Professional Documents
Culture Documents
S:
A)
B) C)
PREPARATION
● Before beginning installation of product, make sure all parts are present. Compare parts with package
contents list and diagram above. If any part is missing or damaged, do not attempt to assemble, install or
operate the product. Contact customer service for replacement part.
● Estimated Assembly Time: 30 - 45 minutes
● Tools Required for Assembly (not included): Flathead screwdriver , Phillips screwdriver, pliers, electrical
tape, wire cutters, safety glasses &3, 60 Watt, Candelabra Base Bulbs.
● Helpful Tools (not included): Wire Strippers.
1 OF 6
INSTALLATION INSTRUCTIONS STYLE NUMBER: RLV5303MA
STEP 1: Fig . 1
a. Thread the Stem on the top center of the Socket Assembly
into the Mounting Hole on the center of the Band B. Hand
tighten until snug. Socket should align between Spokes
Band B
( see Fig. 2 ). Stem
Mounting Hole
Socket
Assembly
Fig . 2
Spoke
Socket
Band B
STEP 2:
a. Thread the short nipple end of the Center Stem into the
Mounting Hole on the center of the Band B as shown. Hand Center Stem
tighten until snug.
Band B
Mounting Hole
STEP 3: Fig . 1
a. Locate the center hole on the Band A (Top ring with 9 loops, Fixture Loop
bottom ring with 18 loops and 9 wooden balls) over the top
end of the Center Stem, line up Band A and B as shown in
the Fig. 2 . Secure by threading the Fixture Loop onto the Band A
Center Stem and hand tighten until snug.
Center Stem
Fig . 2 Band A
Top
View
Line up the
s pok es as shown Front
during assembly .
View
Band B
Top View
Socket
Front
View
2 OF 6
INSTALLATION INSTRUCTIONS STYLE NUMBER: RLV5303MA
STEP 4: Fig . 1
a. Locate the Band C(Top ring with 18 loops, bottom ring with
9 loops and 9 wooden balls) over the end of the Stem.
(Refer to Fig . 2 ) Please make sure the Band A, B and C are
lined up correctly as shown in the illustration.
b. Secure the Band C by threading the Finial onto the end of
the Stem. Hand tighten until snug.
Stem
Junction Box
Band C
Finial
Fig . 2
Band A
Top
Line up the
spokes as View
shown during
assembly .
Front
View
Band B
Top
View
Front
View
Band C Top
View
Front
View
STEP 5: Crossbar
a. Secure the Crossbar onto the Outlet Box with Outlet Box
Screws. Tighten until snug .
Outlet Box
Screw
Outlet Box
3 OF 6
INSTALLATION INSTRUCTIONS STYLE NUMBER: RLV5303MA
STEP 6:
* Plier is required on this step.
a . Thread one Hex Nut onto top end of the Nipple .
b . Place one Lock Washer over the top end of the Nipple
and then thread the Nipple into the center lock hole of
the Crossbar . Lock Washer
c . Us ing plier , thread the Hex Nut against the c rossbar Crossbar
Hex Nut
and hand tighten until snug .
d . Thread another Hex Nut onto the bottom end of the
Nipple .
Nipple
Hex Nut
STEP 7 :
a . Adjust the Fixture Chain to your desired length by
removing the links if needed .
* Please note that depends on chain material thickness ,
Nipple
you might be required to use chain pliers to spread links
open . Hex Nut
b . Pull the supply wires through the Fixture Chain alternating
links. And then pull the wires through the following Lock Washer
components in turn:
Canopy Lock Ring, Ceiling Canopy, Canopy Chain Loop, Canopy Chain
Lock Washer , and Nipple . Loop
c . Place Lock Washer over the end of the Nipple and thread
the Canopy Chain Loop onto the end of the Nipple .
d . Using plier , thread the Hex Nut against the Canopy Chain Ceiling
Loop and tighten until snug . Canopy
e . Attach one end of the Fixture Chain onto the Fixture Loop
and attach the another end of the chain onto the Canopy
Chain Loop .
f . Refer to Step 8 - Wire Connections to connect wires. Fixture Chain
g . Push the Ceiling Canopy upward over the Outlet Box .
h . Thread the Canopy Lock Ring onto the Canopy Chain Loop
and tighten until snug to secure the Ceiling Canopy .
Canopy Lock
Ring
Fixture Loop
STEP 8 :
* Use Wire Connectors ( not supplied ) to connect the wires .
WHITE WIRE WHITE OR RIBBED
a . Connect the House Ground Wire to the Fixture Ground
Wire. FROM HOUSE FROM FIXTURE
b . Connect the House White Wire to the Fixture Supply Wire
BLACK( OR RED )WIRE BLACK OR SMOOTH
( White or Ribbed Side ) .
c . Connect the House Black ( or Red ) Wire to the Fixture FROM HOUSE FROM FIXTURE
Supply Wire ( Black or Smooth Side) .
d . Wrap each connection with approved electrical tape and GROUND WIRE GROUND WIRE
carefully stuff all of the connected wires into the Outlet Box . FROM HOUSE FROM FIXTURE
4 OF 6
INSTALLATION INSTRUCTIONS STYLE NUMBER: RLV5303MA
STEP 9:
a. Locate Candle Covers over Sockets as shown. Candle Cover
Socket
STEP 10:
a. Install correct Bulbs referring to fixture markings and/or labels for maximum wattage.
STEP 11 :
a. Align the Spokes in Bands A , B & C as shown in BEAD Fig . 1
STRINGS ALIGNMENT drawing .
Band A
b. Begin with Bead String A by attaching the one end to
the loop directly below one of the three Spokes on the
bottom ring of Band A .
c. Attach the other end of Bead String A to the loop on the
top ring of Band B corresponding with the loop in the
Bead
same position on Band A above . String A
d. Attach one end of Bead String B to the loop on the
bottom ring of Band B corresponding with the loop in
the same position on top ring of Band B .
e. Attach the other end of Bead String B to the loop on the
top of Band C at the Spoke . This point corresponds
with the loop in the same position on bottom ring of
Band B above.
f. Now you should have a continuous line of Bead String
from Band A to Band B to Band C .
g . Repeat this process for the remaining strings noting that Band B
every loop on Band A and C has a Bead String attached
but only every second loop ( Skip one loop ) on Band B
has a Bead String attached .
h . Attach Bead C to every loop on the bottom of ring on
Band C .
i . Bead Strings A & B should hang parallel to the center
tube of the fixture . If they are not parallel , slightly Bead
rotate Band A or C to obtain parallel alignment . String B
Band C
Bead C
Ring B
Sockets are in
between Spokes.
Your installation is completed now. Restore electricity. Keep this sheet for future reference.
5 OF 6
Photograph STYLE NUMBER: RLV5303MA
6 OF 6