You are on page 1of 33

S u n - Te c h

NABL ACCREDITED TEST HOUSE


ISO17025:2005 & ISO 9001:2008
T-1523

SUB-SURFACE
INVESTIGATION
REPORT

PROPOSED
33/11kV SUB-STATION
ODGI
(RGGVY PACKAGE: SAR-A)

PDF processed with CutePDF evaluation edition www.CutePDF.com


Sun-Tech

SUB-SURFACE INVESTIGATION REPORT

PROPOSED 33/11KV SUB-STATION


LOCATION:
ODGI/ SARGUJA/ CHHATISGARH
Job Code: S530910

SUBMITTED TO:
OWNER:
CHHATISGARH STATE POWER DISTRIBUTION COMPANY LTD.
CONSULTANT:
POWER GRID CORPOARTION OF INDIA LTD.
CONTRACTOR:
JYOTI STRUCTURES LTD.

INVESTIGATIONS DONE BY:

Sun-Tech
HI-230, HARMU HOUSING COLONY, RANCHI-12, JHARKHAND
TEL: 0651-2242954, 6003411,FAX: 0651-2243889
E-MAIL: sun.tech.lab@gmail.com. VISIT US AT: www.suntech.co.in
This document is the property of Sun-Tech, Hi-230, Harmu Housing Colony, Ranchi-12 .
Any unauthorised employment or reproduction, in full or part is forbidden.
 Sun-Tech, Hi-230, Harmu Housing Colony, Ranchi-12, Jharkhand, India , 2010
THE LABORATORY TESTS WERE CONDUCTED AT OUR LABORATORY NABL ACCREDITED (ISO 17025:2005) AND ISO
9001:2008 CERTIFIED AT HI-230, HARMU HOUSING COLONY, RANCHI-12, JHARKHAND.

2
Sun-Tech

Table Of Contents__________________
1.0 INTRODUCTION
1.1 Project Description
1.2 Purposes of Study

2.0 FIELD INVESTIGATIONS


2.1 Soil Borings
2.2 Rock Drilling
2.3 Groundwater

3.0 LABORATORY TESTS

4.0 GENERAL SITE CONDITIONS


4.1 Site Stratigraphy
4.2 Lithology
4.3 Underground water
4.4 Seismicity

5.0 FOUNDATION ANALYSIS AND RECOMMENDATIONS


5.1 General
5.2 Foundation Type and Depth
5.3 Shallow Foundations

6.0 GENERAL COMMENTS

7.0 REFERENCES

Sub-Surface Investigation Report CODE:S530910


33/11kV SUB-STATION AT ODGI, SARGUJA, UNDER RGGVY PACKAGE# SAR-A ii
Sun-Tech
1. INTRODUCTION

1.1. Project Description

M/s. Jyoti Structures Ltd. Valecha Chamber’s, 5-6th Floor, New Link Road,
Oshiwara, Andheri (W) has undertaken construction of a new Sub-Station of
33/11 kV at Odgi, Sarguja in Chhatisgarh State under Rural Electrification works
in Sarguja District under RGGVY package# SAR-A for the Chhatisgarh State
Power Distribution Company Limited. M/s. Power Grid Corporation of India Ltd.
are the Consultants of the Project.
The proposed Sub-Station will have Office buildings and foundations for various
electric equipments.
The current study is a detailed investigation for comprehensive assessment of
the site conditions, and inputs for foundation design of the various structures of
Sub-Station.
A layout plan showing the location of various boreholes is illustrated in the
annexure. This report presents the results of the investigation and our
recommendations based on the available geotechnical data.
1.2. Purposes of Study
The overall purpose of these investigations is to investigate the transmission
route and to develop geotechnical recommendation for foundation design and
construction. To accomplish these purposes, the study was conducted in the
following phases:
(a) Drilling Three nos. boreholes through soil and up to refusal to determine site
Stratigraphy and to collect disturbed and undisturbed soil samples for laboratory
testing;
(b) Conducting Dynamic Cone Penetration test at three locations.
(c) Testing selected soil samples in the laboratory to determine pertinent index and
engineering properties; and
(d) Analyzing all field and laboratory data to develop foundation design and
construction recommendations.

