+0.80)/2 3.93 ''
(0.16+0.16)/2 1.66 ''
(0.16+0.16)/2 1.38 ''
(0.16+0.16)/2 1.10 ''
(0.80+0.90)/2 4.40 ''
(0.16+0.16)/2 1.66 ''
(0.16+0.16)/2 1.38 ''
(0.16+0.16)/2 1.10 ''
(0.90+0.90)/2 4.66 ''
(0.16+0.16)/2 1.66 ''
(0.16+0.16)/2 1.38 ''
(0.16+0.16)/2 1.10 ''
(0.90+0.92)/2 4.71 ''
(0.16+0.16)/2 0.88 ''
(0.16+0.16)/2 0.74 ''
(0.16+0.16)/2 0.59 ''
(0.92+0.90)/2 2.51 ''
(0.16+0.16)/2 0.41 ''
(0.16+0.16)/2 0.34 ''
(0.16+0.16)/2 0.27 ''
(0.90+0.89)/2 1.14 ''
(0.16+0.16)/2 1.66 ''
(0.16+0.16)/2 1.38 ''
(0.16+0.16)/2 1.10 ''
(0.89+0.95)/2 4.76 ''
(0.16+0.16)/2 1.03 ''
(0.16+0.16)/2 0.86 ''
(0.16+0.16)/2 0.68 ''
(0.95+0.95)/2 3.05 ''
1.20 4.14 ''
1.20 4.14 ''
1.20 4.14 ''
1.20 4.14 ''
1.20 4.14 ''
1.20 4.14 ''
1.20 4.14 ''
1.20 4.14 ''
1.20 2.21 ''
1.20 4.14 ''
1.20 2.57 ''
1.20 2.29 ''
0.30 0.67 ''
0.63 1.06 ''
0.91 1.02 ''
0.30 0.53 ''
0.63 0.84 ''
0.91 0.81 ''
0.91 0.30 ''
0.56 0.17 ''
0.24 0.04 ''
0.30 0.31 ''
1.67 1.16 ''
0.32 0.15 ''
0.30 0.93 ''
0.30 0.70 ''
1.30 2.02 ''
0.40 0.23 ''
0.30 0.23 ''
1.57 0.81 ''
0.53 0.22 ''
''
I.No. Description No. L B
15 Demolishing RCC work including stacking of steel bars and
disposal of unserviceable material within 50 metres lead.
Dallupura Bound, DDA Drain
Start from R.D 607.50
Ist cut, RD 607.50 to 683.00 2 30.00 2.85
1 15.50 2.85
Less for man hole 7 1.00 1.00

IInd cut, RD- 1215.00 to1225.00 2 30.00 2.85


1 5.00 2.85
2 6.25 2.85
1 6.70 2.85
Less for man hole 10 1.00 1.00

IIInd cut, RD- 1215.00 to1225.00 2 30.00 2.85


1 15.00 2.85
1 12.05 2.85
Less for man hole 10 1.00 1.00

IVth cut, RD- 1215.00 to1225.00 3 30.00 2.85


1 6.75 2.85
Less for man hole 13 1.00 1.00
D or H Quantity Unit

0.13 21.38 Cum


0.13 5.52
0.13 -0.88
0.13 26.02
0.13 21.38
0.13 1.78
0.13 4.46
0.13 2.39 Cum
0.13 -1.25
0.13 30.00
0.13 21.38
0.13 5.34
0.13 4.29 Cum
0.13 -1.25
0.13 29.76
0.13 32.06
0.13 3.08 Cum
0.13 -1.63
33.52
Total= 119.30 Cum
I.No Description No L B
16 Consolidation of subgrade with power road roller of 8 to
12 tonne capacity
Dallupura Bound including making good the undulations
etc. with earth or quarry spoils etc. and rerolling the
Near RD(-12.30) to Drain Edge RD199.50
subgrade 1 12.30 (0.80+0.90)/2
1 9.40 (3.40+2.80)/2
1 15.00 (2.80+1.60)/2
1 15.00 (1.60+2.10)/2
1 15.00 (2.10+1.60)/2
1 15.00 (1.60+1.50)/2
1 15.00 (1.50+1.40)/2
1 15.00 (1.40+1.40)/2
1 15.00 (1.40+1.25)/2
1 15.00 (1.25+1.20)/2
1 9.60 (1.20+1.10)/2
1 13.50 (1.20+1.10)/2
1 12.00 (4.08+4.55)/2
1 15.00 (4.55+5.30)/2
1 15.00 (5.30+4.25)/2
1 5.00 (4.25+4.20)/2
Deduction 1 13.50 (0.80+0.90)/2
After BudhSingh Marg Cut RD-283.50 to 309.00
1 15.00 (2.40+1.95)/2
1 1.50 (1.95+2.00)/2
1 1.30 (2.00+1.50)/2
1 7.70 (4.35+4.90)/2
Deduction for chamber Edge 1 1.70 (1.10+1.20)/2

Noida Bound R.D 293.70 to R.D-350.00 1 6.30 (2.90+2.85)/2


1 15.00 (2.85+3.45)/2
1 15.00 (3.45+2.55)/2
1 15.00 (2.55+3.10)/2
1 5.00 (3.10+3.16)/2
Noida Bound R.D 390.00 to R.D-480.00 1 15.00 (2.87+3.00)/2
1 15.00 (3.00+2.60)/2
1 15.00 (2.60+2.70)/2
1 15.00 (2.70+2.95)/2
1 15.00 (2.95+2.80)/2
1 15.00 (2.80+3.00)/2
Deduction For slab 1 1.15 2.85

Noida Bound R.D 505.00 to R.D 780.00 1 5.00 (2.95+2.95)/2


1 15.00 (2.95+2.65)/2
1 15.00 (2.65+2.80)/2
1 15.00 (2.80+2.75)/2
1 15.00 (2.75+2.50)/2
1 15.00 (2.50+2.90)/2
1 15.00 (2.90+3.40)/2
1 15.00 (3.40+3.85)/2
1 15.00 (3.85+4.60)/2
1 15.00 (4.60+5.45)/2
1 15.00 (5.45+5.70)/2
1 15.00 (5.70+5.93)/2
1 15.00 (5.93+6.05)/2
1 15.00 (6.05+6.00)/2
1 15.00 (6.00+5.55)/2
1 15.00 (5.55+5.05)/2
1 15.00 (5.05+5.25)/2
1 15.00 (5.25+5.40)/2
1 15.00 (5.40+5.50)/2
Deduction For M.H. 2 3.14./4 0.85
Deduction For M.H. 1 1.50 1.70

Noida Bound R.D 780.00 to R.D-905.50 1 15.00 (5.50+5.90)/2


1 15.00 (5.90+6.20)/2
1 15.00 (6.20+6.80)/2
1 15.00 (6.80+7.15)/2
1 15.00 (7.15+7.22)/2
1 15.00 (7.22+7.45)/2
1 15.00 (7.45+7.82)/2
1 15.00 (7.82+7.90)/2
1 5.50 (7.90+7.90)/2

Noida Bound R.D 922.00 to R.D-1023.40 1 8.00 (4.95+4.75)/2


1 15.00 (4.75+4.75)/2
1 15.00 (4.75+4.90)/2
1 15.00 (4.90+4.90)/2
1 15.00 (4.90+5.00)/2
1 15.00 (5.00+5.35)/2
1 13.20 (5.35+5.80)/2
Flair 2./3 5.20 5.8
Budhsingh Marg Cut C/v 1 10.55 (1.80+1.80)/2
Noida Bound R.D.96.00 to R.D 117.00 1 15.00 (1.80+2.20)/2
1 6.00 (2.20+2.50)/2
BudhSingh Marg Vasundhara Bound 1 15.00 (2.30+2.50)/2
1 9.10 (2.50+2.95)/2
1 5.40 (2.95+3.20)/2
1 22.00 (1.35+1.20)/2
C/V Budh singh Marg Cut 1 10.55 (1.80+1.80)/2

Cutting By Jalboard 1 6.70 (2.00+2.00)/2


1 9.45 (2.25+2.30)/2
1 4.30 (2.65+2.62)/2
1 5.10 (2.75+2.80)/2
Vasundhara Cut 1 14.00 (3.55+3.50)/2
1 2.20 (1.20+1.20)/2
Noida Bound R.D 350.00 to R.D-390.00 1 10.00 (3.16+3.22)/2
1 15.00 (3.22+3.05)/2
1 15.00 (3.05+2.87)/2
Noida Bound R.D 480.00 to R.D-505.00 1 15.00 (3.00+3.00)/2
1 10.00 (3.00+2.95)/2
Noida Bound R.D 905.50 to R.D-922.00 1 9.50 (5.25+5.25)/2
1 7.00 (5.25+4.95)/2
D or H Quantity Unit

10.46 Sqm.
29.14 "
33.00 "
27.75 "
27.75 "
23.25 "
21.75 "
21.00 "
19.88 "
18.38 "
11.04 "
15.53 "
51.78 "
73.88 "
71.63 "
21.13 "
-11.48 "

32.63 "
2.96 "
2.28 "
35.61 "
-1.96 "
537.39 "

18.11 Sqm.
47.25 "
45.00 "
42.38 "
15.65 "
44.03 "
42.00 "
39.75 "
42.38 "
43.13 "
43.50 "
-3.28 "
419.90 "

14.75 "
42.00 "
40.88 "
41.63 "
39.38 "
40.50 "
47.25 "
54.38 "
63.38 "
75.38 "
83.63 "
87.23 "
89.85 "
90.38 "
86.63 "
79.50 "
77.25 "
79.88 "
81.75 "
-1.34 "
-2.55 "
1211.74 "

85.50 "
90.75 "
97.50 "
104.63 "
107.78 "
110.03 "
114.53 "
117.90 "
43.45 "
872.07 "

40.00 "
71.25 "
72.38 "
73.50 "
74.25 "
77.63 "
73.59 "
19.91 "
18.99 "
30.00 "
14.10 "
36.00 "
24.80 "
16.61 "
28.05 "
18.99 "
690.05 "

13.40 Sqm.
21.50 "
11.33 "
14.15 "
49.35 "
2.64 "
31.90 "
47.03 "
44.40 "
45.00 "
29.75 "
49.88 "
35.00 "
395.33 "
I.No Description No L B
Measurement on dated:-
17 Supplying & Stacking of graded stone aggregate at site of size range.
(a) 90mm to 45mm
Dallupura Bound
Near RD(-12.30) to Drain Edge RD199.50
Stack No. 1 1 7.65 (1.00+2.20)/2
Stack No. 2 1 6.85 (1.00+2.20)/2
Stack No. 3 1 7.05 (1.00+2.20)/2
Stack No. 4 1 7.25 (1.00+2.20)/2
Stack No. 5 1 7.00 (1.00+2.20)/2
Stack No. 6 1 6.85 (1.00+2.20)/2
Stack No. 7 1 6.95 (1.00+2.20)/2
Stack No. 8 1 7.05 (1.00+2.20)/2
Stack No. 9 1 6.95 (1.00+2.20)/2
After BudhSingh Marg Cut RD-283.50 to 309.00
Stack No. 10 1 4.80 (1.00+2.20)/2
Stack No. 11 1 5.05 (1.00+2.20)/2

Less 7.5% for voids

Noida Bound R.D 760.00 to R.D-905.50


Stack No. 1 1 7.10 (1.00+2.20)/2
Stack No. 2 1 7.20 (1.00+2.20)/2
Stack No. 3 1 6.30 (1.00+2.20)/2
Stack No. 4 1 6.70 (1.00+2.20)/2
Stack No. 5 1 7.05 (1.00+2.20)/2
Stack No. 6 1 6.90 (1.00+2.20)/2
Stack No. 7 1 7.60 (1.00+2.20)/2
Stack No. 8 1 6.95 (1.00+2.20)/2
Stack No. 9 1 7.10 (1.00+2.20)/2
Stack No. 10 1 6.70 (1.00+2.20)/2
Stack No. 11 1 7.40 (1.00+2.20)/2
Stack No. 12 1 6.70 (1.00+2.20)/2
Stack No. 13 1 7.00 (1.00+2.20)/2
Stack No. 14 1 6.45 (1.00+2.20)/2
Stack No. 15 1 6.85 (1.00+2.20)/2
Stack No. 16 1 6.60 (1.00+2.20)/2
Stack No. 17 1 7.10 (1.00+2.20)/2
Stack No. 18 1 6.90 (1.00+2.20)/2

Less 7.5% for voids

Noida Bound R.D 922.00 to R.D-1023.40


Stack No. 1 1 6.35 (1.00+2.20)/2
Stack No. 2 1 6.80 (1.00+2.20)/2
Stack No. 3 1 7.05 (1.00+2.20)/2
Stack No. 4 1 6.55 (1.00+2.20)/2
Stack No. 5 1 6.40 (1.00+2.20)/2
Stack No. 6 1 6.80 (1.00+2.20)/2
Stack No. 7 1 7.15 (1.00+2.20)/2
Stack No. 8 1 7.10 (1.00+2.20)/2
Stack No. 9 1 6.90 (1.00+2.20)/2
Stack No. 10 1 7.40 (1.00+2.20)/2
Noida Bound R.D.96.00 to R.D 117.00
Stack No. 11 1 8.60 (1.00+2.20)/2
BudhSingh Marg Vasundhara Bound
Stack No. 12 1 7.35 (1.00+2.20)/2
Stack No. 13 1 7.05 (1.00+2.20)/2

Less 7.5% for voids

Cutting By Jalboard & Vasundhara Cut


Stack No. 1 1 7.70 (1.00+2.20)/2
Stack No. 2 1 7.80 (1.00+2.20)/2
Noida Bound R.D 350.00 to R.D 390.00
Stack No. 3 1 5.40 (1.00+2.20)/2
Stack No. 4 1 5.70 (1.00+2.20)/2
Stack No. 5 1 5.90 (1.00+2.20)/2
Noida Bound R.D 480.00 to R.D-505.00
Stack No. 6 1 5.35 (1.00+2.20)/2
Stack No. 7 1 4.90 (1.00+2.20)/2
Noida Bound R.D 905.50 to R.D-922.00
Stack No. 8 1 6.15 (1.00+2.20)/2
Stack No. 9 1 5.45 (1.00+2.20)/2

Less 7.5% for voids

17 Supplying & Stacking of graded stone aggregate at site of size range.


(b) 63mm to 45mm
Dallupura Bound
Near RD(-12.30) to Drain Edge RD199.50
Stack No. 1 1 6.90 (1.00+2.20)/2
Stack No. 2 1 7.05 (1.00+2.20)/2
Stack No. 3 1 6.20 (1.00+2.20)/2
Stack No. 4 1 7.20 (1.00+2.20)/2
Stack No. 5 1 7.60 (1.00+2.20)/2
Stack No. 6 1 6.80 (1.00+2.20)/2
Stack No. 7 1 6.20 (1.00+2.20)/2
After BudhSingh Marg Cut RD-283.50 to 309.00
Stack No. 8 1 7.35 (1.00+2.20)/2

Less 7.5% for voids

Noida Bound R.D 293.70 to R.D-480.00


Stack No. 1 1 6.80 (1.00+2.20)/2
Stack No. 2 1 7.20 (1.00+2.20)/2
Stack No. 3 1 6.45 (1.00+2.20)/2
Stack No. 4 1 7.45 (1.00+2.20)/2
Stack No. 5 1 7.80 (1.00+2.20)/2
Stack No. 6 1 7.25 (1.00+2.20)/2

Less 7.5% for voids


Noida Bound R.D 505.00 to R.D 780.00
Stack No. 1 1 7.65 (1.00+2.20)/2
Stack No. 2 1 7.05 (1.00+2.20)/2
Stack No. 3 1 7.25 (1.00+2.20)/2
Stack No. 4 1 7.60 (1.00+2.20)/2
Stack No. 5 1 7.65 (1.00+2.20)/2
Stack No. 6 1 7.45 (1.00+2.20)/2
Stack No. 7 1 7.30 (1.00+2.20)/2
Stack No. 8 1 7.60 (1.00+2.20)/2
Stack No. 9 1 7.30 (1.00+2.20)/2
Stack No. 10 1 7.30 (1.00+2.20)/2
Stack No. 11 1 7.15 (1.00+2.20)/2
Stack No. 12 1 7.05 (1.00+2.20)/2
Stack No. 13 1 6.90 (1.00+2.20)/2
Stack No. 14 1 6.75 (1.00+2.20)/2
Stack No. 15 1 7.55 (1.00+2.20)/2
Stack No. 16 1 7.60 (1.00+2.20)/2
Stack No. 17 1 6.70 (1.00+2.20)/2

Less 7.5% for voids

Noida Bound R.D 780.00 to R.D-905.50


Stack No. 1 1 7.10 (1.00+2.20)/2
Stack No. 2 1 6.80 (1.00+2.20)/2
Stack No. 3 1 6.60 (1.00+2.20)/2
Stack No. 4 1 6.90 (1.00+2.20)/2
Stack No. 5 1 7.05 (1.00+2.20)/2
Stack No. 6 1 6.70 (1.00+2.20)/2
Stack No. 7 1 7.55 (1.00+2.20)/2
Stack No. 8 1 6.90 (1.00+2.20)/2
Stack No. 9 1 6.60 (1.00+2.20)/2
Stack No. 10 1 7.20 (1.00+2.20)/2
Stack No. 11 1 6.85 (1.00+2.20)/2
Stack No. 12 1 6.20 (1.00+2.20)/2
Stack No. 13 1 6.80 (1.00+2.20)/2

Less 7.5% for voids

Noida Bound R.D 922.00 to R.D-1023.40


Stack No. 1 1 7.60 (1.00+2.20)/2
Stack No. 2 1 7.55 (1.00+2.20)/2
Stack No. 3 1 7.20 (1.00+2.20)/2
Stack No. 4 1 7.10 (1.00+2.20)/2
Stack No. 5 1 7.70 (1.00+2.20)/2
Stack No. 6 1 6.80 (1.00+2.20)/2
Stack No. 7 1 7.60 (1.00+2.20)/2
Noida Bound R.D.96.00 to R.D 117.00
Stack No. 8 1 6.55 (1.00+2.20)/2
BudhSingh Marg Vasundhara Bound
Stack No. 9 1 10.90 (1.00+2.20)/2

Less 7.5% for voids


Cutting By Jalboard & Vasundhara Cut
Stack No. 1 1 5.80 (1.00+2.20)/2
Stack No. 2 1 5.95 (1.00+2.20)/2
Noida Bound R.D 350.00 to R.D 390.00
Stack No. 3 1 6.20 (1.00+2.20)/2
Stack No. 4 1 6.75 (1.00+2.20)/2
Noida Bound R.D 480.00 to R.D-505.00
Stack No. 5 1 7.75 (1.00+2.20)/2
Noida Bound R.D 905.50 to R.D-922.00
Stack No. 6 1 8.10 (1.00+2.20)/2

Less 7.5% for voids

17 Supplying & Stacking of graded stone aggregate at site of size range.


(c) 53mm to 22.4mm
Dallupura Bound
Near RD(-12.30) to Drain Edge RD199.50 1st layer
Stack No. 1 1 6.95 (1.00+2.20)/2
Stack No. 2 1 7.10 (1.00+2.20)/2
Stack No. 3 1 7.65 (1.00+2.20)/2
Stack No. 4 1 6.20 (1.00+2.20)/2
Stack No. 5 1 6.65 (1.00+2.20)/2
Stack No. 6 1 6.80 (1.00+2.20)/2
Stack No. 7 1 6.45 (1.00+2.20)/2
After BudhSingh Marg Cut RD-283.50 to 309.00
Stack No. 8 1 7.40 (1.00+2.20)/2

Less 7.5% for voids

Noida Bound R.D 293.70 to R.D-480.00 1st layer

Stack No. 1 1 6.60 (1.00+2.20)/2


Stack No. 2 1 6.95 (1.00+2.20)/2
Stack No. 3 1 7.55 (1.00+2.20)/2
Stack No. 4 1 6.80 (1.00+2.20)/2
Stack No. 5 1 7.45 (1.00+2.20)/2
Stack No. 6 1 7.65 (1.00+2.20)/2

Less 7.5% for voids

Noida Bound R.D 505.00 to R.D 780.00 1st layer


Stack No. 1 1 6.85 (1.00+2.20)/2
Stack No. 2 1 6.80 (1.00+2.20)/2
Stack No. 3 1 7.25 (1.00+2.20)/2
Stack No. 4 1 7.45 (1.00+2.20)/2
Stack No. 5 1 7.90 (1.00+2.20)/2
Stack No. 6 1 7.05 (1.00+2.20)/2
Stack No. 7 1 7.85 (1.00+2.20)/2
Stack No. 8 1 7.35 (1.00+2.20)/2
Stack No. 9 1 7.45 (1.00+2.20)/2
Stack No. 10 1 7.80 (1.00+2.20)/2
Stack No. 11 1 7.30 (1.00+2.20)/2
Stack No. 12 1 7.30 (1.00+2.20)/2
Stack No. 13 1 7.45 (1.00+2.20)/2
Stack No. 14 1 7.15 (1.00+2.20)/2
Stack No. 15 1 6.45 (1.00+2.20)/2
Stack No. 16 1 6.60 (1.00+2.20)/2
Stack No. 17 1 7.85 (1.00+2.20)/2

Less 7.5% for voids

Noida Bound R.D 780.00 to R.D-905.501st layer


Stack No. 1 1 7.80 (1.00+2.20)/2
Stack No. 2 1 7.05 (1.00+2.20)/2
Stack No. 3 1 7.60 (1.00+2.20)/2
Stack No. 4 1 6.30 (1.00+2.20)/2
Stack No. 5 1 6.50 (1.00+2.20)/2
Stack No. 6 1 6.95 (1.00+2.20)/2
Stack No. 7 1 6.85 (1.00+2.20)/2
Stack No. 8 1 6.65 (1.00+2.20)/2
Stack No. 9 1 7.15 (1.00+2.20)/2
Stack No. 10 1 6.60 (1.00+2.20)/2
Stack No. 11 1 7.50 (1.00+2.20)/2
Stack No. 12 1 6.05 (1.00+2.20)/2
Stack No. 13 1 6.30 (1.00+2.20)/2

Less 7.5% for voids

Noida Bound R.D 922.00 to R.D-1023.401st layer


Stack No. 1 1 6.25 (1.00+2.20)/2
Stack No. 2 1 6.75 (1.00+2.20)/2
Stack No. 3 1 7.90 (1.00+2.20)/2
Stack No. 4 1 7.05 (1.00+2.20)/2
Stack No. 5 1 8.05 (1.00+2.20)/2
Stack No. 6 1 7.65 (1.00+2.20)/2
Stack No. 7 1 7.85 (1.00+2.20)/2
Noida Bound R.D.96.00 to R.D 117.00
Stack No. 8 1 6.45 (1.00+2.20)/2
BudhSingh Marg Vasundhara Bound
Stack No. 9 1 5.70 (1.00+2.20)/2
Stack No. 10 1 5.15 (1.00+2.20)/2

Less 7.5% for voids

Cutting By Jalboard & Vasundhara Cut 1st layer


Stack No. 1 1 6.05 (1.00+2.20)/2
Stack No. 2 1 5.75 (1.00+2.20)/2
Noida Bound R.D 350.00 to R.D 390.00 1st layer
Stack No. 3 1 7.25 (1.00+2.20)/2
Stack No. 4 1 5.50 (1.00+2.20)/2
Noida Bound R.D 480.00 to R.D-505.00 1st layer
Stack No. 5 1 7.85 (1.00+2.20)/2
Noida Bound R.D 905.50 to R.D-922.00 1st layer
Stack No. 6 1 8.15 (1.00+2.20)/2

Less 7.5% for voids

17 Supplying & Stacking of graded stone aggregate at site of size range.

(c) 53mm to 22.4mm


Near RD(-12.30) to Drain Edge RD199.50 2nd layer

Stack No. 1 1 6.70 (1.00+2.20)/2


Stack No. 2 1 6.80 (1.00+2.20)/2
Stack No. 3 1 7.15 (1.00+2.20)/2
Stack No. 4 1 7.60 (1.00+2.20)/2
Stack No. 5 1 6.20 (1.00+2.20)/2
Stack No. 6 1 6.45 (1.00+2.20)/2
Stack No. 7 1 6.75 (1.00+2.20)/2
After BudhSingh Marg Cut RD-283.50 to 309.00
Stack No. 8 1 7.40 (1.00+2.20)/2

Less 7.5% for voids

Noida Bound R.D 293.70 to R.D-480.00 2nd layer


Stack No. 1 1 8.05 (1.00+2.20)/2
Stack No. 2 1 7.15 (1.00+2.20)/2
Stack No. 3 1 6.35 (1.00+2.20)/2
Stack No. 4 1 6.65 (1.00+2.20)/2
Stack No. 5 1 7.90 (1.00+2.20)/2
Stack No. 6 1 6.95 (1.00+2.20)/2

Less 7.5% for voids

Noida Bound R.D 505.00 to R.D 780.00 2nd layer


Stack No. 1 1 8.15 (1.00+2.20)/2
Stack No. 2 1 7.60 (1.00+2.20)/2
Stack No. 3 1 7.35 (1.00+2.20)/2
Stack No. 4 1 7.15 (1.00+2.20)/2
Stack No. 5 1 7.30 (1.00+2.20)/2
Stack No. 6 1 7.95 (1.00+2.20)/2
Stack No. 7 1 6.95 (1.00+2.20)/2
Stack No. 8 1 7.25 (1.00+2.20)/2
Stack No. 9 1 6.25 (1.00+2.20)/2
Stack No. 10 1 6.55 (1.00+2.20)/2
Stack No. 11 1 6.45 (1.00+2.20)/2
Stack No. 12 1 7.85 (1.00+2.20)/2
Stack No. 13 1 7.40 (1.00+2.20)/2
Stack No. 14 1 7.70 (1.00+2.20)/2
Stack No. 15 1 7.90 (1.00+2.20)/2
Stack No. 16 1 7.05 (1.00+2.20)/2
Stack No. 17 1 7.05 (1.00+2.20)/2

Less 7.5% for voids


Noida Bound R.D 780.00 to R.D-905.501 2nd layer
Stack No. 1 1 7.55 (1.00+2.20)/2
Stack No. 2 1 7.80 (1.00+2.20)/2
Stack No. 3 1 6.75 (1.00+2.20)/2
Stack No. 4 1 6.45 (1.00+2.20)/2
Stack No. 5 1 7.35 (1.00+2.20)/2
Stack No. 6 1 6.40 (1.00+2.20)/2
Stack No. 7 1 5.60 (1.00+2.20)/2
Stack No. 8 1 7.35 (1.00+2.20)/2
Stack No. 9 1 7.60 (1.00+2.20)/2
Stack No. 10 1 6.35 (1.00+2.20)/2
Stack No. 11 1 6.50 (1.00+2.20)/2
Stack No. 12 1 7.15 (1.00+2.20)/2
Stack No. 13 1 6.40 (1.00+2.20)/2

Less 7.5% for voids

Noida Bound R.D 922.00 to R.D-1023.40 2nd layer


Stack No. 1 1 7.85 (1.00+2.20)/2
Stack No. 2 1 7.35 (1.00+2.20)/2
Stack No. 3 1 6.50 (1.00+2.20)/2
Stack No. 4 1 7.70 (1.00+2.20)/2
Stack No. 5 1 7.60 (1.00+2.20)/2
Stack No. 6 1 6.90 (1.00+2.20)/2
Stack No. 7 1 7.65 (1.00+2.20)/2
Noida Bound R.D.96.00 to R.D 117.00
Stack No. 8 1 6.55 (1.00+2.20)/2
BudhSingh Marg Vasundhara Bound
Stack No. 9 1 6.05 (1.00+2.20)/2
Stack No. 10 1 4.85 (1.00+2.20)/2

Less 7.5% for voids

Cutting By Jalboard & Vasundhara Cut 2nd layer


Stack No. 1 1 5.60 (1.00+2.20)/2
Stack No. 2 1 6.05 (1.00+2.20)/2
Noida Bound R.D 350.00 to R.D 390.00 2nd layer
Stack No. 3 1 6.45 (1.00+2.20)/2
Stack No. 4 1 6.30 (1.00+2.20)/2
Noida Bound R.D 480.00 to R.D-505.00 2nd layer
Stack No. 5 1 7.80 (1.00+2.20)/2
Noida Bound R.D 905.50 to R.D-922.00 2nd layer
Stack No. 6 1 8.25 (1.00+2.20)/2

Less 7.5% for voids


D or H Quantity Unit

0.60 7.34 Cum.


0.60 6.58 "
0.60 6.77 "
0.60 6.96 "
0.60 6.72 "
0.60 6.58 "
0.60 6.67 "
0.60 6.77 "
0.60 6.67 "

0.60 4.61 "


0.60 4.85 "
70.51 "
-5.29 "
65.22 Cum.

