You are on page 1of 12

BILL OF QUANTITIES Sl.No Description of the items Unit Qty Rate (Rs.) Amount (Rs.

1.00 Excavation and Backfilling works 1.01 Earth work excavation in all types of soil excluding hard rock requiring blasting for column foundations, trenches, drains, plinth beams, underground sump, cable trenches manholes, Cft brick-footing etc. including dressing of sides and ramming bottoms including dewatering subsoil water or chemically contaminated water, shoring, strutting labour, tools and tackles etc. complete, a) Above 1.5m Depth Cft 1.02 Back filling with approved earth in trenches, plinths, foundations under floors etc. Wherever required in layers not exceeding 15cm depth and Cft consolidating each layers by ramming and watering etc. complete as per the direction of engineer-in-charge. 1.03 Filling with approved earth in trenches, plinths foundations under floors etc. Wherever required in layers not exceeding 15cm depth and Cft consolidating each layers by ramming and watering etc. complete as per the direction of engineer-in-charge. 1.04 Supplying and filling with approved river sand under floors, foundations, plinth etc. spreading in layers of 15cm at all depths, watering, ramming, Cft compacting etc complete as per standard specification. 2.00 Concrete & allied work

0.00

0.00

0.00

0.00

0.00

0.00

2.01 Providing and laying plain cement concrete of grade 1:5:10 (1 cement:5 sand :10 coarse aggregate) with 40mm nominal size of blue granite metal of approved quality over river sand Cft layer as levelling course in foundations under floors on sub grade pavements etc including tamping ,curing ,shuttering complying with standard specification 2.02 Providing and laying plain brick jelly concrete 1:5:10 (1 cement:5sand :10 brick ballast 25mm Cft nominal size) in filling of sunken floors in toilet, pantry at all levels. Total carried over to summary 3.00 Antitermite treatment 3.01 Providing and injecting chemical emulsion in the ratio of 1:19 ( 1 part of chemical and 19 parts of water ) for pre constucti0nal anti termite treatment and creating a chemical barrier under Sft and all round foundations trenches, basement excavation, top surface of plinth filling junction of walls and floors along the external perimeter of building expansion joints etc Total carried over to summary

0.00

0.00 0.00 0.00

0.00

0.00

Page 1 of 12

Sl.No 4.00

Description of the items Centering and shuttering Work Supplying, erecting, centering and shuttering works of any shape using mild steel sheets or 90 cm x 60cm or any other approved centering material by architect with necessary supports, cross bracings etc. Rate should cover decentering of the same as directed by the architect etc. complete for the following works.

Unit

Qty

Rate (Rs.)

Amount (Rs.) 0.00

0.00

4.01 Foundation a) under ground sump b) Grade beam c) Pile cab d)R.c.c wall f) Over Head Tank 4.02 Column in any shape in all floors a) Basement Floor b) Stilt cum Ground Floor c) First floor d) Second Floor e) Third Floor f) Fourth Floor e) Terrace floor 4.03 Sunshades, canopy, loft slab, Helical staircase, waist slab etc. in all floors a)Stilt Floor b) First Floor c) Second Floor d) Third Floor e) Fourth Floor f) Terrace floor Sft Sft Sft Sft Sft Sft Sft Sft Sft Sft Sft Sft Sft Sft Sft Sft Sft Sft

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Page 2 of 12

Sl.No

Description of the items

Unit

Qty

Rate (Rs.)

Amount (Rs.) 0.00

4.04 Lintel Beam & Floor beam including curved or any shape in all floors a) Basement Floor b) Stilt cum Ground Floor c) First floor d) Second Floor e) Third Floor f) Fourth Floor g) Terrace floor 4.05 Roof/floor Slabs including curved or any shape in all floors a) Basement Floor b) Stilt cum Ground Floor c) First floor d) Second Floor e) Third Floor f) Fourth Floor g) Terrace floor 4.06 Providing Coffer salbs including curved or any shape in all floors a) First floor b) Second floor 4.07 Sft Sft Sft Sft Sft Sft Sft Sft Sft Sft Sft Sft Sft Sft Sft Sft

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Exposed conctere (M20) (1:5:3) at Front elevation Sft ( Water proof ply wood to be used for centering) Reinforced cement concrete work Providing and laying reinforced cement concrete of specified grade with 20mm graded HBG. metal and river sand for all structures, sub structures like foundations, footings, column (any shape) plinth beams, (any shape) lintel, roof beam coffer beam, pergola, slopped/ flat roof slab any shape etc including cost of labour, materials, curing charges, tamping vibrating with all necessary tools and tackles complete but excluding shuttering and centering work and the cost of reinforcement and fabrication

5.00

0.00

Page 3 of 12

Sl.No 5.01 Foundation

Description of the items

Unit

Qty

Rate (Rs.)

