! WARNINGS AND CAUTIONS ISSUED 11-2008

WARNING:
● Before beginning the installation, turn off electricity at the circuit breaker box or the main fuse box by
switching off the circuit breaker or removing the fuse.
CAUTIONS:
● These instructions are provided for your safety. It is very important that they are read completely before
the installation of your fixture. We strongly recommend that a professional electrician install the fixture.
● Disconnect fixture from the power source before replacing the bulb(s), making sure the bulb(s) had
sufficient time to cool down. DO NOT subject the lamp to any shock while lit as shattering of lamp may
result.

PREPARATION
● Before beginning installation of product, make sure all parts are present. Compare parts with package
contents list and diagram above. If any part is missing or damaged, do not attempt to assemble, install or
operate the product. Contact customer service for replacement part.
● Estimated Assembly Time: 30 - 45 minutes
● Tools Required for Assembly (not included): Flathead screwdriver , Phillips screwdriver, pliers, electrical
tape, wire cutters, safety glasses &3, 60 Watt, Type -A Medium Base Bulbs.
● Helpful Tools (not included): Wire Strippers.

INSTALLATION INSTRUCTIONS
STEP 1:
a. Thread one end of the Nipple into the Hex Coupling on the Junction Box
bottom center of the Junction Box. Hand tighten until snug.

Hex Coupling

Nipple

STEP 2:
a. Drill proper holes on the Ceiling, which are for placing Wall
Anchors. Wall Anchor
b. Place Wall Anchors into the drilled holes on the Ceiling. Ceiling
Locate the Crossbar onto the Ceiling, match slots onto Crossbar
Wall Anchors. Thread Mounting Screws into Wall Anchors
and tighten until snug to secure the Crossbar.
Mounting
Screw

1 OF 2
INSTALLATION INSTRUCTIONS STYL E NUMBER : TF281 9VBUK

STEP 3:
a. Thread one Hex Nut onto the Bolt and then lift the Frog
Hook with Fixture Chain into the “U” Channel on the Crossbar Hex Nut
Crossbar. Locate the Bolt with Hex Nut through the Frog Hex Nut Bolt
A View Frog
Hook and the holes on the “U” Channel. Thread the rest Hook
Hex Nut onto the Bolt and tighten until snug to secure "U" Channel
them.
b. Refer to step 4 for wire connection instructions. A View
c. Lift the Ceiling Canopy upward, over the Crossbar, attach
onto the ceiling. Using screwdriver, thread Set Screw until Ceiling Canopy
snug to secure the Ceiling Canopy. Set Screw

Fixture Chain

STEP 4: Connector Block


a. To conserve this product all its safety, the length of the Flexible Sleeve
Power Cables coming from the wall or from the Ceiling/Wall
must imperatively delimited to 8 cm, which will make them
being completely covered by the Flexible Sleeve(If they
are shorter, cut the sleeve).
b. Connect the wires coming from the Ceiling/Wall: 8cm
*1) Connect Brown wire to position L in the Connector Lock Screw
Block.
*2) Connect Blue wire to position N in the Connector
Block. Power Cables from the Ceiling/Wall
*3) Connect Green and Yellow wire to position in the
Connector Block.

STEP 5:
a. Screw the Knurled Nut onto the end of the Nipple and adjust
to proper location for rest components.
b. Lift the Shade upward and make the hole on the bottom
Hook
center over the end of the Nipple. Secure by threading the
Finial onto the Nipple. Hand tighten until snug.
c. Locate one ends of Side Chains onto the Hangers inside of
Center Column
the Shade and then locate another ends onto the Hooks on
the side of the Center Column.
Side Chain

Hanger
Nipple
Knurled Nut
STEP 6 :
a. Install correct Bulbs referring to fixture markings and/or
labels for maximum wattage. Shade

Your installation is completed now. Restore electricity. Finial