0.60 6.82 "


0.60 6.91 "
0.60 6.05 "
0.60 6.43 "
0.60 6.77 "
0.60 6.62 "
0.60 7.30 "
0.60 6.67 "
0.60 6.82 "
0.60 6.43 "
0.60 7.10 "
0.60 6.43 "
0.60 6.72 "
0.60 6.19 "
0.60 6.58 "
0.60 6.34 "
0.60 6.82 "
0.60 6.62 "
119.62 "
-8.97 "
110.64 Cum.

0.60 6.10 "


0.60 6.53 "
0.60 6.77 "
0.60 6.29 "
0.60 6.14 "
0.60 6.53 "
0.60 6.86 "
0.60 6.82 "
0.60 6.62 "
0.60 7.10 "

0.60 8.26 "

0.60 7.06 "


0.60 6.77 "
87.84 "
-6.59 "
81.25 Cum.

0.60 7.39 "


0.60 7.49 "

0.60 5.18 "


0.60 5.47 "
0.60 5.66 "

0.60 5.14 "


0.60 4.70 "

0.60 5.90 "


0.60 5.23 "
52.18 "
-3.91 "
48.26 Cum.

0.60 6.62 Cum.


0.60 6.77 "
0.60 5.95 "
0.60 6.91 "
0.60 7.30 "
0.60 6.53 "
0.60 5.95 "

0.60 7.06 "


53.09 "
-3.98 "
49.11 Cum.

0.60 6.53 Cum.


0.60 6.91 "
0.60 6.19 "
0.60 7.15 "
0.60 7.49 "
0.60 6.96 "
41.23 "
-3.09 "
38.14 Cum.
0.60 7.34 Cum.
0.60 6.77 "
0.60 6.96 "
0.60 7.30 "
0.60 7.34 "
0.60 7.15 "
0.60 7.01 "
0.60 7.30 "
0.60 7.01 "
0.60 7.01 "
0.60 6.86 "
0.60 6.77 "
0.60 6.62 "
0.60 6.48 "
0.60 7.25 "
0.60 7.30 "
0.60 6.43 "
118.90 "
-8.92 "
109.98 Cum.

0.60 6.82 "


0.60 6.53 "
0.60 6.34 "
0.60 6.62 "
0.60 6.77 "
0.60 6.43 "
0.60 7.25 "
0.60 6.62 "
0.60 6.34 "
0.60 6.91 "
0.60 6.58 "
0.60 5.95 "
0.60 6.53 "
85.68
-6.43 "
79.25 Cum.

0.60 7.30 "


0.60 7.25 "
0.60 6.91 "
0.60 6.82 "
0.60 7.39 "
0.60 6.53 "
0.60 7.30 "

0.60 6.29 "

0.60 10.46 "


66.24
-4.97 "
61.27 Cum.
0.60 5.57 "
0.60 5.71 "

0.60 5.95 "


0.60 6.48 "

0.60 7.44 "

0.60 7.78 "


38.93 "
-2.92 "
36.01 Cum.

0.60 6.67 Cum.


0.60 6.82 "
0.60 7.34 "
0.60 5.95 "
0.60 6.38 "
0.60 6.53 "
0.60 6.19 "

0.60 7.10 "


52.99 "
-3.97 "
49.02 Cum.

0.60 6.34 Cum.


0.60 6.67 "
0.60 7.25 "
0.60 6.53 "
0.60 7.15 "
0.60 7.34 "
41.28 "
-3.10 "
38.18 Cum.

0.60 6.58 Cum.


0.60 6.53 "
0.60 6.96 "
0.60 7.15 "
0.60 7.58 "
0.60 6.77 "
0.60 7.54 "
0.60 7.06 "
0.60 7.15 "
0.60 7.49 "
0.60 7.01 "
0.60 7.01 "
0.60 7.15 "
0.60 6.86 "
0.60 6.19 "
0.60 6.34 "
0.60 7.54 "
118.90 "
-8.92 "
109.98 Cum.

0.60 7.49 "


0.60 6.77 "
0.60 7.30 "
0.60 6.05 "
0.60 6.24 "
0.60 6.67 "
0.60 6.58 "
0.60 6.38 "
0.60 6.86 "
0.60 6.34 "
0.60 7.20 "
0.60 5.81 "
0.60 6.05 "
85.73
-6.43 "
79.30 Cum.

0.60 6.00 "


0.60 6.48 "
0.60 7.58 "
0.60 6.77 "
0.60 7.73 "
0.60 7.34 "
0.60 7.54 "

0.60 6.19 "

0.60 5.47 "


0.60 4.94 "
66.05
-4.95 "
61.09 Cum.

0.60 5.81 "


0.60 5.52 "

0.60 6.96 "


0.60 5.28 "

0.60 7.54 "


0.60 7.82 "
38.93 "
-2.92 "
36.01 Cum.

0.60 6.43 Cum.


0.60 6.53 "
0.60 6.86 "
0.60 7.30 "
0.60 5.95 "
0.60 6.19 "
0.60 6.48 "

0.60 7.10 "


52.85 "
-3.96 "
48.88 Cum.

0.60 7.73 Cum.


0.60 6.86 "
0.60 6.10 "
0.60 6.38 "
0.60 7.58 "
0.60 6.67 "
41.33 "
-3.10 "
38.23 Cum.

0.60 7.82 Cum.


0.60 7.30 "
0.60 7.06 "
0.60 6.86 "
0.60 7.01 "
0.60 7.63 "
0.60 6.67 "
0.60 6.96 "
0.60 6.00 "
0.60 6.29 "
0.60 6.19 "
0.60 7.54 "
0.60 7.10 "
0.60 7.39 "
0.60 7.58 "
0.60 6.77 "
0.60 6.77 "
118.94 "
-8.92 "
110.02 Cum.
0.60 7.25 "
0.60 7.49 "
0.60 6.48 "
0.60 6.19 "
0.60 7.06 "
0.60 6.14 "
0.60 5.38 "
0.60 7.06 "
0.60 7.30 "
0.60 6.10 "
0.60 6.24 "
0.60 6.86 "
0.60 6.14 "
85.68
-6.43 "
79.25 Cum.

0.60 7.54 "


0.60 7.06 "
0.60 6.24 "
0.60 7.39 "
0.60 7.30 "
0.60 6.62 "
0.60 7.34 "

0.60 6.29 "

0.60 5.81 "


0.60 4.66 "
66.24
-4.97 "
61.27 Cum.

0.60 5.38 "


0.60 5.81 "

0.60 6.19 "


0.60 6.05 "

0.60 7.49 "

0.60 7.92 "


38.83 "
-2.91 "
35.92 Cum.
I.No Description No. L B
18 Laying spreading and compacting stone aggregate of specified sizes
to
Ist WBM specifications
layer, 90- 45mm including spreading in uniform thickness,
hand picking, rolling with 3 wheeled road / vibratory roller 8-10
Near
tonneRD(-12.30)
in stages totoproper
Draingrade
Edge and
RD199.50
camber, applying and brooming 1 12.30 (0.80+0.90)/2
requisite type of screening / binding material to fill up interstices of 1 9.40 (3.40+2.80)/2
coarse aggregate watering and compacting to the required density . 1 15.00 (2.80+1.60)/2
1 15.00 (1.60+2.10)/2
1 15.00 (2.10+1.60)/2
1 15.00 (1.60+1.50)/2
1 15.00 (1.50+1.40)/2
1 15.00 (1.40+1.40)/2
1 15.00 (1.40+1.25)/2
1 15.00 (1.25+1.20)/2
1 9.60 (1.20+1.10)/2
1 13.50 (1.20+1.10)/2
1 12.00 (4.08+4.55)/2
1 15.00 (4.55+5.30)/2
1 15.00 (5.30+4.25)/2
1 5.00 (4.25+4.20)/2
Deduction 1 13.50 (0.80+0.90)/2
After BudhSingh Marg Cut RD-283.50 to 309.00 1 15.00 (2.40+1.95)/2
1 1.50 (1.95+2.00)/2
1 1.30 (2.00+1.50)/2
1 7.70 (4.35+4.90)/2
Deduction for chamber Edge 1 1.70 (1.10+1.20)/2

18 Laying spreading and compacting stone aggregate of specified sizes


to WBM specifications including spreading in uniform thickness,
hand picking, rolling with 3 wheeled road / vibratory roller 8-10
IInd
tonnelayer, 63-45mm
in stages to proper grade and camber, applying and brooming
Dallupura
requisite Bound
type of screening / binding material to fill up interstices of
coarse aggregate watering
Near RD(-12.30) and compacting
to Drain Edge RD199.50 to the required density . 1 12.30 (0.80+0.90)/2
1 9.40 (3.40+2.80)/2
1 15.00 (2.80+1.60)/2
1 15.00 (1.60+2.10)/2
1 15.00 (2.10+1.60)/2
1 15.00 (1.60+1.50)/2
1 15.00 (1.50+1.40)/2
1 15.00 (1.40+1.40)/2
1 15.00 (1.40+1.25)/2
1 15.00 (1.25+1.20)/2
1 9.60 (1.20+1.10)/2
1 13.50 (1.20+1.10)/2
1 12.00 (4.08+4.55)/2
1 15.00 (4.55+5.30)/2
1 15.00 (5.30+4.25)/2
1 5.00 (4.25+4.20)/2
Deduction 1 13.50 (0.80+0.90)/2
After BudhSingh Marg Cut RD-283.50 to 309.00 1 15.00 (2.40+1.95)/2
1 1.50 (1.95+2.00)/2
1 1.30 (2.00+1.50)/2
1 7.70 (4.35+4.90)/2
Deduction for chamber Edge 1 1.70 (1.10+1.20)/2
18 Laying spreading and compacting stone aggregate of specified sizes
to WBM
IIIrd layer,specifications
53-22.50mm including spreading in uniform thickness,
hand picking, rolling with 3 wheeled road / vibratory roller 8-10
Dallupura Bound
tonne in stages to proper grade and camber, applying and brooming
Near RD(-12.30)
requisite to Drain Edge
type of screening RD199.50
/ binding material to fill up interstices of 1 12.30 (0.80+0.90)/2
coarse aggregate watering and compacting to the required density . 1 9.40 (3.40+2.80)/2
1 15.00 (2.80+1.60)/2
1 15.00 (1.60+2.10)/2
1 15.00 (2.10+1.60)/2
1 15.00 (1.60+1.50)/2
1 15.00 (1.50+1.40)/2
1 15.00 (1.40+1.40)/2
1 15.00 (1.40+1.25)/2
1 15.00 (1.25+1.20)/2
1 9.60 (1.20+1.10)/2
1 13.50 (1.20+1.10)/2
1 12.00 (4.08+4.55)/2
1 15.00 (4.55+5.30)/2
1 15.00 (5.30+4.25)/2
1 5.00 (4.25+4.20)/2
Deduction 1 13.50 (0.80+0.90)/2
After BudhSingh Marg Cut RD-283.50 to 309.00 1 15.00 (2.40+1.95)/2
1 1.50 (1.95+2.00)/2
1 1.30 (2.00+1.50)/2
1 7.70 (4.35+4.90)/2
Deduction for chamber Edge 1 1.70 (1.10+1.20)/2

18 Laying spreading and compacting stone aggregate of specified sizes


to WBM specifications including spreading in uniform thickness,
hand picking,
IVth layer, rolling with 3 wheeled road / vibratory roller 8-10
53-22.50mm
tonne in stages to proper grade and camber, applying and brooming
Dallupura Bound
requisite type of screening / binding material to fill up interstices of
Near RD(-12.30) to Drain Edge
coarse aggregate watering RD199.50 to the required density .
and compacting 1 12.30 (0.80+0.90)/2
1 9.40 (3.40+2.80)/2
1 15.00 (2.80+1.60)/2
1 15.00 (1.60+2.10)/2
1 15.00 (2.10+1.60)/2
1 15.00 (1.60+1.50)/2
1 15.00 (1.50+1.40)/2
1 15.00 (1.40+1.40)/2
1 15.00 (1.40+1.25)/2
1 15.00 (1.25+1.20)/2
1 9.60 (1.20+1.10)/2
1 13.50 (1.20+1.10)/2
1 12.00 (4.08+4.55)/2
1 15.00 (4.55+5.30)/2
1 15.00 (5.30+4.25)/2
1 5.00 (4.25+4.20)/2
Deduction 1 13.50 (0.80+0.90)/2
After BudhSingh Marg Cut RD-283.50 to 309.00 1 15.00 (2.40+1.95)/2
1 1.50 (1.95+2.00)/2
1 1.30 (2.00+1.50)/2
1 7.70 (4.35+4.90)/2
Deduction for chamber Edge 1 1.70 (1.10+1.20)/2

18 Laying spreading and compacting stone aggregate of specified sizes


to
Ist WBM specifications
layer, 90- 45mm including spreading in uniform thickness,
hand picking, rolling with 3 wheeled road / vibratory roller 8-10
Noida Bound
tonne in stagesR.D 293.70 grade
to proper to R.D-350.00
and camber, applying and brooming 1 6.30 (2.90+2.85)/2
requisite type of screening / binding material to fill up interstices of 1 15.00 (2.85+3.45)/2
coarse aggregate watering and compacting to the required density . 1 15.00 (3.45+2.55)/2
1 15.00 (2.55+3.10)/2
1 5.00 (3.10+3.16)/2
Noida Bound R.D 390.00 to R.D-480.00 1 15.00 (2.87+3.00)/2
1 15.00 (3.00+2.60)/2
1 15.00 (2.60+2.70)/2
1 15.00 (2.70+2.95)/2
1 15.00 (2.95+2.80)/2
1 15.00 (2.80+3.00)/2
Deduction For slab 1 1.15 2.85

18 Laying spreading and compacting stone aggregate of specified sizes


to WBM specifications including spreading in uniform thickness,
hand picking, rolling with 3 wheeled road / vibratory roller 8-10
IInd
tonnelayer, 63-45mm
in stages to proper grade and camber, applying and brooming
Noida Bound
requisite type R.D 293.70 to/ R.D-350.00
of screening binding material to fill up interstices of 1 6.30 (2.90+2.85)/2
coarse aggregate watering and compacting to the required density . 1 15.00 (2.85+3.45)/2
1 15.00 (3.45+2.55)/2
1 15.00 (2.55+3.10)/2
1 5.00 (3.10+3.16)/2
Noida Bound R.D 390.00 to R.D-480.00 1 15.00 (2.87+3.00)/2
1 15.00 (3.00+2.60)/2
1 15.00 (2.60+2.70)/2
1 15.00 (2.70+2.95)/2
1 15.00 (2.95+2.80)/2
1 15.00 (2.80+3.00)/2
Deduction For slab 1 1.15 2.85

18 Laying spreading and compacting stone aggregate of specified sizes


to WBM
IIIrd layer,specifications
53-22.50mm including spreading in uniform thickness,
hand picking, rolling with 3 wheeled road / vibratory roller 8-10
Noida
tonne inBound
stagesR.D 293.70 grade
to proper to R.D-350.00
and camber, applying and brooming 1 6.30 (2.90+2.85)/2
requisite type of screening / binding material to fill up interstices of 1 15.00 (2.85+3.45)/2
coarse aggregate watering and compacting to the required density . 1 15.00 (3.45+2.55)/2
1 15.00 (2.55+3.10)/2
1 5.00 (3.10+3.16)/2
Noida Bound R.D 390.00 to R.D-480.00 1 15.00 (2.87+3.00)/2
1 15.00 (3.00+2.60)/2
1 15.00 (2.60+2.70)/2
1 15.00 (2.70+2.95)/2
1 15.00 (2.95+2.80)/2
1 15.00 (2.80+3.00)/2
Deduction For slab 1 1.15 2.85
18 Laying spreading and compacting stone aggregate of specified sizes
to WBM
IVth layer,specifications
53-22.50mm including spreading in uniform thickness,
hand picking, rolling with 3 wheeled road / vibratory roller 8-10
Noida Bound
tonne in stagesR.D 293.70 grade
to proper to R.D-350.00
and camber, applying and brooming 1 6.30 (2.90+2.85)/2
requisite type of screening / binding material to fill up interstices of 1 15.00 (2.85+3.45)/2
coarse aggregate watering and compacting to the required density . 1 15.00 (3.45+2.55)/2
1 15.00 (2.55+3.10)/2
1 5.00 (3.10+3.16)/2
Noida Bound R.D 390.00 to R.D-480.00 1 15.00 (2.87+3.00)/2
1 15.00 (3.00+2.60)/2
1 15.00 (2.60+2.70)/2
1 15.00 (2.70+2.95)/2
1 15.00 (2.95+2.80)/2
1 15.00 (2.80+3.00)/2
Deduction For slab 1 1.15 2.85

18 Laying spreading and compacting stone aggregate of specified sizes


to WBM specifications including spreading in uniform thickness,
hand picking, rolling with 3 wheeled road / vibratory roller 8-10
Ist layer, 90- 45mm
tonne in stages to proper grade and camber, applying and brooming
Noida Bound
requisite type R.D 505.00 to/ R.D
of screening 780.00
binding material to fill up interstices of 1 5.00 (2.95+2.95)/2
coarse aggregate watering and compacting to the required density . 1 15.00 (2.95+2.65)/2
1 15.00 (2.65+2.80)/2
1 15.00 (2.80+2.75)/2
1 15.00 (2.75+2.50)/2
1 15.00 (2.50+2.90)/2
1 15.00 (2.90+3.40)/2
1 15.00 (3.40+3.85)/2
1 15.00 (3.85+4.60)/2
1 15.00 (4.60+5.45)/2
1 15.00 (5.45+5.70)/2
1 15.00 (5.70+5.93)/2
1 15.00 (5.93+6.05)/2
1 15.00 (6.05+6.00)/2
1 15.00 (6.00+5.55)/2
1 15.00 (5.55+5.05)/2
1 15.00 (5.05+5.25)/2
1 15.00 (5.25+5.40)/2
1 15.00 (5.40+5.50)/2
Deduction For M.H. 2 3.14./4 0.85
Deduction For M.H. 1 1.50 1.70

18 Laying spreading and compacting stone aggregate of specified sizes


to WBM specifications including spreading in uniform thickness,
IInd layer, 63-45mm
hand picking, rolling with 3 wheeled road / vibratory roller 8-10
Noida Bound
tonne in stagesR.D 505.00 grade
to proper to R.Dand
780.00
camber, applying and brooming 1 5.00 (2.95+2.95)/2
requisite type of screening / binding material to fill up interstices of 1 15.00 (2.95+2.65)/2
coarse aggregate watering and compacting to the required density . 1 15.00 (2.65+2.80)/2
1 15.00 (2.80+2.75)/2
1 15.00 (2.75+2.50)/2
1 15.00 (2.50+2.90)/2
1 15.00 (2.90+3.40)/2
1 15.00 (3.40+3.85)/2
1 15.00 (3.85+4.60)/2
1 15.00 (4.60+5.45)/2
1 15.00 (5.45+5.70)/2
1 15.00 (5.70+5.93)/2
1 15.00 (5.93+6.05)/2
1 15.00 (6.05+6.00)/2
1 15.00 (6.00+5.55)/2
1 15.00 (5.55+5.05)/2
1 15.00 (5.05+5.25)/2
1 15.00 (5.25+5.40)/2
1 15.00 (5.40+5.50)/2
Deduction For M.H. 2 3.14./4 0.85
Deduction For M.H. 1 1.50 1.70

18 Laying spreading and compacting stone aggregate of specified sizes


to WBM
IIIrd layer,specifications
53-22.50mm including spreading in uniform thickness,
hand picking, rolling with 3 wheeled road / vibratory roller 8-10
Noida
tonne inBound
stagesR.D 505.00 grade
to proper to R.Dand
780.00
camber, applying and brooming 1 5.00 (2.95+2.95)/2
requisite type of screening / binding material to fill up interstices of 1 15.00 (2.95+2.65)/2
coarse aggregate watering and compacting to the required density . 1 15.00 (2.65+2.80)/2
1 15.00 (2.80+2.75)/2
1 15.00 (2.75+2.50)/2
1 15.00 (2.50+2.90)/2
1 15.00 (2.90+3.40)/2
1 15.00 (3.40+3.85)/2
1 15.00 (3.85+4.60)/2
1 15.00 (4.60+5.45)/2
1 15.00 (5.45+5.70)/2
1 15.00 (5.70+5.93)/2
1 15.00 (5.93+6.05)/2
1 15.00 (6.05+6.00)/2
1 15.00 (6.00+5.55)/2
1 15.00 (5.55+5.05)/2
1 15.00 (5.05+5.25)/2
1 15.00 (5.25+5.40)/2
1 15.00 (5.40+5.50)/2
Deduction For M.H. 2 3.14./4 0.85
Deduction For M.H. 1 1.50 1.70

18 Laying spreading and compacting stone aggregate of specified sizes


to WBM specifications including spreading in uniform thickness,
IVth layer, 53-22.50mm
hand picking, rolling with 3 wheeled road / vibratory roller 8-10
Noida Bound
tonne in stagesR.D 505.00 grade
to proper to R.Dand
780.00
camber, applying and brooming 1 5.00 (2.95+2.95)/2
requisite type of screening / binding material to fill up interstices of 1 15.00 (2.95+2.65)/2
coarse aggregate watering and compacting to the required density . 1 15.00 (2.65+2.80)/2
1 15.00 (2.80+2.75)/2
1 15.00 (2.75+2.50)/2
1 15.00 (2.50+2.90)/2
1 15.00 (2.90+3.40)/2
1 15.00 (3.40+3.85)/2
1 15.00 (3.85+4.60)/2
1 15.00 (4.60+5.45)/2
1 15.00 (5.45+5.70)/2
1 15.00 (5.70+5.93)/2
1 15.00 (5.93+6.05)/2
1 15.00 (6.05+6.00)/2
1 15.00 (6.00+5.55)/2
1 15.00 (5.55+5.05)/2
1 15.00 (5.05+5.25)/2
1 15.00 (5.25+5.40)/2
1 15.00 (5.40+5.50)/2
Deduction For M.H. 2 3.14./4 0.85
Deduction For M.H. 1 1.50 1.70

18 Laying spreading and compacting stone aggregate of specified sizes


to WBM specifications including spreading in uniform thickness,
Ist layer, 90- 45mm
hand picking, rolling with 3 wheeled road / vibratory roller 8-10
Noida Bound
tonne in stagesR.D 780.00 grade
to proper to R.D-905.50
and camber, applying and brooming 1 15.00 (5.50+5.90)/2
requisite type of screening / binding material to fill up interstices of 1 15.00 (5.90+6.20)/2
coarse aggregate watering and compacting to the required density . 1 15.00 (6.20+6.80)/2
1 15.00 (6.80+7.15)/2
1 15.00 (7.15+7.22)/2
1 15.00 (7.22+7.45)/2
1 15.00 (7.45+7.82)/2
1 15.00 (7.82+7.90)/2
1 5.50 (7.90+7.90)/2

18 Laying spreading and compacting stone aggregate of specified sizes


to
IIndWBM
layer, specifications
63-45mm including spreading in uniform thickness,
hand picking, rolling with 3 wheeled road / vibratory roller 8-10
Noida Bound
tonne in stagesR.D 780.00 grade
to proper to R.D-905.50
and camber, applying and brooming 1 15.00 (5.50+5.90)/2
requisite type of screening / binding material to fill up interstices of 1 15.00 (5.90+6.20)/2
coarse aggregate watering and compacting to the required density . 1 15.00 (6.20+6.80)/2
1 15.00 (6.80+7.15)/2
1 15.00 (7.15+7.22)/2
1 15.00 (7.22+7.45)/2
1 15.00 (7.45+7.82)/2
1 15.00 (7.82+7.90)/2
1 5.50 (7.90+7.90)/2

18 Laying spreading and compacting stone aggregate of specified sizes


to WBM specifications including spreading in uniform thickness,
IIIrd layer, 53-22.50mm
hand picking, rolling with 3 wheeled road / vibratory roller 8-10
Noida
tonne inBound
stagesR.D 780.00 grade
to proper to R.D-905.50
and camber, applying and brooming 1 15.00 (5.50+5.90)/2
requisite type of screening / binding material to fill up interstices of 1 15.00 (5.90+6.20)/2
coarse aggregate watering and compacting to the required density . 1 15.00 (6.20+6.80)/2
1 15.00 (6.80+7.15)/2
1 15.00 (7.15+7.22)/2
1 15.00 (7.22+7.45)/2
1 15.00 (7.45+7.82)/2
1 15.00 (7.82+7.90)/2
1 5.50 (7.90+7.90)/2

18 Laying spreading and compacting stone aggregate of specified sizes


to WBM
IVth layer,specifications
53-22.50mm including spreading in uniform thickness,
hand picking, rolling with 3 wheeled road / vibratory roller 8-10
Noida Bound R.D 780.00 to R.D-905.50 1 15.00 (5.50+5.90)/2
tonne in stages to proper grade and camber, applying and brooming
requisite type of screening / binding material to fill up interstices of
1 15.00 (5.90+6.20)/2
1 15.00 (6.20+6.80)/2
1 15.00 (6.80+7.15)/2
1 15.00 (7.15+7.22)/2
1 15.00 (7.22+7.45)/2
1 15.00 (7.45+7.82)/2
1 15.00 (7.82+7.90)/2
1 5.50 (7.90+7.90)/2

18 Laying spreading and compacting stone aggregate of specified sizes


to
Ist WBM specifications
layer, 90- 45mm including spreading in uniform thickness,
hand picking, rolling with 3 wheeled road / vibratory roller 8-10
Noida Bound R.D 922.00 to R.D-1023.40 1 8.00 (4.95+4.75)/2
tonne in stages to proper grade and camber, applying and brooming
requisite type of screening / binding material to fill up interstices of 1 15.00 (4.75+4.75)/2
coarse aggregate watering and compacting to the required density . 1 15.00 (4.75+4.90)/2
1 15.00 (4.90+4.90)/2
1 15.00 (4.90+5.00)/2
1 15.00 (5.00+5.35)/2
1 13.20 (5.35+5.80)/2
Flair 2./3 5.20 5.8
Budhsingh Marg Cut C/v 1 10.55 (1.80+1.80)/2
Noida Bound R.D.96.00 to R.D 117.00 1 15.00 (1.80+2.20)/2
1 6.00 (2.20+2.50)/2
BudhSingh Marg Vasundhara Bound 1 15.00 (2.30+2.50)/2
1 9.10 (2.50+2.95)/2
1 5.40 (2.95+3.20)/2
1 22.00 (1.35+1.20)/2
C/V Budh singh Marg Cut 1 10.55 (1.80+1.80)/2

18 Laying spreading and compacting stone aggregate of specified sizes


to
IIndWBM
layer, specifications
63-45mm including spreading in uniform thickness,
hand
Noida Bound R.D 922.00 to 3R.D-1023.40
picking, rolling with wheeled road / vibratory roller 8-10 1 8.00 (4.95+4.75)/2
tonne in stages to proper grade and camber, applying and brooming
requisite type of screening / binding material to fill up interstices of 1 15.00 (4.75+4.75)/2
coarse aggregate watering and compacting to the required density . 1 15.00 (4.75+4.90)/2
1 15.00 (4.90+4.90)/2
1 15.00 (4.90+5.00)/2
1 15.00 (5.00+5.35)/2
1 13.20 (5.35+5.80)/2
Flair 2./3 5.20 5.8
Budhsingh Marg Cut C/v 1 10.55 (1.80+1.80)/2
Noida Bound R.D.96.00 to R.D 117.00 1 15.00 (1.80+2.20)/2
1 6.00 (2.20+2.50)/2
BudhSingh Marg Vasundhara Bound 1 15.00 (2.30+2.50)/2
1 9.10 (2.50+2.95)/2
1 5.40 (2.95+3.20)/2
1 22.00 (1.35+1.20)/2
C/V Budh singh Marg Cut 1 10.55 (1.80+1.80)/2

18 Laying spreading and compacting stone aggregate of specified sizes


to WBM
IIIrd layer,specifications
53-22.50mm including spreading in uniform thickness,
hand picking, rolling with 3 wheeled road / vibratory roller 8-10
Noida
tonne inBound
stagesR.D 922.00 grade
to proper to R.D-1023.40
and camber, applying and brooming 1 8.00 (4.95+4.75)/2
requisite type of screening / binding material to fill up interstices of
coarse aggregate watering and compacting to the required density .
1 15.00 (4.75+4.75)/2
1 15.00 (4.75+4.90)/2
1 15.00 (4.90+4.90)/2
1 15.00 (4.90+5.00)/2
1 15.00 (5.00+5.35)/2
1 13.20 (5.35+5.80)/2
Flair 2./3 5.20 5.8
Budhsingh Marg Cut C/v 1 10.55 (1.80+1.80)/2
Noida Bound R.D.96.00 to R.D 117.00 1 15.00 (1.80+2.20)/2
1 6.00 (2.20+2.50)/2
BudhSingh Marg Vasundhara Bound 1 15.00 (2.30+2.50)/2
1 9.10 (2.50+2.95)/2
1 5.40 (2.95+3.20)/2
1 22.00 (1.35+1.20)/2
C/V Budh singh Marg Cut 1 10.55 (1.80+1.80)/2

