You are on page 1of 67

EMBANKMENT DAMS

TYPES OF EARTHEN EMBANKMENT DAMS

1. Homogeneous dam with toe drain

2. Homogeneous dam with horizontal blanket

3. Homogeneous dam with chimney drain and horizontal blanket

4. Zoned dam with central vertical core and toe drain

5. Zoned dam with central vertical core, chimney filter and horizontal
blanket

6. Zoned dam with inclined core, chimney filter and horizontal blanket
TYPES OF ROCKFILL EMBANKMENT DAMS

1. Central vertical clay core

2. Inclined clay core with drains

3. Decked with asphalt or concrete membrane on upstream face with drains


CAUSES OF FAILURE OF EARTH DAMS

1. Hydraulic failures

2. Seepage failures, and

3. Structural failures
HYDRAULIC FAILURES
SEEPAGE FAILURES
STRUCTURAL FAILURES
RECOMMENDATIONS FOR SIZE OF AN EARTH DAM

(A) FREE BOARD

Wave height by Moliter equation

h w  0.032 VF  0.763  0.271F 1 / 4 for F  32 km


h w  0.032 VF for F  32 km
hw (m); Fetch F (km); Wind velocity V (km/hr)

Free board = 1.5 hw

US BUREAU OF RECLAMATION (USBR) Recommendations

Spillway height dam height Min. free board above MWL

Uncontrolled Any height 2-3 m


Controlled < 60 m 2.5 m above top of gate
Controlled > 60 m 3.0 m above top of gate
(a) Free Board

Saville method (IS 10635: 1993)

Normal free board = Free board above the FRL

Minimum free board = Free board above the MWL


Procedure for Computation of Normal Free Board

(1) Effective Fetch

Draw a line AB with A on dam axis and B on FRL so as to cover the maximum
reservoir water spread area within 450 on either side of line AB

Draw 7 radials at 60 interval on each side of AB

Effective Fetch
 X cos 
Fe 
 cos 
(2) Compute wind velocity on water

Read wind velocity on land from IS 875 for 50 year return period for the region

Wind velocity on water = αv × wind velocity on land

Fe αv
1 1.1
2 1.16
4 1.24
6 1.27
8 1.30
>10 1.31
(3) Compute wave height

0.47
gh w  gFe 
 0. 0026 2 
V2 V 
and wave period T
0.25
gT  gF 
 0.45 2e 
V V 
wave length
L  1.56T 2
hw (m); Fe (m); V (m/s); T (s); L(m)

Design wave height, hd = 1.67 hw


(4) Compute wave run up on smooth surface
Wave run up on the rough surface

Type of Pitching Roughness coefficient

Cement concrete surface 1.0


Flexible brick pitching 0.8
Hand place riprap
Laid flat 0.75
Laid with projection 0.60
Dumped riprap 0.50

Run up on rough surface = Run up on smooth surface × roughness coefficient

If corrected R < hd; adopt R = hd


(5) Wind set up computation

V2 F
Wind set up S 
62000D

S (m); V (km/h); F(km); Average depth of along fetch length, D(m)

Free board = R+S

If free board < 2 m; adopt 2m

Top of dam = FRL+Normal free board

Minimum Free Board at MWL

• Calculate effective fetch at MWL


• Consider ½ to 2/3 wind velocity on land for computation of hw
• Take hd = 1.27 hw
• Minimum free board => 1.5 m
(B) TOP WIDTH

A> 3m

A =H/3+3 for low dams 15-20 m height (USBR)

USBR for H  150 m


A  3.6 H1/3
Japanese Code
A  3.6 H 1 / 3  3
A( m); H (m)

For H  30 m
A  0.55 H1/2  0.2 H
For H  30 m
A  1.65H  1.5
1/3
Use SI unit
(C) Upstream and D/s Slopes (Terzaghi’s Side slopes)

Types of material U/s (H:V) D/s (H:V)

Homogeneous well graded 2.5:1 2:1


Homogeneous coarse silt 3:1 2.5:1
Homogeneous silt clay
(a) H < 15 m 2.5:1 2:1
(b) H > 15 m 3:1 2.5:1
Sand or sand and gravel with a central clay core 3:1 2.5:1
Sand or sand and gravel with a RC diagragm 2.5:1 2:1
SEEPAGE CONTROL MEASURES IN EMBANKMENT DAM
AND FOUNDATION

Basic requirements for the design of an earth or rockfill dam is to ensure safety
against internal erosion, piping and excessive pore pressure in the dam.