Sub-Surface Investigation Report CODE:S530910


33/11kV SUB-STATION AT ODGI, SARGUJA, UNDER RGGVY PACKAGE# SAR-A iii
Sun-Tech
2. FILED INVESTIGATION
2.1. Soil Borings
The boreholes were progressed using a hand operated auger to the Specified depth or
refusal, whichever is encountered earlier. The diameter of the borehole was 150 mm. Where
caving of the borehole occurred, casing was used to keep the borehole stable. The work was in
general accordance IS: 1892-1979.
Standard Penetration Test (SPT) was conducted in the borehole at 1.5 m interval by
connecting a split spoon sampler to ‘A’ rods and driving it by 45 cm. The tests were conducted
in accordance with IS: 2131-1981.
The numbers of blows for each 15 cm of penetration were recorded. The blows required
to penetrate the initial 15 cm of the split spoon for seating the sampler is ignored due to the
possible presence of loose materials or cuttings from the drilling operation. The cumulative
number of blows required to penetrate the balance 30 cm of the 45 cm sampling interval is
termed the SPT value of the ‘N’ value.
The ‘N’ values are presented on the profiles for each borehole. Refusal to further boring
penetration was considered when the ‘N’ values exceed 50 or when practical refusal to further
penetration by shell and auger was encountered.
Where the ‘N’ value exceeds 50, the penetration of split spoon sampler (after initial
seating) is recorded together with the number of blows given of the sampler. Where the seating
blow count exceeds 50, the ‘N’ value is recorded as “Ref” on the soil profile.
SPT ‘N’ values are correlated with relative density of non-cohesive stratum and
with consistency of cohesive stratum:

CORRELATION FOR CORRELATION FOR


CLAY/PLASTIC SAND/NON-PLASTIC
SILT SILT
Consistency Penetration Value Relative Density Penetration
(blows) Value (blows)
Very Soft 0-2 Very Loose 0-4
Soft 3-4 Loose 5-10
Medium Stiff 5-8 Medium 11-30
Stiff 9-16 Dense 31-50
Very stiff 17-32 Very Dense >50
Hard >32

Sub-Surface Investigation Report CODE:S530910


33/11kV SUB-STATION AT ODGI, SARGUJA, UNDER RGGVY PACKAGE# SAR-A iv
Sun-Tech

Disturbed Sampling (Soil) in boreholes


Disturbed soil collected in the SPT sampler was preserved in polythene covers and
transported to the laboratory. One more polythene cover was provided to prevent the
loss of moisture during the transit period.

Undisturbed Sampling (Soil) in Boreholes


Undisturbed samples are collected using 100mm diameter and 450mm long MS tubes
provided with sampler head with ball check arrangement. Undisturbed soil samples
are usually collected in soft to stiff clayey soil strata. Collection of undisturbed samples
in refusal strata is practically not possible. All samples were transported to our laboratory
at Ranchi for examination and testing.

2.2. Groundwater
Groundwater level was measured in the boreholes 24 hours after drilling and
sampling was completed. No water table was found in the bore holes.

Sub-Surface Investigation Report CODE:S530910


33/11kV SUB-STATION AT ODGI, SARGUJA, UNDER RGGVY PACKAGE# SAR-A v
Sun-Tech
3. LABORATORY TESTS
The laboratory testing has been carried out in our laboratory at Ranchi. The
quality procedures in our laboratory conform to ISO/IEC-17025-2005 and ISO
9001:2008.
The laboratory testing programme was aimed at verifying the field classifications
and developing parameters for engineering analysis. All testing was performed in
accordance with the current applicable IS specifications. The following tests were
conducted on selected soil and water samples recovered from the borehole:
On Soil :
Laboratory Test IS : Code Referred
Natural moisture content IS : 2720 (Part-2)-1973
Grain size analysis IS : 2720 (Part-4)-1985
Liquid & Plastic limit IS : 2720 (Part-5)-1985
Specify Gravity IS : 2720 (Part-3)-1980
Unconsolidated Undrained Triaxial shear test IS : 2720 (Part-11)-1983
Consolidated Drained Direct Shear Test IS : 2720 (Part-13)-1986
Unconfined Compression Test IS : 2720 (Part-10)-1991
Chemical Determination of pH value IS : 2720 (Part-26)-1987
Analysis of Determination of Sulphate content IS : 2720 (Part-27)-1977