18 Laying spreading and compacting stone aggregate of specified sizes


to WBM
IVth layer,specifications
53-22.50mm including spreading in uniform thickness,
hand picking, rolling with 3 wheeled road / vibratory roller 8-10
Noida Bound R.D 922.00 to R.D-1023.40 1 8.00 (4.95+4.75)/2
tonne in stages to proper grade and camber, applying and brooming
requisite type of screening / binding material to fill up interstices of 1 15.00 (4.75+4.75)/2
coarse aggregate watering and compacting to the required density . 1 15.00 (4.75+4.90)/2
1 15.00 (4.90+4.90)/2
1 15.00 (4.90+5.00)/2
1 15.00 (5.00+5.35)/2
1 13.20 (5.35+5.80)/2
Flair 2./3 5.20 5.8
Budhsingh Marg Cut C/v 1 10.55 (1.80+1.80)/2
Noida Bound R.D.96.00 to R.D 117.00 1 15.00 (1.80+2.20)/2
1 6.00 (2.20+2.50)/2
BudhSingh Marg Vasundhara Bound 1 15.00 (2.30+2.50)/2
1 9.10 (2.50+2.95)/2
1 5.40 (2.95+3.20)/2
1 22.00 (1.35+1.20)/2
C/V Budh singh Marg Cut 1 10.55 (1.80+1.80)/2

18 Laying spreading and compacting stone aggregate of specified sizes


to
Ist WBM specifications
layer, 90- 45mm including spreading in uniform thickness,
hand picking, rolling with 3 wheeled road / vibratory roller 8-10
Cutting
tonne inBy Jalboard
stages to proper grade and camber, applying and brooming 1 6.70 (2.00+2.00)/2
requisite type of screening / binding material to fill up interstices of 1 9.45 (2.25+2.30)/2
coarse aggregate watering and compacting to the required density . 1 4.30 (2.65+2.62)/2
1 5.10 (2.75+2.80)/2
Vasundhara Cut 1 14.00 (3.55+3.50)/2
1 2.20 (1.20+1.20)/2
Noida Bound R.D 350.00 to R.D-390.00 1 10.00 (3.16+3.22)/2
1 15.00 (3.22+3.05)/2
1 15.00 (3.05+2.87)/2
Noida Bound R.D 480.00 to R.D-505.00 1 15.00 (3.00+3.00)/2
1 10.00 (3.00+2.95)/2
Noida Bound R.D 905.50 to R.D-922.00 1 9.50 (5.25+5.25)/2
1 7.00 (5.25+4.95)/2
18 Laying spreading and compacting stone aggregate of specified sizes
to
IIndWBM
layer, specifications
63-45mm including spreading in uniform thickness,
hand picking, rolling with 3 wheeled road / vibratory roller 8-10
Cutting
tonne inBy Jalboard
stages to proper grade and camber, applying and brooming 1 6.70 (2.00+2.00)/2
requisite type of screening / binding material to fill up interstices of 1 9.45 (2.25+2.30)/2
coarse aggregate watering and compacting to the required density . 1 4.30 (2.65+2.62)/2
1 5.10 (2.75+2.80)/2
Vasundhara Cut 1 14.00 (3.55+3.50)/2
1 2.20 (1.20+1.20)/2
Noida Bound R.D 350.00 to R.D-390.00 1 10.00 (3.16+3.22)/2
1 15.00 (3.22+3.05)/2
1 15.00 (3.05+2.87)/2
Noida Bound R.D 480.00 to R.D-505.00 1 15.00 (3.00+3.00)/2
1 10.00 (3.00+2.95)/2
Noida Bound R.D 905.50 to R.D-922.00 1 9.50 (5.25+5.25)/2
1 7.00 (5.25+4.95)/2

18 Laying spreading and compacting stone aggregate of specified sizes


to WBM
IIIrd layer,specifications
53-22.50mm including spreading in uniform thickness,
hand picking, rolling with 3 wheeled road / vibratory roller 8-10
Cutting
tonne inBy Jalboard
stages to proper grade and camber, applying and brooming 1 6.70 (2.00+2.00)/2
requisite type of screening / binding material to fill up interstices of 1 9.45 (2.25+2.30)/2
coarse aggregate watering and compacting to the required density . 1 4.30 (2.65+2.62)/2
1 5.10 (2.75+2.80)/2
Vasundhara Cut 1 14.00 (3.55+3.50)/2
1 2.20 (1.20+1.20)/2
Noida Bound R.D 350.00 to R.D-390.00 1 10.00 (3.16+3.22)/2
1 15.00 (3.22+3.05)/2
1 15.00 (3.05+2.87)/2
Noida Bound R.D 480.00 to R.D-505.00 1 15.00 (3.00+3.00)/2
1 10.00 (3.00+2.95)/2
Noida Bound R.D 905.50 to R.D-922.00 1 9.50 (5.25+5.25)/2
1 7.00 (5.25+4.95)/2

18 Laying spreading and compacting stone aggregate of specified sizes


to WBM
IVth layer,specifications
53-22.50mm including spreading in uniform thickness,
hand picking, rolling with 3 wheeled road / vibratory roller 8-10
Noida Bound R.D 922.00 to R.D-1023.40 1 8.00 (4.95+4.75)/2
tonne in stages to proper grade and camber, applying and brooming
requisite type of screening / binding material to fill up interstices of 1 15.00 (4.75+4.75)/2
coarse aggregate watering and compacting to the required density . 1 15.00 (4.75+4.90)/2
1 15.00 (4.90+4.90)/2
1 15.00 (4.90+5.00)/2
1 15.00 (5.00+5.35)/2
1 13.20 (5.35+5.80)/2
Flair 2./3 5.20 5.8
Budhsingh Marg Cut C/v 1 10.55 (1.80+1.80)/2
Noida Bound R.D.96.00 to R.D 117.00 1 15.00 (1.80+2.20)/2
1 6.00 (2.20+2.50)/2
BudhSingh Marg Vasundhara Bound 1 15.00 (2.30+2.50)/2
1 9.10 (2.50+2.95)/2
1 5.40 (2.95+3.20)/2
1 22.00 (1.35+1.20)/2
C/V Budh singh Marg Cut 1 10.55 (1.80+1.80)/2
D or H Quantity Unit

0.10 1.05 Cum.


0.10 2.91 "
0.10 3.30 "
0.10 2.78 "
0.10 2.78 "
0.10 2.33 "
0.10 2.18 "
0.10 2.10 "
0.10 1.99 "
0.10 1.84 "
0.10 1.10 "
0.10 1.55 "
0.10 5.18 "
0.10 7.39 "
0.10 7.16 "
0.10 2.11 "
0.10 -1.15 "
0.10 3.26 "
0.10 0.30 "
0.10 0.23 "
0.10 3.56 "
0.10 -0.20 "
53.75 "

0.075 0.78 Cum.


0.075 2.19 "
0.075 2.48 "
0.075 2.08 "
0.075 2.08 "
0.075 1.74 "
0.075 1.63 "
0.075 1.58 "
0.075 1.49 "
0.075 1.38 "
0.075 0.83 "
0.075 1.16 "
0.075 3.88 "
0.075 5.54 "
0.075 5.37 "
0.075 1.58 "
0.075 -0.86 "
0.075 2.45 "
0.075 0.22 "
0.075 0.17 "
0.075 2.67 "
0.075 -0.15 "
40.29 "

0.075 0.78 Cum.


0.075 2.19 "
0.075 2.48 "
0.075 2.08 "
0.075 2.08 "
0.075 1.74 "
0.075 1.63 "
0.075 1.58 "
0.075 1.49 "
0.075 1.38 "
0.075 0.83 "
0.075 1.16 "
0.075 3.88 "
0.075 5.54 "
0.075 5.37 "
0.075 1.58 "
0.075 -0.86 "
0.075 2.45 "
0.075 0.22 "
0.075 0.17 "
0.075 2.67 "
0.075 -0.15 "
40.29 "

0.075 0.78 Cum.


0.075 2.19 "
0.075 2.48 "
0.075 2.08 "
0.075 2.08 "
0.075 1.74 "
0.075 1.63 "
0.075 1.58 "
0.075 1.49 "
0.075 1.38 "
0.075 0.83 "
0.075 1.16 "
0.075 3.88 "
0.075 5.54 "
0.075 5.37 "
0.075 1.58 "
0.075 -0.86 "
0.075 2.45 "
0.075 0.22 "
0.075 0.17 "
0.075 2.67 "
0.075 -0.15 "
40.29 "

0.10 1.81 Cum.


0.10 4.73 "
0.10 4.50 "
0.10 4.24 "
0.10 1.57 "
0.10 4.40 "
0.10 4.20 "
0.10 3.98 "
0.10 4.24 "
0.10 4.31 "
0.10 4.35 "
0.10 -0.33 "
42.00 "

0.075 1.36 Cum.


0.075 3.54 "
0.075 3.38 "
0.075 3.18 "
0.075 1.17 "
0.075 3.30 "
0.075 3.15 "
0.075 2.98 "
0.075 3.18 "
0.075 3.23 "
0.075 3.26 "
0.075 -0.25 "
31.48 "

0.075 1.36 Cum.


0.075 3.54 "
0.075 3.38 "
0.075 3.18 "
0.075 1.17 "
0.075 3.30 "
0.075 3.15 "
0.075 2.98 "
0.075 3.18 "
0.075 3.23 "
0.075 3.26 "
0.075 -0.25 "
31.48 "
0.075 1.36 Cum.
0.075 3.54 "
0.075 3.38 "
0.075 3.18 "
0.075 1.17 "
0.075 3.30 "
0.075 3.15 "
0.075 2.98 "
0.075 3.18 "
0.075 3.23 "
0.075 3.26 "
0.075 -0.25 "
31.48 "

0.10 1.48 Cum.


0.10 4.20 "
0.10 4.09 "
0.10 4.16 "
0.10 3.94 "
0.10 4.05 "
0.10 4.73 "
0.10 5.44 "
0.10 6.34 "
0.10 7.54 "
0.10 8.36 "
0.10 8.72 "
0.10 8.99 "
0.10 9.04 "
0.10 8.66 "
0.10 7.95 "
0.10 7.73 "
0.10 7.99 "
0.10 8.18 "
0.10 -0.13 "
0.10 -0.26 "
121.20 "

0.075 1.11 Cum.


0.075 3.15 "
0.075 3.07 "
0.075 3.12 "
0.075 2.95 "
0.075 3.04 "
0.075 3.54 "
0.075 4.08 "
0.075 4.75 "
0.075 5.65 "
0.075 6.27 "
0.075 6.54 "
0.075 6.74 "
0.075 6.78 "
0.075 6.50 "
0.075 5.96 "
0.075 5.79 "
0.075 5.99 "
0.075 6.13 "
0.075 -0.10 "
0.075 -0.19 "
90.87 "

0.075 1.11 Cum.


0.075 3.15 "
0.075 3.07 "
0.075 3.12 "
0.075 2.95 "
0.075 3.04 "
0.075 3.54 "
0.075 4.08 "
0.075 4.75 "
0.075 5.65 "
0.075 6.27 "
0.075 6.54 "
0.075 6.74 "
0.075 6.78 "
0.075 6.50 "
0.075 5.96 "
0.075 5.79 "
0.075 5.99 "
0.075 6.13 "
0.075 -0.10 "
0.075 -0.19 "
90.87 "

0.075 1.11 Cum.


0.075 3.15 "
0.075 3.07 "
0.075 3.12 "
0.075 2.95 "
0.075 3.04 "
0.075 3.54 "
0.075 4.08 "
0.075 4.75 "
0.075 5.65 "
0.075 6.27 "
0.075 6.54 "
0.075 6.74 "
0.075 6.78 "
0.075 6.50 "
0.075 5.96 "
0.075 5.79 "
0.075 5.99 "
0.075 6.13 "
0.075 -0.10 "
0.075 -0.19 "
90.87 "

0.10 8.55 "


0.10 9.08 "
0.10 9.75 "
0.10 10.46 "
0.10 10.78 "
0.10 11.00 "
0.10 11.45 "
0.10 11.79 "
0.10 4.35 "
87.21 "

0.075 6.41 "


0.075 6.81 "
0.075 7.31 "
0.075 7.85 "
0.075 8.08 "
0.075 8.25 "
0.075 8.59 "
0.075 8.84 "
0.075 3.26 "
65.40 "

0.075 6.41 "


0.075 6.81 "
0.075 7.31 "
0.075 7.85 "
0.075 8.08 "
0.075 8.25 "
0.075 8.59 "
0.075 8.84 "
0.075 3.26 "
65.40 "

0.075 6.41 "


0.075 6.81 "
0.075 7.31 "
0.075 7.85 "
0.075 8.08 "
0.075 8.25 "
0.075 8.59 "
0.075 8.84 "
0.075 3.26 "
65.40 "

0.10 4.00 "


0.10 7.13 "
0.10 7.24 "
0.10 7.35 "
0.10 7.43 "
0.10 7.76 "
0.10 7.36 "
0.10 1.99 "
0.10 1.90 "
0.10 3.00 "
0.10 1.41 "
0.10 3.60 "
0.10 2.48 "
0.10 1.66 "
0.10 2.81 "
0.10 1.90 "
69.02 "

0.075 3.00 "


0.075 5.34 "
0.075 5.43 "
0.075 5.51 "
0.075 5.57 "
0.075 5.82 "
0.075 5.52 "
0.075 1.49 "
0.075 1.42 "
0.075 2.25 "
0.075 1.06 "
0.075 2.70 "
0.075 1.86 "
0.075 1.25 "
0.075 2.10 "
0.075 1.42 "
51.74 "

0.075 3.00 "


0.075 5.34 "
0.075 5.43 "
0.075 5.51 "
0.075 5.57 "
0.075 5.82 "
0.075 5.52 "
0.075 1.49 "
0.075 1.42 "
0.075 2.25 "
0.075 1.06 "
0.075 2.70 "
0.075 1.86 "
0.075 1.25 "
0.075 2.10 "
0.075 1.42 "
51.74 "

0.075 3.00 "


0.075 5.34 "
0.075 5.43 "
0.075 5.51 "
0.075 5.57 "
0.075 5.82 "
0.075 5.52 "
0.075 1.49 "
0.075 1.42 "
0.075 2.25 "
0.075 1.06 "
0.075 2.70 "
0.075 1.86 "
0.075 1.25 "
0.075 2.10 "
0.075 1.42 "
51.74 "

0.10 1.34 Cum.


0.10 2.15 "
0.10 1.13 "
0.10 1.42 "
0.10 4.94 "
0.10 0.26 "
0.10 3.19 "
0.10 4.70 "
0.10 4.44 "
0.10 4.50 "
0.10 2.98 "
0.10 4.99 "
0.10 3.50 "
39.54 "
0.075 1.01 Cum.
0.075 1.61 "
0.075 0.85 "
0.075 1.06 "
0.075 3.70 "
0.075 0.20 "
0.075 2.39 "
0.075 3.53 "
0.075 3.33 "
0.075 3.38 "
0.075 2.23 "
0.075 3.74 "
0.075 2.63 "
29.66 "

0.075 1.01 Cum.


0.075 1.61 "
0.075 0.85 "
0.075 1.06 "
0.075 3.70 "
0.075 0.20 "
0.075 2.39 "
0.075 3.53 "
0.075 3.33 "
0.075 3.38 "
0.075 2.23 "
0.075 3.74 "
0.075 2.63 "
29.66 "

0.075 3.00 "


0.075 5.34 "
0.075 5.43 "
0.075 5.51 "
0.075 5.57 "
0.075 5.82 "
0.075 5.52 "
0.075 1.49 "
0.075 1.42 "
0.075 2.25 "
0.075 1.06 "
0.075 2.70 "
0.075 1.86 "
0.075 1.25 "
0.075 2.10 "
0.075 1.42 "
51.74 "
I.No Description No. L B
19 Providing and applying tack coat using hot straight run bitumen
of grade 80/ 100 including heating the bitumen, spraying the
bitumen with mechanically operated spray unit fitted on bitumen
boiler, cleaning and preparing the existing road surface as per
(b) On W.B.M. @: 0.75 Kg / sqm.
specifications
Dallupura Bound
Near RD( -12.30)to Drain Edge RD 199.50
1 12.30 (0.80+0.90)/2
1 9.40 (3.40+2.80)/2
1 15.00 (2.80+1.60)/2
1 15.00 (1.60+2.10)/2
1 15.00 (2.10+1.60)/2
1 15.00 (1.60+1.50)/2
1 15.00 (1.50+1.40)/2
1 15.00 (1.40+1.40)/2
1 15.00 (1.40+1.25)/2
1 15.00 (1.25+1.20)/2
1 9.60 (1.20+1.10)/2
1 13.50 (1.20+1.10)/2
1 12.00 (4.08+4.55)/2
1 15.00 (4.55+5.30)/2
1 15.00 (5.30+4.25)/2
1 5.00 (4.25+4.20)/2
Deduction 1 13.50 (0.80+0.90)/2
After BudhSingh Marg Cut RD 283.50 to 305.00
1 5.00 (2.65+2.40)/2
1 6.00 (2.40+1.95)/2
1 1.50 (1.95+2.0)/2
1 1.30 (2.0+1.50)/2
1 7.70 (4.35+4.90)/2
Deduction for chamber Edge 1 1.70 (1.10+1.20)/2
Cutting By Jal board 1 6.70 (2.00+2.00)/2
1 9.45 (2.25+2.30)/2
1 4.30 (2.65+2.62)/2
1 5.10 (2.75+2.80)/2
Vasundhara Cut 1 14.00 (3.55+3.50)/2
1 2.20 (1.20+1.20)/2
Noida Bound R.D 293.70 to R.D 705.00
1 6.30 (2.90+2.85)/2
1 15.00 (2.85+3.45)/2
1 15.00 (3.45+2.55)/2
1 15.00 (2.55+3.10)/2
1 15.00 (3.10+3.22)/2
1 15.00 (3.22+3.05)/2
1 15.00 (3.05+2.87)/2
1 15.00 (2.87+3.00)/2
1 15.00 (3.00+2.60)/2
1 15.00 (2.60+2.70)/2
1 15.00 (2.70+2.95)/2
1 15.00 (2.95+2.80)/2
1 15.00 (2.80+3.00)/2
1 15.00 3.00+3.00)/2
1 15.00 (3.00+2.95)/2
1 15.00 (2.95+2.65)/2
1 15.00 (2.65+2.80)/2
1 15.00 (2.80+2.75)/2
1 15.00 (2.75+2.50)/2
1 15.00 (2.50+2.90)/2
1 15.00 (2.90+3.40)/2
1 15.00 (3.40+3.85)/2
1 15.00 (3.85+4.60)/2
1 15.00 (4.60+5.45)/2
1 15.00 (5.45+5.70)/2
1 15.00 (5.70+5.93)/2
1 15.00 (5.93+6.05)/2
1 15.00 (6.05+6.00)/2

19 Providing and applying tack coat using hot straight run bitumen
of grade 80/ 100 including heating the bitumen, spraying the
bitumen with mechanically operated spray unit fitted on bitumen
boiler, cleaning and preparing the existing road surface as per
(b) On W.B.M. @: 0.75 Kg / sqm.
specifications
Noida Bound R.D 705.00 to R.D 1023.40
1 15.00 (6.00+5.55)/2
1 15.00 (5.55+5.05)/2
1 15.00 (5.05+5.25)/2
1 15.00 (5.25+5.40)/2
1 15.00 (5.40+5.50)/2
1 15.00 (5.50+5.90)/2
1 15.00 (5.90+6.20)/2
1 15.00 (6.20+6.80)/2
1 15.00 (6.80+7.15)/2
1 15.00 (7.15+7.22)/2
1 15.00 (7.22+7.45)/2
1 15.00 (7.45+7.82)/2
1 15.00 (7.82+7.90)/2
1 5.50 (7.90+7.90)/2
1 9.50 (5.25+5.25)/2
1 15.00 (5.25+4.75)/2
1 15.00 (4.75+4.75)/2
1 15.00 (4.75+4.90)/2
1 15.00 (4.90+4.90)/2
1 15.00 (4.90+5.00)/2
1 15.00 (5.00+5.35)/2
1 13.20 (5.35+5.80)/2
Flair 2/3 5.20 5.8
Deduction For M.H. 2 3.14./4 0.85
Deduction For slab 1 1.15 2.85
Deduction For M.H. 1 1.50 1.70
Noida Bound R.D.96.00 to R.D 117.00
1 15.00 (1.80+2.20)/2
1 6.00 (2.20+2.50)/2
BudhSingh Marg Vasundhara Bound
1 15.00 (2.30+2.50)/2
1 9.10 (2.50+2.95)/2
1 5.40 (2.95+3.20)/2
1 22.00 (1.35+1.20)/2
C/V Budh singh Marg Cut 1 10.55 (1.80+1.80)/2
D or H Quantity Unit

10.46 Sqm.
29.14 "
33.00 "
27.75 "
27.75 "
23.25 "
21.75 "
21.00 "
19.88 "
18.38 "
11.04 "
15.53
51.78 "
73.88 "
71.63 "
21.13 "
-11.48 "

12.63 "
13.05 "
2.96 "
2.28 "
35.61 "
-1.96 "
13.40 "
21.50 "
11.33 "
14.15 "
49.35 "
2.64 "

18.11 Sqm.
47.25 "
45.00 "
42.38 "
47.40 "
47.03 "
44.40 "
44.03 "
42.00 "
39.75 "
42.38 "
43.13
43.50 "
45.00 "
44.63 "
42.00 "
40.88 "
41.63 "
39.38 "
40.50 "
47.25 "
54.38 "
63.38 "
75.38 "
83.63 "
87.23 "
89.85 "
90.38 "
2074.67 "

86.63
79.50 "
77.25 "
79.88 "
81.75 "
85.50 "
90.75 "
97.50 "
104.63 "
107.78 "
110.03 "
114.53 "
117.90 "
43.45 "
49.88
75.00 "
71.25 "
72.38 "
73.50 "
74.25 "
77.63 "
73.59 "
20.11 "
-1.34 "
-3.28 "
-2.55 "

30.00 "
14.10 "

36.00 "
24.80 "
16.61 "
28.05 "
18.99 "
2026.05 "
I.No Description No. L B
19 Providing and applying tack coat using hot straight run
(a) bitumen of grade
On bituminous 80/ @100
surface 0.50including
Kg / sqm.heating the bitumen,
spraying the bitumen with mechanically operated spray unit
From RDbitumen
fitted on -44.90 toboiler,
0.00 cleaning and preparing the existing 1 4.40 (16.70+16.70)/2
road surface as per specifications : 1 3.00 (16.70+15.50)/2
1 5.00 (15.50+12.82)/2
1 5.00 (12.82+13.65)/2
1 5.00 (13.65+14.18)/2
1 7.50 (14.18+14.75)/2
1 15.00 (14.75+15.05)/2
From RD 0.00 to 6.00 1 6.00 (15.05+14.75)/2
Less paid in 2nd R/A Vide P- / EMB-
1 30.00 7.40
Less paid in 2nd R/A Vide P- / EMB-
1 16.00 7.40
Dallupura bound ( RD- 6.00 to 141.60)
1 9.00 (8.85+8.05)/2
1 15.00 (8.05+8.10)/2
1 15.00 (8.10+8.70)/2
1 5.00 (8.70+8.35)/2
1 10.00 (8.65+8.08)/2
1 15.00 (8.08+7.10)/2
1 15.00 (7.10+6.60)/2
1 15.00 (6.60+6.45)/2
1 15.00 (6.45+6.50)/2
1 15.00 (6.50+6.45)/2
1 2.00 (6.35+6.40)/2
1 3.00 (6.40+10.50)/2
1 10.00 (10.50+10.15)/2
1 2.00 (10.15+10.20)/2
Less paid in 2nd R/A Vide P- / EMB- 5 30.00 3.30
Less paid in 2nd R/A Vide P- / EMB- 1 2.00 3.30
Dallupura bound ( RD- 152.00 to 315.00) 1 13.00 (10.20+11.15)/2
1 15.00 (11.15+12.15)/2
1 15.00 (12.15+11.35)/2
1 15.00 (11.35+11.32)/2
1 15.00 (11.32+11.30)/2
1 15.00 (11.30+11.13)/2
1 15.00 (11.13+10.95)/2
1 4.35 (10.10+10.70)/2
Budh Singh Chowk RD-259.35 to 285.00 1 25.65 (10.70+21.90)/2
1 5.00 (9.30+8.80)/2
1 10.00 (8.80+8.40)/2
1 2.00 (8.40+8.45)/2
1 3.00 (8.45+8.40)/2
1 10.00 (12.80+11.30)/2
RD-302.00 1./2 3.00 4.45
Less paid in 2nd R/A Vide P- / EMB- 5 30.00 7.10
Less paid in 2nd R/A Vide P- / EMB- 1 13.00 7.10

Noida Bound ( RD- 6.00 to 141.60) 1 9.00 (7.03+6.78)/2


1 15.00 (6.78+6.84)/2
1 15.00 (6.84+7.20)/2
1 15.00 (7.20+7.16)/2
1 15.00 (7.16+7.45)/2
1 15.00 (7.45+7.70)/2
1 15.00 (7.70+8.58)/2
1 15.00 (8.58+9.10)/2
1 15.00 (9.10+9.25)/2
1 6.60 (9.25+9.32)/2
Less paid in 2nd R/A Vide P- / EMB- 4 30.00 3.30
Less paid in 2nd R/A Vide P- / EMB- 1 21.60 3.30

Noida Bound ( RD- 290.00 to 905.00) 1 10.00 (9.15+9.35)/2


1 15.00 (9.35+9.55)/2
1 15.00 (9.55+8.80)/2
1 15.00 (8.80+9.90)/2
1 15.00 (9.90+10.10)/2
1 15.00 (10.10+9.67)/2
1 15.00 (9.67+9.63)/2
1 15.00 (9.63+9.38)/2
1 15.00 (9.38+9.50)/2
1 15.00 (9.50+9.53)/2
1 15.00 (9.53+9.52)/2
1 15.00 (9.52+9.58)/2
1 15.00 (9.58+9.70)/2
1 15.00 (9.70+9.98)/2
1 15.00 (9.98+9.92)/2
1 15.00 (9.92+9.90)/2
1 15.00 (9.90+9.90)/2
1 15.00 (9.90+9.95)/2
1 15.00 (9.95+9.80)/2
1 15.00 (9.80+10.00)/2
1 15.00 (10.00+10.34)/2
1 15.00 (10.34+11.00)/2
1 15.00 (11.00+11.75)/2
1 15.00 (11.75+12.55)/2
1 15.00 (12.55+13.02)/2
1 15.00 (13.02+13.20)/2
1 15.00 (13.20+13.15)/2
1 15.00 (13.15+12.65)/2
1 15.00 (12.65+12.20)/2
1 15.00 (12.20+12.20)/2
1 15.00 (12.20+12.45)/2
1 15.00 (12.45+12.80)/2
1 15.00 (12.80+13.12)/2
1 15.00 (13.12+13.55)/2
1 15.00 (13.55+14.00)/2
1 15.00 (14.00+14.35)/2
1 15.00 (14.35+14.50)/2
1 15.00 (14.50+14.65)/2
1 15.00 (14.65+14.80)/2
1 15.00 (14.80+15.03)/2
1 15.00 (15.03+15.25)/2
1 5.00 (15.25+15.35)/2
Less paid in 2nd R/A Vide P- / EMB- 20 30.00 6.30
Less paid in 2nd R/A Vide P- / EMB- 1 15.00 6.30

