EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.
LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.
SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
Density Test shall be made with a frequency of not less than one test for
09-SAMSS-097
A1 each 115m3 of concrete on each day, or 1 test each day for each class of
Sec. III.B
concrete delivered. (ASTM C94-04, Sec.16.4)
Slump Test shall be made with a frequency of not less than one test for
09-SAMSS-097
A2 each 115m3 of concrete on each day, or 1 test each day for each class of
Sec. III.B
concrete delivered. (ASTM C94-04, Sec.16.4)
When the specified slump is listed as a single value, the following slump
limits shall apply:
a) For specified slumps of 50mm and less, the tolerance shall be +/-
15mm; 09-SAMSS-097
A4
a) For specified slumps of >50mm to 100mm, the tolerance shall be +/- Sec. III.B
25mm;
b) For specified slumps of more than 100mm, the tolerance shall be +/-
40mm. ASTM C-94, Sec. 6.1.2
No aluminum parts shall be placed in contact with concrete during mixing 09-SAMSS-097
A5
or delivery. Sec. 11
Temperature test shall be made with a frequency of not less than one
09-SAMSS-097
A6 test for every 115m3 of concrete on each day, or 1 test each day for each
Sec. III.B
class of concrete delivered. (ASTM C94-04, Sec. 16.5)
Air content test (if required by the project specifications) shall be made
with a frequency of not less than one test for every 115m3 of concrete on 09-SAMSS-097
A8
each day, or 1 test for each class of concrete delivered. (ASTM C94-04, Sec. III.B
Sec. 16.5)
Page 1 of 2
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - August 2004)
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Fresh Concrete Sampling & Testing Inspection @ The Batch
SAIC-Q-1004 18-May-05 Civil
Plants
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
Strength test samples shall be made in a frequency of not less than one
09-SAMSS-097
A10 set for every 115 cubic meters of concrete on each day, for each class of
Sec. III.B
concrete delivered. (ASTM C94-04, Sec. 16.5)
Slump, air content (when required by the specifications), and
temperature tests shall be made at the time of placement at the option of
inspector as often as necessary for control checks. ASTM C 94-04,Sec
16.4
09-SAMSS-097
A11 Note: It is not the intention to give the inspector to right to require testing
Sec. III.B
for every truckload. Rather, additional testing shall be requested only if
there are indications that a concrete load was tempered (water was
added while concrete was in transit, or when there are indications that
the mix is exhibiting rapid drying).
The blades of the concrete delivery trucks shall not exhibit excessive 09-SAMSS-097
A15
wear that might affect the mixer performance. (ASTM C94-04, Sec.10.3) Sec. III.B
REMARKS:
REFERENCE DOCUMENTS:
1- 09-SAMSS-097 -- Ready Mixed Portland Cement Concrete, 31 August 2002
Page 2 of 2