You are on page 1of 4

BC FRAMER / BC CALC

® ®

INTEGRATED ANALYSIS DESIGN SOFTWARE

STREAMLINE PLANS TO BE LESS


EXPENSIVE AND EASIER TO BUILD:
Plans run through the BC Framer process
can come out less expensive and easier
to build. BC Framer works with BC Calc
to constantly perform integrated analysis
throughout the design process to help EXPERIMENT WITH DIFFERENT
designers create homes that are better FRAMING OPTIONS:
built, less expensive, and easier to build.
BC Framer and BC Calc together can The BC Framer process lets designers quickly
reduce material bills, cycle time, and labor experiment with different design parameters, check
hours for homebuilders. loads, and find the optimal way to frame. Instead
of using the same on-center spacing throughout,
parameters can be varied in different rooms to add
strength under floors taking higher loads, while
reducing costs in other parts of the home. The
designer simply punches in various product options
and chooses the ones that fit the business goals for
that project.

BUY MORE EFFICIENTLY WITH BC FRAMER’S


PRECISE MATERIAL LIST:
BC Framer gives you an exact material list so you
BEFORE AFTER order only the material you need to build each plan.
No more having to throw in extra material that
ordinarily ends up as waste. It can save you both time
REDUCE FRAMING MATERIAL COSTS and material as your crews get used to building with
BY CUTTING OUT THE WASTE: tight plans and the materials provided.

BC Framer plans are engineered for structural


integrity, but not over-engineered. With BC
Framer, designers can take out excess material
without diminishing the home’s quality. Reducing
waste saves you money two ways: a lower
material bill and dramatically lower disposal fees.
CHOOSE 3-D FRAMING DETAIL DRAWINGS
IN ENGLISH, SPANISH, OR BOTH:
Boise framing plans can include framing details for
complex framing situations labeled in either English
or Spanish, or both. It’s one of the many Boise
services that help you build faster and smarter.
TAKE A FEW MINUTES TO GET THE
FOUNDATION AND SILL PLATES RIGHT:
Boise squaring diagrams can locate foundation and
sill plates with precise lineal and diagonal dimensions
so they’re square and accurate. It takes only a few
minutes to get these dimensions correct so the home
is laid out level, flat and plumb. Subcontractors will
thank you throughout construction for easier
installation of doors, windows, cabinets, sheetrock,
and many other jobs.

CONNECTORS AND DESIGN LOADS


ARE ALL SPELLED OUT:
Connectors and design loads are spelled out right on
the framing plan to simplify preparation for framing
the job and to speed the process.

PREVENT FRAMING MISTAKES WITH


COLOR-CODED FRAMING PLANS:
Assure your homes are built correctly with Boise
color-coded framing placement plans showing place-
ment of all framing components. Large-format copies
can be posted on the jobsite to eliminate guesswork
and help less-skilled crews frame correctly. Inspec-
tors who see framing plans in use by your crews will
quickly see that your work is to spec.
BOIS
E B
File: C FRA
BCF
2429 MER® M
AM) - Unit D AIN*
Custo 5
Job
mer: 3.bcf Page
Nam Lumb (4/11 1 of 2
e: e /2007
Brigh rmens P 10:59
Addre t Hav uyallu
s U nit D en / P p Floo
Loca s: 2 oulsb rs :
ti
BC FR on: o To
wn home Com MAIN
STA RIM® AMER®
N , VER ,A s pa ny
Prod DARD SA-S JS™, ALL
TRA City, :
uct MEM ND™ JOIST® State
11-7 BER , VER ,B
SA-S C RIM B
:
/8" B S TUD O AR Draw WOO
CI® ® ar
e tradD™, BCI® n D INVIL
5000 B y:
-1.7 emar ,
ks of BOISE G Subje L E, W
DF Boise LULA ct/M
is TTC A
d Pro ™, VERS c:
M Woo
duct A
s, L. -LAM®,
L.C. VER
SA -RIM
Depth PLU
S ®,
11-7 Mark VER
SA -
1-3/4 /8" Qty
"x1 1
1-7/8 7 Len
" VE
RSA
-LAM
2
4 15' 8 gth
® 2.0 -1/2"
3 13' 1 Tota
2800 7 0-7/8 109' l Len
DF 4
5 1 2' 5-1 " 11-1 .
5 10' 5 /8" 55' 7 /2"
2 -1 -1/2"
11-7 /8" 86' 1
/8" 25 1-7
6 7' 5" 52' 1 /8"
1 -5/8"
7 15' 1 14' 1
1 1-3/4 3 0"
8 " 19' 6
3-1/2 1 15' 9 -1/2"
"x1 9 1 " 15' 1
1-7/8 1 5 ' 6-3/1 1 -3/4"
" VE 1 0 6 "
RSA 1 15' 3 15' 9
-LAM 11 -3/8" 15' 6 "
® 2.0 15' -3/1
1
3100
DF 12 14' 1 -5/8" 15' 3 6"
1 0-5/1 -3/8"
13 14' 9 6" 1 5'
1 -13 14' 1 -5/8"
11-7
/8" 8 14' 7 /16" 0-5/1
-9/16 14' 9 6"
14 " -13
15
1 14' 7 /16"
1 36' 0 -9/16
16 " 1 2 1 ' 10-5 "
5-1/4 1 15' 8 /8"
"x1 17 -1/2"
1-7/8 1 12' 0 36'
" VE
RS A 18 11' 8 " 15' 8 0"
-LAM 1 -1/16 -1/2"
® 2.0 1 9 8' 9-3 " 12' 0
7" x 1 3100 1 "
1-7/8 20 /4 11' 8
" VE DF 1 7' 8-1 " -1/16
STA
NDA
RSA
-LAM 21 7' 6-1 "
/2 8' 9-3 "
RD B ® 2.0 1 /4 /4"
LOC 3100 11 -7/8" 3' 6-1 " 7 ' 8-1/2
KING 8
Prod
DF 22 /2" 7' 6-1 "
uct 1 /4
11-7 23 3' 6-1 "
/8" 1 24' 1 102' /2"
1-3/4 BCI® 50 11-7
/8" 2 2 2' 11 0 " 1 1 -9/16
"x1 0 0-1 24 -1 /2 " "
1-7/8 .7 DF 24'
TOT " VE 1 22' 1 10"
AL L RSA 19' 1 1-1
ENG -LAM 1-1/2
Prod TH P ® 2.0 D ep " 47' 9 /2"
uct ROD 2800 th M -1/2"
1-1/8 UCT DF 11-7 ark 19' 1
S /8" Run On 1-1/2
"x1 11-7 25 L "
1-7/8
" BC /8" 20' 9 ength SpCenter B C
ACC RIM 26 -13/1 acin lock ut
ESS BOA 13' 2 6 " g ing
Man ORIE R -3 19.2" Leng
th
ufact
urer S D ™O /4" 17-3 Qty
Simp SB 16" /16 To
son S
trong 14-1 " 13 18 tal Len.
/4" 1 '
-Tie 0 1 7-7/16"

