SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - August 2004)

SAIC NUMBER DATE APPROVED QR NUMBER


SAUDI ARAMCO INSPECTION CHECKLIST
Inspection Of Structural Alignment During Erection SAIC-M-1070 18-May-05 CIVIL-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?

SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

Vertical Tolerances - For straight compression structural members, the


variation in straightness shall be equal to or less than 1/1000 of the axial
12-SAMSS-008
A1 length between points that are laterally supported.
Sec. I
(AISC, Code of Standard Practice for Steel Buildings and Bridges, Para.
6.4.2 & PIP STS05130, Para. 6.2.1)

The structure shall be plumbed, leveled, and braced before any final 12-SAMSS-008
A2
bolted or welded connections are made. (PIP STS05130, Para. 6.3.2) Sec. I

Leveling plates, leveling nuts and washers and loose baseplates and
bearing plates are set in its correct alignment and elevation. The
12-SAMSS-008
A3 variation in elevation relative to the established grade is equal to or less
Sec. I
than plus or minus 1/8" (3mm). (AISC Code of Standard Practice for
Steel Buildings and Bridges, Para. 7.6, and PIP STS05130, Para. 6.4.1)

Columns or structures with attached base plates are temporarily


supported on leveling nuts, shims and other leveling devices and 12-SAMSS-008
A4
plumbed before grouting. (AISC Code of Standard Practice for Steel Sec. I
Buildings and Bridges, Para. 7.7 & PIP STS05130, Para. 6.2.1)

All column splices shall be field-bolted and conform to AISC Detailing for 12-SAMSS-007
A5
Steel Construction, Appendix D. Para. 6.2.5.20

REMARKS:
1. All survey and dimensional reports shall be recorded in the Structural Steel Alignment Report, SATR-M-2002 or equivalent.

REFERENCE DOCUMENTS:
1- 12-SAMSS-008 -- Erection of Structural and Miscellaneous Steel, 28 January 2004

Contractor / Third-Party Saudi Aramco


Construction Representative* PMT Representative
Work is Complete and Ready for Inspection: T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Inspector PID Representative


Performed Inspection Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Supervisor Proponent and Others


Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified
Name, Organization,
Name, Sign and Date:
Initials and Date:

*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED

Page 1 of 1