FONTANA TOWERS - JUFFAIR

S.NO. DESCRITION Date STATUS

NCR-001 Plaster & Paint Works Quality 27.06.2010 Rejected


NCR-002 Tiles Work at 10th Floor 28.06.2010 Rejected
NCR-003 Tiles Installation 04.07.2010 Accepted
NCR-004 Using unapproved materials 07.07.2010 Accepted
NCR-005 Shaft Block 05.07.2010 Accepted
NCR-006 Flexible Duct Connection for Diffuser 07.07.2010
NCR-007 House Keeping and Safety Violation 12.07.2010 Rejected
NCR - 008 Duct Wooden Sleeves 17.07.2010 Accepted
NCR-009 Inspection Request 19.07.2010 Accepted
NCR-011 Quality of the Block wall 26.07.2010 Rejected
NCR-012 Tiles Work without Bonding work 26.07.2010 Accepted
NCR-013 Tiles Protection 26.07.2010 Accepted
NCR-014 Lack of Supervision 29.07.2010 Rejected
NCR-015 Using the Mixer Machine 29.07.2010 Accepted
NCR-016 Hoist Lift Shaking 29.07.2010 Rejected
NCR-017 Lack of Coordination 29.07.2010 Rejected
NCR-018 Balcony Water Proofing 29.07.2010 Rejected
NCR-019 Safety Violation 29.07.2010 Rejected
NCR-020 Filling the Blocks 02.08.2010 Rejected
NCR-021 Balcony Upstand 05.08.2010 Accepted
NCR-022 Ceiling Framing 17.08.2010
NCR-023 Using unapproved water proofing material 11.08.2010 Accepted
NCR-024 Water Proofing 25.10.2010
NCR-023(A) Safety Violation on Site 02.11.2010
NCR-024(A) Wasting Material 02.11.2010
NCR-025 Plaster Quality 31.10.2010
NCR-026 Balcony Upstand Work Inspection 31.10.2010
NCR-027 Quality of work 31.10.2010
NCR-028 Stoppage of Work 31.10.2010
NCR-029 Kithen Ceiling 31.10.2010
NCR-030 Safety Violation on Site 03.11.2010
NCR-030 (A) Site House Keeping 07.11.2010
NCR-031 Lack of Work Coordination 08.11.2010
NCR-032 Water Proofing Quality 08.11.2010
NCR-033 Closing the Gypsum Board 21.11.2010
Re
Referen from
Date v Submittal Description & Location DIS. to SBIC Status
ce SBIC
no.