CUT ONCE WITH BC FRAMER’S


Depth
Simp 11-7 1' 10
son S /8"
Mark
-1/2"
trong Prod Run
Simp -Tie uct 27 Len Stock
son S HGU
S412 49' 6 gth ed

ACCURATE CUT LIST:


trong -3/4" Len.
-Tie Qty Tota
Simp 2 4 ' 0" l
HU1 L
son S 1 Mark 3 7 en.
trong Qty 2' 0"
-Tie H1 Descr
Simp H U C412 ip
son S 4 3 ti
trong -1/2 on
Simp
-Tie
ITS2
H2 Fac x 11-1/4
son S .0 8 1 e Mount to 18
Simp
son S
Instead of the time-consuming and error-prone
trong
-T ie
Top 6/11.88
ITT2
F la
.06/1
nge 2 .0 x 1
1-7/8
H3 Fac
-3/4
x
2 C e Mount to 16
once
1 1-7/8
*
*

trong 1.88
process of pulling a tape for every cut, BC Framer
-Tie
ITT3
511.8
8
H4
34
1 /2 Face
aled
F la
Moun ge 3-
n
t*
d of R
epor
t- gives you exact cut lists accurate to 1/16”. All you
LSSU
I25&
SK
6 2
Fla
.0 x 1
1-7/8
need to do is to request squaring diagrams from your 8 2 nge Top
-5/16
H6 Fla x 11-7
8 1 nge /8 To
BC Framer designer and work with your concrete * requ
ires W
eb S
-3/4
Face x Slope &
Moun Skew
p

people to lay out accurate foundations and sill plates.


tiffene t*
rs (o
nly ce
rtain
hang
\Prog ers)
ram F
iles\B
You’ll
ois e\Rep
ortEd
save on material costs, labor, and cycle time,
and you’ll itor\S
hared build better homes.
\Laun
ch er.htm
l

4/12/2
007

HAVE UTILITY HOLES PRE-CUT


FOR FASTER INSTALLATION:
BC Framer lets you optimize utility lines through
BCI® Joists when the framing plan is drawn. You and
your HVAC, plumbing and electrical contractors can
get together early, experiment with various line
placements, and find the best ones. This gives you
well laid-out utility lines that install easier and faster.

HAVE FRAMING DELIVERED TO YOUR JOBSITE


READY TO INSTALL:
BC Framer spells out the exact dimensions of all
floor framing pieces accurate to 1/16”. Some Boise
dealers can P.E.T. (precision end-trim) to length
based on exact dimensions, or you can have one end
trimmed and leave the other to be cut at the jobsite.
Either way, your jobs will frame faster.
IT’S FAST AND EASY TO MAKE CHANGES
WITH BC FRAMER:
A designer can quickly adapt the same basic floor
plan to projects with different price points and
options -- an entry-level structure, or one that meets
higher load requirements of stone or tile floors in
upscale projects. Bumping a wall out 2’ or adding
a bedroom was never easier.

MARK PIECES BY LOCATION


IN THE STRUCTURE:
Framing members can be marked and coded to
the placement plan for easy reference. If your
dealer has a SawTek system, the inkjet printer
handles it automatically. This data helps crews
frame fast and right.

BC FRAMER IS FURNISHED BY YOUR DEALER


WHEN YOU BUILD WITH BOISE:
The BC Framer design process is used by your dealer
to help you build more profitability and to be more
competitive in your marketplace. This valuable service
is provided by your Boise dealer free of charge when
you build with Boise Engineered Wood Products.

To learn more, visit bc.com/ewp or call 800-232-0788


to discuss how Boise’s BC Framer and BC Calc work
together to help you build better and more profitably.

© 2007 Boise Building Solutions Manufacturing, L.L.C.


BOISE, BC FRAMER and BC CALC are registered trademarks of Boise Cascade, L.L.C.

You might also like