2. 1 Providing Master Plan for Corporate Office, Vikas Bhawan, Port Blair
including construction of an R.C.C. building block, parking facilities,
landscaping, additional floor in the existing RCC building etc.
2.2 Providing Master Plan for Hotel Megapode Nest, Port Blair including
face lifting of the Hotel by improving the existing lobby, reception,
bar and restaurant, landscaping, construction of swimming pool,
construction of new building/cottages, setting up of affluent
treatment plant, water storage facility etc.
4. Eligibility Criteria
Only those Firms/Consultants who fulfills the following minimum criteria
are eligible to apply :-
4.1 The firm should have satisfactorily completed at least two similar
nature of work within past five years. Proof of having executed
similar work shall be enclosed.
4.2 The Firm should have minimum three well-qualified and
experienced Architects/Engineers associated with them. They shall
submit proof of qualifications/experience of the persons associated
with the project.
4.3 The minimum average turnover of the firm in last 3 years should be
Rs. 25 lakhs for which audited Annual Balance sheet should be
submitted.
6. Method of Application
6.1 Letters of transmittal is attached at Page No. 07 .
6.2 The application should be type written. The applicants name should
appear on each page of the application.
6.10 All the proposals with full details should reach the General Manager,
ANIIDCO, Vikas Bhawan, Port Blair by 3 PM on 6th August, 2007
and it will be opened at 3.30 PM on the same day.
6.11 EMD amounting to Rs. 12,000/- in the form of call deposit from any
scheduled bank issued in favour of the General Manager, ANIIDCO
payable at Port Blair should be enclosed. The tender document
without EMD will be rejected.
8. Rate
The rate to be quoted shall include the following items of work :-
8.1 Preparation and supplying of Conceptual Design, Schematic
Drawing and layout plan for Technical Bid/Evaluation, pre-final
drawing, detailed working drawings, abstract of quantities of items
with sub-heads, field survey and revision of drawing due to any
necessary modification/alteration during the progress of work.
8.2 The rate will be exclusive of cost of civil structure, which shall be
constructed by the department based on the drawing submitted by
the firm.
8.3 The rate will also be exclusive of return air fare (from
Chennai/Kolkata) boarding, lodging and local transportation at Port
Blair, for two visits of Architect, which shall be reimbursed
separately as per actual for two persons on award of work upto the
level of submission of detailed estimate and working drawing.
8.7 Different rates may be quoted for each of the five works mentioned
in Para 2.
8.8 The cost of work is defined as the cost of civil construction for items
as per DSR 2002 plus cost indices approved by the Chief Engineer,
Andaman Public Works Department. Cost Indices as on today over
DSR 2002 with base as 100 are 114 and 249 for Port Blair and
Havelock respectively. For non DSR 2002 items the prevailing
market rate at Port Blair/Havelock be arrived at for calculating the
total cost.
8.9 The Corporation shall pay Professional Fees of Rs. 2,000/- (two
thousand only) per person per day plus air fare, boarding, lodging
and local transportation for the additional visit of Architect/
Landscaper/ Engineer during implementation stage.
-5-
9. Additional Information
9.1 All sites are in Port Blair town except the one in Havelock island.
The Havelock is at a distance of four hrs by boat and there is daily
boats service available.
General Manager
ANIIDCO
-6-
LETTER OF TRANSMITTAL
To,
Sir,
Having examined the details given for qualifications in Press Notice for the
above work, we hereby submit the relevant documents including cover 1 & cover
2.
1. We hereby certify that all the statements made and information supplied in
the cove 1 are true and correct.
3. Certify that we have not been black listed or debarred for tendering by any
organization during the last five years.
SIGNATURE OF APPLICANT
Seal of Applicant
Date of Submission