Meeting Attendees:
Don Lino
Raymond Kennedy
Bernadette Kennedy
Romy Suniga
Engr. Fred (Plumbing)
Engr. Ferdie Velasco (EE)
Minutes of meeting:
1. Kitchen
- Work on hold; waiting for clients choice on accessories then architect will
re-design the layout together with electrical and sanitary design. Depending on
the re-design this might be an additional cost to the construction. Contractor
will have to check if the re-design needs to be charged with additional cost.
- Clean kitchen – Suggestion of using Ribbon grain wood and Walnut stain on
cabinets instead of ducco finish
- Detail of sink hidden under polished concrete countertop was discussed
- Dirty Kitchen – concern on range hood location close to window
- Discussed the shadow gap between overhead cabinet and dry wall of pantry
- Dirty kitchen door will be resized to 2.7m high or will be aligned to window
beside it – OK with client
2. Downspouts on the front elevation will be cladded with concrete and downspouts
on the courtyard will be cladded with ficem board. – OK with client; see attached
drawing.
3. Basement ventilation - discussed the possibility of punching thru the floor slab
adjacent the dirty kitchen wall above to create a cross ventilation in the basement
- see attached design proposal for the vent ; contractor shall try and see if this
can be part of the contingency budget or if it will be an additional cost.
5. entertainment door – discussed the pivot door; and that it will not have any door
jambs – OK with client
8. basement – aircon – discussed that client architect and contractor agreed to stay
with the original proposal of the basement; considering this there is no proposal
for aircon in the basement room as per initial design. – as discussed with client,
contractor shall proceed with the original plan with the exception of
considering AC location and piping.
11. 1st level hallway windows – aligning the window to the door line; elevation – Ok
with client
12. Main stairs design – removing of wall perpendicular to the 1st and 2nd step and
cladding the rest with wood on walnut stain finish; Redesigning also the steps
having a more appropriate approach to the other steps. – see attached drawings
13. Cabinets - suggestion of finishing it with ribbon grain wood with walnut stain
rather than ducco finish; with the exception of the shoe rack in the walk in closet
of the MB. – OK with client
14. Fascia on bdrm toilets 1 and 2 - discussed the natural ventilation and light
coming in the opening – architect will redesign the natural light and ventilation ;
see attached drawings
15. Generator – discussed the location of gen. set in front of the storage in the
garage. – client was given the brand by the Electrical engineer;
Prepared by :
Don Quintin Lino III
Architect