soil* Determination Chloride content IS : 3025 (Part-32)-1988

Determination of pH value IS : 3025 (Part-11)-1996


Chemical
Determination of total soluble IS : 3025 (Part-24)-1998
Analysis of
sulphate
water*
Determination of Chloride content IS : 3025 (Part-32)-1993

All test results are presented in the illustration section of this report.

Sub-Surface Investigation Report CODE:S530910


33/11kV SUB-STATION AT ODGI, SARGUJA, UNDER RGGVY PACKAGE# SAR-A vi
Sun-Tech
4.0 GENERAL SITE CONDITIONS
4.1 Site Stratigraphy
The boreholes are evenly spaced. The plot is about 1.50m above the
existing road level. The soil strata in the plot are uniform. In general, an
overburden of stiff to very stiff high to medium plastic silty sandy gravelly clay
is found up to 3.00-5.00m depth over dense completely weathered rocks.

The Bore logs in the annexure present the detailed Stratigraphy, cross sections and nature of soil at the borehole locations

4.2 SEISMICITY:
The area falls under Zone-III as classified by Bureau of Indian Standards,
indicating moderately active zone.

4.3 LIQUEFACTION:
Liquefaction is the sudden loss of shear strength of the loose fine-grained
sands due to earthquake-induced vibration under saturated conditions.
Subsurface consists of silty gravelly sand with high standard penetration
resistance, followed by dense rock, hence site may be classified as
“Liquefaction unlikely” in earthquake event.

4.4 GROUNDWATER:
Groundwater was encountered in the boreholes at 1.00m depth.

Sub-Surface Investigation Report CODE:S530910


33/11kV SUB-STATION AT ODGI, SARGUJA, UNDER RGGVY PACKAGE# SAR-A vii
Sun-Tech

5.0 FOUNDATION ANALYSIS AND RECOMMENDATIONS


5.1 General
A suitable foundation for any structure should have an adequate factor of safety
against exceeding the bearing capacity of the supporting soils. Also the vertical
movements due to compression of the soils should be within tolerable limits for
the structure. We consider that foundation designed in accordance with the
recommendations given herein will satisfy these criteria.
5.2 Foundation Type and Depth
All depths given in this report are with reference to the existing
ground surface at the time of our investigation. In case any substantial cutting /
filling operation is to be carried out, the recommendations given in this report
should be reviewed. It should be ensured that all foundations are placed on the
natural soils/ rock and not on fill.

5.3 Shallow Foundations


Bearing capacity analysis for open foundations bearing on soils at site has been
done in accordance with IS: 6403-1981 based on laboratory and field tests.
Settlement analysis has been performed in accordance with
IS: 8009 Part-1-1976. The N values from the Standard Penetration tests
conducted are indicated in the respective Bore-Logs. From The Average of N
values over the significant depth below the foundation, the safe bearing pressure
has been evaluated as per IS 8009 (Part-1) 1976 considering the soil is
predominantly sandy.

