You are on page 1of 2

SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - August 2004)

SAIC NUMBER DATE APPROVED QR NUMBER


SAUDI ARAMCO INSPECTION CHECKLIST
Ceramic Wall and Floor Tiles Installation and Final
SAIC-M-1044 18-May-05 CIVIL-
Inspection
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?

SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

A Installation Inspection

Cover surfaces with tile adhesive uniformly without bare spots, with
SAES-M-100
A1 sufficient adhesive to insure a minimum wet film thickness of 1/32 inch
Sec. 803
between tile and backing. (ANSI A108.1A-4.2.1.3.1).

When a bond coat of latex-Portland cement mortar is used, the tile shall SAES-M-100
A2
not be soaked prior to installation. (ANSI A108.1A-4.1a.6.2.2) Sec. 803

Mixing and installation of grouting and adhesive materials shall comply SAES-M-100
A3
with the manufacturer's instructions. (ANSI A108.5A-4.3.1.1) Sec. 803

Install tile with adhesive while maintaining accurate joint alignment and SAES-M-100
A4
spacings. (ANSI A108.4A-4.2.1.4) Sec. 803

All tile work shall extend into recesses and under or behind equipment
and fixtures to form a complete covering without interruptions; Lugs on SAES-M-100
A5
tile determine the joint width between tile. Spacers shall be used for tile Sec. 803
without lugs. (ANSI A108.1A-4.1a.6.2.6)

Alignments shall be provided at the joints on floor, base, walls and trim;
SAES-M-100
A6 Bring all surfaces to a true plane at the proper position or elevation.
Sec. 803
(ANSI A108.1A-4.1a.6.2.6)

Joints shall be filled with grout to a smooth, even surface, have a uniform SAES-M-100
A7
color and smooth even surface. (ANSI A108.5A-4.3.4.3) Sec. 803

Movement joints shall be provided in tiles as required over all


construction, control and expansion joints in the backing and where
SAES-M-100
A8 backing materials change or change direction, including terminations of
Sec. 803
tilework where it abuts restraining or dissimilar surfaces.
(ANSI A108.1A-3.4.1)

Plastic or ceramic spacers shall be provided to give correct vertical and


SAES-M-100
A9 horizontal joint lines, especially to concave and convex corner tiles.
Sec. 803
(ANSI A108.1A-4.1a.6.2.6)

B Final Inspection

Upon completion of setting and grouting, the ceramic tiles shall be SAES-M-100
B1
cleaned per the manufacturer's recommended procedure. Sec. 803

SAES-M-100
B2 All non-latex/polymer modified tile installations shall be damp cured.
Sec. 803

Page 1 of 2
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - August 2004)
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Ceramic Wall and Floor Tiles Installation and Final
SAIC-M-1044 18-May-05 Civil
Inspection
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

REMARKS:

REFERENCE DOCUMENTS:
1- SAES-M-100 -- Saudi Aramco Building Code, 29 January 2003

Contractor / Third-Party Saudi Aramco


Construction Representative* PMT Representative
Work is Complete and Ready for Inspection: T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Inspector PID Representative


Performed Inspection Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Supervisor Proponent and Others


Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified
Name, Organization,
Name, Sign and Date:
Initials and Date:

*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED