SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - August 2004)

SAIC NUMBER DATE APPROVED QR NUMBER


SAUDI ARAMCO INSPECTION CHECKLIST
Glass & Glazing Installation & Final Inspection SAIC-M-1060 18-May-05 CIVIL-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?

SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

A Installation Inspection

Lock Strip gaskets shall be adequate to prevent crushing during insertion


SAES-M-100
A1 and resist permanent deformation when loaded.
Sec. D
(1997 UBC, Sec 2404.4.1 & .2)
Frames for receiving glazing shall be within specified tolerances and not SAES-M-100
A2
out-of-square or out-of-plane. (1997 UBC, Sec 2404.1) Sec. D

Surfaces of frames shall have a non-corrosive finish or be protected with SAES-M-100


A3
a non-corrosive coating. (1997 UBC, Sec 2404.4.1 & .2) Sec. D

No sharp edges on corners shall be permitted unless protection is SAES-M-100


A4
provided. (1997 UBC, Sec 2404.4.1 & .2) Sec. D

Glazing shall be installed in a clean, dry, warm environment (above SAES-M-100


A5
210C). (1997 UBC, Sec 2404.4.1 & .2) Sec. D
Where a gap exists between the gasket and window frame a
SAES-M-100
A6 supplementary wet elastomeric joint sealant may be used with approval
Sec. D
from Saudi Aramco. (1997 UBC, Sec 2404.4.1 & .2)

B Final Inspection

Glass surfaces shall be cleaned soon after installation and regularly if


SAES-M-100
B1 surrounding construction leaves deposits on the glass.
Sec. D
(1997 UBC, Sec 2404.4.1 & .2)
Proper flashing and sealing shall be used to prevent water entering
SAES-M-100
B2 around the glass or window frame and the adjacent construction
Sec. D
material. (1997 UBC, Sec 2404.4.1 & .2)

REMARKS:

REFERENCE DOCUMENTS:
1- SAES-M-100 -- Saudi Aramco Building Code, 29 January 2003
2- 1997 UBC -- Uniform Building Code, 1 January 1997

Contractor / Third-Party Saudi Aramco


Construction Representative* PMT Representative
Work is Complete and Ready for Inspection: T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Inspector PID Representative


Performed Inspection Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Supervisor Proponent and Others


Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified
Name, Organization,
Name, Sign and Date:
Initials and Date:
*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED

Page 1 of 1