01.11.10 WIR 139-10 0 Wall Tile layout @ toilet type D, flat C, 11th floor tower B part 3 WL TL 01.11.10 03.11.10 A
01.11.10 WIR 140-10 0 Wall Tile layout @ toilet type D, flat N, 11th floor tower A part 2 WL TL 01.11.10 02.11.10 A
01.11.10 WIR 141-10 0 Wall Tile layout @ toilet type j g & e, flat A, 10th floor tower A part 1 WL TL 01.11.10
01.11.10 WIR 142-10 0 Wall Tile layout @ toilet type j & g, flat P, 11th floor tower B part 4 WL TL 01.11.10 02.11.10 A
01.11.10 WIR 138-10 0 Wall tile layout @ toilet type a b g j and d, flat o, 11th floor tower b part 4 WL TL 01.11.10 02.11.10 c
01.11.10 WIR 147-10 0 Wall tile layout @ toilet type J, 11th floor tower b part 3, flat c WL TL 01.11.10 02.11.10 A
01.11.10 WIR 144-10 0 Wall tile layout @ toilet type F & c, flat f and e, 7th floor tower A part 1 WL TL 01.11.10 02.11.10 A
01.11.10 WIR 146-10 0 Wall tile layout @ Toilet Type J, flat A & B, 7th floor tower A part 1 WL TL 01.11.10 02.11.10 A
01.11.10 WIR 145-10 0 Wall Tile Layout @ toilet type j, flat I & J, 7th floor tower A part 2 WL TL 01.11.10 02.11.10 C
02.11.10 WIR 121-10 0 All work above ceiling excluding toilet and main door area prior to closegypsum sheet flat C D G and H, 7th gyp 02.11.10 02.11.10 C
02.11.10 WIR 121-10 0 Rush and level point prior to start plaster, ground floor tower A part 1 & 2 Pl 02.11.10 03.11.10 A
02.11.10 WIR 119-10 0 All work above ceiling excluding toilet and main door area prior to close gypsum sheet flat A B E and F gyp 02.11.10 02.11.10 C
02.11.10 WIR 120-10 0 All work above ceiling excluding toilet and main doorarea prior to close gypsum sheet flat I j m & n, 7th floor gyp 02.11.10 04.11.10 C
02.11.10 WIR 122-10 0 All work above ceiling excluding toilet and main door area prior to close gypsum sheet flat k l o & P gyp 02.11.10 02.11.10 C
02.11.10 WIR 143-10 0 Floor Tyle layout, flat F, 8th floor tower A part 1 fl tl 02.11.10 04.11.10 C
02.11.10 WIR 145-10 0 alum 02.11.10 08.11.10 C
02.11.10 WIR 149-10 0 Wall tile layout @ toilet type C & F, Flat I and J, 7th floor tower Apart 2 WL TL 02.11.10 03.11.10 B
03.11.10 WIR 136-10 0 Floor tile Layout, flat O, 8th floor tower B part 4 Fl TL 03.11.10 04.11.10 B
03.11.10 WIR 108-10 0 Floor Tile Layout, Flat L, 11th Floor Tower B part 4 Fl TL 03.11.10 04.11.10 B
03.11.10 WIR 155-10 0 GI Lintel Plaster Works, 20th Floor Tower B Part 3 & 4 PL 03.11.10 06.11.10 A
03.11.10 WIR 156-10 0 GI Lintel Plaster Works, 21st Floor Tower B Part 3 & 4 PL 03.11.10 04.11.10 A
03.11.10 WIR 152-10 0 Wall Tile layout @ Toilet type A B G & J, Flat P, 17th floor towr B Part 4 WL TL 03.11.10 04.11.10 A
03.11.10 WIR 153-10 0 Wall tile Grouting @ Toilet Type A B G & J, Flat A, 16th Floor, Tower A part # 1 TL GRT 03.11.10 04.11.10 B
03.11.10 WIR 157-10 0 Rebars & Shuttering for lintel works @ GF, GF tower A&B Part 1& 3 LNTL 03.11.10 04.11.10 B
03.11.10 WIR 113-10 0 All works above ceiling excluding toilet & main door area prior to close gypsum sheet flat C,D,G, & H, 6th fl gyp 03.11.10 04.11.10 C
03.11.10 WIR 114-10 0 All work above ceiling excluding toilet and main door area prior to close gypsum sheet flat K,L, O & P, 6th floor tower B pa 03.11.10 04.11.10 C
03.11.10 WIR 154-10 0 Wall tile grouting @ toilet type A B G &J, Flat O & P, 16th Floor tower B Part 4 TL GRT 03.11.10 04.11.10 B
03.11.10 WIR 14 1 5-29th Floor motion sensor installation complete with conduiting and wiring modification (Motion sensor sup MEP 03.11.10
04.11.10 wir 158-10 0 Wall tile layout @ toilet type A B G & J, Flat N, 16th Floor Tower A part # 2 WL TL 04.11.10 04.11.10 A
04.11.10 WIR 159-10 0 GI Lintel plaster works, 22nd floor tower A, part # 1 & 2 Pl 04.11.10 04.11.10 B
04.11.10 wir 160-10 0 G I LINTEL WORKS AND BLOCK INSTALLATION PRIOR FOR PLASTERING INCLUDING PASSAGE AREA LNTL 04.11.10 06.11.10 C
04.11.10 wir 161-10 0 G I LINTEL WORKS AND BLOCK INSTALLATION PRIOR FOR PLASTERING INCLUDING PASSAGE AR LNTL 04.11.10 06.11.10 C
06.11.10 WIR 106-10 0 Floor Tile Layout, Flat P, 9th floor tower B part 4 Fl TL 06.11.10 06.11.10 B
06.11.10 WIR 151-10 0 Floor Tile Layout, Flat N, 7th floor tower A part 2 Fl TL 06.11.10 06.11.10 B
06.11.10 WIR 150-10 0 Floor Tile Layout, Flat J, 11th floor tower A part 2 Fl TL 06.11.10 06.11.10 B
06.11.10 WIR 133-10 0 All work above ceiling excluding toilet and Fire dumper area prior to close gypsum sheet flat c d g and h gyp 06.11.10 06.11.10 C
06.11.10 WIR 132-10 0 All work above ceiling excluding toilet and Fire dumper area prior to close gypsum sheet flat I j m & n, 8th fl gyp 06.11.10 06.11.10 C
06.11.10 WIR 131-10 0 All work above ceiling excluding toilet and Fire dumper area prior to close gypsum sheet flat AB E & F 8th fl gyp 06.11.10 06.11.10 C
06.11.10 WIR 134-10 0 All work above ceiling excluding toilet and Fire dumper area prior to close gypsum sheet flat K L O & P 8th f gyp 06.11.10 06.11.10 C
06.11.10 WIR 16 Rev. 0 0 5th floor db to flatwise megger value/insulation resistance teast(Megger value report attached in the DB elec DB 06.11.10 08.11.10 B
06.11.10 WIR 168-10 0 Floor Tile Layout, flat C, 11th floor tower B, part 3 fl tl 06.11.10 06.11.10 B
