Fast track - Ultimate Screeding Systems combined with Ardit 55
lay floorcoverings after 24 hours lay floorcoverings after 4 hours when applied to a fresh
Ardurapid 35 Screed/Screed Mix
Ardurapid 35
Mix Proportions
MIX ARDURAPID 35 FINE AGGREGATE WATER
100kg clean, sharp sand, Total water content
1:4 25kg
Table 1 of BS 8204-1 (including water contained in the sand)
Optimum 10 litres
1:5 25kg 125kg clean, sharp sand, Maximum 11 litres
Table 1 of BS 8204-1 per 25kg Ardurapid 35 cement
Where the screed thickness is greater than 50mm a fine concrete mix can be used by partially replacing the sand with 10mm single sized aggregate (table 3 of BS 882). The optimum proportions of cement to sand,
or sand to aggregate should be determined within the limits given in the table above, in order to obtain good workability and achieve the required soundness category with the BRE screed test.
Technical Data Compressive Strength (DIN 1164) Tensile Bending Strength (DIN 1164)
Weight of fresh mortar approx. 2kg/litre Mixing ratio by weight 1:4 1:5 Mixing ratio by weight 1:4 1:5
Working time at 20°C approx. 60 minutes After 1 day 25.0 N/mm2 23.0 N/mm2 After 1 day 5.0 N/mm2 4.0 N/mm2
Initial Set (Vicat) 20°C approx. 100 minutes After 3 days 32.0 N/mm2 28.0 N/mm2 After 3 days 6.5 N/mm2 5.0 N/mm2
Final Set (Vicat) 20°C approx. 160 minutes After 28 days 40.0 N/mm2 32.0 N/mm2 After 28 days 8.0 N/mm2 6.0 N/mm2
Coverage BRE Screed Test Note: Due to the specific properties and composition
Approximately 0.37kg Ardurapid 35 cement/sq. metre for (For testing soundness of bonded and unbonded screeds). of Ardurapid 35 Screed the moisture content cannot be
each millimetre of screed thickness using a 1:4 mix. The installed Ardurapid 35 screed can be tested after 6 to 24 determined with either electrical conductivity of hygrometer
Approximately 0.31kg Ardurapid 35 cement/sq. metre for hours using the BRE screed tester. The depth of indentation methods.
each millimetre of screed thickness using a 1:5 mix. For of a correctly mixed and compacted screed should comply
slurry bonding allow an extra 2 x 25kg Ardurapid 35 cement with the requirements of the floor finish and category of use. British Standard Codes of Practice
and 3 x 5kg of bonding agent (either Ardion 51 or Ardion The following British Standard Codes of Practice can be
100) per 100 sq. metres. Moisture Content referred to for advice on screeding:-
2-3% by weight after 24 hours in an unbonded screed on a BS 8204-1 : In-Situ Floorings - Bases and Screeds
Drying Time damp-proof membrane. This can only be determined using BS 5385 : Part 3 : Appendix C. Ceramic Floor Tiling & Mosaics
24 hours suitable to receive vinyl and ceramic tiles to the Carbide Method which will detect 1-2% by weight BS 8000 : Part 9 : Code of Practice for cement/sand floor
bonded, unbonded and floating screeds. additional bound water. screeds and concrete floor toppings (Workmanship on
building sites).
Coverage Note: Due to the specific properties and composition of British Standard Costs of Practice
Approximately 1.85kg/m2/mm. ie. approximately 0.5m2 at Ardurapid 35 Screed the moisture content cannot be The following British Standard Codes of Practice can
25mm thick per bag. determined with either electrical conductivity of hygrometer be referred to for advice on screeding:-
methods. BS 8204-1 : In-situ Floorings - Bases and Screeds
Moisture Content BS 5385 : Part 3 : Appendix C. Ceramic Floor Tiling & Mosaics
2-3% by weight after 24 hours in an unbonded screed on a BS 8000 : Part 9. Code of Practice for cement/sand floor
damp proof membrane. This can only be determined using screeds and concrete floor toppings (Workmanship on
the Carbide Method which will detect 1-2% by weight building sites).
additional bound water.
NOTE: The information supplied in our literature or given by our employees is based upon extensive experience and, together with that supplied by our agents or distributors, is given in good faith
in order to help you. Our Company policy is one of continuous Research and Development; we therefore reserve the right to update this information at any time without prior notice.
We also guarantee the consistent high quality of our products; however, as we have no control over site conditions or the execution of the work, we accept no liability for any loss or damage
which may arise as a result thereof.
EDGE / 6314 / 11 / 03
ARDEX UK LIMITED HOMEFIELD ROAD HAVERHILL SUFFOLK CB9 8QP ENGLAND TEL: +44 (0)1440 714939 FAX: +44 (0)1440 716660
TECHNICAL SERVICES FAX: +44 (0)1440 716640 E-MAIL: technical.services@ardex.co.uk VISIT OUR WEB SITE: www.ardex.co.uk