Prepared By FCM CM Site Director

DAILY REPORT Friday, Feb 04, 2011


OPaL DFCU & AU Project, Dahej Arumoy/Pundarik H J Lee I W Kim H S Choi
1. Daily Manpower Mobilization Status
Previous Cumm. Today Cumulative
Sr.
Description Subcon Remarks
No. Indirect Direct Total Indirect Direct Total Indirect Direct Total

1.1 Soil Investigation 48 810 858 - 48 810 858

1.2 Temporary Facility 8,559 75,299 83,858 9 51 60 8,568 75,350 83,918

ITDC 12,671 71,230 83,901 1 2 3 12,672 71,232 83,904


Piling
1.3 SECL 265 1,740 2,005 - 265 1,740 2,005

Subtotal 12,936 72,970 85,906 1 2 3 12,937 72,972 85,909

ITDC 4,987 25,575 30,562 11 46 57 4,998 25,621 30,619

Taein 3,781 19,966 23,747 - - - 3,781 19,966 23,747

Civil GDC 25,247 91,742 116,989 34 251 285 25,281 91,993 117,274
1.4
VRC 8,677 33,764 42,441 31 91 122 8,708 33,855 42,563

Sandip Nanavati 564 2,919 3,483 21 85 106 585 3,004 3,589

Subtotal 43,256 173,966 217,222 97 473 570 43,353 174,439 217,792

MSK 5,327 25,876 31,203 15 129 144 5,342 26,005 31,347

Building Sandip Nanavati 4,578 31,322 35,900 12 146 158 4,590 31,468 36,058
1.5
GDC 3,828 39,692 43,520 21 194 215 3,849 39,886 43,735

Subtotal 13,733 96,890 110,623 48 469 517 13,781 97,359 111,140

1.6 PC Fabrication ITDC 714 17,142 17,856 - - - 714 17,142 17,856

1.7 PC Erection RCC 4,624 17,269 21,893 - - - 4,624 17,269 21,893

Taein 8,765 45,725 54,490 22 105 127 8,787 45,830 54,617

Metal Craft 7,160 35,453 42,613 27 141 168 7,187 35,594 42,781

Stl. Str. Fabrication Sunsil 3,784 11,705 15,489 15 76 91 3,799 11,781 15,580
1.8
Onshore 7,587 25,474 33,061 21 38 59 7,608 25,512 33,120

IOTEP 5,440 11,886 17,326 37 65 102 5,477 11,951 17,428

Subtotal 32,736 130,243 162,979 122 425 547 32,858 130,668 163,526

1.9 Stl. Str. Painting Heeru Paints 4,022 11,818 15,840 17 46 63 4,039 11,864 15,903

1.10 A/G Piping Painting Heeru Paints 1,206 3,297 4,503 10 24 34 1,216 3,321 4,537

Taein 2,457 7,909 10,366 5 17 22 2,462 7,926 10,388

Onshore 3,036 10,601 13,637 12 64 76 3,048 10,665 13,713


Stl. Str. Erection
1.11 Metal Craft 4,246 19,695 23,941 20 171 191 4,266 19,866 24,132

RCC 492 1,662 2,154 10 28 38 502 1,690 2,192

Subtotal 10,231 39,867 50,098 47 280 327 10,278 40,147 50,425

Durha Const. Pvt. Ltd. 6,533 27,506 34,039 - - - 6,533 27,506 34,039

RCC 4,895 15,884 20,779 20 53 73 4,915 15,937 20,852

U/G Piping Metal Craft 3,395 10,614 14,009 11 39 50 3,406 10,653 14,059
1.12
VRC 3,012 1,730 4,742 15 7 22 3,027 1,737 4,764

Tolani 417 888 1,305 3 10 13 420 898 1,318

Subtotal 18,252 56,622 74,874 49 109 158 18,301 56,731 75,032

Metal Craft 2,517 17,826 20,343 15 136 151 2,532 17,962 20,494

A/G Piping Fabrication Onshore 3,745 24,400 28,145 30 188 218 3,775 24,588 28,363
1.13
RCC 1,846 7,942 9,788 25 123 148 1,871 8,065 9,936

