You are on page 1of 5

SENIOR PROJECT ARCHITECT/ SENIOR PROJECT MANAGER

Summary of Qualifications
Ingenious, innovative Architect, offering more than 30 years of successive exper
tise in project administration, contract development, designing and production;
California business codes and ADA access guidelines, healthcare architecture, an
d education, transportation, institutional, hospitality, retail and residential
designs. Excelled in keeping absolute sophisticated standards in satisfying cust
omers, sustaining excellent quality of client relations, as well as in maintaini
ng comprehensive affiliations with colleagues. Possess dominating flexibility in
fast-changing working environment, utilizing amplified organizational and manag
ement skills. Accustomed to handling multiple priorities in strategizing effecti
ve budgetary planning, proposing of efficient scheduling schematics; and conscie
ntious in demonstrating brilliant, excellent, and sophisticated approaches in re
solving problems. Encompass verifiable eminence in accomplishing and exceeding o
bjectives and goals. Displayed undying consistency in creating astounding and in
novative designs in all facets of architectural perspectives.
Certification
Registered California Licensed Architect
License number # C-16866
LEED GA, NCARB
AREAS OF SPECIALTY
Designing and Planning Execution
* Developed, organized, and supervised working drawings and specifications for m
ajor transit and public utility projects.
* Inaugurated design contents with construction drafts corresponding to comparis
on with existing field conditions.
* Successfully developed, organized, and supervised projects from initial schema
tic design through finalization of construction and implementation.
Organization/ Problem Resolution Skills
* Provided site teams with dynamic solutions in resolving (built-modification) p
roblems.
* Effectively mediated the RFIs, Change Orders, and all submitted review process
es with chief representatives, such as DGS , OSPHD field ACO, DSE, & SFM represe
ntatives.
* Directed, supervised, and managed the essential requirements for OSHPD as well
as DSA from design through construction.
* Assumed overall responsibility for the entire project processes; accountable f
or the initiation of approved OSHPD projects.
* Performed quality assurance and quality control audits upon implementation of
project plans, including detail checking compliance with the 2010 Title-24/Calif
ornia Building Code, DSA Accesses Compliance Reference Manual, ADA Accessibility
Guidelines and California Business Codes.
* Thorough knowledge of the State of California building approval processes incl
uding the California Building Code (CBC - Title 24), the Office of Statewide Hea
lthcare Planning and Development (OSHPD), the licensing division of the Californ
ia Department of Health (CDPH), requirements for licensed Outpatient Clinics and
Surgery Centers, California Environmental Quality Act (CEQA)/jurisdictional pla
nning submittals/entitlements processing, as well as regulations pertaining to T
he Joint Commission (formerly JCAHO)
Client/ Employee Relations
* Acted as liaison between several key personnel to render assistance regarding
the on-time overall execution of project plans.
* Efficiently conformed with the OSPHD, County Department of Public Works, Count
y of Fire Prevention, County Division of Environmental Programming, key sub-cons
ultants, and all related clients and user groups, as well as to the general cont
ractor.
Financial Management
* Initiated the implementation of detailed designs and CAD procedural plans whil
e considering potential expenditures for the project.

List of Major Projects


* Veterans Homes of Los Angeles and Ventura Counties, CA:
Construction Administrator/ Architect of Record
* Commissioned as the Architect of Record in the successful construction of skil
led nursing facilities located in the areas of Lancaster, Ventura and West Los A
ngeles.
* Hubert H. Humphrey Comprehensive Health Clinic- Beautification Project, Los An
geles, CA:
Architect of Record/ Senior Project Manager
* Directed the design and construction of 10,418 sq ft addition / renovation of
an existing 2-story health clinic in Los Angeles County.

