You are on page 1of 15

Presentation of the Company

Engineering

High & Medium


Voltage

Low Voltage
Equipment

Automation

Instrumentation

Installation &
Commissioning
Maintenance

Technical
Assistance
Training

ASEC Automation
6, Street 308 – New Maadi
Cairo - EGYPT A.R.E
Tel: 00 202 227042 6 01/03/05/06
Fax: 00 202 22703 29 48
E-mail: sales@asecautomation.com
Web site://www.asec-holding.com
On June 5, 1975, a decree was signed for the establishment of the
Arab Swiss Engineering Company "ASEC". ASEC was born with
the objective of introducing the advanced state-of-art know-how
and technology to Egypt, to train the Egyptian specialists to
improve their skills in the cement industry, and to introduce the
new dry process technology that cuts down the energy costs.

ASEC was founded by the late Mr.Omar GUEMEI (1934 - 2004).

In 2004 ASEC Group became a subsidiary of CITADEL Capital


managed by Dr. Ahmed HEIKAL.

ASEC ARESCO ASA

Cement
Investments

ASENPRO UNITED ESACO


ASCOM

Today ASEC showed its competence on the Cement and Oil & Gas market
besides other markets like Energy, Water etc...

About 7000 persons


ASA is a company mainly specialized in Electrical & Automation Industrial Field.

Main Shareholders Associated Companies

24% M. Kornienko
53.64% NDT

22.36% Others

Company Constitution Number of Employees till Dec 2008


‫واﻟﻨﻔﻂ واﻟﻐﺎز‬
Arab Swiss Engineering Company with a capital Designation Total
of 10,000,000.00 of Egyptians Pounds Engineers 112
Technicians 76
Date of creation : October 1996 Workshop 58
Erection 73
Maintenance 298
Administration 37
Actual Company Revenue 654

TURN OVER in
YEAR
million of EGP
2008 335
2007 190
2006 110
2005 50
2004 80
2003 54
2002 58
2001 59
2000 44
1999 25
1998 21
1997 3
ASA supply Engineering, Automation and Equipments according to the
requirements of the customer.

Power Distribution System Equipments


9One line diagrams 9 MV Cells
¾ High-voltage 9 MCC
¾ Medium-voltage 9 LVDB
¾ Low-voltage 9 UPS
¾ Emergency 9 Capacitor Bank
9 Load and motor start-up studies 9 Transformer
9 Short-circuiting studies 9 Diesel Generator
9 Harmonic analysis 9 Motors
9 Relay studies 9 Variable Speed Drive
9 Equipment specifications 9 Instrumentation
9 Spare Parts
Electrical rooms 9 Workshop inspection and test
9 General arrangement drawings
9 Equipment outline details
9 Information for civil engineering Communication/System
9 HVAC design information and 9 Telephone System
equipment supply 9 Fire detection
9 CCTV System
9 Clock system
Automation 9 Scanner
9 Engineering
9 Supply
On site
9 Supervision
Cables – Cables Tray 9 Installation
9 Cables Routing 9 Commissioning and as-built
9 All voltage levels documentation
9 All signal levels 9 Technical Assistance
9 Cables Specifications 9 Audit
9 Cables List

Lighting Training
9 Standard office training
9 On site Training
Earthing, Lightning
Engineering:
Study from 200 Kv until the sensor, Project schedule …

ASEC Automation Office 9Basic Engineering


9Electrical Coordination
9Flow Sheet With instrumentation
9Instrumentation list
9Electrical Load List
9Listing of electrical motors and loads
9Unit circuit diagrams typical
Design Office 9Motor Drives basic demands
9One line Diagram
9Local Sub-Station layout an basic requirement for civil
design
9General layout of cable routing (between building and /or
tunnel, conduct banks)
9…
ENGINEERING

EPDS – Electrical Plant Design System


Caneco BT Autocad…
Calculations and Drawings of electric installations
LOW VOLTAGE.

Excel,
Word, CABLE provides facilities for:
Access, 9Automated routing of cables using the shortest route.
PowerPoint, 9Automated calculation of weight distribution.
… 9Automated voltage drop calculation.
9Automated generation of isometric or 3D DXF.
9Cables in cross section of any tray section, tray node, or between any two
Softwares
Softwares nodes.
Used
Used by
by ASA
ASA 9A wide range of listings including calculation of quantities, weight and
lengths.
9…..