Subtotal 8,108 50,168 58,276 70 447 517 8,178 50,615 58,793

IOTEP 5,092 20,539 25,631 54 198 252 5,146 20,737 25,883

Onshore 1,142 7,709 8,851 18 106 124 1,160 7,815 8,975


A/G Piping Erection
1.14 RCC 1,118 3,149 4,267 11 26 37 1,129 3,175 4,304

Metal Craft 104 451 555 11 33 44 115 484 599

Subtotal 7,456 31,848 39,304 94 363 457 7,550 32,211 39,761

1.15 NDT IXAR 1,184 1,761 2,945 4 14 18 1,188 1,775 2,963

Corrtech 516 425 941 1 3 4 517 428 945

PPCPL 866 2,401 3,267 7 34 41 873 2,435 3,308


Electrical
1.16 Kumyang 668 2,802 3,470 7 42 49 675 2,844 3,519

ABB 40 33 73 5 5 10 45 38 83

2,090 5,661 7,751 20 84 104 2,110 5,745 7,855

1.17 Instrument Competent 95 223 318 13 23 36 108 246 354

1.18 Insulation / Fire Proofing Kaefer 2,034 7,591 9,625 13 26 39 2,047 7,617 9,664

1.19 Heavy Rigging Sarens 2,098 9,129 11,227 14 53 67 2,112 9,182 11,294

Onshore 402 2,493 2,895 3 20 23 405 2,513 2,918

IOTEP 1,084 4,119 5,203 12 44 56 1,096 4,163 5,259


Mechanical
1.20 Sharp Tanks 823 1,993 2,816 12 36 48 835 2,029 2,864

RCC 199 461 660 7 15 22 206 476 682

2,508 9,066 11,574 34 115 149 2,542 9,181 11,723

Subcontarctor Total 175,890 811,640 987,530 662 3,004 3,666 176,552 814,644 991,196

SECL Staff 101,782 1,023 102,805 367 - 367 102,149 1,023 103,172

Korean 17,008 238 17,246 42 42 17,050 238 17,288


1.21
Local 44,543 236 44,779 191 191 44,734 236 44,970

Service Contract 40,231 549 40,780 134 134 40,365 549 40,914

MD 277,672 812,663 1,090,335 1,029 3,004 4,033 278,701 815,667 1,094,368


Grand Total
MH 2,776,720 8,126,630 10,903,350 10,290 30,040 40,330 2,787,010 8,156,670 10,943,680

Visitor(s) at Site

Weather Details

Max 35 Sunny Time


Temperature Climate Rainfall Remarks
Min 16 Type

Daily Report(04 February 2011).xlsx


Date : Friday, February 04, 2011

2. Subcontractor's Equipment Status

Randhawa Construction

Previous Total

Total Accum.
ITD Cementation Ltd.