Amount (Rs.) 0.00

a) In pile foundations, (M25) (1:1:2) b) basement floor Bottom slab & wall c) Pile cap (M20) (1:1.5:3) d) Grade beam (M20) (1:1.5:3) e) Sump concrete for with admixtures (M20) (1:1.5:3) f) Over Head Tank (M20) (1:1.5:3) 5.02 Column in any shape in all floors (M20) (1:1.5:3) a) Basement Floor b) Stilt cum Ground Floor c) First floor d) Second Floor e) Third Floor f) Fourth Floor g) Terrace floor 5.03 Sunshades, canopy, loft slab, Helical staircase, waist slab etc. in all floors (M20) (1:1.5:3) a) Basement Floor b) Stilt cum Ground Floor c) First floor d) Second Floor e) Third Floor f) Fourth Floor g) Terrace floor 5.04 Lintels, roof beams, tie beams in any shape in all floors (M20) (1:1.5:3) a) Basement Floor b) Stilt cum Ground Floor c) First floor d) Second Floor wate proofing

Cft Cft Cft Cft Cft Cft

0.00 0.00 0.00 0.00 0.00 0.00 0.00

Cft Cft Cft Cft Cft Cft Cft

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Cft Cft Cft Cft Cft Cft Cft

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Cft Cft Cft Cft

0.00 0.00 0.00 0.00

Page 4 of 12

Sl.No

Description of the items e) Third Floor f) Fourth Floor g) Terrace floor

Unit Cft Cft Cft

Qty

Rate (Rs.)

Amount (Rs.) 0.00 0.00 0.00 0.00

5.05 Roof/floor slabs including curved or any shape in all floors (M20) (1:1.5:3) a) Basement Floor b) Stilt cum Ground Floor c) First floor d) Second Floor e) Third Floor f) Fourth Floor g) Terrace floor Cft Cft Cft Cft Cft Cft Cft

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

5.06 Exposed conctere (M20) (1:5:3) at Front elevation Cft ( Water proof ply wood to be used for centering) Total carried over to summary 6.00 Steel and Metal Work 6.01 Taking delivery of reinforcement bars from company stores, fabricating and fixing in position of high yield strength deformed reinforcement bar for RCC work including straightening, cleaning, cutting, bending to shape and length as per MT drawings including cost of binding wire of 18 SWG placing with proper cover blocks, supports chairs spacers fan hooksetc,complete in all floors including cost of reinforcement

0.00

6.02 Supplying and fixing M.S. ornamentals grills to K.G Detail in opening 6.03 6.04 Supplying and fixing of M.S Rolling Shutter Sq.Ft

0.00 0.00

Providing and fixing in position handrails M.S and grabrails fabricated out of salem stainless steel 304 grade with minimum 4.5% nickel and 18% chromium and bright polished, including matching stainless steel items such as bars, plates, screws R.Ft etc., welding and forming units with best workmanship set in position in to existing masonry / concrete and making good the same, all complete as per specifications, drawings and / or as directed by the engineers.

0.00

Page 5 of 12

Sl.No

Description of the items

Unit

Qty

Rate (Rs.)

Total carried over to summary 7.00 Masonry Work Random Rubble Masonry with hardstone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse 7.01 sand: 12 graded stone aggregate 20mm normal size) at plinth level : window sills : ceiling level : and the like with cement morter 1:6 (1 Cement : 6 coarse sand) a. Extra for random rubble mazonry above plinth level upto First floor level b. Above First floor level upto second floor level c. Above Second floor level upto third floor level Coarse rubble masonry (1st sort) with hard stone 7.02 in foundation & plinth with cement mortar 1:6 (1 Cement 6 coarse sand) a. Extra for course rubble mazonry with above plinth level upto First floor level b. Above First floor level upto second floor level c. Above Second floor level upto third floor level Stone work in plane ashlar in super structure above plinth level upto first floor level in cement mortar 1:6 (1 cement 6 coarse sand) including 7.03 pointing with cement mortar 1:2 (1 white cement 2 stone dust) with an admixture of pigment matching this stone shade using (i) Red sand stone. (ii) White sand stone. a. Extra for stone work plain ashlar or ashlar punched (i) Above first floor level upto second floor level (ii) Above second floor level upto third floor level 7.04 Providing and laying brick masonry work for walls in foundation, superstructure, parapet etc, using good quality approved stock bricks in cement mortar 1:5 of 230mm thickness of any shape according to Architectural drawing / instructions and including scaffoldings,stagings,curing,raking out joints,etc.complete complying with standard specification a) Basement Floor b) Stilt cum Ground Floor c) First floor d) Second Floor e) Third Floor f) Fourth Floor g) Terrace floor 7.05 Providing and laying 115mm thick brick work in cementmortar 1:4 with approved good quality approved second sort table moulded (chamber burnt) bricks including providing openings supplying and placing of 2 nos, 6mm dia MS round bars at every fourth course with necessary scaffolding, staging, curing, raking out joints in all floors as specified and directed etc. complete Cft Cft Cft Cft Cft Cft Cft

