STEVE J. PATMON ARCHITECTS - San Antonio, TX. Intern Architect I to Intern Architect II HEB Store Renovation 1) HEB SA #15 555 Renovation Duties include, assisting the project a rchitect with as-built surveying, development of construction documents, QC/QA, coordination with HEB consultants, and design reviews. The scope of work include s the renovation of the deli and entrance areas and the design of a ramp connect ed to a new on-site modular building. 2) HEB SA #16 205 Renovation Dut ies include, assisting the project architect with as-built surveying, developmen t of construction documents, QC/QA, coordination with HEB consultants, and desig n reviews. The scope of work includes the renovation of the cosmetics, pharmacy, bakery, warehouse, and the design of the cart storage/vestibule expansion. Ella Austin Community Center HVAC and Roof Improvements - Duties include, assis ting the project architect with as-built surveying, development of construction documents, QC/QA, coordination with mechanical-historic preservation consultants , and design reviews. The scope of work includes an existing condition assessmen t of the roof and HVAC equipment. SAC Visual Arts and Technology Center Renovation and Expansion - Duties include, assisting with the pre-design presentations, programming, preliminary cost esti mating, development of construction documents, QC/QA, coordination with Geotechn ical-Civil-Landscape-Structural-MEP consultants, and design reviews. The scope o f work consists of developing construction documents for an 11,000 SF expansion and building improvements to the exterior envelope including replacement of stor efront, windows and roof systems. Bexar County Sheriffs Firing Range Duties include, assisting the project archit ect with the presentation, development of construction documents, QC/QA, coordin ation with Geotechnical-Civil-Structural-MEP consultants, and design reviews. Th e scope of work includes the design of a new Firing Range to be executed in thre e phases of construction. The final complex will include a fully baffled 50pt. f iring range, sniper range, gas house, shoot house, parking lot and administratio n building. Council District 7 Pool Improvements Duties include, assisting the project arch itect with the as-built surveying, presentation, development of construction doc uments, QC/QA, coordination with Structural-MEP consultants, and design reviews. The scope of work includes an existing condition assessment of four public pool facilities. SARA Administration Building - Duties include, assisting the project architect w ith the development of construction documents, QC/QA, and design reviews. The pr ime design firm retained SJPA as consultants to produce elevations, sections and details for a new administration building for the San Antonio River Authority. Chocolate Store - Duties include, producing a preliminary cost estimate, and sch ematic floor plans for a new tenant space. June 2007 to October 2007 HMD GROUP ARCHITECTS - Miami, FL. Student Intern Architect Developed, checked, and coordinated construction documents of several eat-in res taurants for clients restaurant chain. Assisted project architect with preliminary as-built surveying and design develo pment documents of the UNITY Church in Little Havana, Miami. June 2006 to April 2007 ESTEE LAUDER CORPORATION - Miami,FL. Visual Merchandiser Designed plan-o-grams (setup guides for merchandise display shelves) for various product lines distributed by the Estee Lauder Corporation throughout points of sales. October 2005 to March 2006 SPLASHWORKS BATH FURNISHINGS - Miami, FL. Lead Designer Drafted construction drawings, countertop templates, and floor plan layouts for companys line of vanities and bathroom accessories. Developed design layouts, 3-D renderings, assembly instructions, and products ca talogue for companys new vanity Quick Ship program using AutoCad, 3dsmax, Photos hop, and Illustrator. June 2005 to July 2005 WILLIAMS PAVING CO. - Miami, FL. AutoCad Engineer Drafted roadside construction parameters and electrical fittings for two South F lorida thoroughfares. April 2004 to August 2004 ATLAS METAL, INC. - Miami, FL. AutoCad Engineer Drafted 2-D and 3-D mechanical designs for various lines of cafeteria food carts . Developed several food cart design proposals which were submitted to and approve d by the companys manufacturers, who ultimately converted the proposals into wor king drawings for assembly and shipping ------------------------------------------------------------------- EDUCATION: April 2008 FLORIDA INTERNATIONAL UNIVERSITY SCHOOL OF ARCHITECTURE - Miami,FL. Master of Architecture, G.P.A. 3.22 Minor in Engineering Honors: Deans List, School of Engineering, 2003-04 Academic year April 1999 UNIVERSITY OF THE SACRED HEART - San Juan, PR. Bachelor of Science, Major in Biology, cum laude Honors: Department of Natural Sciences Honor Society, 1996 Activities: Member, Biological Sciences Society ------------------------------------------------------------------- OTHER SKILLS AND INTERESTS: Command of 2-D and 3-D modeling and rendering, using AutoCad 2004-2010, and 3dsm ax/Viz software. Command of Adobe programs such as Photoshop, Illustrator, and GoLive. Command of word processing programs, PowerPoint, and Excel. Fluent in Spanish. Enjoy playing the guitar and congas, sports, and doing handyman projects around the house (i.e. Weekend Warrior). Enjoy anything that has to do with construction.