Durha Construction
Taein Construction
Gannon Dunkerley

Total
VRC Construction
Sarens Heavy Lift
Equipment Description

Sandip Nanavati

Heeru Paints

Metal Crafts

Sharp Tanks

Competent
Kumyang
Coretech

Onshore

Kaefer
Tolani
PPCPL
IOTEP
Sunsil
SECL

IXAR
MSK

ABB
LEI
Air Compressor 3 1 1 1 7 1 1 15 3798 3813

Auto Level 1 1 4 2 1 9 3816 3825

B.S.P. Hammer & Acc. - 1235 1235

Bar Cutting & Bending Mach. 1 3 1 3 8 7695 7703

Batching Plant 1 1 1 3 2832 2835

Cement Silo - 960 960

Compactor 2 3 1 6 2477 2483

Concrete Boom Placer 1 1 1398 1399

Transit Mixer 3 2 5 2478 2483

Tower Crane (12Ton) 4 4 452 456

Crane (30Ton) 2 2 1792 1794

Crane (40Ton) 3 1 1 2 7 1710 1717

Crane (60Ton) 5 4 4 13 2598 2611

Hydro Crane (70Ton) - 76 76

Crawler Crane (70Ton) 2 2 2 1 7 3399 3406

Crawler Crane (80Ton) 2 1 2 5 272 277

Crawler Crane (150Ton) 4 4 592 596

Hydro Crane (150Ton) 2 2 137 139

Hydro Crane (250Ton) 1 1 29 30

Crane (450Ton) 1 1 436 437

Crane (500Ton) 1 1 445 446

Crane (600Ton) 1 1 98 99

Crane(1600Ton) 1 1 87 88

Gantry Crane (05 Ton) 10 10 1480 1490

Cargo Crane (05 Ton) 1 1 147 148

Motor Grader (3.6 Mtr) 1 1 147 148

Boom Lift (40 Mtr) 2 2 294 296

Fork Lift 2 2 265 267

Wheel Loader 1 1 2 149 151

D Generator(20~65kv) 2 5 1 1 4 1 14 11653 11667

D Generator(125KV) 1 5 1 1 4 1 2 2 2 1 20 7584 7604

D Generator(250KV) 2 2 323 325

Driven Pilie Rig - 962 962

Excavator 1 1 2 1303 1305

Hydra (5~15 MT) 5 1 6 3 1 1 6 13 1 7 11 1 56 13362 13418

Hydraulic Boring Rig 797 797

JCB 2 1 1 1 2 7 4745 4752

Mobile Lighting Mast 9 1 1 1 12 3635 3647

Rectifier 2 1 11 56 4 16 1 91 26659 26750

Roller 1 3 4 2082 2086

Site Vehicle 2 2 3 8 3 3 11 3 6 3 1 2 1 1 2 51 11596 11647

Total Station 1 2 1 4 1261 1265

Trailor 4 1 3 8 5 4 1 26 4249 4275

Water Tank(500~1500 Ltr.) 1 1 7 1 5 4 16 2 1 5 1 1 1 46 9194 9240

Water Truck (12000 Ltr) 1 1 2 983 985

Water Truck(5000~10000Ltr.) - 3119 3119

Weigh Bridge 50 T 398 398

Welding Machine 1 1 7 42 46 1 1 30 68 12 3 7 7 226 56877 57103

PIR cutting,CNC machine 1 1 162 163

Cellular glass cutting M/c 1 1 162 163

Manual grooving M/c 7 7 721 728

Total 61 8 9 47 57 69 17 12 26 90 18 15 95 100 2 10 10 9 19 1 11 686 203121 203807

Daily Report(04 February 2011).xlsx


Date: 4-Feb-11
Quantitywise Progress
Executed Quantity
Description Unit Total Quantity Remarks
Previous Today Cumulative
CIVIL WORK
Piling Nos. 8,567.0 8,567.0 - 8,567.0 Activity Completed, except Under Reamed Piles.

Excavation M3 168,461.0 158,548.6 185.5 158,734.1


PCC M3 3,098.1 2,564.9 81.1 2,646.0
RCC in Foundation M3 30,180.0 30,179.8 - 30,179.8
Backfilling M3 107,741.3 80,661.4 5.1 80,666.5
RCC in Superstructure M3 920.0 521.9 65.0 586.9
Pre-cast Pipe-rack Fabrication M3 7,694.0 7,694.0 - 7,694.0 Activity Completed
Pre-cast Pipe-rack Erection Nos. 287.0 278.0 - 278.0
Pre-cast Pipe-rack Alignment Nos. 287.0 278.0 - 278.0
First Flash Basin/ Sump/Pond M3 4,075.9 3,549.5 - 3,549.5
RCC in Man-holes/ Catch Basins, etc. M3 802.0 664.6 23.9 688.5
RCC for E&I Duct Banks/ Cable Trenches M3 608.0 202.7 - 202.7
RCC - Pavement M2 80,221.0 10,146.4 - 10,146.4
U/G PIPING WORK
U/G Piping - Pipe Fabrication/ Welding ID 99,625.0 96,030.3 461.8 96,492.0
U/G Piping - Excavation M3 52,031.0 42,719.7 98.7 42,818.4
U/G Piping - Laying IM 309,954.0 212,329.7 1,032.8 213,362.5
U/G Piping - Testing, Flushing IM 309,954.0 211,699.0 134.0 211,833.0
U/G Piping - Wrapping/ Coating ID 99,625.0 68,426.5 410.0 68,836.5
U/G Piping - Backfilling M3 42,780.0 36,880.9 140.8 37,021.6
BUILDING WORK
RCC in Foundation M3 4,461.1 3,983.2 - 3,983.2
RCC in Super Str. (Column/ Slabs etc.) M3 5,219.0 5,199.9 - 5,199.9
Brick Work M2 7,419.0 1,943.6 40.0 1,983.6
Plastering work M2 22,450.0 5,905.8 131.0 6,036.8
STEEL STRUCTURE WORK
Steel Strl. Fabrication MT 11,000.0 9,454.2 29.3 9,483.5
Steel Strl. Erection MT 11,000.0 6,138.6 33.6 6,172.2
Steel Strl. Alignment MT 11,000.0 1,265.1 97.0 1,362.0
Handrail/ Stairs & Misc Fabrication MT 398.0 246.0 8.4 254.4
Handrail/ Stairs & Misc Erection MT 398.0 5.0 - 5.0
Grating Erection MT 1,951.0 40.6 - 40.6
MECHANICAL WORK

Equipment Platform & Ladders MT 359.6 109.0 - 109.0

Erection/Alignment Static Equipment- Columns 7,999.0 3,930.5 - 3,930.5 Progress Quantity


Step-1 : Chipping, Padding & Erection (65%) MT 7,999.0 4,720.3 - 4,720.3
Step-2 : Alignment & Grouting (25%) MT 7,999.0 3,449.2 - 3,449.2
Step-3 : Mechanical Completion (10%) MT 7,999.0 - - -

Erection/Alignment Static Equipment- Reactors 565.0 280.6 - 280.6 Progress Quantity


Step-1 : Chipping, Padding & Erection (65%) MT 565.0 311.8 - 311.8
Step-2 : Alignment & Grouting (25%) MT 565.0 311.8 - 311.8
Step-3 : Mechanical Completion (10%) MT 565.0 -

Erection/Alignment Static Equipment- Vessels 2,104.0 393.9 - 393.9 Progress Quantity