06.11.10 WIR 167-10 0 Floor Tile Layout, flat D, 11th floor tower B, part 3 fl tl 06.11.10 06.11.10 B
06.11.10 WIR 171-10 0 Water proofing water rest @ wet area, 6th floor Tower A& B part 1 2 3 & 4 WP 06.11.10
06.11.10 WIR 164-10 0 Wall tile layout @ Toilet type A B & E, flat P, 9th floor tower B part 4 WL TL 06.11.10 07.11.10 C
06.11.10 WIR 162-10 0 Wall tile layout @ toilet type K, lat E, 11th floor tower A part 1 WL TL 06.11.10 08.11.10 B
06.11.10 WIR 166-10 0 Wall tile layout @ toilet type E, flat P, 5th floor towr B part 4 WL TL 06.11.10 07.11.10 A
06.11.10 Wir 169-10 0 Floor Tile Layout, flat O, 11th floor towr B part 4 fl tl 06.11.10 06.11.10 B
06.11.10 Wir 170-10 0 Floor Tile Layout, flat P, 11th floor towr B part 4 fl tl 06.11.10 06.11.10 B
06.11.10 WIR 172-10 0 Rebars & Shuttering for lintel works @ GF, GF tower A&B Part 1& 3 LNTL 06.11.10 08.11.10 A
06.11.10 WIR 165-10 0 Wall tile layout @ toilet type F, flat F, 9th floor tower A part 1 WL TL 06.11.10 06.11.10 B
06.11.10 WIR 163-10 0 Rebars & Shuttering for con. Seat on swimming pool 4th floor swimming pool part 5 Shuttering rebars 06.11.10 08.11.10 B
07.11.10 WIR 174-10 0 Prepertaion for balcony upstand concreting works flat F & G, 16-23 flor, tower A part 1 & 2 Civil 07.11.10 08.11.10 B
07.11.10 WIR 178-10 0 Wall Tile layout @ toilet type J, flat D, 9th floor tower B, part # 3 WL TL 07.11.10 08.11.10 B
07.11.10 Wir 177-10 0 Wall Tile layout @ toilet type C, flat E, 11th floor tower A, part # 1 WL TL 07.11.10 08.11.10 B
07.11.10 WIR 176-10 0 Wall tile layout @ toilet type C, flat L, 11th floor tower B part 4 WL TL 07.11.10 08.11.10 B
07.11.10 WIR 175-10 0 Wall Tile layout @ toilet type C, Flat E & I, 10th floor tower A part 1 WL TL 07.11.10 08.11.10 B
07.11.10 WIR 173-10 0 Floor tile layout, Flat P, 16th floor tower B, part 4 fl tl 07.11.10
08.11.10 WIR 17 0 5th floor db to flatwise megger value/insulation resistance test(Megger value report attached in the DB elecb DB 08.11.10 08.11.10 B
08.11.10 WIR 105-10 0 Floor tile layout, flat O, 9th floor tower B part 4 fl tl 08.11.10 08.11.10 B
08.11.10 WIR 179-10 0 Floor tile layout, Flat A, 16th Floor Tower A part 1 fl tl 08.11.10
08.11.10 WIR 179-10 1 Floor tile layout, Flat A, 16th Floor Tower A part 1 fl tl 08.11.10 08.11.10 C
08.11.10 WIR 197-10 0 Wall tiles prior for grouting @ toilet type A & B, 10th floor tower A part 1 WL TL 08.11.10
08.11.10 WIR 196-10 0 Wall tiles prior for grouting @ toielt type A B E J & E, flat A, 10th floor tower A part 1 WL TL 08.11.10
10.11.10 WIR 126-10 0 Floor Tile Layout, Flat H, 11th floor Tower B part # 3 fl tl 10.11.10 10.11.10 B
10.11.10 WIR 107-10 0 Floor Tile Layout, Flat G, 11th floor Tower B part # 3 fl tl 10.11.10 10.11.10 B
10.11.10 WIR 18 rev. 0 0 6th floor DB to flatwise Megger value/Insulation resistance test (Megger value report attached herwith fo db 10.11.10 11.11.10 B
10.11.10 WIR 19 rev. 0 0 6th floor DB to flatwise Megger value/Insulation resistance test (Megger value report attached herwith fo db 10.11.10 11.11.10 B
10.11.10 wir 213-10 0 G I LINTEL PLASTER WORKS, 23RD FLOOR TOWER A&B PART 1 2 3 & 4 LNTL 10.11.10 11.11.10 B
10.11.10 wir 215-10 0 WALL TILES LAYOUT @ TOILET TYPE D& F, FLAT F, 16TH FLOOR TOWER A PART 1 WL TL 10.11.10 10.11.10 A
10.11.10 wir 208-10 0 Wall tiles layout @ toilet type F, flat G, 09th floor tower B part 3 WL TL 10.11.10 10.11.10 B
10.11.10 WIR 207-10 0 Wall tiles layout@ toilet type f, flat f, 10th floor tower A part 1 WL TL 10.11.10 10.11.10 A
10.11.10 WIR 206-10 0 Wall tiles layout @ toilet type K, flat I, 10th floor tower A part 2 WL TL 10.11.10 10.11.10 A
10.11.10 WIR 209-10 0 Wall tiles layout @ toilet type g, flat pI, 07th floor tower b part 4 WL TL 10.11.10 13.11.10 A
10.11.10 WIR 205-10 0 Floor tiles layout , Flat K, 11th floor tower B part 4 Fl TL 10.11.10 10.11.10 a
10.11.10 WIR 203-10 0 GI Lintel and blockwork installation prior for plastering flat C D G & H, 11th floor tower B part 3 LNTL 10.11.10 11.11.10 A
10.11.10 WIR 202-10 0 G I LINTEL AND BLOCKWORK INSTALLATION PRIOR FOR PLASTERING FLAT K L O & P 10TH FLOR BL WRK 10.11.10 11.11.10 A
10.11.10 wir 199-10 0 Bathroom water proofing preperation flat a& b, 16th floor tower A part 1 WP 10.11.10 11.11.10 B
10.11.10 WIR 204-10 0 Gi Lintel and blockwork installation prior for plastering Flat K.L o & P, 11th floor tower B part 4 LNTL 10.11.10 11.11.10 B
11.11.10 WIR 222-10 0 Wall tile layout flat L, Type K, 11th floor tower B part 4 WL TL 11.11.10 11.11.10 A
11.11.10 WIR 221-10 0 Bathtub installation at master bathroom flat O type A, 5th floor tower B part 4 WL TL 11.11.10 13.11.10 B
11.11.10 WIR 220-10 0 Wall tile layout flat L, Type K, 11th floor tower B part 4 WL TL 11.11.10 11.11.10 A
11.11.10 WIR 219-10 0 Wall tile layout flat J, Type F, 10th floor tower A part 2 WL TL 11.11.10 11.11.10 A
11.11.10 WIR 218-10 0 Wall tile layout flat H, Type C, 11th floor tower B part 3 WL TL 11.11.10 13.11.10 B
11.11.10 WIR 217-10 0 Wall tile layout flat A, Type J & G, 12th floor tower A part 1 WL TL 11.11.10 11.11.10 A
11.11.10 WIR 216-10 0 Balcony upstand rebar work prior for concreting Flat B C N & o Rebar 11.11.10 13.11.10 B