Amount (Rs.) 0.00 0.00

0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00

Page 6 of 12

Sl.No a) First floor

Description of the items

Unit Sft Sft Sft Sft

Qty

Rate (Rs.)

Amount (Rs.) 0.00 0.00 0.00 0.00 0.00

b) Second Floor c) Third Floor d) Fourth Floor 8.00 Plastering Work 8.01 12mm cement plaster in cm 1:3 (1 cement : 3 sand) to ceiling, beam soffits and sides, sunshades etc., discontinuous to masonry including preparation of surface cleaning, scaffolding, curing etc. to have uniform and smooth finished surface and making wall grooves etc complete in all floors

0.00

Page 7 of 12

Sl.No

Description of the items a) Basement Floor b) Stilt cum Ground Floor c) First floor d) Second Floor e) Third Floor f) Fourth Floor g) Terrace floor

Unit Sft Sft Sft Sft Sft Sft Sft

Qty

Rate (Rs.)

Amount (Rs.) 0.00 0.00 0.00 0.00 0.00 0.00 0.00

8.02 12mm cement plaster in cm 1:4 (1cement :4 sand) to all walls and/or concrete surfaces including cleaning racking out joints, hacking concrete surfaces, scaffolding, watering, curing, etc. complete for all heights to have uniform finished surface a) Basement Floor b) Stilt cum Ground Floor c) First floor d) Second Floor e) Third Floor f) Fourth Floor g) Terrace floor Sft Sft Sft Sft Sft Sft Sft

0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

8.03 15mm cement plaster in cm 1:4 (1cement :4 sand) to all walls and/or concrete surfaces including cleaning racking out joints, hacking Sft concrete surfaces, scaffolding, watering, curing, etc. complete for all heights to have uniform finished surface at all floors Total carried over to summary 9.00 Flooring & Facias Works 9.01 Providing and laying ceramic non slippery floor tiles 300 x 300 mm of first quality conforming to IS:13755 of NITCO, ORIENT, KAJARIA, SOMANY, or equivalent make in all colours, shades, design and prints, except white, ivory, Sft grey, fume red brown aid in 20 mm thick bed of cement mortar 1:4( 1 cement: 4 Sand) including pointing the joints with white cement and matching pigments etc.complete Providing and laying ceramic glazed wall tiles 9.02 300 x 300 mm of first quality conforming to IS:13755 of NITCO, ORIENT, KAJARIA, SOMANY, or equivalent make in all colours, shades, design and prints, except white, ivory, Sft grey, fume red brown aid in 20 mm thick bed of cement mortar 1:4( 1 cement: 4 Sand) including pointing the joints with white cement and matching pigments etc.complete 9.03 Providing and fixing 20mm thick mirror polished, machine cut granite for facias and similar locations of required size of approved shade, colour, pattern and texture laid out over 20mm Sft thick base cement mortar 1:4 (1 cement: 4 Sand) including pointing the joints with white cement and matching pigments etc. complete

0.00

0.00 0.00

0.00

0.00

0.00

Page 8 of 12

Sl.No

Description of the items

Unit

Qty

Rate (Rs.)