* St. Rose Hospital 5th Floor Renovation, Hayward, CA:


Architect of Record/ Senior Project Manager
* Led the implementation of conceptualized designs in the construction of a 13,4
77 sq ft renovation of an existing 5th floor administration area into an in-pati
ent medical and surgery beds comprising of 30 single patient rooms and 4 isolati
on rooms.
* Kaiser Permanente Medical Center, Irvine, CA:
Construction Administrator/ Site Architect
* Functioned as the on-site architect for the accomplished formation of a 435,00
0 sq ft 200-bed template hospital for Kaiser Permanente currently known as Irvin
e Medical Center.
* Loma Linda University Medical Center, Loma Linda, CA:
Construction Administrator/ Site Architect
* Played the integral role as senior manager and firm associate, providing exper
t oversight to a total of eight personnel, ranging from interns to senior staff
with team responsibility for implementation of various (OSHP 1) approved SPC-2 &
NPC-3 projects.
* St. Jude Medical Center, Fullerton, CA:
Senior Project Manager
* Provided direct supervision in the reconstruction of a 2,000 sq ft pharmaceuti
cal unit into a manageable and organized ADA/OSPHD/USP facility comprising of a
new isolation IV preparation room, ante-rooms, and medical storage rooms.
* St. Mary Medical Center, Apple Valley, CA:
Senior Project Manager
* Retrofitted the Cardiac Catheterization Laboratory with G.E. cardiac catheteri
zation rooms, control rooms, equipment rooms, and new scrub area for surgeons, a
nd nurses' lounge.
* CHOC, Garden Grove Medical and Dental Center, Garden Grove, CA:
Senior Project Manager
* Designed a new 2-Story, 14,500 sq ft clinic from initial conceptualization, an
d supervised the overall construction and designing phases until the final compl
etion, including:
* First Floor: 12 examination rooms, triage areas, preparation rooms, 2 new nurs
e stations, doctors' charting area, and administration offices.
* Second Floor: 9 dental operatories (2 for full sedation), doctors' offices, co
mmunity conference room, counseling offices, and a Children's Hygiene Teaching
Center
* Mission Hospital, Mission Viejo, CA:
Senior Project Manager
* Performed oversight in the designed and construction procedures of a new 8,000
sq ft CICU Unit, composed of seven patient rooms, blood-gas testing, as well as
lounge area, locker room and nurses' station. Upgraded lavatory facilities in c
ompliance with current Title 24/ADA requirements.
* Children's Hospital of Los Angeles, Los Angeles, CA:
Senior Project Manager
* Instrumental in the successful implementation of supplementary renovations, i
ncluding:
* Additional renovations to an existing 10,000 sq ft endocrinology clinic, wish
22 examination rooms, waiting room, patient registration area, nurses' station,
two new treatment rooms, casting room, accessible lavatory facilities, staff con
ference, training rooms, and general laboratory.
* 2,000 sq ft (Class 10,000) bone marrow research laboratory, with two negative
pressure rooms, laser experimental room, and other general laboratories.
* 5,000 sq ft Parents' Sleeping Rooms , essential for the critical condition pat
ients' parents, with 18 rooms, 2 lounge areas, 1 break room, and accessible toil
et and shower facilities.
* 1st floor pulmonary clinic with 12 new exam rooms, 2 new treatment rooms, staf
f conference room, and new testing laboratory for cystic fibrosis patients.
* Supervised the erection of a $5 Million worth cardiac catheterization laborato
ry with a new Siemens' catheterization room, control room, equipment room, cathe
terization storage room, and surgeons' scrub room.
* Spearheaded the construction of a 1,400 sq ft gastrointestinal clinic with 8 n
ew exam rooms, 2 new treatment rooms, preparation room, and other offices for ph
ysicians and clinic administration.
* Led the modification project of a 4,500 sq ft multi-use clinic, with 8 new exa
m rooms, new check-in and check-out areas, patient consultation rooms, new prepa
ration rooms, physician's charting rooms, offices for nurses, and clinic personn
el.
* Remodeled 5,500 sq ft outpatient clinic oncology/day hospital and clinic for c
hemotherapy-receiving patients, comprising of triage areas, preparation rooms, d
ay beds, two nurses' stations and doctors' charting area.
* Coordinated the implementation of the reengineering plans for the pulmonary la
boratory of the ICU/PICU conference room and staff lounge, into a multi-use conf
erence room featured with telecommunication devices and other cardiovascular dep
artments across Southern California.
* Developed Telemedicine Conference Room and Intern Teaching Center with Stryker
Communication System necessary for the interns' learning purposes.
* Designed, developed and constructed the outpatient surgery area for Lasik pati
ents, consisting of new outpatient waiting facilities, doctors' charting offices
, and examination rooms.
* City of Long Beach Parking Structure, Long Beach, CA:
Architect of Record/ Senior Project Manager
* Oversaw the design and construction of an $8 Million worth of additional renov
ation to the existing 3-story parking structure for the City of Long Beach.
* Metro Rail (Redline) Hollywood and Vine subway station, Hollywood, CA:
Senior Project Manager
* Instrumental in the design of a $300 Million worth of underground station and
other relevant complementary facilities for the MTA.
* Punta Mita Resort, Punta Mita, Mexico:
Project Manager
* Collaborated with local Mexican architects and landscape artisans in designing
and developing the Palapas' native design, exclusively for the $14 Million wort
h project, for the Four Seasons Resort and Timeshare located in South Puerto Val
larta, Mexico.
* Caesar's Palace Hotel/Resort, Las Vegas, Nevada:
Project Manager
* Successfully commenced the construction plans for the $1 Billion worth of hote
l including:
Phase One: comprised of 32-story guest room tower, 3 levels of banquet r
oom facilities, hotel pool, and sauna area
Phase Two: consisting of 32-story tower for guests with VIP amenities
* Sixth Street Warehouse Distribution Center, Rancho Cucamonga, CA:
Project Manager
* Constructed an award-winning 110,000 sq ft distribution center with both rail
and truck loading and unloading capabilities.
* Bell High School Renovation, Bell, CA:
Project Manager
* Managed a $3 Million worth of additional renovation for the Los Angeles Unifie
d School District. Retrofitted 40,000 sq ft of science wing, which included 8 sc
ience classrooms, 2 chemistry laboratories, and a lunch facility which could acc
ommodate 400 students and 200 faculty members.
* Corona Elementary School, Bell, CA:
Project Manager
* Directed a $1.5 Million worth of reconstruction for the main administration bu
ildings and classroom facilities and performed ADA upgrades for the entire campu
s for the Los Angeles Unified School District.