11.11.10 WIR 214-10 0 Floor tiles layout works, flat B, 16th floor tower A part # 1 fl tl 11.11.10 13.11.10 B
10.11.10 WIR 223-10 0 Wall tile prior for grouting Flat E Type K, 11th floor tower A part 1 WL TL 11.11.10 11.11.10 B
13.11.10 WIR 217-10 0 Wall tiles layout @ toilet type F & D WL TL 13.11.10
13.11.10 WIR 216-10 0 Block work layout @ 3rd floor, 3rd floor parking area part # 5(SNT BACK) BL WRK returned 13.11.10 B
13.11.10 WIR 200-10 0 rebar an shuttering for con. Seat @ swimming pool area, 4th floor swimming pool part 5 Rebar returned
13.11.10 WIR 198-10 0 Rust coat and point level, GF tower B part 4 Civil 13.11.10 13.11.10 A
13.11.10 WIR 21 0 7th floor DB to flatwise megger value /insulation resistane test, 7th floor tower b db 13.11.10 15.11.10 b
13.11.10 WIR 218-10 0 GI lintel and block work installation prior for plastering, 11th floor tower A part 1 & 2 LNTL 13.11.10 13.11.10 B
13.11.10 WIR 222-10 0 Wall tiles layout @ toilet type J& B, flat n, 9th floor tower A part 2 WL TL returned
13.11.10 WIR 221-10 0 Wall tiles layout @ toilet type J& B, flat n, 10th floor tower A part 2 WL TL returned 13.11.10 B
13.11.10 WIR 220-10 0 Wall tiles layout @ toilet type A B J& G, flat B, 12th floor tower A part 1 WL TL returned
13.11.10 WIR 219-10 0 Wall tiles layout @ toilet type E & B, flat A, 12th floor tower A part 1 WL TL returned
14.11.10 WIR PI-64 0 PPR pressure testing @ 10 bar pressure, 26th floor tower A & B PL 14.11.10 15.11.10 A
14.11.10 WIR 236-10 0 Block work layout @ 3rd floor, 3rd floor parking area part # 5 BL WRK 14.11.10 14.11.10 A
14.11.10 WIR 200-10 0 rebar an shuttering for con. Seat @ swimming pool area, 4th floor swimming pool part 5 Rebar 14.11.10 14.11.10 B
14.11.10 WIR 232-10 0 Wall tiles layout @ toilet type J& B, flat n, 9th floor tower A part 2 WL TL 14.11.10 14.11.10 C
14.11.10 WIR 233-10 0 Wall tiles layout @ toilet type J& B, flat n, 10th floor tower A part 2 WL TL 14.11.10 14.11.10 A
14.11.10 WIR 234-10 0 Wall tiles layout @ toilet type A B J& G, flat B, 12th floor tower A part 1 WL TL 14.11.10 14.11.10 A
14.11.10 WIR 235-10 0 Wall tiles layout @ toilet type E & B, flat A, 12th floor tower A part 1 WL TL 14.11.10 14.11.10 A
14.11.10 WIR 240-10 0 Wall tiles layout @ toilet type J, flat P, 10th floor tower B part 4 WL TL 14.11.10 15.11.10 a
14.11.10 WIR 171-10 0 Water proofing water test @ wet Area, 6th floor tower A & B part 1 2 3 4 WP 14.11.10 14.11.10 c
14.11.10 WIR 237-10 0 Wall tiles layout @ toilet type C & K, flat I, 12th floor tower A, part 2 WL TL 14.11.10 15.11.10 A
14.11.10 WIR 239-10 0 Wall Tiles layput @ toilet type J, Flat O, 10th floor tower B part 4 WL TL 14.11.10 15.11.10 A
14.11.10 WIR 238-10 0 Wall tiles layout @ toilet type A & B, Flat D, 12th floor tower B part 3 WL TL 14.11.10 15.11.10 A
14.11.10 WIR 20 0 7th Floor DB to flatwise Megger value/Insulation resistance test in the db -elcb&mcbs will be fixed after inst DB 14.11.10 15.11.10 b
14.11.10 wir 241-10 0 WATER PROOFINGWATER TEST @ WET AREA, 7TH FLOOR TOWER A AND B PART 1 2 3 & 4 WP 14.11.10 15.11.10 C
14.11.10 WIR 244-10 0 WATER PROOFINGWATER PG LEAK TEST, 5TH FLOR TOWER A &b, PART 1 3 & 4 WP 14.11.10 14.11.10 A
15.11.10 WIR 249-10 0 Blockwork layout @ 4th floor, 4th floor panorama area BL WRK 15.11.10 15.11.10 A
15.11.10 WIR 245-10 0 Wall tiles layout @ toilet type D, flat B, 12th floor Tower A part 1 WL TL 15.11.10 15.11.10 A
15.11.10 WIR 246-10 0 Wall tile layout @ toilet type A & D, Flat N, 10th floor Tower A part 2 WL TL 15.11.10 15.11.10 A
15.11.10 WIR 248-10 0 Wall tiles layout @ toilet type J, flat D, 12th floor Tower B part # 3 WL TL 15.11.10 15.11.10 A
15.11.10 WIR 247-10 0 Wall tiles layout @ toile type A & J, flat C, 12th floor tower B part 3 WL TL 15.11.10 15.11.10 A
15.11.10 WIR 258-10 0 STEEL WORK @ SLOPE OF SWIMMING POOL TO START CONCRETING AREA, 4TH FLOOR SP PART Sw pool 15.11.10 21.11.10 A
15.11.10 WIR 242-10 0 Floor tiles layout works, flat o, 16th floor tower B part 4 Fl TL 15.11.10 15.11.10 B
15.11.10 WIR 250-10 0 Wall tiles layout @ toilet type G, Flat D, 12th floor tower B part 3 WL TL 15.11.10 15.11.10 A
15.11.10 WIR 251-10 0 Wall tiles layout @ toilet type B & G, Flat C, 12th floor tower B part 3 WL TL 15.11.10 15.11.10 C
15.11.10 WIR 252-10 0 Wall tiles layout @ toilet type D, flat B, 10th floor tower A part 1 WL TL 15.11.10 20.11.10 a
15.11.10 WIR 253-10 0 Wall tiles layout @ toilet type D, flat B, 10th floor tower A part 1 WL TL 15.11.10 15.11.10 A
15.11.10 WIR 255-10 0 Wall tiles layout @ toilet type K, Flat L, 12th floor Tower B part # 4 WL TL 15.11.10 15.11.10 A
15.11.10 WIR 256-10 0 Wall tiles layout @ toilet type G, flat N, 10th floor tower a, part 2 WL TL 15.11.10 15.11.10 A
15.11.10 wir 257-10 0 Wall tiles layout @ toilet type j, flat P, 09th floor tower b, part 4 WL TL 15.11.10 15.11.10 A
15.11.10 WIR 254-10 0 Wall tiles laout @ toilet type k & Gm flat e, 12th floor tower A, part 1 WL TL 15.11.10 15.11.10 A
15.11.10 WIR 171-10 2 WATER PROOFING WATER TEST @ WETAREA, 6TH FLOOR TOWER a & b PART 1 2 3 & 4 WP 15.11.10 20.11.10 c
