Estimator - Project Manager - Superintendent - Construction Manager


Having completed a vast array of projects on many different levels: underground
utilities, churches, public schools, universities, hospitals, apartment complexe
s, office buildings, pharmaceutical manufacturing facilities, local government b
uildings, correctional facilities, and military building projects; there is the
continued passion for building construction projects and building long-lasting b
usiness relationships. Looking to add exciting professional experiences while dr
awing on the knowledge gained from the past.
Loved the fast-paced action of being a field superintendent but also thrives on
the constant change involved with being an estimator and project manager. The co
nstruction industry has so many variables and so much to offer.
Attributes:
Instructive - Patient - Calm
Team Oriented and an Independent Worker
Confident
WORK EXPERIENCE
Sr. Project Estimator/Project Manager
January 2008 - present
Bloomington, IN
* Handle the execution of the jobs from start to finish.
* Maintain strong relationship with our company's current clients through on-go
ing maintenance and new projects.
* Develop new potential clients through networking relationships.
* Responsible for quantity take-off and input into Touchdown estimating softwar
e.
* Perform quantity take-offs by "hand".
* Analyze self-performed work for appropriate man-hours, equipment, and materia
l needed.
* Responsible for solicitation of subcontractor and supplier bids.
* Complete project scope for quote, bid, and negotiations on bid day.
* Transition from bid to construction on projects that are awarded; meeting wit
h superintendent and foremen to assist with job set up.
* Responsible for project management on projects successfully bid and awarded.
This to include contracts, billings, submittals, project financial overview and
review, budget updates, scheduling, submittals, O&M and close-out documents, etc
.
* Meeting with General Contractors, Owners, Architects to facilitate project pr
ogress.
* Price and process changes to on-going projects, along with RFI submissions.
Project Estimator
November 2005 - January 2008
Bloomington, IN
* Responsible for quantity take-off and input into ICE/MC2 estimating software.
Perform quantity take-offs both by "hand" and by digitizer of self-perform and
subcontracted work. (Digitizer software - MC2 Digiticer and Timberline Cut/Fill)
* Analyze self-performed work for appropriate crew size, equipment, and materia
l needed (concrete, carpentry, earthwork, utilities).
* Responsible for solicitation of subcontractor and supplier bids.
* Complete bid on bid day.
* Prepare budget estimates for design-build endeavors and see project through u
ntil construction begins. Along with assisting designers with cost effective alt
ernatives for "value engineering" a budget.
* Develop proposals for military projects, including price, technical, and desi
gn submittals. Worked closely with architect in our design team to complete desi
gn as per government specifications and requirements.
* Set up initial project schedule - pre-bid.
* Transition from bid to construction on projects that are awarded, from meetin
g with superintendents to assist with job set up and kick-off through contract b
uy-out process.
* Completed ICE MC2 Basic Training, Administrator Training, Toolkits Training,
and Wizards Training (Certifications provided by MC2).
* MC2 Network Administrator - July 2005 - January 2008
* Completed company specific user manual for MC2.
Assistant to Project Manager
December 2005 - June 2007
Bloomington, IN
* Performed project management duties while under the supervision of a Project
Manager.
* Created project budgets and completed contract buy out.
* Development of owner/contractor/subcontractor contracts.
* Write purchase orders for contract services and materials.
* Work closely with subcontractors, suppliers, architects, engineers, and on-si
te supervision for the duration of construction of the project from design issue
s and design changes to field installations.
* Monitor on-site overall project quality and conformance to project documents
and building codes.
* Create and monitor project schedules, project budget, and project cost foreca
sts.
* Process all changes to the contract (PRs, ASIs, RFIs, etc.).
* Facilitate Owner/Architect/Contractor progress meetings along with contractor
coordination meetings.
Project Superintendent
May 2003 - December 2005
Bloomington, IN
* Support company equal employment opportunity and affirmative action plans.
* Conduct safety meetings as required; establish and maintain safety awareness
on the jobsite, to include subcontractors and suppliers.
* Plan and supervise subcontractor activities. Hold weekly coordination meeting
s. Assist in resolving subcontractor issues.
* Effectively communicate and interact with architect, owner, union representat
ives, subcontractors, building inspectors, and general public.
* Track costs and subcontractors' costs to ensure accurate budget reports and a
ccruals.
* Monitor budget reports for potential problem areas and track unit costs for w
ork performed.
* Apply approved budget to determine manpower, equipment, and method of constru
ction.
* Prepare and communicate Short Interval Schedule. Schedule materials and subco
ntractors appropriately. Look ahead for potential problems in design, schedule,
and budget.
* Order and procure materials.
* Accurately prepare daily reports, unit reports, accident reports, safety repo
rt/checklist, photos, and purchase orders, time sheets, and receipts/invoices, q
uantities of work in place, as-builts and phone logs.
* Prepare and procure punch lists.
* Provide clean instruction in project objectives. Develop cooperation and team
work through use of sound supervisory practices.
* Enforce company standards of quality. Monitor all on-going work and ensure th
at all meets building code and project specifications. This includes, inspecting
and monitoring subcontractor work. Identify potential problems early and makes
corrections as required.
* Understand material and storage requirements and costs. Conserve materials an
d avoid waste.
* Set performance goals for employees. Evaluate work of employees. Be effective
in training, instructing, and correcting performance deficiencies. Delegate res
ponsibilities.
* Initiate, monitor, and maintain scheduling tools as required for productive w
ork. Assist project engineer in scheduling.
* Schedule regular maintenance on jobsite equipment.
* Estimate quantities of labor, material, and equipment required to complete en
tire scope of potential change orders. Solicit pricing from subcontractors. Subm
it pricing on potential change orders to project manager for review.
* Manage 80+ construction personnel on two simultaneous projects.
Project Engineer
May 2000 - May 2003
Bloomington, IN
* Review and approve shop drawings and product data submittals as per job speci
fications.
* Create and track all major materials, products, and quantities using target d
elivery dates and actual delivery dates through a Procurement Log.
* Interpret design/drawings for crafts installing material.
* Work closely and professionally with owners, architects, engineers, subcontra
ctors, suppliers, and field personnel.
* Building, maintaining, and updated schedules (SureTrak).
* Verify all completed work complies with applicable codes, drawings, and speci
fications.
* Prepare and disseminate required documentation records such as status reports
, meeting minutes, punch lists, requires for information, and material requireme
nt calculations to supervisor and subcontractors.
* Update contract documents as required by RFI responses, project design change
s, change orders, Architectural Supplemental Instructions, and as-built conditio
ns.
* Coordinate multi-phased projects.
* Prepare, estimate, and negotiate Change Order Requests.
* Software Administrator & Trainer - Meridian's Prolog Project Manager
* On-site problem solving.
* Coordinate different trades' work.
* Track job progress through photo documentation, Daily Reports, and Short Inte
rval Schedules.
EDUCATION
Some College Coursework Completed
8/2006 - 12/2006
* Indiana State University | Terre Haute, IN
* Started Graduate Certificate Program in Public Administration. Credits earned
in the certificate program transfer into the Masters program. I plan on continu
ing classes as time allows.