Sub-Surface Investigation Report CODE:S530910


33/11kV SUB-STATION AT ODGI, SARGUJA, UNDER RGGVY PACKAGE# SAR-A viii
Sun-Tech
:
RECOMMENDED ALLOWABLE BEARING PRESSURE
Likely foundation bearing Embedment Width (m) / Recommended
material Depth, m Type of Allowable Bearing Net
2
foundation Pressure, ton /m for a Allowable
settlement of Bearing
2
Pressure, ton /m
25mm 40mm

1.00/ Open 10.00 16.00 10.00

2.00/ Open 8.00 13.00 8.00

3.00/ Open 8.00 13.00 8.00


Sandy gravelly clay 1.00
4.00/ Open 9.00 14.00 9.00

5.00/ Open 8.50 13.50 8.50

6.00/ Open 8.50 13.50 8.50

1.00/ Open 15.00 24.00 24.00

2.00/ Open 12.50 20.00 20.00

3.00/ Open 12.00 20.00 20.00


Sandy gravelly clay 1.50
4.00/ Open 11.50 18.00 18.00

5.00/ Open 11.00 17.50 17.50

6.00/ Open 10.50 17.00 17.00

1.00/ Open 16.00 25.50 25.50

2.00/ Open 13.00 21.00 21.00

3.00/ Open 12.50 20.00 20.00


Sandy gravelly clay 2.00
4.00/ Open 11.50 19.00 19.00

5.00/ Open 11.00 18.00 18.00

6.00/ Open 11.00 17.00 17.00

1.00/ Open 21.00 34.00 34.00

2.00/ Open 17.00 27.00 27.00

3.00/ Open 15.00 24.00 24.00


Sandy gravelly clay 3.00
4.00/ Open 14.00 22.00 22.00

5.00/ Open 13.00 21.00 21.00

6.00/ Open 13.00 20.00 20.00

Sub-Surface Investigation Report CODE:S530910


33/11kV SUB-STATION AT ODGI, SARGUJA, UNDER RGGVY PACKAGE# SAR-A ix
Sun-Tech
Notes:
⇒ It has been found that the water table will rise to founding level from EGL in the peak rainy
season.
⇒ A maximum settlement of 40mm is expected.
⇒ The depth of embedment of foundation has been given from the existing ground level any
cutting or filling at that point should be adequately taken care of.
5.4 Excavation Scheme
The temporary excavation is expected to be through the Silty clay / completely weathered Rock.

Description of Strata Recommended Side slopes Excavation Method

silty gravelly clay 1V:2H Conventional Excavators

Drilling / Blasting or needle


Highly Weathered rocks 2-3V:1H
breaker

6.0 GENERAL COMMENTS:

The choice of the value for design is a matter of engineering judgment and field assessment of
soil and rock character. After review of the net bearing pressure computed from different
methods, the final value has been selected based on our engineering judgment based on soil and
rock encountered in the limited number of boreholes as reported herein. If any significant
departure from the reported data is noticed during actual construction, the Geotechnical
consultants may be referred for advice.

For Sun-Tech, Ranchi

(Pranay Kumar)
Geotechnical Consultant

Sub-Surface Investigation Report CODE:S530910


33/11kV SUB-STATION AT ODGI, SARGUJA, UNDER RGGVY PACKAGE# SAR-A x
Sun-Tech
7.References:
1. IS:2720 (part), Grain size Analysis
2. IS:2720(Part XIV), Determination of Density Index
3. IS:2720(Part V), Determination of Liquid & Plastic Limits
4. IS:1498-1970: Classification & identification of soils
5. IS 2720 (Part XV), Determination of Consolidation Properties.
6. IS:2720( Part XI)1975, Triaxial Test (UUT)
7. IS 2720 (Part X) 1973, unconfined compressive strength.
8. IS:1892-1962, site investigation
9. IS 2131-1981, Method for SPT.
10. IS: 2132-1981, Thin walled tube sampling of soils.
11. IS: 1904-1978, Structural Safety of Building Foundations
12. IS:6403-1981, Determination of Bearing Capacity of Foundations
13. IS:8009(Part-1)-1976, Calculation of Settlement of foundations.
14. Arora ,K.R. Soil Mechanics & Foundation Engg.
15. Murthy. VNS, Principles of soil mech. & foundation Engg.
16. Punamia, B.C. Soil Mechanics & foundation Engg.
17. Nayak, M.V., Foundation Design Manual.
18. Brahma, S.P. Soil Mechanics
19. Singh, Alam Modern Geotechnical Engineering
20. IS:2950 (Part-I)-1981 Code of Practice for Raft Foundations