15.11.10 WIR 22 0 8TH FLOOR DB TO FLATWISEMEGGER NALUE /INSULATION RESISTANCE, 8TH FLOOR TWR A DB 15.11.10 21.11.10 B
15.11.10 WIR 146-10 1 Inspection for rusting bolts cleaning and rust removing in tower B 14 floor east elev and north elevation SG7 alum 15.11.10 20.11.10
15.11.10 WIR 147-10 1 Inspection for rusting bolts application of wash primer in Tower B 14th floor east elev and north elev SG7b/L alum 15.11.10 21.11.10 A
16.11.10 WIR 148 stage inspection for alum structural framing tower A SG08/r/r & L West Elev 27-29flr, 12-14& 04-06 on Grid alum 16.11.10 22.11.10 B
20.11.10 ME-32 0 installation of ceiling mounted exhaust fan in laundry room, 16th floor part 3 tower b civil 20.11.10 23.11.10 B
20.11.10 WIR 259-10 0 GI lintel and block work installation prior for plastering, flat A B E F I J M & N, 12th floor tower A part 1 & 2 LNTL 20.11.10 21.11.10 A
20.11.10 WIR 263-10 0 Wall tiles layout @ toilet type A B G & J, flat M, 10th floor tower A, part WL TL 20.11.10 21.11.10 B
20.11.10 WIR 267-10 0 All worksabove ceiling prior closing gypsum sheet ceiling flat k l o p 5th floor tower B part 4 gyp
20.11.10 WIR 266-10 0 All worksabove ceiling prior closing gypsum sheet ceiling flat k l o p 5th floor tower B part 4 gyp
20.11.10 WIR 262-10 0 Wall tiles layout @ toilet type A B G j flat A 17th floor tower A part # 1 WL TL 20.11.10 21.11.10 C
20.11.10 WIR 261-10 0 Wall tiles layout @ toilrt type F & D flat j, 16th floor tower A par t2 WL TL 20.11.10 21.11.10 C
20.11.10 WIR 260-10 0 Wall tiles layout @ toilrt type C E K flat I, 16th floor tower A par t2 WL TL 20.11.10 C
20.11.10 WIR 171-10 0 Water proofing water rest @ we area @ toilet type G D J flat C N & M, 6th floor tower A & B part 2 & 3 WP 20.11.10 21.11.10 C
20.11.10 WIR 149-10 0 Stage inspection for aluminium structural framing in tower B SG07 /c/l/l west elev 15-17 02-04 on grid Q alum 20.11.10 22.11.10 B
20.11.10 WIR 150-10 0 Stage inspection for aluminium structural framing in tower B SG07B/c/R/R east elev 14-24 02-04 on grid J alum
20.11.10 WIR 151-10 0 Stage inspection for aluminium structural framing in tower B SG07B/c/R/l east elev 15-27 14-16 on grid J alum 20.11.10 22.11.10 B
20.11.10 WIR 225-10 0 Floor tiles layout works, flat C, 12th floor tower B part 3 Fl TL 20.11.10 21.11.10 B
20.11.10 wir 265-10 0 All worksabove ceiling prior closing gypsum sheet ceiling flat I em & n 5th floor tower A part 2 gyp 20.11.10 25.11.10 c
20.11.10 WIR 264-10 All worksabove ceiling prior closing gypsum sheet ceiling flat AB E & F 5th floor tower A part 1 gyp 20.11.10 25.11.10 c
21.11.10 WIR 243-10 0 Dry area gypsum ceiling closing works, flat a b e f I j m& N, 16th floor tower A part 1 & 2 gyp 21.11.10 23.11.10 C
21.11.10 WIR 38 0 16th floor DB to flatwise Megger value /Insulation resistance test (megger value report attached herewith) i DB 21.11.10 22.11.10 B
22.11.10 WIR 276-10 0 Wall tiles layout @ toilet type A, flat P, 12th floor Tower B par 4 WL TL 22.11.10 22.11.10 A
22.11.10 WIR 275-10 0 Wall Tiles layout @ toilet type K, Flat H, 12th floor Tower B, part 3 WL TL 22.11.10 22.11.10 A
22.11.10 WIR 268-10 0 Wall Tiles layout @ toilet type A, Flat A, 12th floor TowerA, part 1 WL TL 22.11.10 22.11.10 A
22.11.10 WIR 271-10 0 Wall Tiles layout @ toilet type A b j e & D, Flat O, 12th floor TowerB, part 4 WL TL 22.11.10 22.11.10 A
22.11.10 WIR 272-10 0 Wall Tiles Layout @ Toilet Type F, Flat K, 9th floor tower B part 4 WL TL 22.11.10 22.11.10 A
22.11.10 WIR 270-10 0 Wall Tiles Layout @ Toilet Type C, Flat L, 12th floor tower B part 4 WL TL 22.11.10 22.11.10 A
22.11.10 WIR 269-10 0 Wall Tiles Layout @ Toilet Type E, Flat M, 10th floor tower A part 2 WL TL 22.11.10 22.11.10 A
22.11.10 WIR 281-10 0 Wall Tiles Layout @ Toilet Type A B G & J, Flat A, 17th floor tower A part 2 WL TL 22.11.10 23.11.10 A
22.11.10 WIR 153-10 1 Stage inspection for Aluminium structural framing SG07A/R Tower A west elevation from 27-29 floor, 06-11 alum 22.11.10 23.11.10 B
22.11.10 WIR 152-10 1 Stage inspection for Aluminium structural framing SG07A/R Tower A west elevation from 27-29 floor, 02-04 alum 22.11.10 23.11.10 B
22.11.10 WIR 154-10 1 Stage inspection for Aluminium structural framing SG07A/R Tower b west elevation from 25-29 floor, 14-16 alum 22.11.10 23.11.10 B
22.11.10 WIR 155-10 1 Stage inspection for Aluminium structural framing SG07A/R Tower b west elevation from 25-29 floor, 02-04 alum 22.11.10 23.11.10 B
22.11.10 wir PI-65 0 fire fightng riser testing, 15 bar pressure FF 22.11.10 23.11.10 B
22.11.10 wir 23 0 8TH FLOOR DB TO FLATWISEMEGGER NALUE /INSULATION RESISTANCE, elcb & mcb's will be fixed aft megger 22.11.10
22.11.10 WIR 24 0 9TH FLOOR DB TO FLATWISEMEGGER NALUE /INSULATION RESISTANCE, in the db elcb & mcb's will bemegger 22.11.10
22.11.10 wir 277-10 0 water proofing & leak test @ toilet type a b cd cd, e, f, g & k, flat a b e f I j m& N, 8th floor tower a, part 1&2 WP 22.11.10
22.11.10 wir 284-10 0 GI LINTEL PLASTER WORKS, 24TH FLOOR TOWER a & b PART 1 & 2 LNTL 22.11.10 23.11.10 A
22.11.10 wir 288-10 0 Fire sealent application @ passages & inside the flat, excluding fire dumper area flat a b m n c d o & p, 7th fire damper 22.11.10 25.11.10 B