Step-1 : Chipping, Padding & Erection (65%) MT 2,104.0 480.8 - 480.8
Step-2 : Alignment & Grouting (25%) MT 2,104.0 325.7 - 325.7
Step-3 : Mechanical Completion (10%) MT 2,104.0 - - -

Erection/Alignment Static Equipment-Heat Exchangers 5,613.0 1,856.0 3.4 1,859.4 Progress Quantity
Step-1 : Chipping, Padding & Erection (65%) MT 5,613.0 2,532.7 5.2 2,537.9
Step-2 : Alignment & Grouting (25%) MT 5,613.0 838.8 - 838.8
Step-3 : Mechanical Completion (10%) MT 5,613.0 - - -

Erection/Alignment Static Equipment- Site Fabricated Storage Tanks


Step-1 : Fabrication & Erection (70%) MT 195.0 33.6 7.3 40.9
Step-2 : Welding (10%) MT 195.0 31.3 2.3 33.6
Step-3 : Hydrotest (10%) Nos. 3.0 -
Step-4 : Painting (5%) Nos. 3.0 -
Step-5 : Final acceptance (5%) Nos. 3.0 -

PIPING WORK
A/G Piping (CS) - Shop Fabrication ID 427,624.0 191,590.5 1,806.0 193,396.5
A/G Piping (CS) - Field Welding ID 427,627.0 37,499.5 483.0 37,982.5
A/G Piping (CS) - Erection IM 1,052,393.0 193,224.7 2,857.2 196,081.9
A/G Piping (CS) - NDT Nos. 18,750.0 2,255.0 3.0 2,258.0
A/G Piping (CS) - Support Fabrication Ton 926.0 96.5 2.2 98.6
A/G Piping (CS)- Support Install & Alignment Ton 1,167.0 40.2 - 40.2
A/G Piping (SS) - Shop Fabrication ID 73,424.0 18,404.0 92.0 18,496.0

Page 3
Executed Quantity
Description Unit Total Quantity Remarks
Previous Today Cumulative
A/G Piping (SS) - Field Welding ID 73,427.0 10,070.0 13.0 10,083.0
A/G Piping (SS) - Erection IM 157,859.0 13,900.5 - 13,900.5
A/G Piping (SS) - NDT Nos. 3,750.0 216.0 - 216.0
A/G Piping - Hydrotest IM 1,315,492.0 8,798.0 - 8,798.0
ELECTRICAL WORK

Earthing system Mtr. 33,895.0 4,800.0 108.0 4,908.0

Cable Tray Erection- Inside Sub-station Mtr. 6,050.0 1,692.0 - 1,692.0

Cable Tray Erection- Field Mtr. 26,830.0 2,530.0 - 2,530.0

Cathodic Protection System Nos. 169.0 29.0 - 29.0

INSTRUMENTATION WORK
Perforated Cable Tray Installation Mtr. 141,504.0 156.0 - 156.0

PAINTING WORK

Surface prep. & primer application-Stl. Str. M2 297,126.0 175,842.3 6,869.8 182,712.1
Surface prep. & primer application-Piping M2 120,025.0 37,022.7 416.4 37,439.0
Final painting-Steel Structure M2 297,125.9 167,433.0 1,333.1 168,766.1

Final painting-Piping M2 120,025.0 11,805.0 - 11,805.0

INSULATION WORK

Hot Insulation - Equipment M2 15,011.7 3,908.5 - 3,908.5

Cold Insulation - Equipment M2 6,062.0 3,356.5 - 3,356.5

Note : As on today total Equipments arrived at Site : 166 Nos.


As on today total Equipments Erected : 78 Nos.
Today Erected : 02 Nos.
11-EE-306 (Comp)
11-EE-307 (Comp)

Page 3
Material Status - OPaL DFCU & AU Project
ITDC (Piling/Civil/RMC Supply) Friday, February 04, 2011

Material Stock on Days to


Sl. Unit Remarks
Description Today Last

1 Cement Bag 34.00 2

2 Rebar MT 3.00 2

3 Admixture Kg. 500.00 6

GDC (Civil/Building) Monday, January 10, 2011

Material Stock on Days to


Sl. Unit Remarks
Description Today Last

1 Cement Bag 1,312.00 7

2 Rebar MT 80.00 6

3 Admixture Kg. 3,995.00 20

Taein (Civil/PC Fab/Stl. Str.) Friday, August 13, 2010

Material Stock on Days to


Sl. Unit Remarks
Description Today Last

1 Cement Bag 356.00 4

2 Rebar MT 110.00 21

3 Admixture Kg. 2,600.00 13

VRC (Civil) Friday, October 01, 2010

Material Stock on Days to


Sl. Unit Remarks
Description Today Last

1 Cement Bag 4,575.00 27

2 Rebar MT 53.00 3

3 Admixture Kg. 2,600.00 23