SERVICES OFFERED QUALIFICATIONS SCHEDULE OF PAYMENT

201 PRE-DESIGN 1.       ECONOMIC FEASIBILITY


SERVICES Arch.
STUDIES
2.       PROJECT FINANCING Arch.
3.       ARCH’L PROGRAMMING Arch.
4.       SITE SELECTION AND Arch.
ANALYSIS
5.       SITE UTILIZATION AND Arch.
LAND USE STUDIES
6.       SPACE MANAGEMENT Arch.
STUDIES
7.       PROMOTIONAL SERVICES Arch.
202 DESIGN SERVICES 1.       SCHEMATIC PHASE 5% UPON SIGNING
Arch. 10%
SCHEMATIC PHASE

2.       DESIGN DEV'T PHASE Arch. 35%


3.       CONTRACT DOCUMENT Arch.
PHASE 85%
4.       CONSTRUCTION PHASE 15% RETENTION FEE
a. 10%
CIVIL CODE (3 MOS.)
b.
5% CONSTRUCTION
PHASE (SUPERVISION)

Arch.

203 SPECIALIZED Environmental


ALLIED SERVICES 1.       PHYSICAL PLANNING Planner
SITE DEV'T PLANNING
SUBD. PLANNING (URBAN)
SUBD. PLANNING (RURAL)
2.       INTERIOR Interior Designer
30 % PRELIMINARY
DESIGN/DECORATION Landscape DESIGN
3.       LANDSCAPE DESIGN Architect 5% Proposal Phase
50% Preliminary Dwgs
4.       ACOUSTIC, Electronics and 50%
COMMUNICATION AND Communication FINAL DESIGN
ELECTRONIC ENGR'G Engineer 20% COMPLETION
5.       COMPREHENSIVE Environmental OF THE PROJECT
PLANNING Planner
PHYSICAL (PLANNING
SERVICES)
ECONOMIC
SOCIO-CULTURAL
TRANSPORTATION & UTILITIES
LEGAL & ADMINISTRATIVE
204 CONSTRUCTION 1.       FULL-TIME SUPERVISION College Grad. (FOR CONTRACTOR)
SERVICES (Arch/CE/ME/EE/ 20-50% DOWNPAYMENT
Sanitary Engr..) PROGRESS BILLING
Design Experience (Upon partial
completion)
2.       CONSTRUCTION Licensed 65% Cert. Of Non-
Financial Obligation
MANAGEMENT Professional with
98% Substantial
Management Skills
Completion (for
inspection, Cert. Of
Completion)
GUARANTEE BOND
30% (retention to be
held for 1yr. Upon
turnover)

205 POST-CONST'N 1.       BUILDING AND EQUIPMENT


SERVICES MAINTENANCE
2.       BUILDING AND GROUND
ADMINISTRATION
3.       POST-CONSTRUCTION
EVALUATION
206 COMPREHENSIVE 1.       COMPREHENSIVE DOC 01-
ARCH'L SERVICES 05
2.       PROJECT MANAGEMENT
207 DESIGN-BUILD
SERVICES 1.       BY ADMINISTRATION
2.       BY GUARANTEED
MAXIMUM COST
METHOD OF COMPENSATION ADDT'L INFO

MDPE (MULTIPLE OF DIRECT


PERSONAL EXPENSE)

SIMPLE - 6% of PROJ. COST METHODS OF


MODERATE - 7% COMPENSATION
COMPLEX - 8% PERCENTAGE OF CONST'N
RESIDENCES - 10% COST - based on minimum
MONUMENTAL BLDGS. - 12% basic fee
REPETETIVE CONST. MDPE - none creative “no-
1st Structure - MBF construction” projects.
2nd Structure - 80% of MBF LUMP SUM + FIXED FEE -
3rd Structure - 60% of MBF convert the cost to the
4th Structure - 40% of MBF nearest whole number
HOUSING PROJECTS PROFESSIONAL FEE +
1ST. Unit - MBF COSTS COMBINATION -
2-10 Units - 60% of MBF combination of 1-4
11 Units & up - 30% of MBF PER DIEM
FURNITURE DESIGN - 15% of TURN KEY
PROJ. COST - payments received after
ALTERATIONS & ADDITIONS - all the works has been
150% of MBF (From groups 1 done
– 5)
CONSULTATION - Php 200/hr.
appearance w/in 100km.
radius of office - Php
50/appearance
EXTRA ARCH'L FEES:
Php 5000 / 1ST50 ha. (Type a. Architect as a consultant
I) - 5 % of Project Cost
Php 3000 / ha. (URBAN) b. If the land is rugged with
Php 2000 / ha. (RURAL) steep terrain - 30 %
Increase
c. For detailed Engineering
15% OF PROJECT COST
drawings and specifications
- 4 % “Cost of
development”
10 – 15% OF PROJECT COST
1 - 1.5% 0F Project Const'nMILESTONES OF CONS'T
Cost ESTAB. OF REFERENCES
MDPE EXCAVATION
REINFORCEMENTS
CONCRETING
1.5 - 3% ESTIMATED CONST'N FINISHING
COST
OTHERS:
AWARD FEE PROVISION
PRICE ADJUSTMENT PROVISION
OPERATING & SUPPORT COST
FACTOR
FIRM FIXED PRICE
CPIF/CPAF
COST + FIXED FEE

SALARY BASIS
4-6% OF GROSS RENTALS

2-5% OF PROJECT COST


7% OF PROJECT CONST'N CONTRACTOR
COST - holds the money
- purchase the materials
10% OF PROJECT CONST'T
- payment for laborers
COST
- profit motivate
BUILDER
- no responsibilities in
holding the money
- canvass and identify
suppliers
- compute the payroll &
submit to the owner
- completion motivated