22.11.10 wir 279-10 0 Fire sealent application @ passages inside the flat, excluding fire dumper area, flat A B M N C D O & O,P, 6 fire damper 22.11.10 23.11.10 C
22.11.10 WIR 280-10 0 Fire sealent application @ passages inside the flat, excluding fire dumper area, flat A B M N C D O & P, 8th fire damper 22.11.10 25.11.10 B
22.11.10 WIR 278-10 0 Fire sealent application @ passages inside the flat excluding fire damper area flat a b m n c d O & o, P, 5th fire damper 22.11.10 24.11.10 C
22.11.10 WIR PI-65 0 Fire fighting riser testing 15 bar pressure FF 22.11.10
23.11.10 WIR 282-10 0 Floor Tiles Layout, Flat N, 16th Floor Tower A, part 2 Fl TL 23.11.10 23.11.10 B
23.11.10 WIR 283-10 0 Floor Tiles Layout, Flat K, 16th Floor Tower B, part 4 Fl TL 23.11.10 23.11.10 B
23.10.10 WIR 156 0 INSPECTION FOR RUSTING BOLTS APPLICATION OF EPOXY PRIMER IN TOWER B 14TH & 15TH FLOORalum
EA 23.11.10 23.11.10 B
23.10.10 wir 25 0 9TH FLOOR DB TO FLATWISEMEGGER NALUE /INSULATION RESISTANCE, in the db elcb & mcb's will be DB 23.11.10
23.10.10 wir 291-10 0 Wall tiling installation @ kitchens flat c d g j k l o & P, 5th floor towr B WL TL 23.11.10 25.11.10 C
23.10.10 WIR 289-10 0 GI lintel block work installation prior for plastering flat c d g h k l o & P, 12th floor tower B part 3& 4 BL WRK 23.11.10 24.11.10 A
23.10.10 WIR 273-10 0 Floor tiles layout, flat F, 12th floor tower A Part 1 Fl TL 23.11.10 24.11.10 B
23.10.10 WIR 293-10 0 Wall tiling installation @ kitchens Flat C D G H k L O P, 6th floor tower B part 3 & 4 WL TL 23.11.10 25.11.10 C
23.10.10 WIR 292-10 0 Wall tiling installation @ kitchens, flat A B E F I J M & N, 6th floor tower A part 1& 2 WL TL 23.11.10 25.11.10 C
23.10.10 WIR 290-10 0 Wall tiling installation @ Kitchens Flat A, B E,F I, J M & N, 5th floor tower A part 1 & 2 WL TL 23.11.10 25.11.10 C
23.10.10 WIR 230-10 0 Floor Tiles Layout, Flat G & H, 12 floor tower B Part 3 Fl TL 23.11.10 24.11.10 B
23.10.10 wir 231-10 0 Floor Tiles Layout, Flat k& L, 12 floor tower B Part 3 Fl TL 23.11.10 24.11.10 B
23.10.10 WIR 228-10 0 Floor Tiles Layout, Flat A & b, 12 floor tower A Part 1 Fl TL 23.11.10 24.11.10 B
23.10.10 Wir 226-10 0 Floor Tiles Layout, Flat D, 12 floor tower B Part 3 Fl TL 23.11.10 25.11.10 B
23.10.10 WIR 302-10 0 Block work layout @ 3 rd floor, 3rd floor tower A & B, Part 6 BL WRK 23.11.10 25.11.10 B
23.10.10 WIR 301-10 0 Block work layout @ 2nd floor, 2rd floor tower A , Part 1& 2 BL WRK 23.11.10 24.11.10 B
24.11.10 WIR 305-10 0 Wall Tiles Layout @ Toilet type D, Flat C, 12th Floor Tower B, Part 3 WL TL 24.11.10 25.11.10 A
24.11.10 WIR 306-10 0 Wall Tiles layout @ Toilet Type F, Flat G, 12th Floor Tower B Part # 3, WL TL 24.11.10 25.11.10 A
24.11.10 WIR 307-10 0 Wall Tiles layout @ Toilet Type A B E J & G, Flat M, 09th Floor Tower A Part # 2 WL TL 24.11.10 25.11.10 C
24.11.10 WIR 308-10 0 Wall Tiles layout @ Toilet Type G, Flat N, 09th Floor Tower A Part # 1 WL TL 24.11.10 25.11.10 C
24.11.10 WIR 309-10 0 Wall Tiles Layout @ Toilet Type A B & J, Flat B, 17th Floor Tower A Part 1 WL TL 24.11.10 25.11.10 A
24.11.10 WIR 310-10 0 Wall Tiles Layout @ Toilet Type D & F, Flat J, 16th Floor Tower A Part 2 WL TL 24.11.10 25.11.10 B
24.11.10 WIR 39 0 16th floor DB to flatwise Megger value /Insulation resistance test (megger value report attached herewith) i DB 24.11.10
24.11.10 WIR 298-10 0 Wall Tiles Layout @ Toilet Type F, Flat J, 6th Floor Tower A, Part # 2 WL TL 24.11.10 25.11.10 A
24.11.10 WIR 297-10 0 Wall Tiles Layout @ Toilet Type F, Flat F, 6th Floor Tower A, Part 1 WL TL 24.11.10 25.11.10 C
24.11.10 WIR 300-10 0 Wall Tiles Layout @ Toilet Type J, Flat M, 6th Floor Tower A, Part 2 WL TL 24.11.10 25.11.10 A
24.11.10 WIR 299-10 0 Wall Tiles Layout @ Toilet Type J, Flat M & N, 7th Floor Tower A Part # 2 WL TL 24.11.10 25.11.10 A
24.11.10 WIR 294-10 0 Wall Tiles Layout @ Toilet Type F, Flat F, 12th Floor Tower A Part 1 WL TL 24.11.10 25.11.10 A
24.11.10 WIR 295-10 0 Wall Tiles Layout @ Toilet Type E, Flat P, 11th Floor Tower B part 4 WL TL 24.11.10 25.11.10 A
24.11.10 WIR 304-10 0 Wall Tiles Layout @ Toilet Type C E & K, Flat I, 16th Floor Tower A part # 2 WL TL 24.11.10 25.11.10 B
24.11.10 WIR 303-10 0 Wall Tiles Layout @ Toilet Type C E & K, Flat E, 16th Floor Tower A part # 1 WL TL 24.11.10 25.11.10 A
24.11.10 WIR 312-10 0 Rush coat & point level @ Ground Floor, Ground Floor Tower B part 3 & 4, GF Tower B Part 3& 4 alum 24.11.10 25.11.10 B
24.11.10 WIR 296-10 0 Floor Tiles Layout, Passage Area, 5th Floor Tower A part 1 & 2 Fl TL 24.11.10 25.11.10 B
25.11.10 WIR 297-10 0 wall TILES LAYOUT @ TOILET TYPE F, FLAT F, 6TH FLOOR TOWER A PART 1 WL TL 25.11.10
25.11.10 WIR 314-10 0 wall TILES LAYOUT @ TOILET TYPE C, FLAT H, 12TH FLOOR TOWER B PART 3 WL TL 25.11.10
25.11.10 WIR 313-10 0 wall TILES LAYOUT @ TOILET TYPE G, FLAT M&n, 09TH FLOOR TOWER A PART 2 WL TL 25.11.10
25.11.10 WIR 157 0 INSPECTION FOR RUSTING BOLTS APPLICATION OF EPOXY PRIMER IN TOWER B 14TH & 15TH FLOORalum
EA 25.11.10
25.11.10 wir 311-10 0 FLOOR TILES LAYOUT, FLAT I, 16TH FLOOR, TOWER a PART # 2 Fl TL 25.11.10
FONTANA Project
(MAR) MATERIAL APPROVAL REQUEST