*******************************END OF REPORT****************************

Sub-Surface Investigation Report CODE:S530910


33/11kV SUB-STATION AT ODGI, SARGUJA, UNDER RGGVY PACKAGE# SAR-A xi
Sun-Tech

Annexures
`

BOREHOLE LOCATION PLAN

SOIL PROFILE

BORE LOG DATA SHEET

VARIATION OF SPT VALUES WITH DEPTH

DCPT RESULTS

SAMPLE CALCULATIONS

LABORATORY TEST RESULTS

GRAIN SIZE CURVE

TRIAXIAL TEST

Sub-Surface Investigation Report CODE:S530910


33/11kV SUB-STATION AT ODGI, SARGUJA, UNDER RGGVY PACKAGE# SAR-A xii
Borehole No. : 1 Ground R.L. : 100.000 m
Termination : 5.00 m from EGL

0 10 20 30 40 50 60 70 80 90 100
0

1 9

2
Depth from E.G.L. (m)

32

42

100
5

6
Field 'N' value
Variation of 'N' value with Depth

33/11 kV NEW SUBSTATION AT ODGI


Sun-Tech Job No. : S530910
N Value Curve
Ranchi Fig No. :
Borehole No. : 2 Ground R.L. : 100.000 m
Termination : 3.00 m from EGL

0 10 20 30 40 50 60 70 80 90 100
0

15

2
Depth from E.G.L. (m)

100
3

6
Field 'N' value
Variation of 'N' value with Depth

33/11 kV NEW SUBSTATION AT ODGI


Sun-Tech Job No. : S530910
N Value Curve
Ranchi Fig No. : 2
Borehole No. : 3 Ground R.L. : 100.000 m
Termination : 4.00 m from EGL

0 10 20 30 40 50 60 70 80 90 100
0

18

2
Depth from E.G.L. (m)

25
3

100
4

6
Field 'N' value
Variation of 'N' value with Depth

33/11 kV NEW SUBSTATION AT ODGI


Sun-Tech Job No. : S530910
N Value Curve
Ranchi Fig No. : 3
Borehole No. : 1/DCPT Ground R.L. : 100.000 m
Termination : 3.10 m from EGL

0 10 20 30 40 50 60 70 80 90 100
0

1 10
9

27
2
78
Depth from E.G.L. (m)

79

100
3

6
Field 'N' value
Variation of DCPT value with Depth

33/11 kV NEW SUBSTATION AT ODGI


Sun-Tech Job No. : S530910
DCPT Value Curve
Ranchi Fig No. : 4
Borehole No. : 2/DCPT Ground R.L. : 100.000 m
Termination : 3.10 m from EGL

0 10 20 30 40 50 60 70 80 90 100
0

1 9
11

18

15
2
17
Depth from E.G.L. (m)

47

100
3

6
Field 'N' value
Variation of DCPT value with Depth

33/11 kV NEW SUBSTATION AT ODGI


Sun-Tech Job No. : S530910
DCPT Value Curve
Ranchi Fig No. : 5
Borehole No. : 3/DCPT Ground R.L. : 100.000 m
Termination : 2.20 m from EGL

0 10 20 30 40 50 60 70 80 90 100
0

1 12
15

35

100
2
Depth from E.G.L. (m)

6
Field 'N' value
Variation of DCPT value with Depth

33/11 kV NEW SUBSTATION AT ODGI


Sun-Tech Job No. : S530910
DCPT Value Curve
Ranchi Fig No. : 6
Sun-Tech
Ranchi

LABORATORY TEST RESULTS ON SOIL SAMPLES Page 1 of 1

OWNER: CHHATISGARH STATE POWER DISTRIBUTION COMPANY LTD.