SmartTools

Caneco HT (Resecoht)
Calculations and Drawings of electric installations
HIGH VOLTAGE.

Autocad file

Design Office ASA


asec

AUTOMATI ON
High, Medium & Low Voltage

9One line Diagram (detailed)


9Calculation of power demands
9Short circuit calculation
9Current Carrying capacity
9Discrimination Study
9Relay setting
9Power factor
9Harmonics study
9Transformers power calculation

9Variable Speed Drives & MV Motor Drives


9Relation with working machine and power distribution system
9Drive type specification
9Cooling form
9Enclosure
9Service to be performed by manufacturer
9…

9Cable List, Cable specifications and Cable Routing


9MCC, ACC, MP ….
9Capacitor banks requirement and calculation of power factor
9Diesel Generator loads requirements
9Motor specifications
9Lighting Design
9Grounding and lightning Arrester
9Design of lightning protection
9Telephone and communication system
9Fire detection system
9Heat Ventilation Air Conditioning
9……
Electrical Workshop
Surface of 1400 m2
Tebbin Cairo

Our electrical workshop permits us to carry out various electrical panels:

•Low voltage distribution board (LVDB),


•Motors Control Center (MCC),
•Auxiliary Control Center (ACC),
•Marshalling Panels Logics (MPL),
•Marshalling Panels Instrumentations (MPI),
•Lighting Panels,…………………….

A team of 30 skilled Engineers and Technicians have the knowhow to control techniques
to manufacture all types of Electrical Panels.

Surface of 2000 m2
Electrical Workshop
Suez Port Free Zone Area

This workshop has the same functionalities as our electrical workshop in Tebbin but with the
following advantages:

9Customs FREE (Abroad project)


9Sales Taxes FREE (Abroad project)
9Suez port at 50 meters from our workshop
9Heavy Infrastructure for Exportation and Importation
9Ability to avoid passing by the canal of Suez (by road)

A team of 20 skilled Engineers and Technicians assure the manufacturing of all types of
Electrical Panels.
Automation

ASEC Automation can carry out the conception, programming, diagnostic management
control, process control and technical assistance, preventive and intervening maintenance,
C.A.D. , all services regarding Automation or Industrial Data Processing.

9Configuration and scope definition


9 Work station hardware and software
9 Operator station
9 PLC and I/O, cabinet layout and wiring
9 Process instrumentation
9 Process control loop definition
9 Application programming
9 Operation simulation test in workshop Control Room: Honduras, Incehsa
9 Commissioning and Technical Assistance

ASEC Automation’s experience is applied to the


following systems :

¾ ABB Procontic, Master, Advant and Industrial IT


¾ SIEMENS, S5, S7, PCS7 and CEMAT
¾ ALSTOM Alspa 8000 ICS
¾ FLS AUTOMATION system ECS/NT
¾ MODICON, APRIL and SCHNEIDER Control Room: Egypt, Assiut
¾ MODCOMP, Protop PIA216

¾ ALLEN BRADLEY
¾ GEFANUC
¾ FOXBORO
¾ --------
Surface of 800 m2 Automation Workshop

The Automation Workshop is the place where the Automation Engineering, Programming,
Testing are fulfilled according to the customer specifications and standards.

20 skilled automation engineers work on different DCS Systems from the complete System
Erection to the complete Factory Acceptance Tests (FAT Tests) in the same conditions as it must
be in the plant.

Our FAT test equipment is able to handle 3000 digital I/Os and 300 analog I/Os simultaneously
Instrumentation Equipment

Study selection of actuators and sensors, layout, cabling, tuning and commissioning.
As measurement transmitters : Temperature, rotation speed, pressure, flow, position...