Referenc to
# Date Rev. Submittal Description & Location from Status
e consult
1 08.09.10 A-16-10 0 Hilti Fire Stop System CP 606 DSE
2 08.09.10 D-0015 0 Hilti Fire Stop System CP 606 (with sample material) SBIC
3 14.09.10 A-14-10 0 Panoramic Glass DSE
4 11.10.10 A-17-10 0 panaromic glazing steel structure, hilti sweitzerland dse
5 12.10.10 MAC-001-10 0 Wall & Ceiling Paint (Jutton), colour cahrt and data sheet Dev-const Dev-const b
6
7 18.10.10 MAC-002-10 0 water proofing for bathrooms and balconies Dev-const Dev-const b
8 20.10.10 MAC-003-10 0 Rockwool for installation back of the aluminium cladding
9 23.10.10 MAC-002-10 1 water proofing for bathrooms and balconies Dev-const Dev-const b
10 25.10.10 MAC-004-10 Aluminium welding on aluminium pipe handrailing for l shape balcony deep sea
11 28.10.10 AC-30 0 Fire Damper (ModelAFD3), air master catalogue enclosed
12 31.10.10 MAC-002-10 water proofing for bathrooms and balconies, golden care construction caluse A, letter f Dev-const Dev-const b
13 31.10.10 MAC-005-10 Fiber mesh for use with toilets water proofing (alyaf ts163+), bathrooms & toilets, alyaf Dev-const Dev-const a
14 31.10.10 MAC-006-10 Fire damper (moel AFD3). As per drawings, air master, uae, clause e, catalogue 50% ( Dev-const Dev-const b
15 04.11.10 MAC-007-10 0 GI profiles for gypsum ceiling Dev-const Dev-const a
16 08.11.10 MAC-008-10 0 Sigma acrylic primer sealer, walls floors in the typical floors and car parking floors,sigma ksa skyline trading cor b
17 23.11.10 DAC-005-10 0 Drawing & Document, window cleaning system, elevations of the towers
18 23.11.10 MAC-010-10 0 Submittalfor fire stop application, al mahroos bsc dev-cons dev-cons b
19 23.11.10 MAC-011-10 0 Fire Damper (Model -AFD3) dev-cons dev-cons b
20 24.11.10 DAC/s-28-10 0 Submission of structural calculations for typical panels
21 24.11.10 MAC-012-10 0 Sanitary services products, axis-arepro dev-cons dev-cons a
22 25.11.10 dac-006-10 0 Drwing INTERNal doors details@ tyical floors, frm 5th to 29th typical floors
return
date