Bachelor's Degree
8/1997 - 5/2000
* Indiana State University | Terre Haute, IN
* B.S. in Construction Technology
* Minor: Architectural Drafting
* Cumulative GPA: 3.96 (4.0 Scale)
* Major GPA: 4.0 (4.0 Scale)
* Graduated Magna Cum Laude
Some College Coursework Completed,
8/1995 - 5/1997
* Purdue University Calumet | Hammond, IN
* Started in a dual-credit program as a senior in high school
* Major: Architectural and Construction Technology
* Transferred to Indiana State University program
* High School or equivalent,
High School Honors Diploma
8/1992 - 6/1996
* Hanover Central High School | Cedar Lake, IN
* GPA 4.0 (4.0 Scale)
CERTIFICATION
* Associate Constructor - May 2000 - AIC
SKILLS
* SureTrak scheduling software
*
* Microsoft Office
*
* ICE/MC2 Estimating Software
*
* Touchdown Estimating Software
*
* Timberline Estimating Software
*
* Meridian Prolog Project Manager Software
*
LANGUAGES
* English
* Fluent
PROFESSIONAL MEMBERSHIPS / AFFILIATIONS
* American Institute of Constructors - Associate Constructor Certification - Pa
ssed Exam - Certification Granted - 2000
* OSHA - Completed 10 hour course - 1999, 2002
* Sigma Lambda Chi Honor Society - Delta III Chapter
* Epsilon Pi Tau Professional Fraternity - Mu Chapter
* Golden Key National Honor Society
CAREER HIGHLIGHTS
* Associate Constructor Certification - AIC
* OSHA 10-hour Certification
* Completed Prolog Project Manager, Level 1 Training
* Completed ICE/MC2 Basic Training and Administrator Training
* Projects completed as a GC Superintendent beat budget costs
* Projects completed as GC Superintendent were $5 million plus project budgets.
* GC Bid Year 2007 - awarded approximately $35 million in hard, competitively b
id contracts
* Subcontract Bid Year 2008 - awarded approximately $600,000 in hard, competiti
vely bid contracts
* Subcontract Bid Year 2009 - awarded approximately $650,000 in hard, competiti
vely bid contracts
* Longevity. First 8 career years were with the same company.
PROJECT HIGHLIGHTS
* Indiana National Guard - Patriot Academy - Muscatatuck Urban Training Center.
Framing, Drywall, Acoustics. $390,000 - Hard Bid. Position Held: Estimator/Proje
ct Manager (Subcontractor)
* NAVFAC Buildings 2540 & 2084 at NSA Crane. Demo., Framing, Drywall, Acoustic,
Casework, Doors, Hardware, Accessories. $150,000 - Hard Bid. Position Held: Esti
mator/Project Manager (Subcontractor)
* Bloomington Hospital Orange County. Framing, Drywall, Acoustics, Wood Ceilings
- $200,000 - Hard Bid. Position Held: Estimator/Project Manager (Subcontractor)
* Old National Bank. Demo, Drywall, Paint, Carpeting, Casework. $85,000 - Negoti
ated. Position Held: Estimator/Project Manager
* IU SPEA Commons Renovation. Framing, Drywall, Acoustics, Wall Panels. $150,000
- Hard Bid. Position Held: Estimator/Project Manager (Subcontractor)
* Monroe County School Corporation - Binford Elementary, Administration Building
, Tri-North Middle School, New Tech High School. Renovation of existing faciliti
es. $225,000 - Hard Bid. Position Held: Estimator/Project Manager (Subcontractor
)
* Indiana University Cook Hall (Basketball Practice Facility). $15 million - Har
d Bid. Extensive rock excavation, utility work, and sitework. Unique concrete ar
ch/buttress design. High end finishes. Position Held: Estimator (General Contrac
tor)
* Indiana State University School of Education Renovation. $13 million - Hard Bi
d Project. Complex demolition, intricate finish carpentry. Position Held: Estima
tor (General Contractor)
* NAVFAC MACC Proposal and chosen as one of 5 contractors for NSA Crane - 2006.