Noida Bound ( RD- 905.00 to 975.00) 1 10.00 (15.35+15.55)/2


1 15.00 (15.55+15.68)/2
1 15.00 (15.68+15.90)/2
1 15.00 (15.90+16.09)/2
1 15.00 (16.09+16.40)/2
Less paid in 2nd R/A Vide P- / EMB- 1 7.50 (10.05+10.35)/2
Less paid in 2nd R/A Vide P- / EMB- 1 15.00 (11.85+11.56)/2
Less paid in 2nd R/A Vide P- / EMB- 1 3.60 (11.56+11.58)/2
Less paid in 2nd R/A Vide P- / EMB- 1 13.90 (10.48+10.63)/2
Less paid in 2nd R/A Vide P- / EMB- 1 15.00 (10.63+10.73)/2
Less paid in 2nd R/A Vide P- / EMB- 1 15.00 (10.73+10.65)/2
Noida Bound ( RD- 975.00 to 1055.00) 1 15.00 (16.40+16.45)/2
1 15.00 (16.45+16.55)/2
1 15.00 (16.55+16.30)/2
1 15.00 (16.30+15.75)/2
1 15.00 (15.57+15.50)/2
1 5.00 (8.20+8.20)/2
Less paid in 2nd R/A Vide P- / EMB- 1 15.00 (10.65+10.72)/2
Less paid in 2nd R/A Vide P- / EMB- 1 15.00 (10.72+10.75)/2
Less paid in 2nd R/A Vide P- / EMB- 1 10.00 (10.75+10.88)/2
Less paid in 2nd R/A Vide P- / EMB- 1 9.70 (10.88+11.00)/2
Less paid in 2nd R/A Vide P- / EMB- 1 15.00 (12.20+12.15)/2
Less paid in 2nd R/A Vide P- / EMB- 1 6.00 (12.15+11.55)/2
Less paid in 2nd R/A Vide P- / EMB- 1 1.30 (11.55+11.15)/2
Less paid in 2nd R/A Vide P- / EMB- 1 5.00 (11.15+11.15)/2
Less paid in 2nd R/A Vide P- / EMB- 1 3.00 (11.15+8.16)/2
Approch At Noida Cut 1 (11.40+10.65)/2 (2.00+2.20)/2
1./3 1.00 1.50
1 (13.50+12.65)/2 (2.00+2.40)/2
1./3 2.70 2.70
Deduction For School Gate 1 6.15 0.86
Deduction M.H 1x4 3.14/4 (0.85x0.85)
Deduction M.H 1 0.90 1.10
Deduction Chamber 1 1.50 1.80
Budh Singh Marg
RD-0.00 to 15.30 1 15.30 (5.10+29.20)/2
Vasundhara Bound 1 15.00 (7.00+7.56)/2
1 8.00 (7.56+7.80)/2
1 7.00 (7.80+8.02)/2
1 15.00 (8.02+7.54)/2
1 15.00 (7.54+7.16)/2
1 15.00 (7.16+7.06)/2
1 15.00 (7.06+7.10)/2
1 15.00 (7.10+8.25)/2
1 15.00 (8.25+8.73)/2
1 15.00 (8.73+8.80)/2
1 15.00 (8.80+9.02)/2
1 15.00 (9.02+8.79)/2
1 15.00 (8.79+8.70)/2
1 15.00 (8.70+8.68)/2
1 15.00 (8.68+8.67)/2
1 3.75 (8.67+8.68)/2
1 15.00 (18.67+18.46)/2

Budh Singh Marg Dallupura Bound 1 15.00 (7.42+8.40)/2


1 9.00 (8.40+9.25)/2
1 6.00 (9.25+8.13)/2
1 8.00 (8.13+7.25)/2
1 7.00 (7.00+7.20)/2
1 15.00 (7.20+7.22)/2
1 15.00 (7.22+7.18)/2
1 15.00 (7.18+7.02)/2
1 6.00 (7.02+6.96)/2
1 9.00 (6.96+6.05)/2
1 6.00 (6.05+7.80)/2
1 9.00 (7.80+8.80)/2
1 15.00 (8.80+8.90)/2
1 15.00 (8.90+8.80)/2
1 15.00 (8.80+8.77)/2
1 15.00 (8.77+8.78)/2
1 15.00 (8.78+8.20)/2
1 15.00 (8.20+8.85)/2
1 3.75 (8.85+9.02)/2
Approach 1 12.33 (5.20+5.35)/2
C/V 1 15.7 1.00
M.H 1 0.85 0.85
Less paid in 2nd R/A Vide P- / EMB-

DBC
Noida Bound ( RD- 6.00 to 300.00) 1 9.00 (7.03+6.78)/2
1 15.00 (6.78+6.84)/2
1 15.00 (6.84+7.20)/2
1 15.00 (7.20+7.16)/2
1 15.00 (7.16+7.45)/2
1 15.00 (7.45+7.70)/2
1 15.00 (7.70+8.58)/2
1 15.00 (8.58+9.10)/2
1 15.00 (9.10+9.25)/2
1 15.00 (9.25+9.40)/2
1 15.00 (9.40+9.45)/2
1 15.00 (9.45+9.45)/2
1 15.00 (9.45+9.45)/2
1 15.00 (9.45+9.38)/2
1 15.00 (9.38+9.25)/2
1 15.00 (9.25+9.10)/2
1 15.00 (9.10+9.02)/2
1 15.00 (9.02+8.90)/2
1 15.00 (8.90+9.05)/2
1 15.00 (9.05+9.05)/2
Deduction For School Gate 1 6.15 0.86

Noida Bound ( RD- 300.00 to 600.00) 1 15.00 (9.35+9.55)/2


1 15.00 (9.55+8.80)/2
1 15.00 (8.80+9.90)/2
1 15.00 (9.90+10.10)/2
1 15.00 (10.10+9.67)/2
1 15.00 (9.67+9.63)/2
1 15.00 (9.63+9.38)/2
1 15.00 (9.38+9.50)/2
1 15.00 (9.50+9.53)/2
1 15.00 (9.53+9.52)/2
1 15.00 (9.52+9.58)/2
1 15.00 (9.58+9.70)/2
1 15.00 (9.70+9.98)/2
1 15.00 (9.98+9.92)/2
1 15.00 (9.92+9.90)/2
1 15.00 (9.90+9.90)/2
1 15.00 (9.90+9.95)/2
1 15.00 (9.95+9.80)/2
1 15.00 (9.80+10.00)/2
1 15.00 (10.00+10.34)/2
Deduction Chamber 1 1.50 1.80
Deduction M.H 1x4 3.14/4 (0.85x0.85)
Deduction M.H 1 0.90 1.10

Noida Bound ( RD- 600.00 to 825.00) 1 15.00 (10.34+11.00)/2


1 15.00 (11.00+11.75)/2
1 15.00 (11.75+12.55)/2
1 15.00 (12.55+13.02)/2
1 15.00 (13.02+13.20)/2
1 15.00 (13.20+13.15)/2
1 15.00 (13.15+12.65)/2
1 15.00 (12.65+12.20)/2
1 15.00 (12.20+12.20)/2
1 15.00 (12.20+12.45)/2
1 15.00 (12.45+12.80)/2
1 15.00 (12.80+13.12)/2
1 15.00 (13.12+13.55)/2
1 15.00 (13.55+14.00)/2
1 15.00 (14.00+14.35)/2

Noida Bound ( RD- 825.00 to 1005.00) 1 15.00 (14.35+14.50)/2


1 15.00 (14.50+14.65)/2
1 15.00 (14.65+14.80)/2
1 15.00 (14.80+15.03)/2
1 15.00 (15.03+15.25)/2
1 15.00 (15.25+15.55)/2
1 15.00 (15.55+15.68)/2
1 15.00 (15.68+15.90)/2
1 15.00 (15.90+16.09)/2
1 15.00 (16.09+16.40)/2
1 15.00 (16.40+16.45)/2
1 15.00 (16.45+16.55)/2

Noida Bound ( RD- 1005.00 to 1225.00) 1 15.00 (16.55+16.30)/2


1 15.00 (16.30+15.75)/2
1 15.00 (15.57+15.50)/2
1 5.00 (8.20+8.20)/2
1 5.00 (9.95+10.60)/2
1 5.00 (10.60+10.60)/2
1 15.00 (10.60+10.60)/2
1 15.00 (10.60+10.65)/2
1 15.00 (10.65+10.62)/2
1 15.00 (10.62+10.55)/2
1 15.00 (10.55+10.55)/2
1 15.00 (10.55+10.55)/2
1 15.00 (10.55+10.45)/2
1 15.00 (10.45+10.35)/2
1 15.00 (10.35+10.28)/2
1 15.00 (10.28+10.35)/2
1 10.00 (10.35+9.65)/2
Approch At Noida Cut 1 (11.40+10.65)/2 (2.00+2.20)/2
1./3 1.00 1.50
1 (13.50+12.65)/2 (2.00+2.40)/2
1./3 2.70 2.70

From RD -44.90 to 0.00 1 4.40 (16.70+16.70)/2


1 3.00 (16.70+15.50)/2
1 5.00 (15.50+12.82)/2
1 5.00 (12.82+13.65)/2
1 5.00 (13.65+14.18)/2
1 7.50 (14.18+14.75)/2
1 15.00 (14.75+15.05)/2
From RD 0.00 to 6.00 1 6.00 (15.05+14.75)/2
Dallupura bound ( RD 6.00 to 195) 1 9.00 (8.85+8.05)/2
1 15.00 (8.05+8.10)/2
1 15.00 (8.10+8.70)/2
1 5.00 (8.70+8.35)/2
1 10.00 (8.65+8.08)/2
1 15.00 (8.08+7.10)/2
1 15.00 (7.10+6.60)/2
1 15.00 (6.60+6.45)/2
1 15.00 (6.45+6.50)/2
1 15.00 (6.50+6.45)/2
1 2.00 (6.35+6.40)/2
1 3.00 (6.40+10.50)/2
1 10.00 (10.50+10.15)/2
1 15.00 (10.15+11.15)/2
1 15.00 (11.15+12.15)/2
1 15.00 (12.15+11.35)/2
Approach Community hall cut 1 12.60 0.30
Approach Facility Center 1 12.90 0.30
For planter 2x2./3 1.75 0.6

Dallupura bound ( RD 195.00 to 420.00) 1 15.00 (11.35+11.32)/2


1 15.00 (11.32+11.30)/2
1 15.00 (11.30+11.13)/2
1 15.00 (11.13+10.95)/2
1 4.35 (10.10+10.70)/2
Budh Singh Chowk RD-259.35 to 285.00 1 25.65 (10.70+21.90)/2
1 5.00 (9.30+8.80)/2
1 10.00 (8.80+8.40)/2
1 2.00 (8.40+8.45)/2
1 3.00 (8.45+8.40)/2
1 10.00 (12.80+11.30)/2
1 15.00 (11.30+10.10)/2
1 15.00 (10.10+10.00)/2
1 15.00 (10.00+9.80)/2
1 15.00 (9.80+9.80)/2
1 15.00 (9.80+10.02)/2
1 15.00 (10.02+10.10)/2
1 15.00 (10.10+10.70)/2
C/V Budh Singh Marg Cut 1 28.70 (1.85+1.80)/2
RD-302.00 1./2 3.00 4.45
Deduction For Drain Edge 1 5.20 (0.60+0.75)/2
Deduction For Drain Edge 1 4.65 (0.60+0.75)/2

Dallupura bound ( RD 420.00 to 675.00) 1 15.00 (10.70+10.40)/2


1 15.00 (10.40+10.40)/2
1 15.00 (10.40+10.45)/2
1 15.00 (10.45+10.40)/2
1 15.00 (10.40+10.63)/2
1 15.00 (10.63+11.10)/2
1 10.00 (11.10+12.35)/2
1 5.00 (12.35+12.60)/2
1 15.00 (12.60+13.45)/2
1 15.00 (13.45+13.25)/2
1 15.00 (13.25+12.65)/2
1 15.00 (12.65+12.20)/2
1 5.00 (12.20+11.95)/2
1 10.00 (11.95+10.10)/2
1 15.00 (10.10+9.52)/2
1 15.00 (9.52+9.70)/2
1 15.00 (9.70+9.83)/2
1 15.00 (9.83+9.75)/2
1 15.00 (9.75+9.73)/2

Dallupura bound ( RD 675.00 to 967.50) 1 15.00 (9.73+9.85)/2


1 15.00 (9.85+10.07)/2
1 15.00 (10.07+10.20)/2
1 15.00 (10.20+9.55)/2
1 15.00 (9.55+9.35)/2
1 15.00 (9.35+9.58)/2
1 15.00 (9.58+9.70)/2
1 15.00 (9.70+9.78)/2
1 15.00 (9.78+9.50)/2
1 15.00 (9.50+9.78)/2
1 15.00 (9.78+9.72)/2
1 15.00 (9.72+9.80)/2
1 15.00 (9.80+9.74)/2
1 15.00 (9.74+9.74)/2
1 15.00 (9.74+9.65)/2
1 15.00 (9.65+9.80)/2
1 15.00 (9.80+9.89)/2
1 15.00 (9.89+9.75)/2
1 7.00 (9.75+8.95)/2
1 8.00 (8.95+8.95)/2
1 7.50 (8.95+9.65)/2
C/V Vasundra cut 1 19.53 (1.70+1.65)/2
Approach Vasundra cut 1 3.75 (11.40+15.10)/2
Deduction M.H 1x4 3.14/4 (0.85x0.85)
Deduction tree 1 0.40 0.20
Deduction tree 1 0.20 0.20
Deduction tree 1 0.50 0.55

Dallupura bound ( RD967.50 to 1225.00) 1 7.50 (9.65+9.85)/2


1 15.00 (9.85+9.90)/2
1 15.00 (9.90+10.00)/2
1 15.00 (10.00+10.05)/2
1 15.00 (10.05+10.35)/2
1 15.00 (10.35+10.15)/2
1 2.50 (10.15+10.10)/2
1 15.00 (10.10+9.50)/2
1 3.70 (10.10+9.50)/2
1 8.80 (9.50+9.70)/2
1 15.00 (9.70+9.55)/2
1 15.00 (9.55+9.70)/2
1 15.00 (9.70+9.70)/2
1 15.00 (9.70+9.70)/2
1 15.00 (9.70+9.70)/2
1 15.00 (9.70+9.70)/2
1 15.00 (9.70+9.65)/2
1 15.00 (9.65+9.65)/2
1 15.00 (9.65+8.90)/2
1 10.00 (8.90+8.50)/2
C/V Noida Cut 1 22.00 1.70
C/V At End 1 8.60 1.85

Budh Singh Marg


RD-0.00 to 15.30 1 15.30 (5.10+29.20)/2
Vasundhara Bound 1 15.00 (7.00+7.56)/2
1 8.00 (7.56+7.80)/2
1 7.00 (7.80+8.02)/2
1 15.00 (8.02+7.54)/2
1 15.00 (7.54+7.16)/2
1 15.00 (7.16+7.06)/2
1 15.00 (7.06+7.10)/2
1 15.00 (7.10+8.25)/2
1 15.00 (8.25+8.73)/2
1 15.00 (8.73+8.80)/2
1 15.00 (8.80+9.02)/2
1 15.00 (9.02+8.79)/2
1 15.00 (8.79+8.70)/2
1 15.00 (8.70+8.68)/2
1 15.00 (8.68+8.67)/2
1 3.75 (8.67+8.68)/2
1 15.00 (18.67+18.46)/2
1 16.05 (18.46+17.90)/2

Budh Singh Marg Dallupura Bound 1 15.00 (7.42+8.40)/2


1 9.00 (8.40+9.25)/2
1 6.00 (9.25+8.13)/2
1 8.00 (8.13+7.25)/2
1 7.00 (7.00+7.20)/2
1 15.00 (7.20+7.22)/2
1 15.00 (7.22+7.18)/2
1 15.00 (7.18+7.02)/2
1 6.00 (7.02+6.96)/2
1 9.00 (6.96+6.05)/2
1 6.00 (6.05+7.80)/2
1 9.00 (7.80+8.80)/2
1 15.00 (8.80+8.90)/2
1 15.00 (8.90+8.80)/2
1 15.00 (8.80+8.77)/2
1 15.00 (8.77+8.78)/2
1 15.00 (8.78+8.20)/2
1 15.00 (8.20+8.85)/2
1 3.75 (8.85+9.02)/2
Approach 1 12.33 (5.20+5.35)/2
C/V 1 15.7 1.00
M.H 1 0.85 0.85
D or H Quantity Unit

62.30 Sqm.
39.71 "
69.58 "
72.33 "
74.50 "
111.75 "
250.50 "
96.60 "

-222.00 "

-118.40 "

76.05 "
121.13 "
126.00 "
42.63 "
83.65 "
113.85 "
102.75 "
97.88 "
97.13 "
97.13 "
12.75 "
25.35 "
103.25 "
20.35 "
-674.25 "
-6.40 "
138.45 "
174.75 "
176.25 "
170.03 "
169.65 "
168.23 "
165.60 "
45.24 "
418.10 "
45.25 "
86.00 "
16.85 "
25.28 "
120.50 "
6.68 "
-967.50 "
-90.35 "
1745.13 "

62.15 Sqm.
102.15 "
105.30 "
107.70 "
109.58 "
113.63 "
122.10 "
132.60 "
137.63 "
61.28 "
-421.80 "
-76.25 "
556.07 "

90.50 "
141.75 "
137.63 "
140.25 "
150.00 "
148.28 "
144.75 "
142.58 "
141.60 "
142.73 "
142.88 "
143.25 "
144.60 "
147.60 "
149.25 "
148.65 "
148.50 "
148.88 "
148.13 "
148.50 "
152.55 "
160.05 "
170.63 "
182.25 "
191.78 "
196.65 "
197.63 "
193.50 "
186.38 "
183.00 "
184.88 "
189.38 "
194.40 "
200.03 "
206.63 "
212.63 "
216.38 "
218.63 "
220.88 "
223.73 "
227.10 "
76.50 "
-3780.00 "
-94.50 "
3161.40 "

154.50 "
234.23 "
236.85 "
239.93 "
243.68 "
-76.50 "
-175.58 "
-41.65 "
-146.71 "
-160.20 "
-160.35 "
246.38 "
247.50 "
246.38 "
240.38 "
233.03 "
41.00 "
-160.28 Sqm
-161.03 "
-108.15 "
-106.12 "
-182.63 "
-71.10 "
-14.76 "
-55.75 "
-28.97 "
23.15 "
0.50 "
28.77 "
2.41 "
-5.29 "
-2.27 "
-0.99 "
-2.70 "

262.40 Sqm.
109.20 "
61.44 "
55.37 "
116.70 "
110.25 "
106.65 "
106.20 "
115.13 "
127.35 "
131.48 "
133.65 "
133.58 "
131.18 "
130.35 "
130.13 "
32.53 "
278.48 "

118.65 "
79.43 "
52.14 "
61.52 "
49.70 "
108.15 "
108.00 "
106.50 "
41.94 "
58.55 "
41.55 "
74.70 "
132.75 "
132.75 "
131.78 "
131.63 "
127.35 "
127.88 "
33.51 "
65.04 "
15.70 "
-0.72 "
-3512.45 "
1315.78 "

62.15 Sqm.
102.15 "
105.30 "
107.70 "
109.58 "
113.63 "
122.10 "
132.60 "
137.63 "
139.88 "
141.38 "
141.75 "
141.75 "
141.23 "
139.73 "
137.63 "
135.90 "
134.40 "
134.63 "
135.75 "
-5.29 "
2511.58 "

141.75 "
137.63 "
140.25 "
150.00 "
148.28 "
144.75 "
142.58 "
141.60 "
142.73 "
142.88 "
143.25 "
144.60 "
147.60 "
149.25 "
148.65 "
148.50 "
148.88 "
148.13 "
148.50 "
152.55 "
-2.70 "
-2.27 "
-0.99 "
2906.40 "

160.05 "
170.63 "
182.25 "
191.78 "
196.65 "
197.63 "
193.50 "
186.38 "
183.00 "
184.88 "
189.38 "
194.40 "
200.03 "
206.63 "
212.63 "
2849.82 "

216.38 "
218.63 "
220.88 "
223.73 "
227.10 "
231.00 "
234.23 "
236.85 "
239.93 "
243.68 "
246.38 "
247.50 "
2786.29 "

246.38 "
240.38 "
233.03 "
41.00 "
51.38 "
53.00 "
159.00 "
159.38 "
159.53 "
158.78 "
158.25 "
158.25 "
157.50 "
156.00 "
154.73 "
154.73 "
100.00 "
23.15 "
0.50 "
28.77 "
2.41 "
2596.15 "

62.30 Sqm.
39.71 "
69.58 "
72.33 "
74.50 "
111.75 "
250.50 "
96.60 "
76.05 Sqm.
121.13 "
126.00 "
42.63 "
83.65 "
113.85 "
102.75 "
97.88 "
97.13 "
97.13 "
12.75 "
25.35 "
103.25 "
159.75 "
174.75 "
176.25 "
3.78 "
3.87 "
-1.40 "
2393.82 "

170.03 "
169.65 "
168.23 "
165.60 "
45.24 "
418.10 "
45.25 "
86.00 "
16.85 "
25.28 "
120.50 "
160.50 "
150.75 "
148.50 "
147.00 "
148.65 "
150.90 "
156.00 "
52.38 "
6.68 "
-3.51 "
-3.14 "
2545.44 "

158.25 "
156.00 "
156.38 "
156.38 "
157.73 "
162.98 "
117.25 "
62.38 "
195.38 "
200.25 "
194.25 "
186.38 "
60.38 "
110.25 "
147.15 "
144.15 "
146.48 "
146.85 "
146.10 "
2804.97 "

146.85 "
149.40 "
152.03 "
148.13 "
141.75 "
141.98 "
144.60 "
146.10 "
144.60 "
144.60 "
146.25 "
146.40 "
146.55 "
146.10 "
145.43 "
145.88 "
147.68 "
147.30 "
65.45 "
71.60 "
69.75 "
32.71 "
20.34 "
-2.27 "
-0.08 "
-0.04 "
-0.28 "
2888.81 "

73.13 "
148.13 "
149.25 "
150.38 "
153.00 "
153.75 "
25.31 "
147.00 "
36.26
84.48 "
144.38 "
144.38 "
145.50 "
145.50 "
145.50 "
145.50 "
145.13 "
144.75 "
139.13 "
87.00 "
37.40 "
15.91 "
2560.77 "

262.40 Sqm.
109.20 "
61.44 "
55.37 "
116.70 "
110.25 "
106.65 "
106.20 "
115.13 "
127.35 "
131.48 "
133.65 "
133.58 "
131.18 "
130.35 "
130.13 "
32.53 "
278.48 "
291.79 "
2563.86 "

118.65 "
79.43 "
52.14 "
61.52 "
49.70 "
108.15 "
108.00 "
106.50 "
41.94 "
58.55 "
41.55 "
74.70 "
132.75 "
132.75 "
131.78 "
131.63 "
127.35 "
127.88 "
33.51 "
65.04 "
15.70 "
-0.72 "
1798.50 "
I.No Description No L B
20 Providing and laying Bituminous Macadam on prepared
surface with specified graded crushed stone aggregate
for profile corrective base/ binder course including
(a) 80mm average compacted thickness with bitumen of
loading of aggregate with F.E. loader , hot mixing of
60/70 grade @ 3.5% (Percentage by weight of total mix)
stone aggregates and bitumen in hot mix plant,
transporting the mixed material by tippers to paver and
Qty B/Fthe
laying Marked
mixedas 'X' on P-
material with paver finisher fitted with
Qty B/F Marked
electronic sensingasdevice
'X' on to
P- the required level and grade
and rolling with road rollers, as per MORTH Total Area in Sqm=
specification to achieve the desired density and
compaction but excluding the cost of primer/ tack coat.
Hence Total Qty of BM 1 4100.72

Less 5% Qty for submission of levels


1 328.06
D or H Quantity Unit

2074.67 sqm.
2026.05 "
Total Area in Sqm= 4100.72 sqm.

0.08 328.06 cum.

0.05 -16.40 "


Total= 311.65 cum.
I.No. Description No L B
21 Providing & laying dense bituminous macadam on
prepared surface with specified graded crushed stone
aggregate for profile corrective base/binding course
including loading of aggregate with FE loader and hot
(a) 50/75mm
mixing of average compactedfiller
stone aggregate, thickness with bitumen
and bitumen of
in batch
60/70 grade @ 5% (percentage by weight of
type hot mix plant transporting the mixed material by total mix)
and
tipperlime fillerand@laying
toMarked
paver 2% (percentage by weight of
Qty B/F as 'X' on P-the mixed material with paver
Aggregate).
finisher fitted with
Qty B/F Marked as 'X' electronic
on P- sensing device to the
required level and grade and rolling by road rollers as per
Qty
MORTHB/F Marked as 'X' on
specifications to P-
achieve the desired density, but
Qty B/F Marked as 'X' on P-
excluding cost of primer/tack coat.
Total Area in Sqm=

Hence Total Qty of DBM 1 6778.38

Less 5% Qty for submission of levels


1 508.38
D or H Quantity Unit

1745.13 sqm.
556.07 "
3161.40 "
1315.78 "
Total Area in Sqm= 6778.38 sqm.

0.08 508.38 cum.

0.05 -25.42 "


Total= 482.96 cum.
I.No. Description No L B D or H
22 Providing & laying dense bituminous
concrete on prepared surface with
specified graded stone aggregate for
wearing course including loading of
(a) (a) 40/50 mm
aggregate with compacted
FE loader, thickness
hot mixing with
of
bitumen of grade 60/70 @
bitumen filler and aggregates in batch5.50% and
lime
type @ 3%
hot mix(percentage
plant by weight
theofmixed
total
Qty B/F Marked as transporting
'X' on P-
mix )
materialand adding waste plastic
by tipperasto'X'paver additive @
Qty
8% B/F
weightMarked
of bitumen P-andThe
onused. laying the
plastic
mixed material with mechanically paver
Qty
wasteB/F
finisher Marked
powder as 'X'
fitted shall
with beon P- free and
dust
electronic the
sensing
partical size
Qty B/FtoMarked
device of plastic
as 'X' level
the required waste powder
on P-and grade and
should
Qty B/Fbe
rolling byless
road
Marked than 2'X'mm.
rollers
as onas
P- per MORTH
specifications
Qty B/F Marked as 'X' on P- the desired
to achieve
density, but excluding cost of primer /
Qty B/F Marked as 'X' on P-
tack coat.
Qty B/F Marked as 'X' on P-
Qty B/F Marked as 'X' on P-
Qty B/F Marked as 'X' on P-
Qty B/F Marked as 'X' on P-
Qty B/F Marked as 'X' on P-
Total Area in Sqm=

Hence Total Qty of DBC 1 31206.41 0.05

Less 5% Qty for submission of levels


1 1560.32 0.05
Total=
Quantity Unit

2511.58 sqm.
2906.40 "
2849.82 "
2786.29 "
2596.15 "
2393.82 "
2545.44 "
2804.97 "
2888.81 "
2560.77 "
2563.86 "
1798.50 "
31206.41 sqm.

1560.32 cum.

-78.02 "
1482.30 cum.
I.No Description No L B
27 Providing and laying 60mm thick factory made cement concrete
interlocking paver block of M-30 grade made by block making machine
with strong vibratory compaction and of approved size and design/ shape
Budh Singh Marg, Dallupura bound
laid in required colour and pattern over and including 50mm thick
Ist Cut
compacted bed of course sand, filling the joints with coarse sand etc. all 2 30.00 0.20
complete as per the direction of Engineer-in-charge. 2 22.65 0.20
Central Strip 1 15.18 0.10
1 0.66 0.20
4 0.80 0.20
4 0.95 0.20
2 1.03 0.20
5 1.21 0.20
1 1.44 0.20
6 1.78 0.20
1 1.86 0.20
1 1.55 0.20

IInd cut 2 30.00 0.20


2 24.55 0.20
Central Strip 1 54.55 0.10
22 1.80 0.20
1 4.00 0.20
1 4.20 0.20

IIIrd Cut 2 19.25 0.20


Central Strip 1 19.25 0.10
1 4.20 0.20
7 2.15 0.20
1 4.20 0.20

IVth Cut 2 30.00 0.20


2 30.00 0.20
2 30.00 0.20
2 18.50 0.20
Central Strip 1 30.00 0.10
1 30.00 0.10
1 30.00 0.10
1 18.50 0.10
7 2.10 0.20
7 2.15 0.20
7 2.13 0.20
6 2.05 0.20
7 2.10 0.20
7 1.90 0.20
2 1.82 0.20
1 4.20 0.20
1 4.85 0.20
1 4.60 0.20
1 2.32 0.20
Budh Singh Marg Vasundhara Bound
Ist Cut 2 26.05 0.20
Central Strip 1 26.05 0.10
12 1.73 0.20

IInd cut 2 30.00 0.20


2 30.00 0.20
2 30.00 0.20
2 30.00 0.20
2 30.00 0.20
2 30.00 0.20
2 30.00 0.20
2 11.65 0.20
Central Strip 1 30.00 0.10
1 30.00 0.10
1 30.00 0.10
1 30.00 0.10
1 30.00 0.10
1 30.00 0.10
1 30.00 0.10
1 11.65 0.10
7 2.17 0.20
7 1.95 0.20
6 2.05 0.20
7 1.95 0.20
7 1.92 0.20
7 1.98 0.20
7 2.05 0.20
7 2.05 0.20
6 2.00 0.20
14 2.08 0.20
7 2.18 0.20
7 2.05 0.20
3 2.10 0.20
D or H Quantity Unit

12.00 Sqm.
9.06 "
1.52 "
0.13 "
0.64 "
0.76 "
0.41 "
1.21 "
0.29 "
2.14 "
0.37 "
0.31 "
28.84
12.00 "
9.82
5.46 "
7.92 "
0.80 "
0.84 "
36.84
7.70 "
1.93 "
0.84 "
3.01 "
0.84 "
14.32
12.00 "
12.00 "
12.00 "
7.40 "
3.00 "
3.00 "
3.00 "
1.85 "
2.94 "
3.01 "
2.98 "
2.46 "
2.94 "
2.66 "
0.73 "
0.84 "
0.97 "
0.92 "
0.46 "
75.16
10.42 "
2.61 "
4.15 "
17.18
12.00 "
12.00 "
12.00 "
12.00 "
12.00 "
12.00 "
12.00 "
4.66 "
3.00 "
3.00 "
3.00 "
3.00 "
3.00 "
3.00 "
3.00 "
1.17 "
3.04 "
2.73 "
2.46 "
2.73 "
2.69 "
2.77 "
2.87 "
2.87 "
2.40 "
5.82 "
3.05 "
2.87 "
1.26 "
148.39 "
I.No Description No L B D or H
32 Deduct on account of old C.T.D. bars
received from the demolishing of RCC
work at site.(Credit to Work)

Dallupura Bound, DDA Drain


Start from R.D 607.50
Ist cut, RD- 1215.00 to1225.00 2 30.00 2.85 0.13
1 15.50 2.85 0.13
Less for man hole 7 1.00 1.00 0.13
0.13
IInd cut, RD- 1215.00 to1225.00 2 30.00 2.85 0.13
1 5.00 2.85 0.13
2 6.25 2.85 0.13
1 6.70 2.85 0.13
Less for man hole 10 1.00 1.00 0.13
0.13
IIInd cut, RD- 1215.00 to1225.00 2 30.00 2.85 0.13
1 15.00 2.85 0.13
1 12.05 2.85 0.13
Less for man hole 10 1.00 1.00 0.13
0.13
IVth cut, RD- 1215.00 to1225.00 3 30.00 2.85 0.13
1 6.75 2.85 0.13
Less for man hole 13 1.00 1.00 0.13

Total=
Quantity Unit

21.38 Cum
5.52 ###
-0.88
26.02
21.38 ###
1.78 ###
4.46 ###
2.39 Cum
-1.25 ###
30.00
21.38 ###
5.34
4.29 Cum
-1.25
29.76
32.06 ###
3.08 Cum
-1.63
33.52
119.30 Cum
NAME OF WORK :- Widening of Dallupura Road, at Mayur Vihar Phase- III
(From DDA Chilla Sports Complex to Dallupura) and Strenthening
/Improvement of riding quality and construction of storm water drain at one
side.