Teaching Experience
University of California at Riverside-Extension
Part-time Instructor in the Interior Design Certificate Program
Part-time Instructor in the Construction Management Certificate Program
The Art Institute of California- Inland Empire
Part-time Instructor in the Bachelor of Arts in Interior Design Degree Program

Education
Master of Architecture, NewSchool of Architecture & Design, San Diego, CA. (expe
cted completion - 3/2011)
Bachelor of Science in Architecture, University of Southern California, Los Ange
les, CA
Associate of Arts in Architectural Technology, Pasadena City College, Pasadena,
CA

Professional Development
AUTOCAD Design (14 Years): Versions 2000, 2002, 2006, 2007, 2008, 2009, ADT3.3
MS Excel 2009, MS PowerPoint, MS Project, MS Word, 2009 iWorks
Revit Architecture

Awards
Glendora Community Action Award: Glendora
City of Rancho Cucamonga Community Design Award: Sixth Street Distribution Cente
r

Professional Affiliations
American Institute of Architects: Los Angeles California Chapter
American Guild: University of Southern California
Alumni Association: University of Southern California
International Conference of Building Officials
U.S Green Building Council

Activities
Amador Homeowners Association: Chairman-Architectural Committee
Brethren in Christ Church: Chairman-Building Committee

DANIEL UBOVICH
8090 Cornwall Court Unit #49, Rancho Cucamonga, California 91739, 951.809.2035,
du112fc06@westpost.net

You might also like