You are on page 1of 4

CURRICULUM VITAE

PANKAJ KAPIL Permanent Address:


72/10,Sugar mill colony
B. Tech.-Civil ,
Yamuna nagar-135001
M.B.A (Construction Management) (Haryana), Mobile no: 08800328203
-pursuing from N.I.C.MA.R
Email : kapil.pankaj@gmail.com
Personal Information:-
Date of birth: - April 16, 1982

EMPLOYMENT RECORD:
Present Job:
RITES LTD. (Rail India Technical Economic Service)
(Schedule’ A’ Govt. of India Enterprise -Under Ministry of Railways)

Position: - Design Engineer {consultant in Kolkata metro rail corporation


Duration: - 26Th June, 2008 to till date
Job profile: - Design of New Garia Eastern Metro Station ,Kolkata
Current salary- 35000/-
Responsibilities:
Served as Structural Engineer for national project involving design of Truss,Gallery,slab ,Metro
rail project in Kolkata metro project. Verified drawings and designed foundations and
modifications for RC buildings, requiring complicated, challenging, and creative structural
engineering analysis approaches and solutions for metro rail projects

RITES LTD. (Rail India Technical Economic Service)


(Schedule’ A’ Govt. of India Enterprise -Under Ministry of Railways)
Position: - Project Engineer {consultant in Delhi metro rail corporation (D.M.R.C)}
Duration: - 18Th June, 2008 to 25th June, 2010
Client:- Delhi Metro Rail Corporation
Contractor: - KMB-ERA JV
Job profile: -
Construction of Underground Metro Station (Total 4 storied building having about
52,000 sqm floor area) at Sector-21, Dwarka, New Delhi including three tunnels (by Cut
and Cover Method) having total length of about 2.10 km with two ramps (total length of
about 625 m) for Airport Metro Express Link. (Project Cost: Rs. 170 Crores, Client:
DMRC, PMC Consultants: JV of PCI, PBI, JARTS, TONICHI and RITES Ltd.).
This Contract is Design and Construct Contract...

Responsibilities:

 Checking/Review of Bar Bending Schedule as well as implementation of them at site.


 Rebaring of R/F with the help of Fischer FIS EM 390 S Cartridge
 All mandatory test related to various construction materials viz. cement ,Sand,
Aggregate, calibration of fully automatic concrete Batching Plant
 Backfilling work by controlling it layer wise & Density does lie within limit.
 Undertake regular site inspections and chair meetings with contractor to assess,
programme and quality.
 Issue minutes of meetings and progress reports to project team.
 checking all checklist related to steel, shuttering & concrete and survey
coordinate with help of AutoCAD and total station.
 Treatment of Honey combing Structure by epoxy resin mortars like nitobond &
Renderoc.
 Treatment of cracks by injection / nipple Grouting
 Provide EPDM membrane and EPDM Compression seal on expansion Joint
 Implementation of mix-design at plant site, necessary proportioning of concrete mix
for desired workability.
 Implementation of various method statements for various activities.
 Water proofing of tunnel roof slab with the help of APP Membrane
 To ensure that safety requirements are being met as per statuary rules.
Larsen & Toubro (L&T)-E.C.C Division

Position: - Senior Engineer (O-1 Cadre)


Duration: - 3rd April, 2008 to 15th June 2008
Cost of project:-7,500 crore
Client:- GMR
Job profile: -
Renovation & expansion of Indira Gandhi International Airport,Delhi

JOB RESPONSIBILITY:-
 Site execution of P.T.P Block.
 Supervision of shuttering & reinforcement work.
 Site execution & billing work for subcontractor.
 Making of bar bending schedule(B.B.S) by using Indian standard

Shapoorji Pallonji & Construction limited (S.P Group)

Position:- Assistant Engineer


Duration:- 25th February,2007 to 2nd April ,2008
Cost of project:-205 crore
Client: - TATA MOTORS
Job profile:-
Construction of SP-Tata Motors Project-pantnagar-Ruderpur And renovation &
expansion of Jawaharlal Nehru stadium, Delhi

JOB RESPONSIBILITY:-
 Site execution of 25 m long piling work in stadium
 Site execution & billing work for subcontractor as well as client
including Rate Estimation.
 Making of bar bending schedule(B.B.S) by using Indian standard
Layout & supervision of brickwork
Supervision of V.D Flooring
 Site execution of Documentation building & assembly block.
 Preparing work schedules, monitoring the progress, supervision of works.
Nagarjuna Construction Company limited (N.C.CL)
Position:- Graduate Engineer Trainee
Duration:-July 13, 2006 to 24th February 2007
Cost of project:-85 crore
Job profile:-Army College of medical science, Delhi Cantt.
JOB RESPONSIBILITY:-
 Supervision of shuttering & reinforcement work.
 Supervision of concrete work as well as column, slab, r.c.c wall & staircase etc
 Site execution & billing work for subcontractor.

ACADMEIC & TECHNICAL QUALIFICATION:


 Passed Matriculation from Haryana Board
 Passed Senior Secondary Examination from Haryana Board
 Passed regular B. Tech in Civil Engineering from M.M. Engineering College,
Mullana (Kurukshetra University) with an aggregate of 67.46%
 Pursing correspondence post graduate diploma in construction management
(PGDCM) from NICMAR

SUMMER TRAINING:
 Six week training in Delhi Metro Rail Corporation (under L & T in
underground construction of Mandi house station ) from 12th July, 2005 to17th
August, 2005
 Participated in 30 days Survey camp at Dehradun, Uttranchal.The objective
of the camp was to study and plotting of Hilly landscape based on
Triangulation Survey. The work involved was base line measurement and
calibration, double leveling, Satellite station calculations and area
calculations.

COMPUTER AWARENESS:
 Two month certificate course in “AUTO CAD”
 6 month working knowledge of “STAAD Pro” & “Road Estimator 5.x”
Software
 Microsoft office & Internet Surfing

ACHIEVEMENTS:
 3rd position in 400m race in 3rd National level sports fest held at
B.R.C.M.,Bahal,Bhiwani in 2006.
 Member of Civil society in college.
 Campus placement in Nagarjuna Construction Company LTD

PROFFESIONAL EXPERIENCE:
 Involved in Traffic Volume Study as Enumerator at Yamuna nagar, on NH-
73 from 1st Feb. to 8th Feb. 2006 conducted by MMEC (MULLANA) Derived
from Ministry of Shipping, Road Transport and Highways, Govt. of
India.
 Total 4 years experience in construction field.
CERTIFICATION:
It is solemnly declared that the information furnished above are true. If any of these is
found incorrect at any point of time, I shall be liable for action as per rules of the
company.

Date: (PANKAJ KAPIL)


Place: Delhi

You might also like