Measurements for IIIrd R/A BILL


NAME OF WORK :- Widening of Dallupura Road, at Mayur Vihar Phase- III (From DDA Chilla
Dallupura) and Strenthening /Improvement of riding quality and construction of storm water drain at on

SITUATION :- Mayur vihar Phase- III. Delhi

AGENCY :- Sh Mahavir Prasad Gupta

AGGREMENT NO :- 32 / EE / PWD / M-212 / 2009- 2010

DATE OF START :- 8/12/2009

D.O.C. (Stipulated) 7/6/2010

D. O. C.(Actual) :- Work in Progress

DATE OF MEASUREMENT :- 30/03/10


I.No. Description No L B
3 Earth work in excavation by
mechanical means (Hydraulic
excavator) / mannual labour in
(a) All kinds of soil.
foundation trenches or drain (not
Noida Bound,
exceeding 1.5 mBox Drain or 10 sqm.on
in width
Add for
plan) gap bt'n dressing
including RD 303 toof435
sides and
ramming of bottom lift up to 1.5 m 1 1.15 (2.30+2.40)/2
including getting out the excavated soil 1 0.90 (2.40+2.40)/2
as directed with in a lead of 50m.
1 1.40 (2.40+2.50)/2
1 1.40 (2.50+2.35)/2
R.D.600.00 to 705.00 1 15.00 (2.10+2.05)/2
1 15.00 (2.05+1.95)/2
1 15.00 (1.95+2.00)/2
1 15.00 (2.00+2.10)/2
1 15.00 (2.10+1.95)/2
1 15.00 (1.95+2.10)/2
1 15.00 (2.10+2.00)/2
C/o to this EMB. P-

Submitted By:- Checked By................

Sh Mahavir Prasad Gupta JE. .... AE..........


NAME OF WORK :- Widening of Dallupura Road, at Mayur Vihar Phase- III
(From DDA Chilla Sports Complex to Dallupura) and Strenthening
/Improvement of riding quality and construction of storm water drain at one
side.

I.No. Description No L B
DATE OF MEASUREMENT :- 1/4/2010
6 P/L in position cement concrete of
specified grade excluding the cost of
centering and shuttering all work upto
(a) 1:5:10 ( 1 cement : 5 coarse sand : 10
plinth level.
graded stone aggregate 40 mm
Noida Bound, Box Drain
nominal size).
R.D. 320.30 to R.D.324.00 1 3.70 1.40
R.D.343 to R.D.345 1 2.00 1.40
R.D. 350.30 to 351.00 1 0.70 1.40
R.D.406.75 to R.D.410.00 1 3.25 1.40
C/o to this EMB. P-

9 Centring and shuttering including


strutting, propping etc. and removal of
form for.
(b) Small lintels not exceeding 1.5m clear
span, moulding as in cornices, window
sills, string courses, bands, copings,
Noida Bound,
bed plates, Boxblocks
anchor Drain (For 1:5:10)
and the like.

R.D. 320.30 to R.D.324.00 2 3.70


R.D.343 to R.D.345 2 2.00
R.D. 350.30 to 351.00 2 0.70
R.D.406.75 to R.D.410.00 2 3.25
C/o to this EMB. P-

Submitted By:- Checked By................

Sh Mahavir Prasad Gupta JE. .... AE..........


NAME OF WORK :- Widening of Dallupura Road, at Mayur Vihar Phase- III
(From DDA Chilla Sports Complex to Dallupura) and Strenthening
/Improvement of riding quality and construction of storm water drain at one
side.

I.No. Description No L B
DATE OF MEASUREMENT :- 3/4/2010
6 P/L in position cement concrete of
specified grade excluding the cost of
centering and shuttering all work upto
(a) 1:5:10 (1 cement : 5 coarse sand : 10
plinth level.
graded stone aggregate 40 mm
R.D. 529.50 to 600.00 2 30.00 1.40
nominal size).
1 10.50 1.40
C/o to this EMB. P-

8 Reinforcement for RCC work


including straightening, cutting,
bending placing in position and
(a) TMT bars.
binding all complete.
Noida Bound, Box Drain
R.D 321 to R.D 324 & R.D 343.50 to
R.D 345.00 (3+1.5=4.5m)

Raft & Wall


10mm Dia.
Bottom, main 32 4.95
Top, main 32 4.25
Bottom, Chair,12x2. 16 1.00
Wall, U- Chair 6 0.60

@ 0.617 kg/m, 314.00 x 0.617=


Marked……[A]
Raft & Wall
8mm Dia.
Bottom, Distribution 9 4.50
Top, Distribution 8 4.50
Over Lap,2x2x17 68 0.50
Road side wall, Distribution , (7+7)
14 4.50
STP Boundary Side Wall, Distribution,
(7+7) 14 4.50
Over Lap, 2x14x2 56 0.50

@ 0.395 kg/m, 264.50 x 0.395=


Marked……[B]

Total Weight [A] + [B] =


C/o to this EMB. P-

Submitted By:- Checked By................

Sh Mahavir Prasad Gupta JE. .... AE..........


NAME OF WORK :- Widening of Dallupura Road, at Mayur Vihar Phase- III
(From DDA Chilla Sports Complex to Dallupura) and Strenthening
/Improvement of riding quality and construction of storm water drain at one
side.

I.No. Description No L B
1 Disposal and carriage of excavated
malba, lime, moorum and earth etc by
machenical transport including
Qty B/F Marked
loading, as and
unloading 'X' on P-1 for all
stacking
leads and lifts (Beyond initial lead of
50
Lessm30%, lift upto filling.
for back 1.5 m or as per
direction
C/o to this EMB. P-- in - Charge )
of Engieer

Submitted By:- Checked By................

Sh Mahavir Prasad Gupta JE. .... AE..........


NAME OF WORK :- Widening of Dallupura Road, at Mayur Vihar Phase- III
(From DDA Chilla Sports Complex to Dallupura) and Strenthening
/Improvement of riding quality and construction of storm water drain at one
side.

I.No. Description No L B

9 Centring and shuttering including


strutting, propping etc. and removal of
form for.
(b) Small lintels not exceeding 1.5m clear
span, moulding as in cornices, window
sills, string courses, bands, copings,
Noida Bound, Box Drain
bed plates, anchor blocks and the like.
R.D. 529.5 to 583.25 2x1 30.00
" 2x1 23.75
R.D. 583.25 to 600 1 16.75
Less already paid R.D.483.50 to
520.25 2 36.75

9 Centring and shuttering including


strutting, propping etc. and removal of
form for.
(c) Walls (any thickness) including
attached pilasters, butteresses, plinth
and
Noidastring courses
Bound, Boxetc.
Drain
R.D 318.50 to R.D 324.00, 2x2
4 5.50
R.D 335.80 to R.D 351.00,
2x2 4 15.20
R.D 401.30 to 483.50, 2x2
4x2 30.00
…. '' ……., 2x2
4x1 22.20
C/o to this EMB. P-

Submitted By:- Checked By................

Sh Mahavir Prasad Gupta JE. .... AE..........


NAME OF WORK :- Widening of Dallupura Road, at Mayur Vihar Phase- III
(From DDA Chilla Sports Complex to Dallupura) and Strenthening
/Improvement of riding quality and construction of storm water drain at one
side.

I.No. Description No L B
DATE OF MEASUREMENT :- 5/4/2010
3 Earth work in excavation by
mechanical means (Hydraulic
excavator) / mannual labour in
(a) All kinds of soil.
foundation trenches or drain (not
Noida Bound,
exceeding 1.5 mBox Drain or 10 sqm.on
in width
R.D.705.00
plan) to 810.00
including dressing of sides and
ramming of bottom lift up to 1.5 m 1 15.00 (2.00+2.05)/2
including getting out the excavated soil 1 15.00 (2.05+2.00)/2
as directed with in a lead of 50m.
1 15.00 (2.00+1.95)/2
1 15.00 (1.95+2.05)/2
1 15.00 (2.05+2.10)/2
1 15.00 (2.10+2.15)/2
1 15.00 (2.15+2.05)/2
C/o to this EMB. P-

2 Earth work in excavation by


mechanical means (Hydraulic
excavator) / mannual labour over areas
Noida Bound
(exceeding 30cm in depth, 1.5m in
R.D 1215.00
width as well to1225.00
as 10 sq.m.on plan) i/c 1 10.00 (3.70+3.60)/2
DallupuraofBound
disposal excavated earth lead upto
50m and lift
Deduction forupto
bus1.5m,
stand .disposed earth 1 9.40 0.35
to
Deduction for chamber dressed.
be levelled and neatly 1 3.00 1.2
Deduction for bus stand 1 7.00 0.9
Deduction for bus stand 1 6.90 0.6
Deduction for trees 3 0.60 0.6
C/o to this EMB. P-

6 P/L in position cement concrete of


specified grade excluding the cost of
centering and shuttering all work upto
(a) 1:5:10 (1 cement : 5 coarse sand : 10
plinth level.
graded stone aggregate 40 mm
nominal size).
R.D 600 to 705 3 30.00 1.40
1 15.00 1.40
C/o to this EMB. P-

Submitted By:- Checked By................

Sh Mahavir Prasad Gupta JE. .... AE..........


NAME OF WORK :- Widening of Dallupura Road, at Mayur Vihar Phase- III
(From DDA Chilla Sports Complex to Dallupura) and Strenthening
/Improvement of riding quality and construction of storm water drain at one
side.

I.No. Description No L B

8 Reinforcement for RCC work


including straightening, cutting,
bending placing in position and
(a) TMT bars.
binding all complete.
Noida Bound, Box Drain
Bt'n R.D 407 to R.D 410 (3m)

Raft & Wall


10mm Dia.
Bottom, main 26 4.90
Top, main 26 4.25
Bottom, Chair 10 1.00
Wall, U- Chair 4 0.60

@ 0.617 kg/m, 250.30 x 0.617=


Marked……[A]
Raft & Wall
8mm Dia.
Bottom, Distribution 8 3.00
Top, Distribution 7 3.00
Over, Lap 30 0.50
Road side wall, Distribution ,(8+8) 16
3.00
STP Boundary Side Wall, Distribution, 16 3.00
(8+8)
Over Lap 32 0.50

@ 0.395 kg/m, 172.00x 0.395=


Marked……[B]

Total Weight [A] + [B] =


C/o to this EMB. P-
9 Centring and shuttering including
strutting, propping etc. and removal of
form for.
(b) Small lintels not exceeding 1.5m clear
span, moulding as in cornices, window
sills, string courses, bands, copings,
R.D 600 to anchor
bed plates, 705 blocks and the like. 1x3 30.00
1 15.00
C/o to this EMB. P-

Submitted By:- Checked By................

Sh Mahavir Prasad Gupta JE. .... AE..........


NAME OF WORK :- Widening of Dallupura Road, at Mayur Vihar Phase- III
(From DDA Chilla Sports Complex to Dallupura) and Strenthening
/Improvement of riding quality and construction of storm water drain at one
side.

I.No. Description No L B
DATE OF MEASUREMENT :- 6/4/2010
8 Reinforcement for RCC work
including straightening, cutting,
bending placing in position and
(a) TMT bars.
binding all complete.
Noida Bound, Box Drain
Bt'n RD.530 to 555 (25m)
Raft & Wall
10mm Dia.
Bottom, main 167 4.93
Top, main 167 4.34
Bottom, Chair 83 1.00
Wall, U- Chair 30 0.60

@ 0.617 kg/m, 1649.09 x 0.617=


Marked……[A]
Raft & Wall
8mm Dia.
Bottom, Distribution 8 25.00
Top, Distribution 7 25.00
Over Lap 15 0.50
Road side, wall, Distribution ,(9+9) 18
25.00
STP Boundary Side Wall, Distribution, 18 25.00
(9+9)
Over Lap 36 0.50

@ 0.395 kg/m, 1300.05x 0.395=


Marked……[B]

Total Weight [A] + [B] =


C/o to this EMB. P-
9 Centring and shuttering including
strutting, propping etc. and removal of
form for.
(b) Small lintels not exceeding 1.5m clear
span, moulding as in cornices, window
sills, string courses, bands, copings,
Noida Bound, Box Drain Raft
bed plates, anchor blocks and the like.

R.D 320.30 to R.D 324.00 2 3.70


R.D 343 to R.D 345 2 2.00
R.D 350.30 to R.D 351.00 2 0.70
R.D 406.75 to R.D 410.00 2 3.25
C/o to this EMB. P-

Submitted By:- Checked By................

Sh Mahavir Prasad Gupta JE. .... AE..........


NAME OF WORK :- Widening of Dallupura Road, at Mayur Vihar Phase- III
(From DDA Chilla Sports Complex to Dallupura) and Strenthening
/Improvement of riding quality and construction of storm water drain at one
side.

I.No. Description No L B
DATE OF MEASUREMENT :- 7/4/2010
16 Consolidation of subgrade with power
road roller of 8 to 12 tonne capacity
including making good the undulations
Noida Bound
etc. with earth or quarry spoils etc. and
R.D 1215.00
rerolling to 1225.00
the subgrade 1 10.00 (3.70+3.60)/2
Dallupura Bound
Deduction for bus stand 1 9.40 0.35
Deduction for chamber 1 3.00 1.20
Deduction for bus stand 1 7.00 0.90
Deduction for bus stand 1 6.90 0.60
Deduction for trees 3 0.60 0.60
C/o to this EMB. P-

17 Supplying & Stacking of graded stone


aggregate at site of size range.
(a) 90mm to 45mm
Noida Bound
1 6.70 (1.00+2.20)/2
1 6.85 (1.00+2.20)/2
1 7.10 (1.00+2.20)/2
1 7.15 (1.00+2.20)/2
1 7.00 (1.00+2.20)/2
1 6.85 (1.00+2.20)/2
1 6.95 (1.00+2.20)/2
1 7.10 (1.00+2.20)/2
1 7.05 (1.00+2.20)/2
1 6.70 (1.00+2.20)/2
1 6.95 (1.00+2.20)/2
1 6.80 (1.00+2.20)/2
1 7.10 (1.00+2.20)/2
1 6.90 (1.00+2.20)/2
1 6.95 (1.00+2.20)/2
1 7.10 (1.00+2.20)/2
1 7.05 (1.00+2.20)/2
1 7.00 (1.00+2.20)/2
1 7.15 (1.00+2.20)/2
1 7.14 (1.00+2.20)/2
1 6.75 (1.00+2.20)/2
1 7.10 (1.00+2.20)/2
1 7.00 (1.00+2.20)/2
1 6.85 (1.00+2.20)/2

Submitted By:- Checked By................

Sh Mahavir Prasad Gupta JE. .... AE..........


NAME OF WORK :- Widening of Dallupura Road, at Mayur Vihar Phase- III
(From DDA Chilla Sports Complex to Dallupura) and Strenthening
/Improvement of riding quality and construction of storm water drain at one
side.

I.No. Description No L B
1 7.10 (1.00+2.20)/2
1 6.95 (1.00+2.20)/2
1 6.85 (1.00+2.20)/2
1 7.15 (1.00+2.20)/2
1 6.90 (1.00+2.20)/2
1 7.10 (1.00+2.20)/2
1 7.05 (1.00+2.20)/2

Less 7.5% for voids


C/o to this EMB. P-

9 Centring and shuttering including


strutting, propping etc. and removal of
form for.
(c) Walls (any thickness) including
attached pilasters, butteresses, plinth
and string courses etc.
Noida Bound, Box Drain
R.D 501 to R.D.529.5, 2x2
4 28.50
C/o to this EMB. P-

1 Disposal and carriage of excavated


malba, lime, moorum and earth etc by
machenical transport including
Qty B/F Marked as 'X' on P-5
loading, unloading and stacking for all
leads and lifts (Beyond initial lead of
Lessm30%
50 for back
, lift upto filling.
1.5 m or as per
direction ofEMB.
C/o to this EngieerP-- in - Charge )

Submitted By:- Checked By................

Sh Mahavir Prasad Gupta JE. .... AE..........


NAME OF WORK :- Widening of Dallupura Road, at Mayur Vihar Phase- III
(From DDA Chilla Sports Complex to Dallupura) and Strenthening
/Improvement of riding quality and construction of storm water drain at one
side.

I.No. Description No L B
DATE OF MEASUREMENT :- 8/4/2010
18 Laying spreading and compacting
stone aggregate of specified sizes to
WBM specifications including
Noida Bound
spreading in uniform thickness, hand
Ist layer, rolling
picking, 90- 45mmwith 3 wheeled road /
R.D 1215.00
vibratory rollerto1225.00
8-10 tonne in stages to
proper grade and camber, applying and 1 10.00 (3.70+3.60)/2
brooming requisite
Dallupura Bound type of screening /
binding material to fill up interstices
Deduction
of coarse foraggregate
bus stand watering and 1 9.40 0.35
Deduction for chamber
compacting to the required density . 1 3.00 1.20
Deduction for bus stand 1 7.00 0.90
Deduction for bus stand 1 6.90 0.60
Deduction for trees 3 0.60 0.60
C/o to this EMB. P-

17 Supplying & Stacking of graded stone


aggregate at site of size range.
(b) 63mm to 45mm
Noida Bound
1 7.17 (1.00+2.20)/2
1 7.10 (1.00+2.20)/2

Less 7.5% for voids


C/o to this EMB. P-

6 P/L in position cement concrete of


specified grade excluding the cost of
centering and shuttering all work upto
(a) 1:5:10 (1 cement : 5 coarse sand : 10
plinth level.
graded stone aggregate 40 mm
nominal size).
R.D. 705 to 810 3 30.00 1.40
1 15.00 1.40
C/o to this EMB. P-

9 Centring and shuttering including


strutting, propping etc. and removal of
(b) form
Smallfor.
lintels not exceeding 1.5m clear
span, moulding as in cornices, window
sills, string courses, bands, copings, 1x3
R.D. 705 to 810 30.00
bed plates, anchor blocks and the like.
1 15.00
C/o to this EMB. P-

Submitted By:- Checked By................

Sh Mahavir Prasad Gupta JE. .... AE..........


NAME OF WORK :- Widening of Dallupura Road, at Mayur Vihar Phase- III
(From DDA Chilla Sports Complex to Dallupura) and Strenthening
/Improvement of riding quality and construction of storm water drain at one
side.

I.No. Description No L B
DATE OF MEASUREMENT :- 9/4/2010
7 Providing and laying in position ready
mixed concrete manufactured in fully
automatic batching plant and
Noida Bound,
transported to Box
site Drain
of work in transit
Raft. for a lead up to 10kms having
mixer
continuous
R.D 320.30 to agitated
R.D 324 mixer, manuf 1 3.70 1.30
-actured
R.D.343 as per mix design of specified 1
to R.D.345 2.00 1.30
grade for reinforced cement concrete
R.D. 350.3 to 351.00 1 0.70 1.30
work including pumping of R.M.C.
R.D.406.75
from transit to R.D.410
mixer to site of laying , 1 3.25 1.30
Wall
excluding the cost of centering,
shuttering
R.D 318.5 finishing
to R.D.324 and reinforcement 2 5.50 0.15
including cost
R.D.335.8 to R.D.351 of admixtures in 2 15.20 0.15
recommended proportions as per IS :
R.D.
9103 401.3 to 483.5 retard setting of 2x2
to accelerate/ 30.00 0.15
concrete, improve workability without 2x1 22.20 0.15
impairing
C/o to this strength
EMB. P-and durability as
per direction of the Engineer - in -
charge. M-25 grade Reinforced cement
concrete by using 410kg of cement per
cum of concrete.

Submitted By:- Checked By................

Sh Mahavir Prasad Gupta JE. .... AE..........


NAME OF WORK :- Widening of Dallupura Road, at Mayur Vihar Phase- III
(From DDA Chilla Sports Complex to Dallupura) and Strenthening
/Improvement of riding quality and construction of storm water drain at one
side.

I.No. Description No L B
DATE OF MEASUREMENT :- 12/4/2010
3 Earth work in excavation by
mechanical means (Hydraulic
excavator) / mannual labour in
(a) All kinds of trenches
foundation soil. or drain (not
Noida Bound
exceeding 1.5 m in width or 10 sqm.on
plan) including
R.D.810.00 dressing of sides and
to 900.00
ramming of bottom lift up to 1.5 m 1 15.00 (2.05+1.90)/2
including getting out the excavated soil
1 15.00 (1.90+2.00)/2
as directed with in a lead of 50m.
1 15.00 (2.00+1.95)/2
1 15.00 (1.95+1.90)/2
1 15.00 (1.90+2.00)/2
1 15.00 (2.00+1.85)/2
Noida Bound, Drain
R.D 1226 to R.D.1166 (60m)
2 30.00 1.60
C/o to this EMB. P-

18 Laying spreading and compacting


stone aggregate of specified sizes to
WBM specifications including
Noida Bound
spreading in uniform thickness, hand
IInd layer,
picking, 63-45mm
rolling with 3 wheeled road /
vibratory roller
RD 1215.00 to 8-10 tonne in stages to
1225.00
proper grade and camber, applying and 1 10.00 (3.70+3.60)/2
brooming requisite type of screening /
Dallupura Bound
binding material to fill up interstices
Deduction
of coarse foraggregate
bus stand watering and 1 9.40 0.35
Deduction for
compacting to chamber
the required density . 1 3.00 1.20
Deduction for bus stand 1 7.00 0.90
Deduction for bus stand 1 6.90 0.60
Deduction for trees 3 0.60 0.60
C/o to this EMB. P-

17 Supplying & Stacking of graded stone


aggregate at site of size range.
(c) 53mm to 22.4mm
Dallupura Bound
1 6.95 (1.00+2.20)/2
1 6.85 (1.00+2.20)/2

Less 7.5% for voids


C/o to this EMB. P-

Submitted By:- Checked By................

Sh Mahavir Prasad Gupta JE. .... AE..........


NAME OF WORK :- Widening of Dallupura Road, at Mayur Vihar Phase- III
(From DDA Chilla Sports Complex to Dallupura) and Strenthening
/Improvement of riding quality and construction of storm water drain at one
side.

I.No. Description No L B
8 Reinforcement for RCC work
including straightening, cutting,
bending placing in position and
(a) TMT bars.
binding all complete.
Noida Bound, Box Drain
Bt'n RD 555 to 615 (60m)
Raft & Wall
10mm Dia.
Bottom, main 400 5.00
Top, main 400 4.41
Bottom, Chair 200 1.00
Wall, U- Chair 60 0.60

@ 0.617 kg/m, 4000.00x 0.617=


Marked……[A]
Raft & Wall
8mm Dia.
Bottom, Distribution 8 60.00
Top, Distribution 7 60.00
Over Lap 60 0.50
Road side wall, Distribution ,(9+9) 18
60.00
STP Boundary Side Wall, Distribution,
(9+9) 18 60.00
Over Lap, (2x4x14) 140 0.50

@ 0.395 kg/m, 3160.00x 0.395=


Marked……[B]

Total Weight [A] + [B] =


C/o to this EMB. P-

9 Centring and shuttering including


strutting, propping etc. and removal of
form for.
(c) Walls (any thickness) including
attached pilasters, butteresses, plinth
and string courses etc.
Noida Bound, Box Drain
R.D 529.50 to R.D 555.00, 2x2
4 25.50
C/o to this EMB. P-

Submitted By:- Checked By................

Sh Mahavir Prasad Gupta JE. .... AE..........


NAME OF WORK :- Widening of Dallupura Road, at Mayur Vihar Phase- III
(From DDA Chilla Sports Complex to Dallupura) and Strenthening
/Improvement of riding quality and construction of storm water drain at one
side.

I.No. Description No L B
DATE OF MEASUREMENT :- 13/4/2010
9 Centring and shuttering including
strutting, propping etc. and removal of
form for.
(b) Small lintels not exceeding 1.5m clear
span, moulding as in cornices, window
sills, string courses, bands, copings,
R.D. 529.5 anchor
bed plates, to 583.25
blocks and the like. 2x1 30.00
" 2x1 23.75
R.D. 583.25 to 600 1 16.75
C/o to this EMB. P-

Submitted By:- Checked By................

Sh Mahavir Prasad Gupta JE. .... AE..........


NAME OF WORK :- Widening of Dallupura Road, at Mayur Vihar Phase- III
(From DDA Chilla Sports Complex to Dallupura) and Strenthening
/Improvement of riding quality and construction of storm water drain at one
side.

I.No. Description No L B
DATE OF MEASUREMENT :- 15/4/2010
18 Laying spreading and compacting
stone aggregate of specified sizes to
WBM specifications including
Noida Bound
spreading in uniform thickness, hand
IIIrd layer,
picking, 53-22.50mm
rolling with 3 wheeled road /
RD 1215.00
vibratory to1225.00
roller 8-10 tonne in stages to
proper grade and camber, applying and 1 10.00 (3.70+3.60)/2
brooming
Budh requisite
Singh type of screening
Marg,Vasundhara /
binding
Enclave material
Bound to fill up interstices
of coarse aggregate watering and
compacting to the required density . 1 15.00 (2.00+1.90)/2
1 15.00 (1.90+1.65)/2
1 15.00 (1.65+1.60)/2
1 15.00 (1.60+1.60)/2
1 15.00 (1.60+1.40)/2
1 15.00 (1.40+1.55)/2
1 15.00 (1.55+1.60)/2
1 15.00 (1.60+1.90)/2
1 15.00 (1.90+1.25)/2
1 15.00 (1.25+1.45)/2
1 15.00 (1.45+1.35)/2
1 15.00 (1.35+1.30)/2
1 15.00 (1.30+1.22)/2
1 15.00 (1.22+1.35)/2
1 13.00 (1.35+1.34)/2
Dallupura Bound
Deduction for bus stand 1 9.40 0.35
Deduction for chamber 1 3.00 1.20
Deduction for bus stand 1 7.00 0.90
Deduction for bus stand 1 6.90 0.60
Deduction for trees 3 0.60 0.60
C/o to this EMB. P-
1 Disposal and carriage of excavated
malba, lime, moorum and earth etc by
machenical transport including
Qty B/F Marked
loading, unloadingas and
'X' on P-12 for all
stacking
leads and lifts (Beyond initial lead of
50
Lessm30% , lift upto filling.
for back 1.5 m or as per
direction
C/o to this EMB. P-- in - Charge )
of Engieer

Submitted By:- Checked By................

Sh Mahavir Prasad Gupta JE. .... AE..........


NAME OF WORK :- Widening of Dallupura Road, at Mayur Vihar Phase- III
(From DDA Chilla Sports Complex to Dallupura) and Strenthening
/Improvement of riding quality and construction of storm water drain at one
side.