- Process instrumentation
-Gas Analysis Systems
-Measuring and Control Equipment
- Temperature Measurement
- Electrical Ear
-Dust Emission monitoring equipment
-Imaging Systems
- Kiln and Cooler Camera
- Kiln Scanner
- Closed Circuit TV system

- Control Valves (Actuators & Positioners) - Flow Switches


- Safety & Relief Valves - Level Switches
- Solenoid Valves - Temperature Switches
- Shut Down Valves - Pressure & D/P Switches
- Temperature Transmitters - Self Actuated Pressure Regulators
- Pressure & D/P Transmitters - RotaMeters (Variable Area Flow Meters)
- Level Transmitters & Controllers - Oil & Gas Metering Skid
- Temperature Gauge - Thermocouple Assemblies RTD & Wells
- Pressure & D/P Gauge - Transducer 1/P & P/1
- Level Gauge Glasses - Data Logger
- Tank Gauging - Logic Shut Down, Inter Lock Systems & Safety
- Oil & Gas Analyzers Systems

Technical Assistance Training Spare Parts

Upon Request….
Installation Commissioning
-Starting UP
-Highly flexible work force
-The OFF Load Tests
-Logistics
-The NO Load Tests
-Site management
-Starting and Test ON Load

-Reception Report

ASEC Automation employ highly qualified professionals, engineers and technicians


with wide experience in domestic and international contexts. This enables us to
undertake all kind of installation and erection with full guarantee of success.

Our Reference included:


11 complete Turnkey Projects each (4200T/D,5000T/D,6000T/D)

12 Upgrading Projects
Maintenance
In this activity ASA provides a complete service of maintenance corresponding to two types of
contracts:

Long-term contracts: The electrical maintenance is completely under the responsibility of


ASA, the maintenance team works on a shift base and the spare parts are under ASA cost.
ASA is also responsible for preparing, preventive maintenance program activities, and budget
investment for the next years. That kind of contracts are paid by fees per ton.

9 Helwan Cement Plant:


2 lines of 5500 T/D
Team of 83 persons

9 Qena Cement Plant:


1 line of 4500 T/D
Team of 44 persons

9 Beni Suef Cement Plant:


9 Tourah Cement Plant 1 line of 5000 T/D
lines 7 and 5 Team of 57 persons
500 T/D and 2000 T/D
Team of 28 persons
Helwan Cement Plant
9 National Cement Plant
2 lines of 4 500 T/D
Team of 78 persons

9 South Valley Cement Plant


1 line
Team of 8 persons

Short-term contracts: During Kiln stoppage, ASA provides a complete team of electrical,
instrumentation, Automation staff, for the required period and on lump sum price bases.
Oil & Gas Division for Services and Integrated
Solutions
After being the leader of the cement market,
ASA has decided to breakthrough to other
industries where it will give the company the
possibility to offer its extensive knowledge &
professionalism in Electrical & Automation
domain by getting interesting projects through
new clients for the coming years.

ASA has the full capacity to take up new


challenges, accordingly a complete department
with it’s commercial and technical staff has been
created and entirely dedicated to Oil & Gas
division.

Example of Organization related to Oil & Gas


Sector:
The staff is divided into 3 divisions: one for Oil &
Gas, the second is in charge of Refinery and
the last is responsible for the Petrochemist part,
the 3 divisions are under the supervision of Oil
& Gas Department Manager whom is reporting
to MD/CEO.
One of the most important Key values of ASEC
Automation: Health/Safety/Environment

Health Safety and Environmental protection is considered as


ASA permanent concerns and a high priority in all our business
processes and development projects

ASA ongoing responsibility and priority is Health and


Safety since everyday people are exposed to a certain
hard work conditions

ASA initiates programs and policies to be followed in


this field such: medical examination, preventive care
programs to ensure a complete protection of our staff and
preserve safe work conditions.
As a result ASA succeed to decrease the number of
injuries related to work

Any project carried by ASA is based on studies


in order to comply with the international
standards and Egypt's own regulations
regarding environment protection

ASA is committed to maintain a Healthy & Safe work Environment.


Your partner
around the world ISO 9001:2000

More than 10 Years of Success


Electrical & Automation E.P.C. Company
Engineering, Procurement, Construction
ASEC Automation, the company who brings you the latest
technology for your Electrical and Automation plan wherever you are.