PROJECT: 33/11 kV NEW SUBSTATION AT ODGI, UNDER RGVY
CONSULTANT: POWER GRID CORPORATION OF INDIA LTD. Proj. Code. :530910
PCAKAGE-SAR-A
CONTRACTOR: JYOTI STRUCTURES LTD.

Classification (IS:1498-1970)
Consolidation

Natural Moisture Content %


Grain Size Distribution Shear Strength test Chemical Test
Test

Bulk Density (gm/cc)


Shrinkage Limit %
Sample Number

Plasticity Index

Specific Gravity
Plastic Limit %
Liquid Limit %
Sample Type

Co-eff. Of Compression
Depth (m)

Initial Void ratio (eo)


Cohesion (Kg/cm )
BH No.

Friction (Degree)
Angle of internal

Chloride (%)

Sulfate (%)
Type of test
Gravel %

Sand %

Clay %
Silt %

(Cc)
pH

U/P 2702 1.00 6.34 51.28 39.38 3.00 52.3 13.7 38.6 - SC 13.60 2.08 2.76 UUT 0.23 24 7 0.004 0.004 - -

P 2103 3.50 7.26 50.20 39.74 2.80 50.3 14.19 36.11 - SC 12.80 2.10 2.64 UUT 0.2 24.5 - - - - -
BH-1
P 2105 4.50 0.30 61.36 35.54 2.80 40.6 17.65 22.95 - SC 11.85 1.99 2.61 - - - - - - - -

P 2717 4.90 0.00 53.20 37.80 9.00 36.8 17.74 19.06 - SC 12.06 2.02 2.64 - - - - - - - -

U/P 2713 1.50 1.88 58.44 23.68 16.00 43.1 14.5 28.6 - SC 14.31 1.99 2.56 UUT 0.36 20.5 6.5 0.005 0.004 - -
BH-2
P 2715 3.00 1.32 58.90 39.78 0.00 33.7 15.68 18.02 - SM 13.00 2.04 2.71 UUT 0.01 32 - - - - -

U/P 2707 1.50 0.00 54.34 38.66 7.00 40.8 18.73 22.07 - SC 15.30 2.10 2.74 UUT 0.27 23 7 0.006 0.004 - -
BH-3 p 2109 3.00 6.50 54.12 35.38 4.00 34.5 17.6 16.9 - SC 11.70 2.03 2.64 - - - - - - - -

p 2109 4.00 0.00 55.64 24.36 20.00 35.6 18.62 16.98 - SC 12.80 2.00 2.71 - - - - - - - -
Notes: CONSOLIDATION TEST NOT CONDUCTED DUE TO SANDY NATURE OF SOIL

Abrreviation used : UUT : Triaxial Unconsolidated Undrained, TCU : Triaxial Consolidated Undrained, TCD : Triaxial Consolidated Drained, DS : Direct Shear,
UC : Unconfined Compression, ( R ) : Remoulded sample, U : Undisturbed sample, D : Disturbed sample, P : SPT sample NP: Non Plastic

Notes: Test Methods Referred to: 1. Grain Size Distribution IS:2720 Part-4-1985 2. Liquid, Plastic & Shrinkage Limit IS:2720 Part-5-1985
3. Specific Gravity IS:2720 Part-3-1980 4. Direct Shear Test IS:2720-Part-13 1986 5. Triaxial Test IS:2720 Part-12 1981 6. Consolidation test IS: 2720 Part-15 -1986
7. pH of Soil IS:2720- Part-41 1976 8. Free Swell Index IS: 2720 part-40 1977
Sampling Process: Samples from Bore holes P- SPT Sample, D- Disturbed/ Wash Sample C- Rock Core Sample

Checked/ approved
PARTICLE SIZE DISTRIBUTION CURVE

100

90

80

70
% Finer than D

60

50

40

30

20

10

0
0.001 0.01 0.1 1 10
Particle Size, D (mm)

BH No. - 1 Depth :1.00m BH No. - 1 Depth : 3.50m BH No. - 2 Depth 1.50m

100
90
80
70
% Finer than D

60
50
40
30
20
10
0
0.001 0.01 0.1 1 10
Particle Size, D (mm)