The seepage of reservoir water through the body of the dam or at the
interfaces of the dam with the foundation or abutment creates two main
problems, apart from causing excessive water loss and thereby reducing
usable storage of reservoir:

1. Seepage force causing excessive water loss

2. Piping
SEEPAGE CONTROL AND DRAINAGE FEATURES - ADOPTED FOR
THE EMBANKMENT DAM

 Impervious core
 Inclined/vertical filter with horizontal filter
 Network of inner longitudinal drain and cross drains
 Horizontal filter
 Transition zones/transition filters
 Intermediate filters
 Rock toe
 Toe drain
 Relief wells
 Upstream Impervious Blanket
Section of homogenous dam showing seepage control features
Section of zoned dam showing seepage control features
Inclined/Vertical Filter
Inclined or vertical filter abutting downstream face of either impervious core or
downstream transition zone is provided to collect seepage emerging out of
core/transition zone and thereby keeping the downstream shell relatively dry.

Horizontal Filter
It collects the seepage from the inclined/vertical filter or from the body of the dam,
in the absence of inclined/vertical filter, and carries it to toe drain.

The horizontal filter may extend from 25 to 100% of the distance from d/s toe to
the centre line of the dam.

Graded filter be provided.

Inner Longitudinal and Inner Cross Drains


When the filter material is not available in the required quantity at reasonable cost,
a network of inner longitudinal and inner cross drains is preferred to
inclined/vertical filters and horizontal filters.
Transition Zones and Transition Filters

Transition zones/filters in earth and rockfill dams in the upstream and


downstream shells are necessary, when the specified gradation criterion is not
satisfied between two adjacent zones. They help to minimize failure by internal
piping, cracking, etc, that may develop in the core or by migration of fines from
the core material.

The filter material used for drainage system shall satisfy the following criteria:

a) Filter materials shall be more pervious than the base materials;


b) Filter materials shall be of such gradation that particles of base material do
not totally migrate through to clog the voids in filter material; and
c) Filter material should help in formation of natural graded layers in the zone
of base soil adjacent to the filter by readjustment of particles.
Horizontal Filters at Intermediate Levels

Horizontal filter layers at intermediate levels are sometimes provided in


upstream and downstream shells, to reduce pore pressures during
construction and sudden drawdown condition and also after prolonged
rainfall.

These filter layers should not be connected with inclined or vertical filters. A
minimum space of 2.0 m or more, should be kept between the face of
inclined/vertical filter and downstream intermediate filter
Horizontal intermediate filters
Rock Toe

The principal function of the rock toe is to provide drainage. It also protects the
lower part of the downstream slope of an earth dam from tail water erosion.
The top level of the rock toe/pitching should be kept above the maximum tail
water level (TWL). In the reach where the ground level at the dam toe is above
the maximum tail water level, only conventional pitching should be adopted.
The top of such pitching should be kept 1.0 m above the top of horizontal filter,
or stripped level, whichever is higher.

Details of rock toe/pitching protection and toe drains are illustrated for various
combination of Tail Water Level (TWL) and stripped Ground Level (SGL).

1. Rock toe when TWL is higher than SGL


2. Pitching when TWL is higher than SGL
3. Rock toe + pitching when TWL is higher than rock toe
4. Pitching when SGL is above TWL
5. Pitching and lined toe drain

Height of rock toe is generally 30 to 40% of the reservoir head and gradation
of material should satisfy the filter criteria.
TWL

Toe Drain

Toe drain is provided at the downstream toe of the earth/rockfill dam to collect
seepage from the horizontal filter or inner cross drains, through the foundation as
well as the rain water falling on the face of the dam.