We do so by applying our extensive knowledge in the


following area:
9 Audit
9 Project specification
9 Engineering 1

OS Client 1
2 3

OS Client 2
4

Server A
5

Server B
6 7

OS Client 3
8 9

OS Client 4
Copying of this document and giving it to others and the use or communication of the contens thereof are forbidden, without express authority of ASEC AUTOMATION.

9 High and Medium Voltage


F F

9 Low Voltage Equipments


E E
Switch A Switch B

9 Automation
D D

PLC 1 PLC 2 PLC 3 PLC 4 PLC 5 PLC 6 PLC 7 PLC 8


140 140 1 40 140 14 0 14 0 14 0 14 0 14 0 140 1 40 140 14 0 1 40
C P U 41 6 S X C P U 41 6 S X C P U 41 6 S X C P U 41 6 S X C P U 41 6 S X C PU 4 1 6S X C P U 4 1 6 SX CP U 4 16 S X C P U 4 1 6S X C P U 41 6 S X C P U 41 6 S X C P U 41 6 S X C P U 41 6 S X C P U 41 6 S X
D S F R E V 456 7 X B D S F R E V 45 67 X B D S F R E V4 56 7 XB D S F R E V 456 7 X B D S F R EV 4 56 7X B D SF R E V 45 6 7X B D S F RE V 4 56 7X B DS F R E V 45 6 7X B D S FR E V 45 6 7X B D S F R E V 45 67 X B D S F R E V4 56 7 XB D S F R E V 456 7 X B D S F R EV 4 56 7X B D S F R E V4 56 7 XB

9 Instrumentation
C

R I/O 1 R I/O 2 R I/O 3 R I/O 4 R I/O 5 R I/O 6 R I/O 7 R I/O 8


0
4
1 0
4
1 0
4
1 0
4
1 0
4
1 0
4
1
X
S
6
1
4
U
P
C X
S
6
1
4
U
P
C X
S
6
1
4
U
P
C X
S
6
1
4
U
P
C X
S
6
1
4
U
P
C X
S
6
1
4
U
P
C
B
X
7
6
5
4
V
E
R
F
S
D B
X
7
6
5
4
V
E
R
F
S
D B
X
7
6
5
4
V
E
R
F
S
D B
X
7
6
5
4
V
E
R
F
S
D B
X
7
6
5
4
V
E
R
F
S
D B
X
7
6
5
4
V
E
R
F
S
D

P OE
WR P OE
WR

AB AB
A le n
- B ra
d e
l y B #1 5 B # 15 A le -n B a
d
r e
l y B #1 5 B # 15

B B

9 Installation
0
4
1 0
4
1 0
4
1 0
4
1 0
4
1 0
4
1
X
S
6
1
4
U
P
C X
S
6
1
4
U
P
C X
S
6
1
4
U
P
C X
S
6
1
4
U
P
C X
S
6
1
4
U
P
C X
S
6
1
4
U
P
C

B
X
7
6
5
4
V
E
R
F
S
D B
X
7
6
5
4
V
E
R
F
S
D B
X
7
6
5
4
V
E
R
F
S
D B
X
7
6
5
4
V
E
R
F
S
D B
X
7
6
5
4
V
E
R
F
S
D B
X
7
6
5
4
V
E
R
F
S
D

0
4
1 0
4
1 0
4
1 0
4
1 0
4
1 0
4
1
X
S
6
1
4
U
P
C X
S
6
1
4
U
P
C X
S
6
1
4
U
P
C X
S
6
1
4
U
P
C X
S
6
1
4
U
P
C X
S
6
1
4
U
P
C

B
X
7
6
5
4
V
E
R
F
S
D B
X
7
6
5
4
V
E
R
F
S
D B
X
7
6
5
4
V
E
R
F
S
D B
X
7
6
5
4
V
E
R
F
S
D B
X
7
6
5
4
V
E
R
F
S
D B
X
7
6
5
4
V
E
R
F
S
D

9 Commissioning
A A

1 2 3 4 5 6 7 8 9

9 Training
9 Maintenance
9 After-sales support

ASEC Automation
6, Street 308 – New Maadi - Cairo – EGYPT A.R.E
Tel: +202 27042 6 01/03/05/06 Fax: +202 2703 29 48 A member of:
E-mail:sales@asecautomation.com
Web site: http://www.asec-holding.com

You might also like