I.No. Description No L B
8 Reinforcement for RCC work
including straightening, cutting,
bending placing in position and
(a) TMT bars.
binding all complete.
Noida Bound, Box Drain
Bt'n RD 615.00 to 675.00 (60m)

Raft & Wall


10mm Dia.
Bottom, main 400 5.10
Top, main 400 4.50
Bottom, Chair 200 1.00
Wall, U- Chair 60 0.60

@ 0.617 kg/m, 4076.00 x 0.617=


Marked……[A]
Raft & Wall
8mm Dia.
Bottom, Distribution 8 60.00
Top, Distribution 7 60.00
Over Lap 60 0.50
Road side wall, Distribution ,(9+9) 18
60.00
STP Boundary Side Wall, Distribution,
(9+9) 18 60.00
Over Lap 141 0.50

@ 0.395 kg/m, 3160.50 x 0.395=


Marked……[B]

Total Weight [A] + [B] =


C/o to this EMB. P-
9 Centring and shuttering including
strutting, propping etc. and removal of
form for.
(c) Walls (any thickness) including
attached pilasters, butteresses, plinth
and string courses etc.
Noida Bound, Box Drain
R.D 555 to R.D 583.50, 2x2
4 28.50
R.D 583.50 to R.D 615.00, 3x1
3x1 30.00
" 3x1 1.50

Submitted By:- Checked By................

Sh Mahavir Prasad Gupta JE. .... AE..........


NAME OF WORK :- Widening of Dallupura Road, at Mayur Vihar Phase- III
(From DDA Chilla Sports Complex to Dallupura) and Strenthening
/Improvement of riding quality and construction of storm water drain at one
side.

I.No. Description No L B
DATE OF MEASUREMENT :- 16/4/2010
6 P/L in position cement concrete of
specified grade excluding the cost of
centering and shuttering all work upto
(a) 1:5:10 (1 cement : 5 coarse sand : 10
plinth level.
graded stone aggregate 40 mm
nominal size).
R.D. 810 to 900 3 30.00 1.40
Noida Bound, Drain
R.D 1226 to R.D 1166 (60m)
2 30.00 1.60
C/o to this EMB. P-

9 Centring and shuttering including


strutting, propping etc. and removal of
form for.
(b) Small lintels not exceeding 1.5m clear
span, moulding as in cornices, window
sills, string courses, bands, copings,
R.D 810 to anchor
bed plates, 900 blocks and the like. 1x3 30.00
Noida Bound, Drain
R.D 1226 to R.D 1166 (60m)
2 30.00
C/o to this EMB. P-

Submitted By:- Checked By................

Sh Mahavir Prasad Gupta JE. .... AE..........


NAME OF WORK :- Widening of Dallupura Road, at Mayur Vihar Phase- III
(From DDA Chilla Sports Complex to Dallupura) and Strenthening
/Improvement of riding quality and construction of storm water drain at one
side.

I.No. Description No L B
DATE OF MEASUREMENT :- 17/4/2010
18 Laying spreading and compacting
stone aggregate of specified sizes to
WBM specifications including
Noida Bound
spreading in uniform thickness, hand
VIth layer,
picking, 53-22.50mm
rolling with 3 wheeled road /
RD 1215.00
vibratory to 8-10
roller 1225.00
tonne in stages to
proper grade and camber, applying and 1 10.00 (3.70+3.60)/2
brooming requisite type
Budh Singh Marg Vasundhara of screening /
binding
Enclave material
Bound to fill up interstices
of coarse aggregate watering and 1 15.00 (2.00+1.90)/2
compacting to the required density . 1 15.00 (1.90+1.65)/2
1 15.00 (1.65+1.60)/2
1 15.00 (1.60+1.60)/2
1 15.00 (1.60+1.40)/2
1 15.00 (1.40+1.55)/2
1 15.00 (1.55+1.60)/2
1 15.00 (1.60+1.90)/2
1 15.00 (1.90+1.25)/2
1 15.00 (1.25+1.45)/2
1 15.00 (1.45+1.35)/2
1 15.00 (1.35+1.30)/2
1 15.00 (1.30+1.22)/2
1 15.00 (1.22+1.35)/2
1 13.00 (1.35+1.34)/2
Dallupura Bound
Deduction for bus stand 1 9.40 0.35
Deduction for chamber 1 3.00 1.20
Deduction for bus stand 1 7.00 0.90
Deduction for bus stand 1 6.90 0.60
Deduction for trees 3 0.60 0.60
C/o to this EMB. P-

Submitted By:- Checked By................

Sh Mahavir Prasad Gupta JE. .... AE..........


NAME OF WORK :- Widening of Dallupura Road, at Mayur Vihar Phase- III
(From DDA Chilla Sports Complex to Dallupura) and Strenthening
/Improvement of riding quality and construction of storm water drain at one
side.

I.No. Description No L B
DATE OF MEASUREMENT :- 19/4/2010
8 Reinforcement for RCC work
including straightening, cutting,
bending placing in position and
(a) TMT bars.
binding all complete.
Noida Bound, Box Drain
Bt'n RD.675 to 705 (30m)
Raft & Wall
10mm Dia.
Bottom, main 200 5.45
Top, main 200 4.80
Bottom, Chair 100 1.00
Wall, U- Chair 30 0.60

@ 0.617 kg/m, 2168.00 x 0.617=


Marked……[A]
Raft & Wall
8mm Dia.
Bottom, Distribution 8 30.00
Top, Distribution 7 30.00
Over Lap 30 0.50
Road side wall, Distribution ,(9+9) 18
30.00
STP Boundary Side Wall, Distribution,
(9+9) 18 30.00
Over Lap 72 0.50

@ 0.395 kg/m, 1581.00 x 0.395=


Marked……[B]

Total Weight [A] + [B] =


C/o to this EMB. P-

9 Centring and shuttering including


strutting, propping etc. and removal of
form for.
(c) Walls (any thickness) including
attached pilasters, butteresses, plinth
and string courses etc.
Noida Bound, Box Drain
R.D. 615 to R.D.675, 3x1
3x2 30.00
C/o to this EMB. P-

Submitted By:- Checked By................

Sh Mahavir Prasad Gupta JE. .... AE..........


NAME OF WORK :- Widening of Dallupura Road, at Mayur Vihar Phase- III
(From DDA Chilla Sports Complex to Dallupura) and Strenthening
/Improvement of riding quality and construction of storm water drain at one
side.

I.No. Description No L B
DATE OF MEASUREMENT :- 21/4/2010
9 Centring and shuttering including
strutting, propping etc. and removal of
form for.
(b) Small lintels not exceeding 1.5m clear
span, moulding as in cornices, window
sills, string courses, bands, copings,
R.D. 600 to 705 1x3 30.00
bed plates, anchor blocks and the like.
1 15.00
C/o to this EMB. P-

Submitted By:- Checked By................

Sh Mahavir Prasad Gupta JE. .... AE..........


NAME OF WORK :- Widening of Dallupura Road, at Mayur Vihar Phase- III
(From DDA Chilla Sports Complex to Dallupura) and Strenthening
/Improvement of riding quality and construction of storm water drain at one
side.

I.No. Description No L B
DATE OF MEASUREMENT :- 22/4/2010
8 Reinforcement for RCC work
including straightening, cutting,
bending placing in position and
(a) TMT bars.
binding all complete.
Noida Bound, Box Drain
Bt'n RD.705 to 765 (60m)
Raft & Wall
10mm Dia.
Bottom, main 400 5.71
Top, main 400 5.13
Bottom, Chair 200 1.00
Wall, U- Chair 60 0.60

@ 0.617 kg/m, 4572.00 x 0.617=


Marked……[A]
Raft & Wall
8mm Dia.
Bottom, Distribution 8 60.00
Top, Distribution 7 60.00
Over Lap 60 0.50
Road side wall, Distribution ,(9+9) 18
60.00
STP Boundary Side Wall, Distribution,
(9+9) 18 60.00
Over Lap 140 0.50

@ 0.395 kg/m, 3160.00 x 0.395=


Marked……[B]

Total Weight [A] + [B] =

9 Centring and shuttering including


strutting, propping etc. and removal of
form for.
(c) Walls (any thickness) including
attached pilasters, butteresses, plinth
and string courses etc.
Noida Bound, Box Drain
R.D 675 to R.D.705, 3x1
3 30.00
C/o to this EMB. P-

Submitted By:- Checked By................

Sh Mahavir Prasad Gupta JE. .... AE..........


NAME OF WORK :- Widening of Dallupura Road, at Mayur Vihar Phase- III
(From DDA Chilla Sports Complex to Dallupura) and Strenthening
/Improvement of riding quality and construction of storm water drain at one
side.

I.No. Description No L B
DATE OF MEASUREMENT :- 24/4/2010
8 Reinforcement for RCC work
including straightening, cutting,
bending placing in position and
(a) TMT bars.
binding all complete.
Noida Bound, Box Drain
Bt'n RD.765 to 810 (45m)
Raft & Wall
10mm Dia.
Bottom, main 300 5.91
Top, main 300 5.33
Bottom, Chair 150 1.00
Wall, U- Chair 46 0.60

@ 0.617 kg/m, 3549.60 x 0.617=


Marked……[A]
Raft & Wall
8mm Dia.
Bottom, Distribution 8 45.00
Top, Distribution 7 45.00
Over Lap 45 0.50
Road side wall, Distribution ,(9+9) 18
45.00
STP Boundary Side Wall, Distribution,
(9+9) 18 45.00
Over Lap 105 0.50

@ 0.395 kg/m, 2370.00 x 0.395=


Marked……[B]

Total Weight [A] + [B] =


C/o to this EMB. P-

7 Providing and laying in position ready


mixed concrete manufactured in fully
automatic batching plant and
Noida Bound, Box Drain
transported to site of work in transit
Raft. for a lead up to 10kms having
mixer
R.D 529.50 to
continuous R.D.705 mixer, manuf 5
agitated 30.00 1.30
-actured as per mix design of specified 1 25.50 1.30
grade
Wall for reinforced cement concrete
work including pumping of R.M.C.
R.D
from501 to R.D.529.50
transit mixer to site of laying , 2 28.50 0.15
R.D 529.50 the
excluding to R.D.705
cost of centering, 2x5 30.00 0.15
shuttering finishing and reinforcement 2x1 25.50 0.15
including cost of admixtures in
recommended proportions as per IS :
9103 to accelerate/ retard setting of
concrete,
Submitted By:-improve workability without Checked By................
impairing strength and durability as
per direction of the Engineer - in -
charge. M-25 grade Reinforced cement
Sh Mahavir Prasad Gupta JE. .... AE..........
concrete by using 410kg of cement per
NAME OF WORK :- Widening of Dallupura Road, at Mayur Vihar Phase- III
(From DDA Chilla Sports Complex to Dallupura) and Strenthening
/Improvement of riding quality and construction of storm water drain at one
side.

I.No. Description No L B
C/o to this EMB. P-

Submitted By:- Checked By................

Sh Mahavir Prasad Gupta JE. .... AE..........


NAME OF WORK :- Widening of Dallupura Road, at Mayur Vihar Phase- III
(From DDA Chilla Sports Complex to Dallupura) and Strenthening
/Improvement of riding quality and construction of storm water drain at one
side.

I.No. Description No L B
19 Providing and applying tack coat using
hot straight run bitumen of grade 80/
(b) 100 including
On W.B.M. heating
@ 0.75 the bitumen,
Kg / sqm.
spraying the bitumen with
mechanically operated spray unit fitted
Dallupura
on bitumen Bound
boiler, cleaning and
preparing the existing
After toll Tax, roadtosurface
RD-1065.00 1225.00as
per specifications : 0.50 2.10 2.60
1 12.90 (2.60+2.50)/2
1 15.00 (2.50+3.35)/2
1 15.00 (3.35+2.70)/2
1 15.00 (2.90+2.50)/2
1 15.00 (2.50+2.75)/2
1 15.00 (2.75+2.80)/2
1 2.40 (2.80+2.70)/2
Ramp ( Delhi Jal bord) 1 6.10 (3.00+2.90)/2
1 6.50 (2.60+2.58)/2
1 15.00 (2.58+2.40)/2
1 15.00 (2.40+2.70)/2
1 10.10 (2.70+2.60)/2
1 8.40 (2.45+1.80)/2
1 6.50 (1.80+1.70)/2
After Vasundhra Red Light RD
931.90 to 1051.10 1 3.00 (2.50+2.80)/2
1 10.10 (2.80+2.85)/2
1 15.00 (2.85+2.95)/2
1 15.00 (2.95+2.98)/2
1 15.00 (2.98+2.90)/2
1 15.00 (2.90+2.95)/2
1 15.00 (2.95+3.02)/2
1 15.00 (3.02+2.95)/2
1 15.00 (2.95+2.94)/2
1 1.10 (2.94+1.90)/2
Vasundhara Red Light, RD 795.00
to RD 913.30 1 2.90 (2.95+2.94)/2
1 14.50 (3.45+3.70)/2
1 5.00 (4.00+3.30)/2
1 7.60 (3.30+2.70)/2
1 15.00 (2.70+2.90)/2
1 15.00 (2.90+2.92)/2
1 15.00 (2.92+2.75)/2
1 15.00 (2.75+2.60)/2
1 15.00 (2.60+2.60)/2

Submitted By:- Checked By................

Sh Mahavir Prasad Gupta JE. .... AE..........


NAME OF WORK :- Widening of Dallupura Road, at Mayur Vihar Phase- III
(From DDA Chilla Sports Complex to Dallupura) and Strenthening
/Improvement of riding quality and construction of storm water drain at one
side.

I.No. Description No L B
1 10.00 (2.60+3.00)/2
Upto Vasundhara Red Light 1 3.30 (3.00+2.70)/2
C/o to this EMB. P-

Submitted By:- Checked By................

Sh Mahavir Prasad Gupta JE. .... AE..........


NAME OF WORK :- Widening of Dallupura Road, at Mayur Vihar Phase- III
(From DDA Chilla Sports Complex to Dallupura) and Strenthening
/Improvement of riding quality and construction of storm water drain at one
side.

I.No. Description No L B
DATE OF MEASUREMENT :- 25/4/2010
19 Providing and applying tack coat using
hot straight run bitumen of grade 80/
(b) On W.B.M. @ 0.75 Kg / sqm.
100 including heating the bitumen,
Dallupura Bound
spraying the bitumen with
mechanically operated spray unit
Petrol Pump Ramp toVasundhara Red fitted
on bitumen
Light,RD 521.50boiler, cleaning and
to 795.00
preparing the existing road surface as
per specifications : 1 3.50 (4.00+4.10)/2
1 15.00 (4.10+4.50)/2
1 15.00 (4.50+4.05)/2
1 15.00 (4.05+4.10)/2
1 15.00 (4.10+3.75)/2
(Upto Petrol pump Ramp) 1 2.50 (3.75+3.80)/2
1 5.00 (3.50+4.20)/2
1 2.00 (4.20+3.20)/2
1 5.50 (3.20+2.88)/2
1 15.00 (2.88+2.33)/2
1 15.00 (2.33+2.45)/2
1 15.00 (2.45+2.55)/2
1 15.00 (2.55+2.78)/2
1 15.00 (2.78+3.00)/2
1 10.00 (3.00+2.85)/2
Ramp(Cummunity Hall) Near RD- 685
1 10.70 (3.15+3.10)/2
1 9.30 (2.80+2.96)/2
1 15.00 (2.96+3.00)/2
1 15.00 (3.00+2.67)/2
1 15.00 (2.67+2.70)/2
1 15.00 (2.70+2.72)/2
1 15.00 (2.72+2.58)/2
1 15.00 (2.58+2.95)/2
After Budh Singh Marg T-point
,R.D.435.00 to 521.50 1 15.00 (4.05+3.80)/2
1 15.00 (3.80+3.98)/2
1 15.00 (3.98+3.45)/2
1 15.00 (3.45+3.48)/2
1 15.00 (3.48+3.45)/2
upto petrol pump ramp 1 11.50 (3.45+3.70)/2
After Budh Singh Marg T-point
,R.D.355.00 to 435.00 1 15.00 (3.68+3.00)/2
1 15.00 (3.00+2.95)/2
1 15.00 (2.95+3.26)/2

Submitted By:- Checked By................

Sh Mahavir Prasad Gupta JE. .... AE..........


NAME OF WORK :- Widening of Dallupura Road, at Mayur Vihar Phase- III
(From DDA Chilla Sports Complex to Dallupura) and Strenthening
/Improvement of riding quality and construction of storm water drain at one
side.

I.No. Description No L B
1 15.00 (3.26+3.05)/2
1 15.00 (3.05+3.95)/2
1 15.00 (3.95+4.05)/2
C/o to this EMB. P-

Submitted By:- Checked By................

Sh Mahavir Prasad Gupta JE. .... AE..........


NAME OF WORK :- Widening of Dallupura Road, at Mayur Vihar Phase- III
(From DDA Chilla Sports Complex to Dallupura) and Strenthening
/Improvement of riding quality and construction of storm water drain at one
side.

I.No. Description No L B
DATE OF MEASUREMENT :- 26/4/2010
9 Centring and shuttering including
strutting, propping etc. and removal of
form for.
(b) Small lintels not exceeding 1.5m clear
span, moulding as in cornices, window
sills, string courses, bands, copings,
R.D. 705 toanchor
bed plates, 810 blocks and the like. 1x3 30.00
1 15.00
C/o to this EMB. P-

9 Centring and shuttering including


strutting, propping etc. and removal of
form for.
(c) Walls (any thickness) including
attached pilasters, butteresses, plinth
and string courses etc.
Noida Bound, Box Drain
R.D 705 to R.D.765, 3x1
3x2 30.00
C/o to this EMB. P-

19 Providing and applying tack coat using


hot straight run bitumen of grade 80/
100 including heating the bitumen,
(b) On W.B.M. @the
spraying 0.75 Kg / sqm.
bitumen with
mechanically operated spray unit fitted
on bitumen
After Budh singhboiler,
marg cleaning and,
T-point
preparingtothe
R.D.305 355existing road surface as 1 10.00 (2.65+3.65)/2
per specifications :
1 15.00 (4.35+3.40)/2
1 15.00 (3.40+3.68)/2
Budh Singh Marg Vasundhara
Enclave Bound 1 15 (2.00+1.90)/2
1 15 (1.90+1.65)/2
1 15 (1.65+1.60)/2
1 15 (1.60+1.60)/2
1 15 (1.60+1.40)/2
1 15 (1.40+1.55)/2
1 15 (1.55+1.60)/2
1 15 (1.60+1.90)/2
1 15 (1.90+1.25)/2
1 15 (1.25+1.45)/2
1 15 (1.45+1.35)/2
1 15 (1.35+1.30)/2
1 15 (1.30+1.22)/2
1 15 (1.22+1.35)/2

Submitted By:- Checked By................

Sh Mahavir Prasad Gupta JE. .... AE..........


NAME OF WORK :- Widening of Dallupura Road, at Mayur Vihar Phase- III
(From DDA Chilla Sports Complex to Dallupura) and Strenthening
/Improvement of riding quality and construction of storm water drain at one
side.

I.No. Description No L B
1 13 (1.35+1.34)/2

Submitted By:- Checked By................

Sh Mahavir Prasad Gupta JE. .... AE..........


NAME OF WORK :- Widening of Dallupura Road, at Mayur Vihar Phase- III
(From DDA Chilla Sports Complex to Dallupura) and Strenthening
/Improvement of riding quality and construction of storm water drain at one
side.

I.No. Description No L B
Noida Bound
From end of market RD 120.00
to 293.70 1 15.00 (2.40+2.45)/2
1 15.00 (2.45+2.60)/2
1 15.00 (2.60+2.80)/2
1 15.00 (2.80+2.65)/2
1 15.00 (2.65+2.65)/2
1 15.00 (2.65+2.45)/2
1 15.00 (2.45+2.52)/2
1 15.00 (2.52+2.53)/2
1 15.00 (2.53+2.10)/2
1 15.00 (2.10+2.60)/2
1 10.00 (2.60+2.50)/2
1 5.00 (2.70+2.55)/2
1 8.70 (2.55+3.20)/2
After Road no. 102 T- point RD
1061.90 to 1215.00 1 3.10 (3.35+3.28)/2
1 15.00 (3.28+3.20)/2
1 15.00 (3.20+3.45)/2
1 15.00 (3.45+3.40)/2
1 15.00 (3.40+3.48)/2
1 15.00 (3.48+3.44)/2
1 15.00 (3.44+3.34)/2
1 15.00 (3.34+3.38)/2
1 15.00 (3.38+3.50)/2
1 15.00 (3.50+3.50)/2
1 15.00 (3.50+3.70)/2
Qty B/F Marked as 'X' on P-8

C/o to this EMB. P-

Submitted By:- Checked By................

Sh Mahavir Prasad Gupta JE. .... AE..........


NAME OF WORK :- Widening of Dallupura Road, at Mayur Vihar Phase- III
(From DDA Chilla Sports Complex to Dallupura) and Strenthening
/Improvement of riding quality and construction of storm water drain at one
side.

I.No. Description No L B
DATE OF MEASUREMENT :- 27/4/2010
8 Reinforcement for RCC work
including straightening, cutting,
bending placing in position and
(a) TMT bars.
binding all complete.
Noida Bound, Box Drain
Bt'n RD.810 to 825 (15m)
Raft & Wall
10mm Dia.
Bottom, main 100 6.00
Top, main 100 5.42
Bottom, Chair 48 1.00
Wall, U- Chair 16 0.60

@ 0.617 kg/m, 1199.60 x 0.617=


Marked……[A]
Raft & Wall
8mm Dia.
Bottom, Distribution 8 15.00
Top, Distribution 7 15.00
Over Lap 15 0.50
Road side wall, Distribution ,(9+9) 18
45.00
STP Boundary Side Wall, Distribution,
(9+9) 18 45.00
Over Lap 35 0.50

@ 0.395 kg/m, 1870.00 x 0.395=


Marked……[B]

Total Weight [A] + [B] =


C/o to this EMB. P-

Submitted By:- Checked By................

Sh Mahavir Prasad Gupta JE. .... AE..........


NAME OF WORK :- Widening of Dallupura Road, at Mayur Vihar Phase- III
(From DDA Chilla Sports Complex to Dallupura) and Strenthening
/Improvement of riding quality and construction of storm water drain at one
side.

I.No. Description No L B
19 Providing and applying tack coat using
hot straight run bitumen of grade 80/
100 including heating the bitumen,
spraying the bitumen with
(a) On bituminous
mechanically surfacespray
operated @ 0.50 Kg /
unit fitted
sqm.
on bitumen boiler, cleaning and
preparing
Dallupurathe existing road surface as
Bound
per specifications :
Dallupura bound ( RD- 945.00 to
1225.00) 1 13.00 (9.80+9.73)/2
bus stand 1 7.00 (8.70+9.05)/2
1 10.00 (9.80+9.75)/2
1 15.00 (9.75+9.85)/2
1 15.00 (9.85+9.95)/2
1 15.00 (9.95+10.10)/2
1 15.00 (10.10+10.95)/2
1 15.00 (10.95+10.25)/2
1 10.00 (6.75+6.40)/2
1 5.00 (6.40+7.75)/2
1 5.00 (7.75+9.60)/2
gate 1 10.00 (9.60+9.50)/2
1 15.00 (9.50+9.50)/2
1 15.00 (9.50+9.70)/2
1 15.00 (9.70+9.60)/2
1 15.00 (9.60+9.70)/2
1 15.00 (9.70+9.65)/2
Add entry DDA 1 9.00 0.30
1 15.00 (9.65+9.70)/2
1 15.00 (9.70+9.60)/2
Add entry DDA 1 5.50 0.30
1 15.00 (9.60+9.60)/2
1 10.00 (9.60+9.45)/2
1 15.00 (9.45+8.60)/2
Less for M.Hole 3 0.90 0.90
Less for C/Post 1 1.40 0.35
Less for tree 3 0.60 0.60
C/o to this EMB. P-

Submitted By:- Checked By................

Sh Mahavir Prasad Gupta JE. .... AE..........


NAME OF WORK :- Widening of Dallupura Road, at Mayur Vihar Phase- III
(From DDA Chilla Sports Complex to Dallupura) and Strenthening
/Improvement of riding quality and construction of storm water drain at one
side.

I.No. Description No L B
DATE OF MEASUREMENT :- 28/4/2010
19 Providing and applying tack coat using
hot straight run bitumen of grade 80/
100 including heating the bitumen,
spraying the bitumen with
(a) On bituminous
mechanically surfacespray
operated @ 0.50 Kg /
unit fitted
sqm.
on bitumen boiler, cleaning and
preparing the existing road surface as
Dallupura bound ( RD-
per specifications :
615.00 to 945.00) 1 15.00 (9.45+9.65)/2
1 15.00 (9.65+9.74)/2
1 15.00 (9.74+9.80)/2
1 15.00 (9.80+9.81)/2
Add entry DDA 1 9.50 0.30
1 15.00 (9.81+9.81)/2
1 15.00 (9.81+10.05)/2
1 15.00 (10.05+10.20)/2
1 15.00 (10.20+9.50)/2
1 15.00 (9.50+9.32)/2
1 15.00 (9.32+9.52)/2
1 15.00 (9.52+9.63)/2
1 15.00 (9.63+9.70)/2
Add entry DDA 1 14.15 0.30
1 15.00 (9.70+9.80)/2
1 15.00 (9.80+9.74)/2
1 15.00 (9.74+9.78)/2
1 15.00 (9.78+9.80)/2
1 15.00 (9.80+9.80)/2
1 15.00 (9.80+9.70)/2
1 15.00 (9.70+9.70)/2
1 15.00 (9.70+9.90)/2
1 15.00 (9.90+9.75)/2
1 15.00 (9.75+9.70)/2
Vasundra cut , Approach
(14.64+10.60)/2 1 12.62 (5.10+5.75)/2
Less for steel pipe 1 2.80 2.00
Less for M.Hole 4 0.90 0.90
Less for tree 3 0.50 0.50
C/o to this EMB. P-

Submitted By:- Checked By................

Sh Mahavir Prasad Gupta JE. .... AE..........


NAME OF WORK :- Widening of Dallupura Road, at Mayur Vihar Phase- III
(From DDA Chilla Sports Complex to Dallupura) and Strenthening
/Improvement of riding quality and construction of storm water drain at one
side.

I.No. Description No L B
DATE OF MEASUREMENT :- 29/4/2010
19 Providing and applying tack coat using
hot straight run bitumen of grade 80/
100 including heating the bitumen,
spraying the bitumen with
(a) On bituminous
mechanically surfacespray
operated @ 0.50 Kg /
unit fitted
sqm.
on bitumen boiler, cleaning and
preparing the existing road surface as
Dallupura bound ( RD-
per specifications :
315.00 to 615.00) 1 15.00 (11.30+10.10)/2
1 15.00 (10.10+10.00)/2
1 15.00 (10.00+9.78)/2
1 15.00 (9.78+9.90)/2
1 15.00 (9.90+10.05)/2
1 15.00 (10.05+10.12)/2
1 15.00 (10.12+10.22)/2
1 5.00 (10.22+9.30)/2
1 5.00 (9.30+10.40)/2
1 10.00 (10.40+10.40)/2
1 5.00 (10.40+9.27)/2
1 5.00 (9.27+10.40)/2
1 15.00 (10.40+10.40)/2
1 15.00 (10.40+10.35)/2
1 15.00 (10.35+10.65)/2
1 15.00 (10.65+11.12)/2
Start petrol pump 1 10.00 (11.12+12.07)/2
1 5.00 (12.07+12.56)/2
1 15.00 (12.56+13.40)/2
1 15.00 (13.40+13.18)/2
1 15.00 (13.18+12.62)/2
1 15.00 (12.62+12.10)/2
1 5.00 (12.10+11.70)/2
1 5.00 (11.70+10.30)/2
1 5.00 (10.30+10.10)/2
1 5.00 (10.10+10.04)/2
1 5.00 (10.04+9.45)/2
1 5.00 (9.45+9.45)/2
Budh Singh Marg & Dallupura T-
Point 1 17.00 (8.30+14.05)/2

" 0.50 4.00 7.00


" 0.50 7.00 5.30
C/o to this EMB. P-

Submitted By:- Checked By................

Sh Mahavir Prasad Gupta JE. .... AE..........


NAME OF WORK :- Widening of Dallupura Road, at Mayur Vihar Phase- III
(From DDA Chilla Sports Complex to Dallupura) and Strenthening
/Improvement of riding quality and construction of storm water drain at one
side.

I.No. Description No L B
DATE OF MEASUREMENT :- 30/4/2010
8 Reinforcement for RCC work
including straightening, cutting,
bending placing in position and
(a) TMT bars.
binding all complete.
Noida Bound, Box Drain
Bt'n RD.825 to 870 (45m)
Raft & Wall
10mm Dia.
Bottom, main 300 6.15
Top, main 300 5.55
Bottom, Chair 150 1.00
Wall, U- Chair 44 0.60

@ 0.617 kg/m, 3686.40 x 0.617=


Marked……[A]
Raft & Wall
8mm Dia.
Bottom, Distribution 8 15.00
Top, Distribution 7 15.00
Over Lap 45 0.50
Road side wall, Distribution ,(9+9) 18
45.00
STP Boundary Side Wall, Distribution,
(9+9) 18 45.00
Over Lap 105 0.50

@ 0.395 kg/m, 1920.00 x 0.395=


Marked……[B]

Total Weight [A] + [B] =


C/o to this EMB. P-

Submitted By:- Checked By................