Closed toe drain


Relief Wells

 To reduce the sub-stratum


uplift pressure d/s of the dam
to avoid boiling of sand and
piping
 Generally spacing of well is
15 m c/c.
 The well screen consists of
GI pipe of 10-15 cm dia.
Slotted with 5 mm to 50 mm
opening and covering about
10% circumference area of
the pipe.
 Filter should meet the filter
criteria discussed earlier.

D85 filter > hole diameter

A typical relief well


(all dimensions are in mm)
Positive Cut-off Trench

The positive cutoff trench consists of an impervious fill placed in a trench formed
by open excavation into an impervious stratum. Grouting of the contact zone of
the fill and the underlying strata constitutes an integral part of the positive cut-off.
Concrete Diaphragm

A single diaphragm or a double diaphragm may also be used for seepage


control.

Complete Partial
Grout Curtain

• Grouted cutoffs are produced by injection, within the zone assigned to the
cutoff, of the voids of the sediments with cement, clay, chemicals, or a
combination of these materials.

• Reduce permeability

• Approximate range of grain sizes that can be normally be grouted by different


types of grout material and mixture.

Types of grout Dia. of the material (mm) that can be grouted


Cement 0.5 - 1.4
Clay, cement, bentonite 0.3 – 0.5
Clay-chemical, bentonite chemical 0.2 - 0.4
Chemical 0.1 – 0.2

• Blanket grouting is done to a depth of 5-10 m through holes at spacing 3-5 m

• Curtain grouting is done to higher depth


Grout curtain

Sheet Pile Cutoffs

Used in silty, sandy and fine gravel foundation, difficult to drive pile in boulders
UPSTREAM IMPERVIOUS BLANKET

Upstream impervious blanket is provided when a positive cut-off is too expensive.


Thickness 0.6 to 3 m. Effective control of exit gradients can generally be achieved
by a blanket length of about 5 times the head, combined with relief wells and
drainage trenches.

(A) Completely impervious blanket


Without blanket
H
Q  kf Zf
xd

With blanket

H
pQ  k f Zf
L  xd

Substituting first Eq. into the second yield

1 p
L xd
p
(B) Blanket for finite permeability (Bennet’s solution)

Discharge through blanket of thickness Zb in elemental distance dx at distance x


h
dqb  k b dx
Zb
Total discharge qf at distance x from upstream blanket
x x h
q f  q f o   dqb  q f o   kb dx
0 0 Zb

x
dq f dq fo d x h 
    kb dx 
dx dx dx  0 Z b 
dq fo
As 0
dx
dq f h
 kb
dx Zb
dh
for the foundation q f  k f Zf
dx
dq f d 2h h
 k f Z f 2  kb
dx dx Zb
d 2h kb h kb
2
  a 2h where a 2 
dx k f Z f Zb k f Z f Zb
d 2h Bennet’s basic differential equation for a blanket of
2
 a 2
h
dx finite permeability and constant thickness

Infinite length of blanket


h  h 0 e ax
At x  0; h  h o ( x=0 at downstream of blanket)
Let the length of equivalent completly impervious is x r , which passes the same discharge
as the infinite blanket, i.e,
dh h
qf  k f Zf  kf Zf
dx xr
dh h
As   ah0eax  ah
dx xr
1 k f Z f Zb
xr  
a kb
Discharge Reduction (1-p)

Without blanket
H
Q  kf Zf
xd

With blanket
H
pQ  k f Zf
xd  xr

xd
p
xd  xr
Finite length of blanket
h  h n eax  e-ax  h n  constant

 ah n eax  e-ax 
dh
dx
as
dh h

dx x r


e2ax
 1
a e  1
xr 2ax

Discharge Reduction (1-p)

Without blanket
H
Q  kf Zf
xd
With blanket
H xd
pQ  k f Zf p
xd  xr xd  xr

e2ax
 1
a e  1
xr 2ax
for finite length

1
as x   xr  same as infinite length
a

e 2ax
 1
Thus for finite length, effective length x r reduces by factor
e 2ax
 1
This factor increase with increase of x, but rate of increase becomes
very slow after x 2 a , therefore for design optimum value of x  2 a

