IED:-
IED stands for Industrial Engineering Division. Its functions are as follows:
•to handle customer (main function)
•to calculate the total cost required for performing the job
•to give work-order of the job to PCD
•to estimate the strength of material
•to select the material which possesses the required property (if necessary)
If the party does not select any material then IED estimates the required strength of the
material according to its purpose and finally selects the material with required strength
and property.
After estimating the total cost for the job, IED offers a price to the party. If the party
agrees to it, then the party places a work-order to the IED. For a govt. institute/factory,
the total cost can be paid after finishing the job. But for a non-govt. institute/factory, half
of the total cost should be paid instantly. Then IED prepares a job file and gives a job
number. Lastly IED hands over the quotation form and work-order to PCD by a job file.
Page-15
IS:-
IS stands for Inspection Section. The duty of inspection section is to measure the
dimensions of the job and comparing it with the sample or drawing. If the size of the job
becomes alright after matching then it should be sent in heat treatment and protective
coating section and when the job is finally prepared for delivery then it should be further
sent to inspection section. IS then further measures the dimensions of the job and if it
satisfies the required size then it should be handed over to PCD.