Sh Mahavir Prasad Gupta JE. .... AE..........


NAME OF WORK :- Widening of Dallupura Road, at Mayur Vihar Phase- III
(From DDA Chilla Sports Complex to Dallupura) and Strenthening
/Improvement of riding quality and construction of storm water drain at one
side.

I.No. Description No L B
19 Providing and applying tack coat using
hot straight run bitumen of grade 80/
100 including heating the bitumen,
spraying the bitumen with
(a) On bituminous
mechanically surfacespray
operated @ 0.50 Kg /
unit fitted
sqm.
on bitumen boiler, cleaning and
preparing the existing road surface as
RD 0.00 to RD - 46.00 1 30.00 7.40
per specifications :
1 16.00 7.40
Dallupura bound ( RD-
0.00 to 152.00) 5 30.00 3.30
1 2.00 3.30
Dallupura bound ( RD-
152.00 to 315.00) 5 30.00 7.10
1 13.00 7.10
Noida Bound
RD 0.00 to RD 141.60 4 30.00 3.30
1 21.60 3..30
C/V 1 18.00 1.70
C/o to this EMB. P-

Submitted By:- Checked By................

Sh Mahavir Prasad Gupta JE. .... AE..........


NAME OF WORK :- Widening of Dallupura Road, at Mayur Vihar Phase- III
(From DDA Chilla Sports Complex to Dallupura) and Strenthening
/Improvement of riding quality and construction of storm water drain at one
side.

I.No. Description No L B
DATE OF MEASUREMENT :- 1/5/2010

19 Providing and applying tack coat using


hot straight run bitumen of grade 80/
100 including heating the bitumen,
spraying the bitumen with
(a) On bituminous
mechanically surfacespray
operated @ 0.50 Kg /
unit fitted
sqm.
on bitumen boiler, cleaning and
preparing the existing road surface as
RD 141.60 to RD 290.00 1 8.40 (9.26+9.35)/2
per specifications :
1 15.00 (9.35+9.44)/2
1 15.00 (9.44+9.42)/2
1 15.00 (9.42+9.43)/2
1 15.00 (9.43+9.35)/2
1 15.00 (9.35+9.20)/2
1 15.00 (9.20+9.10)/2
1 15.00 (9.10+9.00)/2
1 15.00 (9.00+9.04)/2
1 15.00 (9.04+8.88)/2
1 5.00 (8.88+8.90)/2
RD 290.00 to RD 555.00 8 30.00 6.30
1 25.00 6.30
C/o to this EMB. P-

Submitted By:- Checked By................

Sh Mahavir Prasad Gupta JE. .... AE..........


NAME OF WORK :- Widening of Dallupura Road, at Mayur Vihar Phase- III
(From DDA Chilla Sports Complex to Dallupura) and Strenthening
/Improvement of riding quality and construction of storm water drain at one
side.

I.No. Description No L B
DATE OF MEASUREMENT :- 3/5/2010
9 Centring and shuttering including
strutting, propping etc. and removal of
form for.
(b) Small lintels not exceeding 1.5m clear
span, moulding as in cornices, window
sills, string courses, bands, copings,
R.D. 810 to 840 1 30.00
bed plates, anchor blocks and the like.
C/o to this EMB. P-

9 Centring and shuttering including


strutting, propping etc. and removal of
form for.
(c) Walls (any thickness) including
attached pilasters, butteresses, plinth
and string courses etc.
Noida Bound, Box Drain
R.D 765 to R.D.810, 3x1
3x1 30.00
3x1 15.00
C/o to this EMB. P-

19 Providing and applying tack coat using


hot straight run bitumen of grade 80/
100 including heating the bitumen,
spraying the bitumen with
(a) On bituminous
mechanically surfacespray
operated @ 0.50 Kg /
unit fitted
sqm.
on bitumen boiler, cleaning and
preparing the existing road surface as
RD 555.00 to RD 905.00 11 30.00 6.30
per specifications :
1 20.00 6.30
RD 905.00 to RD 975.00 1 7.50 (10.05+10.35)/2
1 15.00 (11.85+11.56)/2
1 3.60 (11.56+11.58)/2
1 13.90 (10.48+10.63)/2
1 15.00 (10.63+10.73)/2
1 15.00 (10.73+10.65)/2
C/V 1 19.60 1.70
C/o to this EMB. P-

Submitted By:- Checked By................

Sh Mahavir Prasad Gupta JE. .... AE..........


NAME OF WORK :- Widening of Dallupura Road, at Mayur Vihar Phase- III
(From DDA Chilla Sports Complex to Dallupura) and Strenthening
/Improvement of riding quality and construction of storm water drain at one
side.

I.No. Description No L B
DATE OF MEASUREMENT :- 4/5/2010

19 Providing and applying tack coat using


hot straight run bitumen of grade 80/
100 including heating the bitumen,
spraying the bitumen with
(a) On bituminous
mechanically surfacespray
operated @ 0.50 Kg /
unit fitted
sqm.
on bitumen boiler, cleaning and
preparing the existing road surface as
RD 975.00 to RD 1226.00 1 15.00 (10.65+10.72)/2
per specifications :
1 15.00 (10.72+10.75)/2
1 10.00 (10.75+10.88)/2
1 9.70 (10.88+11.00)/2
1 15.00 (12.20+12.15)/2
1 6.00 (12.15+11.55)/2
1 1.30 (11.55+11.15)/2
1 5.00 (11.15+11.15)/2
1 3.00 (11.15+8.16)/2
1 10.00 (9.94+10.62)/2
1 15.00 (10.62+10.62)/2
1 15.00 (10.62+10.60)/2
1 15.00 (10.60+10.62)/2
1 15.00 (10.62+10.54)/2
1 15.00 (10.54+10.50)/2
1 15.00 (10.50+10.53)/2
1 15.00 (10.53+10.45)/2
1 15.00 (10.45+10.30)/2
1 15.00 (10.30+10.25)/2
1 15.00 (10.25+10.35)/2
1 10.00 (10.35+9.90)/2
1 1.00 (4.00+3.90)/2
C/V 1 21.90 1.70
C/V 1 8.00 1.70
C/o to this EMB. P-

Submitted By:- Checked By................

Sh Mahavir Prasad Gupta JE. .... AE..........


NAME OF WORK :- Widening of Dallupura Road, at Mayur Vihar Phase- III
(From DDA Chilla Sports Complex to Dallupura) and Strenthening
/Improvement of riding quality and construction of storm water drain at one
side.

I.No. Description No L B
DATE OF MEASUREMENT :- 5/5/2010
19 Providing and applying tack coat using
hot straight run bitumen of grade 80/
(a) On bituminous surface @ 0.50 Kg /
100 including heating the bitumen,
sqm.
Budh singh Marg
spraying the bitumen with
mechanically operated
Vasundhra Enclave Bound spray unit fitted 0.50 9.70 5.70
on bitumen boiler, cleaning and 1 7.50 (5.70+7.10)/2
preparing the existing road surface as
per specifications : 1 7.50 (7.10+7.41)/2
1 15.00 (7.41+7.66)/2
1 15.00 (7.66+7.42)/2
1 15.00 (7.42+7.45)/2
1 15.00 (7.45+7.15)/2
1 15.00 (7.15+7.30)/2
1 15.00 (7.30+7.80)/2
1 15.00 (7.80+8.35)/2
1 15.00 (8.35+8.60)/2
1 15.00 (8.60+8.85)/2
1 15.00 (8.85+8.92)/2
1 15.00 (8.92+8.70)/2
1 15.00 (8.70+8.65)/2
1 15.00 (8.65+8.80)/2
1 9.60 (8.80+8.80)/2
C/V 1 22.10 1.00
C/V 1 1.95 1.00
Budh singh Marg Vasundhra
Dallupura Bound 0.50 4.20 3.50
1 6.10 (3.50+4.08)/2
1 15.00 (4.08+3.50)/2
1 13.50 (7.75+8.70)/2
1 7.50 (8.70+8.50)/2
1 7.50 (8.50+6.45)/2
1 15.00 (6.95+7.00)/2
1 15.00 (7.00+7.10)/2
1 15.00 (7.10+7.05)/2
1 15.00 (7.05+6.90)/2
1 15.00 (6.90+8.55)/2
1 15.00 (8.55+8.80)/2
1 15.00 (8.80+8.90)/2
1 15.00 (8.90+8.80)/2
1 15.00 (8.80+8.65)/2
1 15.00 (8.65+8.57)/2
1 15.00 (8.57+8.70)/2

Submitted By:- Checked By................

Sh Mahavir Prasad Gupta JE. .... AE..........


NAME OF WORK :- Widening of Dallupura Road, at Mayur Vihar Phase- III
(From DDA Chilla Sports Complex to Dallupura) and Strenthening
/Improvement of riding quality and construction of storm water drain at one
side.

I.No. Description No L B
Village Approach 1 11.10 (5.30+4.80)/2
" 1./3 1.90 4.80
Deduction M.H 1x4 3.14/4 (0.85x0.85)
C/o to this EMB. P-

Submitted By:- Checked By................

Sh Mahavir Prasad Gupta JE. .... AE..........


NAME OF WORK :- Widening of Dallupura Road, at Mayur Vihar Phase- III
(From DDA Chilla Sports Complex to Dallupura) and Strenthening
/Improvement of riding quality and construction of storm water drain at one
side.

I.No. Description No L B
DATE OF MEASUREMENT :- 10/5/2010
11 Brick work with FPS bricks of class
designation 75 in foundation and plinth
in cement mortar :-
(a) 1:6 (1 cement: 6 coarse sand).
Noida Bound, Drain
R.D 1226 to R.D.1166 (60m)

Ist step 2 60.00 0.46


IInd step 2 60.00 0.34
IIIrd step 2 15.00 0.23
" 2 15.00 0.23
" 2 15.00 0.23
" 2 15.00 0.23
C/o to this EMB. P-

7 Providing and laying in position ready


mixed concrete manufactured in fully
automatic batching plant and
Noida Bound,
transported to Box
site Drain
of work in transit
Raft. for a lead up to 10kms having
mixer
continuous agitated mixer, manuf 4
R.D 705 to R.D.840 30.00 1.30
-actured as per mix design of specified 1 15.00 1.30
grade for reinforced cement concrete
Wall
work including pumping of R.M.C.
R.D 705
from to R.D.810
transit mixer to site of laying , 2x3 30.00 0.15
excluding the cost of centering, 2x1 15.00 0.15
shuttering
C/o to thisfinishing
EMB. P-and reinforcement
including cost of admixtures in
recommended proportions as per IS :
10 Providing and fixing
9103 to accelerate/ retardin setting
position
of
precast RCC drain cover of approved
concrete, improve workability without
manufacturere
impairing strength i.e. and
KK.durability
S&S as or
equivalent
per direction of the Engineer - in x-
make of size 1150 x 400
100mm (thickness)
charge. M-25 or required
grade Reinforced size
cement
with ten hole by using M-30
concrete by using 410kg of cement pergrade of
concrete
cum
NoidaofBound& reinforced
concrete. of approved 411 1.15 0.40
manufacture with two layers of 8 mm
C/o to this EMB. P-
dia of steel with six nos along the
length & 14 Nos along the width each
layer suitable distributed &
manufactured by vibrator compaction
process using joint less FRP moulds to
active shuttering finish on five faces as
top face with have broom finish
complete as per direction of Engineer-
in-Charge.

Submitted By:- Checked By................

Sh Mahavir Prasad Gupta JE. .... AE..........


NAME OF WORK :- Widening of Dallupura Road, at Mayur Vihar Phase- III
(From DDA Chilla Sports Complex to Dallupura) and Strenthening
/Improvement of riding quality and construction of storm water drain at one
side.

I.No. Description No L B
20 Providing and laying Bituminous
Macadam on prepared surface with
specified graded crushed stone
aggregate for profile corrective base/
(a) 80mm
binder average compactedloading
course including thickness
of
with
aggregate with F.E. loader , hot@mixing
bitumen of 60/70 grade 3.5%
(Percentage
of
Qtystone by weight
aggregates
B/F Marked andof
as 'X' total
onbitumen
P-23mix)
in hot
mix plant, transporting the mixed
material by tippers to paver and laying
Qty B/F Marked
the mixed as 'X'
material onpaver
with P-24finisher
fitted with electronic sensing device to
the required
Qty B/F Markedlevel
as 'X'and grade and
on P-26
rolling with road rollers, as per
MORTH specification to achieve the
desired density and compaction but
excluding the cost of primer/ tack coat.
Hence Qty of BM 1 4049.28

Less 5% for submission of levels

C/o to this EMB. P-

21 Providing & laying dense bituminous


macadam on prepared surface with
specified graded crushed stone
aggregate for profile corrective
(a) 50/75mm
base/bindingaverage compacted
course includingthickness
loading
with bitumen of 60/70
of aggregate with FE loader grade and
@ 5%hot
(percentage
mixing of by
stone weight of
aggregate, total
filler mix)
and
Qty B/F Marked as 'X' on P-28
and lime infiller
bitumen batch@ type
2% (percentage
hot mix plant by
weight of Aggregate).
transporting the mixed material by
Qty B/FtoMarked
tipper paver and as 'X'laying
on the P-29mixed
material with paver finisher fitted with
electronic
Qty B/F Marked sensing
as 'X' device
on to the
P-30
required level and grade and rolling by
road rollers as per MORTH
Qty B/F Marked as 'X' on P-32
specifications to achieve the desired
density, but excluding cost of
Qty B/F Marked
primer/tack coat. as 'X' on P-33

Qty B/F Marked as 'X' on P-34

Qty B/F Marked as 'X' on P-35

Qty B/F Marked as 'X' on P-36

Hence Qty of BM 1 24320.96

Submitted By:- Checked By................

Sh Mahavir Prasad Gupta JE. .... AE..........


NAME OF WORK :- Widening of Dallupura Road, at Mayur Vihar Phase- III
(From DDA Chilla Sports Complex to Dallupura) and Strenthening
/Improvement of riding quality and construction of storm water drain at one
side.

I.No. Description No L B

Less 5% for submission of levels

C/o to this EMB. P-

Submitted By:- Checked By................

Sh Mahavir Prasad Gupta JE. .... AE..........


NAME OF WORK :- Widening of Dallupura Road, at Mayur Vihar Phase- III
(From DDA Chilla Sports Complex to Dallupura) and Strenthening
/Improvement of riding quality and construction of storm water drain at one
side.

Ird R/A BILL


ayur Vihar Phase- III (From DDA Chilla Sports Complex to
y and construction of storm water drain at one side.

ase- III. Delhi

sad Gupta

E / PWD / M-212 / 2009- 2010

D or H Quantity Unit

1.48 4.00 Cum. ###


1.48 3.20 " ###
1.48 5.08 " ###
1.42 4.82 " ###
1.34 41.71 " ###
1.36 40.8 " ###
1.38 40.88 " ###
1.38 42.44 " ###
1.51 45.87 " ###
1.53 46.47 " ###
1.63 50.12 " ###
Total= 325.39 Cum.

Submitted By:- Checked By................

Sh Mahavir Prasad Gupta JE. .... AE..........


NAME OF WORK :- Widening of Dallupura Road, at Mayur Vihar Phase- III
(From DDA Chilla Sports Complex to Dallupura) and Strenthening
/Improvement of riding quality and construction of storm water drain at one
side.

D or H Quantity Unit

0.10 0.52 Cum.


0.10 0.28 "
0.10 0.10 "
0.10 0.46 "
Total= 1.36 Cum.

0.10 0.74 Sqm


0.10 0.40 "
0.10 0.14 "
0.10 0.65 "
Total= 1.93 Sqm

Submitted By:- Checked By................

Sh Mahavir Prasad Gupta JE. .... AE..........


NAME OF WORK :- Widening of Dallupura Road, at Mayur Vihar Phase- III
(From DDA Chilla Sports Complex to Dallupura) and Strenthening
/Improvement of riding quality and construction of storm water drain at one
side.

D or H Quantity Unit

0.10 8.40 Cum.


0.10 1.47 "
Total= 9.87 Cum.

R.D.343.50 to R.D.345

R.D.407 to R.D.410

158.40 m
136.00 "
16.00 "
3.60 "
Total 314.00 m
@ 0.617 kg/m, 314.00 x 0.617= 193.74 kg.
Marked……[A] 193.74 kg.

40.50 m
36.00 "
34.00 "

63.00 "

63.00 "
28.00 "
Total 264.50 m
@ 0.395 kg/m, 264.50 x 0.395= 104.48 kg.
Marked……[B] 104.48 kg.

298.22 kg.

Submitted By:- Checked By................

Sh Mahavir Prasad Gupta JE. .... AE..........


NAME OF WORK :- Widening of Dallupura Road, at Mayur Vihar Phase- III
(From DDA Chilla Sports Complex to Dallupura) and Strenthening
/Improvement of riding quality and construction of storm water drain at one
side.

D or H Quantity Unit

325.39 cum.
-97.62 "
Total= 227.77 cum.

Submitted By:- Checked By................

Sh Mahavir Prasad Gupta JE. .... AE..........


NAME OF WORK :- Widening of Dallupura Road, at Mayur Vihar Phase- III
(From DDA Chilla Sports Complex to Dallupura) and Strenthening
/Improvement of riding quality and construction of storm water drain at one
side.

D or H Quantity Unit

0.10 6.00 Sqm


0.10 4.75 "
0.10 1.68 "

0.10 -7.35 "


Total= 5.08 Sqm

1.20 26.40 Sqm

1.20 72.96 "

1.20 288.00 "

1.20 106.56 "


Total= 493.92 Sqm

Submitted By:- Checked By................

Sh Mahavir Prasad Gupta JE. .... AE..........


NAME OF WORK :- Widening of Dallupura Road, at Mayur Vihar Phase- III
(From DDA Chilla Sports Complex to Dallupura) and Strenthening
/Improvement of riding quality and construction of storm water drain at one
side.

D or H Quantity Unit

1.69 51.33 Cum. ###


1.71 51.94 " ###
1.72 50.96 " ###
1.73 51.9 " ###
1.82 56.65 " ###
1.83 58.33 " ###
1.83 57.65 " ###
Total= 378.76 Cum.

0.45 16.20 Cum. ###

0.45 -1.48 "


0.45 -1.62 "
0.45 -2.84 "
0.45 -1.86 "
0.45 -0.49 "
Total= 7.92 Cum.

0.10 12.60 Cum.


0.10 2.10 "
Total= 14.70 Cum.

Submitted By:- Checked By................

Sh Mahavir Prasad Gupta JE. .... AE..........


NAME OF WORK :- Widening of Dallupura Road, at Mayur Vihar Phase- III
(From DDA Chilla Sports Complex to Dallupura) and Strenthening
/Improvement of riding quality and construction of storm water drain at one
side.

D or H Quantity Unit

127.40 m
110.50 "
10.00 "
2.40 "
Total 250.30 m
@ 0.617 kg/m, 250.30 x 0.617= 154.44 kg.
Marked……[A] 154.44 kg.

24.00 m
21.00 "
15.00 "

48.00 "

48.00 "
16.00 "
Total 172.00 m
@ 0.395 kg/m, 172.00x 0.395= 67.94 kg.
Marked……[B] 67.94 kg.

222.38 kg.

0.10 9.00 Sqm


0.10 1.50 "
Total= 10.50 Sqm

Submitted By:- Checked By................

Sh Mahavir Prasad Gupta JE. .... AE..........


NAME OF WORK :- Widening of Dallupura Road, at Mayur Vihar Phase- III
(From DDA Chilla Sports Complex to Dallupura) and Strenthening
/Improvement of riding quality and construction of storm water drain at one
side.

D or H Quantity Unit

823.31 m
724.78 "
83.00 "
18.00 "
Total 1649.09 m
@ 0.617 kg/m, 1649.09 x 0.617= 1017.49 kg.
Marked……[A] 1017.49 kg.

200.00 m
175.00 "
7.50 "

450.00 "

450.00 "
18.00 "
Total 1300.50 m
@ 0.395 kg/m, 1300.05x 0.395= 513.70 kg.
Marked……[B] 513.70 kg.

1531.19 kg.

0.15 1.11 Sqm


0.15 0.60 "
0.15 0.21 "
0.15 0.98 "
Total= 2.90 Sqm

Submitted By:- Checked By................

Sh Mahavir Prasad Gupta JE. .... AE..........


NAME OF WORK :- Widening of Dallupura Road, at Mayur Vihar Phase- III
(From DDA Chilla Sports Complex to Dallupura) and Strenthening
/Improvement of riding quality and construction of storm water drain at one
side.

D or H Quantity Unit

36.50 Sqm. ###

-3.29 "
-3.60 "
-6.30 "
-4.14 "
-1.08 "
Total= 18.09 Sqm.

0.60 6.43 Cum. ###


0.60 6.58 " ###
0.60 6.82 " ###
0.60 6.86 " ###
0.60 6.72 " ###
0.60 6.58 " ###
0.60 6.67 " ###
0.60 6.82 " ###
0.60 6.77 " ###
0.60 6.43 " ###
0.60 6.67 " ###
0.60 6.53 " ###
0.60 6.82 " ###
0.60 6.62 " ###
0.60 6.67 " ###
0.60 6.82 " ###
0.60 6.77 " ###
0.60 6.72 " ###
0.60 6.86 " ###
0.60 6.85 " ###
0.60 6.48 " ###
0.60 6.82 " ###
0.60 6.72 " ###
0.60 6.58 " ###

Submitted By:- Checked By................

Sh Mahavir Prasad Gupta JE. .... AE..........


NAME OF WORK :- Widening of Dallupura Road, at Mayur Vihar Phase- III
(From DDA Chilla Sports Complex to Dallupura) and Strenthening
/Improvement of riding quality and construction of storm water drain at one
side.

D or H Quantity Unit
0.60 6.82 " ###
0.60 6.67 " ###
0.60 6.58 " ###
0.60 6.86 " ###
0.60 6.62 " ###
0.60 6.82 " ###
0.60 6.77 " ###
Total 207.73 "
-15.58 "
Total= 192.15 Cum.

1.20 136.80 Sqm


Total= 136.80 Sqm

378.76 cum.
-113.63 "
Total= 265.13 cum.

Submitted By:- Checked By................

Sh Mahavir Prasad Gupta JE. .... AE..........


NAME OF WORK :- Widening of Dallupura Road, at Mayur Vihar Phase- III
(From DDA Chilla Sports Complex to Dallupura) and Strenthening
/Improvement of riding quality and construction of storm water drain at one
side.

D or H Quantity Unit

###
0.10 3.65 Cum ###

0.10 -0.33 "


0.10 -0.36 "
0.10 -0.63 "
0.10 -0.41 "
0.10 -0.11 "
Total= 1.81 Cum

0.60 6.88 Cum. ###


0.60 6.82 " ###
Total 13.70 "
-1.03 "
Total= 12.67 Cum.

0.10 12.60 Cum.


0.10 2.10
Total= 14.70 Cum.

0.10 9.00 Sqm


0.10 1.50 "
Total= 10.50 Sqm

Submitted By:- Checked By................

Sh Mahavir Prasad Gupta JE. .... AE..........


NAME OF WORK :- Widening of Dallupura Road, at Mayur Vihar Phase- III
(From DDA Chilla Sports Complex to Dallupura) and Strenthening
/Improvement of riding quality and construction of storm water drain at one
side.

D or H Quantity Unit

0.15 0.72 Cum.


0.15 0.39 "
0.15 0.14 "
0.15 0.63 "

1.20 1.98 "


1.20 5.47 "
1.20 21.60 "
1.20 7.99 "
Total= 38.92 Cum.

Submitted By:- Checked By................

Sh Mahavir Prasad Gupta JE. .... AE..........


NAME OF WORK :- Widening of Dallupura Road, at Mayur Vihar Phase- III
(From DDA Chilla Sports Complex to Dallupura) and Strenthening
/Improvement of riding quality and construction of storm water drain at one
side.

D or H Quantity Unit

1.87 55.4 Cum. ###


1.92 56.16 " ###
1.95 57.77 " ###
1.95 56.31 " ###
1.98 57.92 " ###
2.00 57.75 " ###

0.80 76.80 " ###


Total= 418.11 Cum.

###
0.075 2.74 Cum ###

0.075 -0.25 "


0.075 -0.27 "
0.075 -0.47 "
0.075 -0.31 "
0.075 -0.08 "
Total= 1.36 Cum

0.60 6.67 Cum. ###


0.60 6.58 " ###
13.25 "
-0.99 "
Total= 12.25 Cum.

Submitted By:- Checked By................

Sh Mahavir Prasad Gupta JE. .... AE..........


NAME OF WORK :- Widening of Dallupura Road, at Mayur Vihar Phase- III
(From DDA Chilla Sports Complex to Dallupura) and Strenthening
/Improvement of riding quality and construction of storm water drain at one
side.

D or H Quantity Unit

2000.00 m
1764.00 "
200.00 "
36.00 "
Total 4000.00 m
@ 0.617 kg/m, 4000.00x 0.617= 2468.00 kg.
Marked……[A] 2468.00 kg.

480.00 m
420.00 "
30.00 "

1080.00 "

1080.00 "
70.00 "
Total 3160.00 m
@ 0.395 kg/m, 3160.00x 0.395= 1248.20 kg.
Marked……[B] 1248.20 kg.

3716.20 kg.

1.20 122.40 Sqm


Total= 122.40 Sqm

Submitted By:- Checked By................

Sh Mahavir Prasad Gupta JE. .... AE..........


NAME OF WORK :- Widening of Dallupura Road, at Mayur Vihar Phase- III
(From DDA Chilla Sports Complex to Dallupura) and Strenthening
/Improvement of riding quality and construction of storm water drain at one
side.

D or H Quantity Unit

0.15 9.00 Sqm


0.15 7.13 "
0.15 2.51 "
Total= 18.64 Sqm

Submitted By:- Checked By................

Sh Mahavir Prasad Gupta JE. .... AE..........


NAME OF WORK :- Widening of Dallupura Road, at Mayur Vihar Phase- III
(From DDA Chilla Sports Complex to Dallupura) and Strenthening
/Improvement of riding quality and construction of storm water drain at one
side.

D or H Quantity Unit

###
0.075 2.74 Cum ###

0.075 2.19 " ###


0.075 2.00 " ###
0.075 1.83 " ###
0.075 1.80 " ###
0.075 1.69 " ###
0.075 1.66 " ###
0.075 1.77 " ###
0.075 1.97 " ###
0.075 1.77 " ###
0.075 1.52 " ###
0.075 1.58 " ###
0.075 1.49 " ###
0.075 1.42 " ###
0.075 1.45 " ###
0.075 1.31 " ###

0.075 -0.25 "


0.075 -0.27 "
0.075 -0.47 "
0.075 -0.31 "
0.075 -0.08 "
Total= 26.81 Cum

418.11 cum.
-125.43 "
Total= 292.68 cum.

Submitted By:- Checked By................

Sh Mahavir Prasad Gupta JE. .... AE..........


NAME OF WORK :- Widening of Dallupura Road, at Mayur Vihar Phase- III
(From DDA Chilla Sports Complex to Dallupura) and Strenthening
/Improvement of riding quality and construction of storm water drain at one
side.

D or H Quantity Unit

2040.00 m
1800.00 "
200.00 "
36.00 "
Total 4076.00 m
@ 0.617 kg/m, 4076.00 x 0.617= 2514.89 kg.
Marked……[A] 2514.89 kg.

480.00 m
420.00 "
30.00 "

1080.00 "

1080.00 "
70.50 "
Total 3160.50 m
@ 0.395 kg/m, 3160.50 x 0.395= 1248.40 kg.
Marked……[B] 1248.40 kg.

3763.29 kg.

1.20 136.80 Sqm

1.20 108.00 "


1.20 5.40 "
Total= 250.20 Sqm

Submitted By:- Checked By................

Sh Mahavir Prasad Gupta JE. .... AE..........


NAME OF WORK :- Widening of Dallupura Road, at Mayur Vihar Phase- III
(From DDA Chilla Sports Complex to Dallupura) and Strenthening
/Improvement of riding quality and construction of storm water drain at one
side.

D or H Quantity Unit

0.10 12.60 Cum.

0.10 9.60 Cum.


Total= 22.20 Cum.

0.10 9.00 Sqm

0.10 6.00 "


Total= 15.00 Sqm

Submitted By:- Checked By................

Sh Mahavir Prasad Gupta JE. .... AE..........


NAME OF WORK :- Widening of Dallupura Road, at Mayur Vihar Phase- III
(From DDA Chilla Sports Complex to Dallupura) and Strenthening
/Improvement of riding quality and construction of storm water drain at one
side.