14.10.10

18.10.10

23.10.10

31.10.10
31.10.10
31.10.10
06.11.10
09.11.10

25.11.10
23.11.10

25.11.10
(DAR) DRAWING / DOCUMEN

# Date Transmittal # Drawing # Rev.


1 28.06.10 DEEP-1016 0
2 08.07.10 sbic-1086 emco/c-323/elp-01 0
3 10.07.10 sbic-1086 emco/c-323/EM-01
jana-1090
4 25.07.10 dse/sbic/320/2010 0
5 26.07.10 deep-1018 0
6 12.08.10 DEEP-1019 1
7 15.08.10 Gulf-1003 GLBO10-MP05 0
8 DEEP-1020 0
1 17.08.10 BUKA-0001 BUKAMAL 0
10 17.08.10 0
11 17.08.10 0
12 17.08.10 0
13 23.08.10 EMCO - 1103 EMCO/C-323/ELP-01 0
14 29.08.2010 DEEP-1021 DEEP-1021/ BR-01 BR--02 0
15 29.08.2010 DEEP-1022 DEEP-1022/ PE-01 & PE-02 0
16 01.09.2010 SBIC-1099 -R AR-0025-10 3
17 01.09.2010 SBIC-1101 AR-0026-10 0
18 07.09.2010 EMCO-1104 EMCO-1104 0

19 07.09.2010 BU-KA-001 r BU-KA-001 r 1

20 07.09.2010 SBIC-1102 SBIC-1102 0


21 21.10.10 DAC/s-23-10 DAC/s-23-10 0
22 16.10.10 + 0
23 27.10.10 DAC/S-24-10(Returned) DAC/S-24-10
24 04.11.10 DAC-002-10 DAC-002-10 0
25 09.11.10 DAC-003-10 DAC-003-10 0
26 20.11.10 DAC-004-10 DAC-004-10 0
27 24.11.10 DAC/s-28-10 DAC/s-28-10
FONTANA PROJECT
) DRAWING / DOCUMENT APPROVAL CERTIFICATE

from
Description & Location to SBIC Status Disc
SBIC
STRUCTURAL CALCULATIONS FOR PANARAMIC GLAZING 28.06.10 sameer
generator electrical room layout (GF) 08.07.10
Modification flats ("6l, 7e&11H)electrical layout 10.07.10 kumar

structural calculations for steel support for cladding wings 25.07.10 socotec
struction calculationsfor typical curtain walls 26.07.10
STRUCTURAL CALCULATIONS FOR PANARAMA GLAZING 12.08.2010
Main Swimming Pool - Balance Tank 15.08.10
Design and Structural Calculation for Mast. 15.08.10
Garbage chute system Plans Block 1 & 2
Garbage chute system Section 1 & 2
Garbage chute system Details A
Garbage chute system Details B
generator electrical room layout (GF) Rev-E
Balcony Railing Elev.Plan & Details
Panaromic Elev, Plan & Details
Tiles Layout of ApartmentS @ Typical Floors. 01.09.10
Emco/C-324/AC-07 HVACon
Internal Stair case details ducting layoutFloors
Penthouse (5th to 15th floor ) 01.09.2010
Rev-4
GC-001Garbage chute system planlayout
Block(116th
& 2 toRev-1 07.09.10
Emco/C-324/AC-06 HVAC ducting 29th floor)
GC-002
Rev-2 Garbage Chute system section block 1 & 2 07..09.10
GC-003
AR-0027-10Garbage chute system
to AR-0037-10 Details
Typical floorAToilets
Rev-1 Tile Details
GC-004 Garbage chute System details B
(Typ.A,B,C,E, 07.09.10
D,H,F ,J & k)
FIN preliminary drawing and details 21.10.10
PH low level lighting layout,PH upper level lighting layout, PH lo 24.10.10 b
Curtain wall/ Cladding wings elevations and sectional details(Returned)
PENTHOUSE SWIMMING POOL DETAILS (HARD AND SOFT 06.11.10 C
electrical layout flat 7e, modification
ladies pool fittings and pipe work layout dev-const
Submission of structural calculations for typical panels