Worked with Architect for numerous design/build proposals under the MACC. Positi
on Held: Estimator
* Renovations for Mitchell Community Schools - Mitchell, IN
March 2005 - October 2005
Position Held: Project Superintendent
* Included full mechanical and electrical renovations, new interior finishes, ne
w exterior finishes, new curtainwall systems, added sprinkler systems, and new f
ire service lines - Burris Elementary and Mitchell Jr. High School
* Two new playgrounds installed at Burris Elementary
* Burris Elementary: 75,244 square feet of renovated space
* Mitchell Jr. High School: 44,244 square feet of renovated space
* Projects happened simultaneously
* Contract Value: $6 Million
* NSA Crane - Bldg. 41 Renovation - Crane, IN
December 2005 - March 2005
Position Held: Asst. Project Superintendent & Project Engineer
* Included full mechanical and electrical renovations, new interior structures,
new interior finishes, added sprinkler systems
* Contract Value: $10.2 Million
* Jordan Tunnel Storm Culvert - Bloomington, IN
August 2004 - January 2005
Position Held: Project Superintendent
* 220' of new poured-in-place concrete storm water culvert to replace existing c
ulvert. Culvert is 5' tall and 25' wide
* Included demolition of existing tunnel and constant dewatering during construc
tion of new tunnel
* Included new pavement, new storm and sanitary sewer systems, and new building
pad for future restaurant
* Worked up against and under existing buildings located in a busy section of do
wntown Bloomington
* Included traffic rerouting and maintenance
* Followed INDOT and City of Bloomington Utility specifications
* Contract Value: $450,000
* Addition and Renovations to Batchelor Middle School - Bloomington, IN
May 2003 - August 2004
Position Held: Project Superintendent
* Included new gym addition: structural steel, precast concrete, poured-in-place
concrete, limestone, and ground face CMU, curtainwall and storefront systems, E
PDM roofing
* Included mass site excavation and grading
* Included 3 floors of full renovation of existing concrete/block structure - 16
0,678 square feet
* Contract Value: $7 Million
* INDOT Traffic Management Center/ISP Post #52 - Indianapolis, IN
July 2002 - April 2003
Position Held: Project Engineer
* Included new two story steel structure on concrete spread pad and continuous c
oncrete footing/wall foundation. Architectural precast exterior with aluminum st
orefront and curtainwall and metal panel accents. Radiused concrete retaining wa
lls and cascading waterfall structure for retention pond expansion. Advanced tec
hnology installations required.
* 57,448 square feet of new office/conference space
* Building constructed under INDOT and architectural specifications.
* Contract Value: $12.5 Million
* Bloomington Hospital PEDS/GYN/REHAB Renovation - Bloomington, IN
July 2002 - September 2002
Position Held: Project Engineer
* Included demolition and renovation of two existing wings at Bloomington Hospit
al. Complete mechanical and electrical renovations. New interior finishes.
* Fast track construction (90 day construction duration)
* 26,170 square feet of new patient rooms and treatment areas
* Contract Value: $2.8 Million
* Select Specialty Hospital - Bloomington, IN
September 2001 - November 2001
Position Held: Project Engineer
* Included partial demolition and renovation of a two existing wings of Blooming
ton Hospital for leased space use
* Fast track construction
* 11,712 square feet of critical care patient space
* Contract value: $175,000
* Bloomington Hospital Addition and Renovation Project - Bloomington, IN
May 2000 - June 2003
Position Held: Project Engineer
* Included multi-phasing
* Phase 1 - Addition portion of project is a 2 story (plus penthouse on 3rd for.
) post-tensioned, poured concrete structure. Structure designed and constructed
for 2 future floors. Metal panel, EIFS, Limestone, Storefront, and Curtainwall e
xterior. Building addition to existing Power Plant included a new boiler room to
house 3 new boilers. Phase 1 included construction of new Maternal and Child He
alth Center, new main hospital Lobby, and new hospital main entrance.
* Phase 2 & 3 - Renovation of 1st and 2nd floors of existing hospital to include
Emergency Department, Radiology Department and Surgery.
Extensive finishes included oak millwork and epoxy terrazzo flooring
* 98,000 square feet of new space and 82,000 square feet of renovated space
* Contract Value: $30 Million