D or H Quantity Unit

###
0.075 2.74 Cum ###

0.075 2.19 " ###


0.075 2.00 " ###
0.075 1.83 " ###
0.075 1.80 " ###
0.075 1.69 " ###
0.075 1.66 " ###
0.075 1.77 " ###
0.075 1.97 " ###
0.075 1.77 " ###
0.075 1.52 " ###
0.075 1.58 " ###
0.075 1.49 " ###
0.075 1.42 " ###
0.075 1.45 " ###
0.075 1.31 " ###

0.075 -0.25 "


0.075 -0.27 "
0.075 -0.47 "
0.075 -0.31 "
0.075 -0.08 "
Total= 26.81 Cum

Submitted By:- Checked By................

Sh Mahavir Prasad Gupta JE. .... AE..........


NAME OF WORK :- Widening of Dallupura Road, at Mayur Vihar Phase- III
(From DDA Chilla Sports Complex to Dallupura) and Strenthening
/Improvement of riding quality and construction of storm water drain at one
side.

D or H Quantity Unit

1090.00 m
960.00 "
100.00 "
18.00 "
Total 2168.00 m
@ 0.617 kg/m, 2168.00 x 0.617= 1337.66 kg.
Marked……[A] 1337.66 kg.

240.00 m
210.00 "
15.00 "

540.00 "

540.00 "
36.00 "
Total 1581.00 m
@ 0.395 kg/m, 1581.00 x 0.395= 624.50 kg.
Marked……[B] 624.50 kg.

1962.15 kg.

1.20 216.00 Sqm


Total= 216.00 Sqm

Submitted By:- Checked By................

Sh Mahavir Prasad Gupta JE. .... AE..........


NAME OF WORK :- Widening of Dallupura Road, at Mayur Vihar Phase- III
(From DDA Chilla Sports Complex to Dallupura) and Strenthening
/Improvement of riding quality and construction of storm water drain at one
side.

D or H Quantity Unit

0.15 13.50 Sqm


0.15 2.25 "
Total= 15.75 Sqm

Submitted By:- Checked By................

Sh Mahavir Prasad Gupta JE. .... AE..........


NAME OF WORK :- Widening of Dallupura Road, at Mayur Vihar Phase- III
(From DDA Chilla Sports Complex to Dallupura) and Strenthening
/Improvement of riding quality and construction of storm water drain at one
side.

D or H Quantity Unit

2284.00 m
2052.00 "
200.00 "
36.00 "
Total 4572.00 m
@ 0.617 kg/m, 4572.00 x 0.617= 2820.92 kg.
Marked……[A] 2820.92 kg.

480.00 m
420.00 "
30.00 "

1080.00 "

1080.00 "
70.00 m
Total 3160.00 m
@ 0.395 kg/m, 3160.00 x 0.395= 1248.20 kg.
Marked……[B] 1248.20 kg.

4069.12 kg.

1.20 108.00 Sqm


Total= 108.00 Sqm

Submitted By:- Checked By................

Sh Mahavir Prasad Gupta JE. .... AE..........


NAME OF WORK :- Widening of Dallupura Road, at Mayur Vihar Phase- III
(From DDA Chilla Sports Complex to Dallupura) and Strenthening
/Improvement of riding quality and construction of storm water drain at one
side.

D or H Quantity Unit

1773.00 m
1599.00 "
150.00 "
27.60 "
Total 3549.60 m
@ 0.617 kg/m, 3549.60 x 0.617= 2190.10 kg.
Marked……[A] 2190.10 kg.

360.00 m
315.00 "
22.50 "

810.00 "

810.00 "
52.50 m
Total 2370.00 m
@ 0.395 kg/m, 2370.00 x 0.395= 936.15 kg.
Marked……[B] 936.15 kg.

3126.25 kg.

0.15 29.25 Cum.


0.15 4.97 "

1.20 10.26 "


1.20 54.00 "
1.20 9.18 "

Submitted By:- Checked By................

Sh Mahavir Prasad Gupta JE. .... AE..........


NAME OF WORK :- Widening of Dallupura Road, at Mayur Vihar Phase- III
(From DDA Chilla Sports Complex to Dallupura) and Strenthening
/Improvement of riding quality and construction of storm water drain at one
side.

D or H Quantity Unit
Total= 107.66 Cum.

Submitted By:- Checked By................

Sh Mahavir Prasad Gupta JE. .... AE..........


NAME OF WORK :- Widening of Dallupura Road, at Mayur Vihar Phase- III
(From DDA Chilla Sports Complex to Dallupura) and Strenthening
/Improvement of riding quality and construction of storm water drain at one
side.

D or H Quantity Unit

2.73 sqm.
32.90 " ###
43.88 " ###
45.38 " ###
40.50 " ###
39.38 " ###
41.63 " ###
6.60 " ###
18.00 " ###
16.84 " ###
37.35 " ###
38.25 " ###
26.77 " ###
17.85 " ###
11.38 " ###

7.95 " ###


28.53 " ###
43.50 " ###
44.48 " ###
44.10 " ###
43.88 " ###
44.78 " ###
44.78 " ###
44.18 " ###
2.66 " ###

8.54 " ###


51.84 " ###
18.25 " ###
22.80 " ###
42.00 " ###
43.65 " ###
42.53 " ###
40.13 " ###
39.00 " ###

Submitted By:- Checked By................

Sh Mahavir Prasad Gupta JE. .... AE..........


NAME OF WORK :- Widening of Dallupura Road, at Mayur Vihar Phase- III
(From DDA Chilla Sports Complex to Dallupura) and Strenthening
/Improvement of riding quality and construction of storm water drain at one
side.

D or H Quantity Unit
28.00 " ###
9.41 " ###
Total= 1114.43 sqm.

Submitted By:- Checked By................

Sh Mahavir Prasad Gupta JE. .... AE..........


NAME OF WORK :- Widening of Dallupura Road, at Mayur Vihar Phase- III
(From DDA Chilla Sports Complex to Dallupura) and Strenthening
/Improvement of riding quality and construction of storm water drain at one
side.

D or H Quantity Unit

14.18 sqm. ###


64.50 " ###
64.13 " ###
61.13 " ###
58.88 " ###
9.44 " ###
19.25 " ###
7.40 " ###
16.72 " ###
39.08 " ###
35.85 " ###
37.50 " ###
39.98 " ###
43.35 " ###
29.25 " ###

33.44 " ###


26.78 " ###
44.70 " ###
42.53 " ###
40.28 " ###
40.65 " ###
39.75 " ###
41.48 " ###

58.88 " ###


58.35 " ###
55.73 " ###
51.98 " ###
51.98 " ###
41.11 " ###

50.10 " ###


44.63 " ###
46.58 " ###

Submitted By:- Checked By................

Sh Mahavir Prasad Gupta JE. .... AE..........


NAME OF WORK :- Widening of Dallupura Road, at Mayur Vihar Phase- III
(From DDA Chilla Sports Complex to Dallupura) and Strenthening
/Improvement of riding quality and construction of storm water drain at one
side.

D or H Quantity Unit
47.33 " ###
52.50 " ###
60.00 " ###
Total= 1469.42 sqm.

Submitted By:- Checked By................

Sh Mahavir Prasad Gupta JE. .... AE..........


NAME OF WORK :- Widening of Dallupura Road, at Mayur Vihar Phase- III
(From DDA Chilla Sports Complex to Dallupura) and Strenthening
/Improvement of riding quality and construction of storm water drain at one
side.

D or H Quantity Unit

0.15 13.50 Sqm


0.15 2.25 "
Total= 15.75 Sqm

1.20 216.00 Sqm


Total= 216.00 Sqm

31.50 Sqm ###


58.13 " ###
53.10 " ###

29.25 "
26.63 "
24.38 "
24.00 "
22.50 "
22.13 "
23.63 "
26.25 "
23.63 "
20.25 "
21.00 "
19.88 "
18.90 "
19.28 "

Submitted By:- Checked By................

Sh Mahavir Prasad Gupta JE. .... AE..........


NAME OF WORK :- Widening of Dallupura Road, at Mayur Vihar Phase- III
(From DDA Chilla Sports Complex to Dallupura) and Strenthening
/Improvement of riding quality and construction of storm water drain at one
side.

D or H Quantity Unit
17.49 "

Submitted By:- Checked By................

Sh Mahavir Prasad Gupta JE. .... AE..........


NAME OF WORK :- Widening of Dallupura Road, at Mayur Vihar Phase- III
(From DDA Chilla Sports Complex to Dallupura) and Strenthening
/Improvement of riding quality and construction of storm water drain at one
side.

D or H Quantity Unit

36.38 " ###


37.88 " ###
40.50 " ###
40.88 " ###
39.75 " ###
38.25 " ###
37.28 " ###
37.88 " ###
34.73 " ###
35.25 " ###
25.50 " ###
13.13 " ###
25.01 " ###

10.28 " ###


48.60 " ###
49.88 " ###
51.38 " ###
51.60 " ###
51.90 " ###
50.85 " ###
50.40 " ###
51.60 " ###
52.50 " ###
54.00 " ###

18.09 ###
Total= 1465.43 sqm.

Submitted By:- Checked By................

Sh Mahavir Prasad Gupta JE. .... AE..........


NAME OF WORK :- Widening of Dallupura Road, at Mayur Vihar Phase- III
(From DDA Chilla Sports Complex to Dallupura) and Strenthening
/Improvement of riding quality and construction of storm water drain at one
side.

D or H Quantity Unit

600.00 m
542.00 "
48.00 "
9.60 "
Total 1199.60 m
@ 0.617 kg/m, 1199.60 x 0.617= 740.15 kg.
Marked……[A] 740.15 kg.

120.00 m
105.00 "
7.50 "

810.00 "

810.00 "
17.50 "
Total 1870.00 m
@ 0.395 kg/m, 1870.00 x 0.395= 738.65 kg.
Marked……[B] 738.65 kg.

1478.80 kg.

Submitted By:- Checked By................

Sh Mahavir Prasad Gupta JE. .... AE..........


NAME OF WORK :- Widening of Dallupura Road, at Mayur Vihar Phase- III
(From DDA Chilla Sports Complex to Dallupura) and Strenthening
/Improvement of riding quality and construction of storm water drain at one
side.

D or H Quantity Unit

126.95 sqm. ###


62.13 " ###
97.75 " ###
147.00 " ###
148.50 " ###
150.38 " ###
157.88 " ###
159.00 " ###
65.75 " ###
35.38 " ###
43.38 " ###
95.50 " ###
142.50 " ###
144.00 " ###
144.75 " ###
144.75 " ###
145.13 " ###
2.70 " ###
145.13 " ###
144.75 " ###
1.65 " ###
144.00 " ###
95.25 " ###
135.38 " ###
2.43 " ###
0.49 " ###
1.08 ###
Total= 2683.59 sqm.

Submitted By:- Checked By................

Sh Mahavir Prasad Gupta JE. .... AE..........


NAME OF WORK :- Widening of Dallupura Road, at Mayur Vihar Phase- III
(From DDA Chilla Sports Complex to Dallupura) and Strenthening
/Improvement of riding quality and construction of storm water drain at one
side.

D or H Quantity Unit

143.25 sqm. ###


145.43 " ###
146.55 " ###
147.08 " ###
2.85
147.15 " ###
148.95 " ###
151.88 " ###
147.75 " ###
141.15 " ###
141.30 " ###
143.63 " ###
144.98 " ###
4.25
146.25 " ###
146.55 " ###
146.40 " ###
146.85 " ###
147.00 " ###
146.25 " ###
145.50 " ###
147.00 " ###
147.38 " ###
145.88 " ###

68.46 " ###


-5.60 "
-3.24 "
-0.75 "
Total= 3280.13 sqm.

Submitted By:- Checked By................

Sh Mahavir Prasad Gupta JE. .... AE..........


NAME OF WORK :- Widening of Dallupura Road, at Mayur Vihar Phase- III
(From DDA Chilla Sports Complex to Dallupura) and Strenthening
/Improvement of riding quality and construction of storm water drain at one
side.

D or H Quantity Unit

160.50 sqm. ###


150.75 " ###
148.35 " ###
147.60 " ###
149.63 " ###
151.28 " ###
152.55 " ###
48.80 " ###
49.25 " ###
104.00 " ###
49.18 " ###
49.18 " ###
156.00 " ###
155.63 " ###
157.50 " ###
163.28 " ###
115.95 " ###
61.58 " ###
194.70 " ###
199.35 " ###
193.50 " ###
185.40 " ###
59.50 " ###
55.00 " ###
51.00 " ###
50.35 " ###
48.73 " ###
47.25 " ###

###
189.98 "
14.00
18.55
Total= 3478.32 sqm.

Submitted By:- Checked By................

Sh Mahavir Prasad Gupta JE. .... AE..........


NAME OF WORK :- Widening of Dallupura Road, at Mayur Vihar Phase- III
(From DDA Chilla Sports Complex to Dallupura) and Strenthening
/Improvement of riding quality and construction of storm water drain at one
side.

D or H Quantity Unit

1845.00 m
1665.00 "
150.00 "
26.40 "
Total 3686.40 m
@ 0.617 kg/m, 3686.40 x 0.617= 2274.51 kg.
Marked……[A] 2274.51 kg.

120.00 m
105.00 "
22.50 "

810.00 "

810.00 "
52.50 "
Total 1920.00 m
@ 0.395 kg/m, 1920.00 x 0.395= 758.40 kg.
Marked……[B] 758.40 kg.

3032.91 kg.

Submitted By:- Checked By................

Sh Mahavir Prasad Gupta JE. .... AE..........


NAME OF WORK :- Widening of Dallupura Road, at Mayur Vihar Phase- III
(From DDA Chilla Sports Complex to Dallupura) and Strenthening
/Improvement of riding quality and construction of storm water drain at one
side.

D or H Quantity Unit

222.00 sqm.
118.40 "

674.25 " ###


6.40 " ###

967.50 " ###


90.35 " ###

421.80 " ###


76.25 " ###
30.60 "
Total= 2607.55 sqm.

Submitted By:- Checked By................

Sh Mahavir Prasad Gupta JE. .... AE..........


NAME OF WORK :- Widening of Dallupura Road, at Mayur Vihar Phase- III
(From DDA Chilla Sports Complex to Dallupura) and Strenthening
/Improvement of riding quality and construction of storm water drain at one
side.

D or H Quantity Unit

78.16 sqm. ###


140.93 " ###
141.45 " ###
141.38 " ###
140.85 " ###
139.13 " ###
137.25 " ###
135.75 " ###
135.30 " ###
134.40 " ###
44.45 " ###
1512.00 " ###
157.50 "
Total= 3038.55 sqm.

Submitted By:- Checked By................

Sh Mahavir Prasad Gupta JE. .... AE..........


NAME OF WORK :- Widening of Dallupura Road, at Mayur Vihar Phase- III
(From DDA Chilla Sports Complex to Dallupura) and Strenthening
/Improvement of riding quality and construction of storm water drain at one
side.

D or H Quantity Unit

0.15 4.50 Sqm


Total= 4.50 Sqm

1.20 108.00 Sqm


1.20 54.00 "
Total= 162.00 Sqm

2079.00 Sqm
126.00 "
76.50 " ###
175.58 " ###
41.65 " ###
146.71 " ###
160.20 " ###
160.35 " ###
33.32 "
Total= 2999.31 Sqm

Submitted By:- Checked By................

Sh Mahavir Prasad Gupta JE. .... AE..........


NAME OF WORK :- Widening of Dallupura Road, at Mayur Vihar Phase- III
(From DDA Chilla Sports Complex to Dallupura) and Strenthening
/Improvement of riding quality and construction of storm water drain at one
side.

D or H Quantity Unit

160.28 Sqm ###


161.03 " ###
108.15 " ###
106.12 " ###
182.63 " ###
71.10 " ###
14.76 " ###
55.75 " ###
28.97 " ###
102.80 " ###
159.30 " ###
159.15 " ###
159.15 " ###
158.70 " ###
157.80 " ###
157.73 " ###
157.35 " ###
155.63 " ###
154.13 " ###
154.50 " ###
101.25 " ###
3.95 " ###
37.23 "
13.60 "
Total= 2721.06 Sqm

Submitted By:- Checked By................

Sh Mahavir Prasad Gupta JE. .... AE..........


NAME OF WORK :- Widening of Dallupura Road, at Mayur Vihar Phase- III
(From DDA Chilla Sports Complex to Dallupura) and Strenthening
/Improvement of riding quality and construction of storm water drain at one
side.

D or H Quantity Unit

27.65 Sqm ###


48.00 " ###
54.41 " ###
113.03 " ###
113.10 " ###
111.53 " ###
109.50 " ###
108.38 " ###
113.25 " ###
121.13 " ###
127.13 " ###
130.88 " ###
133.28 " ###
132.15 " ###
130.13 " ###
130.88 " ###
84.48 " ###
22.10 "
1.95 "

7.35 " ###


23.12 " ###
56.85 " ###
111.04 " ###
64.50 " ###
56.06 " ###
104.63 " ###
105.75 " ###
106.13 " ###
104.63 " ###
115.88 " ###
130.13 " ###
132.75 " ###
132.75 " ###
130.88 " ###
129.15 " ###
129.53 " ###

Submitted By:- Checked By................

Sh Mahavir Prasad Gupta JE. .... AE..........


NAME OF WORK :- Widening of Dallupura Road, at Mayur Vihar Phase- III
(From DDA Chilla Sports Complex to Dallupura) and Strenthening
/Improvement of riding quality and construction of storm water drain at one
side.

D or H Quantity Unit
56.06 " ###
4.56 " ###
-2.26 " ###
Total= 3512.45 Sqm.

Submitted By:- Checked By................

Sh Mahavir Prasad Gupta JE. .... AE..........


NAME OF WORK :- Widening of Dallupura Road, at Mayur Vihar Phase- III
(From DDA Chilla Sports Complex to Dallupura) and Strenthening
/Improvement of riding quality and construction of storm water drain at one
side.

D or H Quantity Unit

0.15 8.28 Cum.


0.15 6.12 "
(0.39+.39)/2 1.05 " ###
(0.39+0.32)/2 0.87 " ###
(0.32+0.32)/2 0.71 " ###
(0.32+0.35)/2 0.77 " ###
Total= 17.80 Cum.

0.15 23.40 Cum.


0.15 2.93 "

1.20 32.40 "


1.20 5.40 "
Total= 64.13 Cum.

189.06 sqm.
Total= 189.06 sqm.

Submitted By:- Checked By................

Sh Mahavir Prasad Gupta JE. .... AE..........


NAME OF WORK :- Widening of Dallupura Road, at Mayur Vihar Phase- III
(From DDA Chilla Sports Complex to Dallupura) and Strenthening
/Improvement of riding quality and construction of storm water drain at one
side.

D or H Quantity Unit

1114.43 sqm.

1469.42 "

1465.43 "
Total= 4049.28 sqm.

0.08 323.94 cum.

-16.20 "
Total= 307.75 cum.

2683.59 sqm.

3280.13 "

3478.32 "

2607.55 "

3038.55 "

2999.31 "

2721.06 "

3512.45 "
Total= 24320.96 sqm.

0.08 1824.07 cum.

Submitted By:- Checked By................

Sh Mahavir Prasad Gupta JE. .... AE..........


NAME OF WORK :- Widening of Dallupura Road, at Mayur Vihar Phase- III
(From DDA Chilla Sports Complex to Dallupura) and Strenthening
/Improvement of riding quality and construction of storm water drain at one
side.

D or H Quantity Unit

-91.20 "
Total= 1732.87 cum.

Submitted By:- Checked By................

Sh Mahavir Prasad Gupta JE. .... AE..........


ABSTRACT OF COST- IInd R/A BILL

NAME OF WORK :- Widening of Dallupura Road, at Mayur Vihar Phase- III (From DDA Chilla Spor
Complex to Dallupura) and Strenthening /Improvement of riding quality and construction of storm water drain
one side.

SITUATION :- Mayur vihar Phase- III. Delhi

AGENCY :- Sh. Mahavir Prasad Gupta

AGGREMENT NO :- 32 / EE / PWD / M-212 / 2009- 2010

DATE OF START :- 8/12/2009

D.O.C. (Stipulated) 7/6/2010

D. O. C.(Actual) :- Work in Progress

DATE OF ABSTRACT :-
I. No. Description of Item Quantity Unit Rate

Sub. Head: - Earth work FR PR


1 Disposal and carriage of excavated
malba, lime, moorum and earth etc by
machenical transport including loading,
unloading and stacking for all leads and
lifts (Beyond initial lead of 50 m , lift
upto 1.5 m or as per direction of
Engieer - in - Charge )

2102.21 Cu.m. 50.66

2 Earth work in excavation by


mechanical means (Hydraulic
excavator) / mannual labour over areas
(exceeding 30cm in depth, 1.5m in
width as well as 10 sq.m.on plan) i/c
disposal of excavated earth lead upto
50m and lift upto 1.5m, .disposed earth
to be levelled and neatly dressed.

1888.84 Cu.m. 101.85


3 Earth work in excavation by
mechanical means (Hydraulic
excavator) / mannual labour in
foundation trenches or drain (not
exceeding 1.5 m in width or 10 sqm.on
plan) including dressing of sides and
ramming of bottom lift up to 1.5 m
including getting out the excavated soil
as directed with in a lead of 50m.

(a) All kinds of soil. 2078.97 Cu.m. 103.40

Sub. Head: - Concrete Work


6 P/L in position cement concrete of
specified grade excluding the cost of
centering and shuttering all work upto
plinth level.

(a) 1:5:10 ( 1 cement : 5 coarse sand : 10


graded stone aggregate 40 mm
nominal size).

71.00 Cu.m. 2237.75

Sub. Head: - Reinforced Cement


Concrete Work
7 Providing and laying in position ready
mixed concrete manufactured in fully
automatic batching plant and
transported to site of work in transit
mixer for a lead up to 10kms having
continuous agitated mixer, manuf
-actured as per mix design of specified
grade for reinforced cement concrete
work including pumping of R.M.C.
from transit mixer to site of laying ,
excluding the cost of centering,
shuttering finishing and reinforcement
including cost of admixtures in
recommended proportions as per IS :
9103 to accelerate/ retard setting of
concrete, improve workability without
impairing strength and durability as per
direction of the Engineer - in - charge.
M-25 grade Reinforced cement
concrete by using 410kg of cement per
cum of concrete.

257.54 Cu.m. 4263.58 4100.00

8 Reinforcement for RCC work including


straightening, cutting, bending placing
in position and binding all complete.

(a) TMT bars. 33304.50 Kg. 42.70

9 Centring and shuttering including


strutting, propping etc. and removal of
form for.

(b) Small lintels not exceeding 1.5m clear


span, moulding as in cornices, window
sills, string courses, bands, copings,
bed plates, anchor blocks and the like.

176.18 Sqm 119.25

(c) Walls (any thickness) including


attached pilasters, butteresses, plinth
and string courses etc.
1905.00 Sqm 180.40
10 Providing and fixing in position precast
RCC drain cover of approved
manufacturere i.e. KK. S&S or
equivalent make of size 1150 x 400 x
100mm (thickness) or required size
with ten hole by using M-30 grade of
concrete & reinforced of approved
manufacture with two layers of 8 mm
dia of steel with six nos along the
length & 14 Nos along the width each
layer suitable distributed &
manufactured by vibrator compaction
process using joint less FRP moulds to
active shuttering finish on five faces as
top face with have broom finish
complete as per direction of Engineer-
in-Charge.

189.06 Sqm 3493.91 3200.00

11 Brick work with FPS bricks of class


designation 75 in foundation and plinth
in cement mortar :-

(a) 1:6 (1 cement: 6 coarse sand). 17.80 Cu.m. 2121.75 -

Sub. Head: - Road Work


16 Consolidation of subgrade with power
road roller of 8 to 12 tonne capacity
including making good the undulations
etc. with earth or quarry spoils etc. and
rerolling the subgrade

4304.27 Sqm 1.07

17 Supplying & Stacking of graded stone


aggregate at site of size range.

(a) 90mm to 45mm 710.86 Cu.m. 742.30

(b) 63mm to 45mm 402.76 Cu.m. 768.45

(c) 53mm to 22.4mm 790.07 Cu.m. 810.55


18 Laying spreading and compacting stone
aggregate of specified sizes to WBM
specifications including spreading in
uniform thickness, hand picking,
rolling with 3 wheeled road / vibratory
roller 8-10 tonne in stages to proper
grade and camber, applying and
brooming requisite type of screening /
binding material to fill up interstices of
coarse aggregate watering and
compacting to the required density .

1371.25 Cu.m. 192.55

19 Providing and applying tack coat using


hot straight run bitumen of grade 80/
100 including heating the bitumen,
spraying the bitumen with
mechanically operated spray unit fitted
on bitumen boiler, cleaning and
preparing the existing road surface as
per specifications :

(a) On bituminous surface @ 0.50 Kg /


sqm. 24320.96 Sqm 17.15 -

(b) On W.B.M. @ 0.75 Kg / sqm.


4049.28 Sqm 23.90 -
20 Providing and laying Bituminous
Macadam on prepared surface with
specified graded crushed stone
aggregate for profile corrective base/
binder course including loading of
aggregate with F.E. loader , hot mixing
of stone aggregates and bitumen in hot
mix plant, transporting the mixed
material by tippers to paver and laying
the mixed material with paver finisher
fitted with electronic sensing device to
the required level and grade and rolling
with road rollers, as per MORTH
specification to achieve the desired
density and compaction but excluding
the cost of primer/ tack coat.

(a) 80mm average compacted thickness


with bitumen of 60/70 grade @ 3.5%
(Percentage by weight of total mix)

307.75 cum 4,242.20 -


21 Providing & laying dense bituminous
macadam on prepared surface with
specified graded crushed stone
aggregate for profile corrective
base/binding course including loading
of aggregate with FE loader and hot
mixing of stone aggregate, filler and
bitumen in batch type hot mix plant
transporting the mixed material by
tipper to paver and laying the mixed
material with paver finisher fitted with
electronic sensing device to the
required level and grade and rolling by
road rollers as per MORTH
specifications to achieve the desired
density, but excluding cost of
primer/tack coat.

(a) 50/75mm average compacted thickness


with bitumen of 60/70 grade @ 5%
(percentage by weight of total mix) and
lime filler @ 2% (percentage by weight
of Aggregate).

1732.87 Cu.m. 5366.50 5275.00


31 Providing and placing barricading 2.00
metre high consisting of 2.50x2.00m
panels made of 1.63mm thick M.S.
sheet with frame of 40x40x6mm
angle iron horizontal & vertical braces
of M.S. flat 30x5mm, 2 nos.MS
Channel ISLC-75-500MM Long at base
as per appoved drawing including
applying a priming coat of approved
steel primer and painting as per
direction of Engineer-in-charge. This
item shall also include arrangement for
traffic diversion such as traffic signals
diversion signs, marking, flages etc. as
directed by the Engineer-in-charge. The
barricading provided shall be retained
in position at site continuously during
the execution of the entire work till its
completion including its maintenance
for damages & painting & shall not be
removed at any stage prior approval of
Engineer-in-charge., for the shifting to
the next location & shall include all
incidental, labour, material, equipment
& works required to execute the job.

NOTE:- One time payment shall be


made for each running meter of
barricading, fabrication& provided
from start of work i/c its shifting from
place to place as also its maintenance,
the barricading provided shall remain
to be property of the contractor on
completion of work.

37.50 Metre 786.40

Add Contractors Enhancement@ 7.25


% above

Less already paid vide Ist R/A Bill

Say
BILL

ase- III (From DDA Chilla Sports


nd construction of storm water drain at

- 2010

Amount
Since previous

106498.06 39797.58

192377.90 806.20
214965.50 116041.69

158880.25 107702.91
1055914.00 863911.00

1422101.99 990661.62

21009.47 10392.64

343662.00 307639.73
604992.00 604992.00

37767.15 37767.15

4605.57 19.36

527674.58 142858.84

309502.27 9737.61

640394.80 9932.80
264033.56 10934.29

417104.46 417104.46

96777.79 96777.79
1305517.03 1305517.03
9140880.81 9140880.81
0.00

29490.00 0.00
16894149.19 14213475.51

1224825.82 1030476.97
18118975.01 15243952.48

-2875023.00
15243952.01 15243952.48
15243952 15243952
Review Notes by superior Officer of the Deptt.
Date Pages recording Value of Measurements Result of the
Measurements-subject to test- checked Measurements checked
check
Deptt.
Dated initials
&designation of the
checking officer
I.No. Description No L B D or H
E I-1 Providing and laying non-pressure NP3 class
(medium duty) R.C.C. pipes with collars
jointed with stiff mixture of cement mortar in
the proportion of 1:2 (1 cement : 2 fine sand)
including testing of joints etc. complete :

(a) 1200 mm dia. R.C.C. pipe


At Dallupura Road & Rd No. 102 T-Point
1 12.50
1 12.50
1 2.50
Quantity Unit

12.50 mtr.
12.50 "
2.50 "
27.50 "
I.No. Description No L B D or H
15.43 Dismantling manually/ by mechanical means
including stacking of serviceable material and
disposal of unserviceable material within
50metres lead as per direction of Engineer-in-
charge :

(b) bituminous road


At Dallupura Road & Rd No. 102 T-Point
1 26.05 2.00
Quantity Unit

52.10 sqm.