BH No. - 2 , Depth :3.00m

Job No. : S530910


Sun-Tech Particle Size Distribution Curves Page 7
PARTICLE SIZE DISTRIBUTION CURVE

100

90

80

70
% Finer than D

60

50

40

30

20

10

0
0.001 0.01 0.1 1 10
Particle Size, D (mm)

BH No. - 3 Depth :1.50m BH No. - 3 Depth : 3.00m BH No. - 3 Depth 4.00m

100
90
80
70
% Finer than D

60
50
40
30
20
10
0
0.001 0.01 0.1 1 10
Particle Size, D (mm)

BH No. - 2 , Depth :3.00m

Job No. : S530910


Sun-Tech Particle Size Distribution Curves Page 8
CALCULATION OF ALLOWABLE BEARING PRESSURE BASED ON SPT 'N' VALUES Calculation Sheet

Project: PROPOSED 33/11 kV substation at ODIGA The Calculation for Allowable Bearing Pressure is based on
Location: ODIGA Teng’s Equation :
For a settlement of 25mm of foundation
Customert: JSL
qna= 3.5(N-3){(B+0.3)2/(4B2)}df.W’
PROJECT CODE: S530910 BH- 1/2/3
ref IS:8009-1976 Part-1
Type of Foundation: OPEN/ RAFT
Allowable Settlement: 50 mm
Position of Water Table: AT FOOTING LEVEL
IS:8009(Part-1)-1976
Depth of Width of SPT Design ALLOWABLE BEARING PRESSURE ton/m2 (qna)
Foundation Foundation Value Water table correction W' Depth factor df Max. expected settelement
D (m) B (m) N 25mm 40mm
1.20 1.00 32.00 0.50 1.20 25.73 41.17
1.00 2.00 16.00 0.50 1.10 8.27 13.24
1.00 3.00 17.00 0.50 1.07 7.91 12.65
1.00 4.00 20.00 0.50 1.05 9.02 14.44
1.00 5.00 20.00 0.50 1.04 8.69 13.91
1.00 6.00 20.00 0.50 1.03 8.47 13.56
1.50 1.00 20.00 0.50 1.20 15.08 24.13
1.50 2.00 22.00 0.50 1.15 12.64 20.23
1.50 3.00 24.00 0.50 1.10 12.23 19.57
1.50 4.00 24.00 0.50 1.08 11.41 18.26
1.50 5.00 24.00 0.50 1.06 10.94 17.51
1.50 6.00 24.00 0.50 1.05 10.64 17.02
2.00 1.00 21.00 0.50 1.20 15.97 25.55
2.00 2.00 22.00 0.50 1.20 13.19 21.11
2.00 3.00 24.00 0.50 1.13 12.60 20.16
2.00 4.00 24.00 0.50 1.10 11.68 18.69
2.00 5.00 24.00 0.50 1.08 11.15 17.84
2.00 6.00 24.00 0.50 1.07 10.80 17.29
3.00 1.00 27.00 0.50 1.20 21.29 34.07
3.00 2.00 27.00 0.50 1.20 16.66 26.66
3.00 3.00 27.00 0.50 1.20 15.25 24.39
3.00 4.00 27.00 0.50 1.15 13.95 22.33
3.00 5.00 27.00 0.50 1.12 13.21 21.14
3.00 6.00 27.00 0.50 1.10 12.73 20.37

Sun-Tech
Ranchi Checked/ Approved
Calculation- Sheet
Sun-Tech
Ranchi

CALCULATION OF BEARING CAPACITY


(IS:6403-1981)
General data: FIELD
1 Project 33/11 kV SUB-STATION AT ODIGI AT AMBIKAPUR
2 Location BH-2
3 Structure ISOLATED
4 RL -
5 Inclination of Load to vertical in drgrees α 0
6 Depth of foundation m 2 1.5
7 RL of Ground water level 1 -
LABORATORY
1 Bulk Density of soil g/cc 1.99
2 Natural moisture Content % 14.31
3 Dry Density g/cc 1.74
4 Specific Gravity 2.56
5 Void ratio 0.47
6 Angle of Internal Friction degree 20.5 Nc 14.83
7 Cohesion kg/cm2 0.36 Nq 6.4
8 Effect of water Table W' 0.5 Nγ 5.39
As the soil is cohesionless the analysis for the bearing capacity will have to in pursuant to the Table-3 of IS:6403-1981based on void ratio.