1.2

Z f  20m 0.8
factor

Z b  1.5m 0.6

k f  5  10 3 cm/s
0.4

0.2
5
k b  10 cm/s
0
a  0.008 0 50 100 150 200 250 300

optimum x  176 m x
DESIGN OF FILTER S (IS Code 9429-1999)

The filter material used for drainage system shall satisfy the following criteria:

• Filter materials shall be more pervious than the base materials;


• Filter materials shall be of such gradation that particles of base material
do not totally migrate through to clog the voids in filter material; and
• Filter material should help in formation of natural graded layers in the
zone of base soil adjacent to the filter by readjustment of the particles

Determination of Gradation of base material


Category Percentage finer than 75 micron
1 > 85%
2 40-85%
3 15-39%
4 < 15%

Note: Wherever the base soil in categories 1, 2 and 3 contains particles larger than 4.75
mm, the percentage of particles passing 4.75 mm shall be adjusted to 100 percent.
(a) Minimum D15 (f)

D15 (f) > 5D15 (b) > 0.1mm

(b) Maximum D15 (f)

D15 (f) ≥ 0.2mm

Base soil category Criteria

1 D15 (f) ≤ 9D85 (b)

≥ 0.2mm

2 D15 (f) ≤ 0.7 mm

3 D15 (f) ≤ (40-A)/25*(4D85 (b)-0.7 mm)+0.7 mm

4 D15 (f) ≤ 4D85 (b)

A = is the percent passing the 75 micron sieve after regrading


(c) To minimize segregation, filters should have relatively uniform grading. D90
(f) should be less than 20 mm- to minimize segregation. Limit of D10(f) and
D90(f) are given below

D10 (f) (min) mm D90 (f) max (mm)

< 0.5 20
0.5-1.0 25
1.0-2.0 30
2.0-5.0 40
5.0-10 50
10-50 60
DESIGN OF FILTER

IS Code 9429-1980

(i) D15 of filter/D85 of base <5

(ii) 4 < D15 of filter/D15 of base < 20

(iii) D50 of filter/D50 of base < 25

(iv) Gradation curve of filter should be nearly parallel to the gradation curve of
base material
G = Gravel; W = well graded; P = Poorly graded; C = clay; S = Sand

M = silt; O = Organic; Pt = highly organic soil; H = high compressibility;

I = Medium Compressibility; L= low compressibility


SLOPE PROTECTION
(a) PROTECTION OF UPSTREAM SLOPE

Upstream protection is required against the wave action. The dumped rock
riprap Is preferred type of protection.

DUMPED STONE RIPRAP

Design of the dumped stone riprap is related to the criteria for the selection of
rock size and thickness of the rip rap layer directly to the design wave height.

(a) For embankment slopes 2:1 to 4:1 dumped riprap shall meet the following
criteria:
(b) Riprap shall be well graded from a maximum size at least 1.5 times the
average rock size to 2.5 cm spalls suitable to fill voids.
(c) Rip rap blanket shall extend to at least 2.4 m below the lowest low water.
(d) Filter shall be provided between the riprap and embankment to meet the
following criteria:

No filter is required if embankment material meets the above requirements for


the D85 size.

Thickness of riprap layer should be at least 1.5 times the size of the average
(D50) rock of weight W50.
SOIL-CEMENT SLOPE PROTECTION

• Provided if suitable rock for riprap is unavailable at the site.

• Consisted of a series of approximately horizontal layers of soil-cement


compacted in stair-step fashion up the embankment slope. The layer is
usually 2 to 3 m wide, compacted 15 cm vertical thickness.

• The most efficient construction 100 % of the soil should pass the 50 mm
sieve, at least 55% should pass the 4.75 mm sieve and between 5 and 35 %
should pass the 75 micron sieve.

• The cement content varies from about 7 to 15 % by volume of soil-cement.


(b) PROTECTION OF DOWNSTREAM SLOPE

 Needed against erosion by rain-water and sometimes by wind also. If d/s


slope is rock – no protection required.

 Turfing is provided.

 Horizontal drain be provided at suitable interval and be joined with vertical


drain
Measured pore pressure in Alcova dam (USBR, Design of small dams)