Date - 2nd May 2011

Florentine Villa Project


Pune.
APPROXIMATE QUOTATION
INTERIOR WORKS AT FLORENTINE VILLA, SOPAN BAUG, PUNE.
COSTING FOR ONE VILLA
SR.NO. PARTICULARS(ITEMS) QTY UNITS RATE AMT.

A MOSQUITO MESH WORKS :


1 Kitchen - 4' 0" x 4' 0" = 2 nos 32 SFT
Living - 4' 0" x 5' 0" = 1 no 20 SFT
Guest Bedroom - 4' 0" x 4'0" = 1 no 16 SFT
Toilets - 2' 0" x 3'0" = 3 nos 18 SFT
Master Bedroom - 4' 0" x 4' 0" = 1 no 16 SFT
Children Bedroom - 4' 0" x 5' 0" = 1 no 20 SFT
NET VALUE OF MOSQUITO MESH WORK. 122 SFT 240 29,280.00

B LOUVERED WINDOWS FOR BATHROOM : 18 SFT 500 9,000.00

C SHOWER SLIDE PARTITION WORKS : 3 NOS 21500 64,500.00

D WOOD LINNING TO WINDOW WORKS : 100 RFT 350 35,000.00

E KITCHEN TOP CHANGING WORKS : 19 RFT 1100 20,900.00

F DECORATIVE JALI NEAR ENTRANCE : 32 SFT 250 8,000.00

G STAIRCASE REFINISHING WORKS : 10,000.00

H STAIRCASE RAILING IN SS & GLASS : 60 RFT 900 54,000.00

I GAZIBO WORKS : 49 SFT 950 46,550.00

J WATER BODY IN THE GARDEN WORKS : 15,000.00

K PLANTATION WITH GRASS MOUND WORKS : 15,000.00

L LIGHTS NEAR DINING WORKS : 7,500.00

M PAINTING OF INTERNAL WALLS IN 5000 SFT 16 80,000.00


LUSTRE :

N PAINTING OF EXTERNAL WALLS IN ICI 4000 SFT 12 48,000.00


DULEX WEATHER SHIELD MAX WORKS :

O STAIRCASE WINDOW IN STAIN GLASS : 35,000.00


P RAILING TO TERRACE IN SS & GLASS 42 RFT 1900 79,800.00
WORKS :

Q MASTER BATHROOM WITH BIG MIRROR 5,000.00


WORKS :

R THEME PLANTATION ON TERRACES : 30,000.00

S COMPOUND WALL FENCING SHEET TO BE 66 FT 210 13,860.00


CHANGED:

T DUCT COVERING TO BE REDESIGNED : 100 SFT 400 40,000.00

U LIGHT ON TERRACE WALLS: 8,000.00

V DUCT MODIFICATION TO CHAMBER: 15,000.00

W PROVISION OF AC IN ALL ROOMS: 5 NOS 46500 232,500.00


[ This includes Copper piping + installation + cost
of AC unit]

X EXTRA KITCHEN PLATFORM: 10,000.00

Y ROLLING SHUTTER GATE TO PARKING: 76.5 SFT 1100 84,150.00

Approx cost
Z SENSOR SYSTEM FOR WATER 10,000.00
REQUIREMENTS:

A1 SOLAR WATER HEATING SYSTEM: 60,000.00

B1 VIDEO DOOR PHONE FOR ACCESS 19,000.00


CONTROL AT MAIN GATE :

C1 POLISHING WORKS OF DOORS & 100,000.00


WINDOWS:

D1 GENSET BACK UP: 125,000.00

E1 MOTION SENSORS & GAS LEAKS 10,000.00


DETECTORS:

F1 POLISHING OF ITALIAN FLOORING TO 40,000.00


MIRROR FINISH:

G1 ELECTRICAL WORKS: 50,000.00


NET VALUE OF INTERIOR WORKS 1,410,040.00

Vat Tax @ (AS APPLICABLE)


Service tax @ (AS APPLICABLE)

Notes –
 Quotation is subjected material & selections.
 All the Drawing and internal layout shall be duly approved before commercement of work.

Terms & Conditions –


 The above prices are without the addition of taxes and taxes will be levied as applicable.
 One the work done as per the approved drawing and any change thereafter shall
be charged Extra.
 Work Shall be done at the Site itself.
 Incase of work carried out elsewhere shall attract loading and unloading
charges at actuals.
 Any Defects shall be attended to till Three months Free of charge. Any problem there
after shall be charged as per the nature of the work.
 The electricity & water should be arrangement on site all the working hours Free of cost.
 Minium 10-12 working hour per day including Sunday, Banking holiday.
 The project will be comleted within 8-10 Weeks from the date of work commenced.
Schedule of Payments -
 40% Advance for mobilisation of work.
 30% AFTER 15 DAYS
 25% AFTER ANOTHER 15 DAYS
 5% AFTER completion of the said work

In case you need any further clarifications please feel free to contact us.
We now look forward to receive your valued order at the earliest.
Thanking you and assuring you of our best & quality services & attention at all times.

Yours faithfully,

Paresh Billimoria
(Endeavour Innovations)