The Void ratio of soil sample 0.47


The condition of soil is dense The bearing capacity will have to be calculated by General Shear Failure Values. Table: 3 of
IS:6403-1981
GENERAL SHEAR FAILURE
Assuming Width of foundation B: (m) 2.00 sc 1.30 dc 1.00
Length of foundation L: (m) 2.00 sq 1.20 dq 1.00
sγ 0.80 dγ 1.00
Ultimate net bearing capacity qd: 93.04 ton/m2
Net Bearing Capacity 31.01 ton/m2 FACTOR OF SAFETY: 3.00
The effect of depth factor has not been considered ref. cl. 5.1.2.2 of IS 6403-1981
qd= cNc. sc .dc.ic + γd(Nq-1).sq.dq.iq + 1/2.B.γγ.Ng.sγγ.dγγ.iγγ.W’
Calculation- Sheet
Sun-Tech
Ranchi

CALCULATION OF BEARING CAPACITY


(IS:6403-1981)
General data: FIELD
1 Project 33/11 kV SUB-STATION AT ODIGI AT AMBIKAPUR
2 Location BH-2
3 Structure ISOLATED
4 RL -
5 Inclination of Load to vertical in drgrees α 0
6 Depth of foundation m 2 2
7 RL of Ground water level 1 -
LABORATORY
1 Bulk Density of soil g/cc 1.99
2 Natural moisture Content % 14.31
3 Dry Density g/cc 1.74
4 Specific Gravity 2.56
5 Void ratio 0.47
6 Angle of Internal Friction degree 20.5 Nc 14.83
7 Cohesion kg/cm2 0.36 Nq 6.4
8 Effect of water Table W' 0.5 Nγ 5.39
As the soil is cohesionless the analysis for the bearing capacity will have to in pursuant to the Table-3 of IS:6403-1981based on void ratio.

The Void ratio of soil sample 0.47


The condition of soil is dense The bearing capacity will have to be calculated by General Shear Failure Values. Table: 3 of
IS:6403-1981
GENERAL SHEAR FAILURE
Assuming Width of foundation B: (m) 2.00 sc 1.30 dc 1.00
Length of foundation L: (m) 2.00 sq 1.20 dq 1.00
sγ 0.80 dγ 1.00
Ultimate net bearing capacity qd: 99.49 ton/m2
Net Bearing Capacity 33.16 ton/m2 FACTOR OF SAFETY: 3.00
The effect of depth factor has not been considered ref. cl. 5.1.2.2 of IS 6403-1981
qd= cNc. sc .dc.ic + γd(Nq-1).sq.dq.iq + 1/2.B.γγ.Ng.sγγ.dγγ.iγγ.W’
Calculation Sheet

RECOMMENDED ALLOWABLE BEARING PRESSURE- ODIGI SUB-STATION


SHEAR PARAMETERS NET BEARING
NET SAFE Av. SPT N PRESSURE ton/m2 for RECOMMENDED
DEPTH OF FOUNDATION
WIDTH OF BEARING value over settlement of ALLOWABLE BEARING
(m) c kg/cm2 φ degree γ g/cc
FOUNDATION CAPACITY significant PRESSURE ton/m2
(m) ton/m2 depth 25mm 40mm
1.50 2.00 0.36 20.50 1.99 31.01 22.00 12.64 20.23 20.00
2.00 2.00 0.36 20.50 1.99 33.16 22.00 13.19 21.11 21.00

Sun-Tech
Ranchi Checked/ Approved
Sun-Tech
Sun-Tech