Amount (Rs.) 0.00

9.04 Providing and laying Eurocon/ ultra tiles size300 x300 mm thick of approved quality and required sizes in flooring laid over a base cement mortar Sft 1:4 20 mm thick with cement slurry including finishing etc complete. 9.05 Providing and laying in position Inter locking Pavor Block 60mm thick over a bed of rivier sand of 25mm thick including joints should be neatly Sft finshed etc complete as per instructions of the Architect 9.06 Stone Cladding work at Front Elevation From Sft sadhurly gray Granite Flamed Finish Total carried over to summary 10.00 Joinery & Joinery fittings 10.01 Labour charges for making and fixing of single leaf pannelled door with First quality burma teak wood frame of size 6"x3" and shutters with top rail and other intermediate rails of size 6"x2" bottom rail being 9"x2" with panel of 20 mm teak wood planks . The pannel to have 1"x.75" teak wood beading alround as per drawing inclusive of fixing 6 nos(50x6x225mm) of MS iron hold fasts fixed in C.C. 1:2:4 etc., including fixing of joinery fittings to all complete. for maindoor c) First floor d) Second Floor e) Third Floor f) Fourth Floor g) Terrace floor 10.02 Labour charges for making and fixing of single leaf flush door with best quality African teak woor frame size 5"x3" and shutters be of 35 mm solid flush door with veneer finish including the cost of fixing (50x6x225mm) six nos MS hod fasts to frames . providing pockets in brick wall and grouting with cement concrete 1:2:4 after fixing holdfasts and frames in position the rate excludes cost of joinery fittings but include fixing charges for the same. a) Stilt cum Ground Floor b) First floor c) Second Floor d) Third Floor Sft Sft Sft Sft Sft Sft Sft Sft Sft

0.00

0.00 0.00 0.00

0.00

0.00 0.00 0.00 0.00 0.00

0.00

0.00 0.00 0.00 0.00

Page 9 of 12

Sl.No

Description of the items e) Fourth Floor f) Terrace floor

Unit Sft Sft

Qty

Rate (Rs.)

Amount (Rs.) 0.00 0.00

10.03 Labour charges for making and fixing of windows and ventilators with best quality of teak wood frame size 4"x2.5 " and with teak wood rail 3"x1.5" with 4mm clear glass. the pannel to have 1"x 3/4" teak wood beading alround. Providing pockets in brick wall and grouting with cement concrete 1:2:4 after fixing holdfasts and grames in position . the rate excludes cost of joinery fittings but include fixing charges for the same a) Stilt cum Ground Floor b) First floor c) Second Floor d) Third Floor e) Fourth Floor f) Terrace floor 11.00 Weather proof and water proofing Sft Sft Sft Sft Sft Sft 0.00 0.00 0.00 0.00 0.00 0.00

11.01 Providing chemical water proofing for sunken slabs including preparing the surface, necessary pressure grouting and application of water proofing coats in two layers as directed. The Sft water proofing to be carried out by the authorised application of fosroc or sika or equivalent. The specifications has got to be approved by the Engineer-in-charge before execution of work. 11.02 Providing and laying weathering course using brick jelly lime concrete composed of 50 Cft. lime to 128 Cft. of brick bats 25mm nominal size for every 100 Cft. off consolidated concrete laid to a average thickness of 100mm including mixing Cft adequate quantity of adhesives like kadukkai water jaggery tamping and consolidation splashing and junction between parapet and roof slab etc.complete in terrace level 11.03 Providing and laying mechanically pressed clay tiles of 20mm thick size 8 x 8 or other size approved by the Architect and set in cement mortar 1:3 (1 cement : 3 sand) mixed with crude oil at 5% weight of cement used and joints neatly Sft pointed with colour pigments including cost of all materials Red oxide water proofing compound, all labour charges etc, complete complying with standard technical specifications and as directed by the architect/ Engineer -in charge Total carried over to summary 12.00 PAINTING AND FINISHING WORK

0.00

0.00

0.00

0.00 0.00

Page 10 of 12

Sl.No

Description of the items

Unit

Qty

Rate (Rs.)

Amount (Rs.)

12.01 Supply and applying of one coat primer two coats of ACE exterior emulsion approved make and shade to wall surfaces to give smooth and even Sft surface including preparation of surface, scaffolding etc. complete in all floors. (Asian) at all floors 12.02 Finishing walls with Textured exterior paint of approved brand and manufacturer of required colour to give an even shade all complete as per Sft drawings, specifications and / or as directed by the engineer. 12.03 Preparing the surface, supply and applicant of 2 coats supercem paint a) Basement Floor b) Stilt cum Ground Floor c) First floor d) Second Floor e) Third Floor f) Fourth Floor g) Terrace floor 12.04 Preparing of Door,Window & ventilator - supply and application of one coat primer and touch up putty and Sealer and melamine mat finishing work Total carried over to summary 13.00 Miscellaneous Work: 13.01 ACP work with exterior wall on Front side from Sft first floor to terrace floor 13.02 Structural Galzing work with exterior wall on front Sft side from First floor to Terrace floor 13.03 Construction of 9"thick Compound wallup to height of 6'-0" from existing ground level with Sft necessary R.C.C piles, Plinth beam, Brick Work, Plastering with providing 16' -0" wide fate at 2nos. Total carried over to summary
TOTAL AMOUNT Area

0.00

0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Sft Sft Sft Sft Sft Sft Sft Sft

0.00

Page 11 of 12

PROPOSED OFFICE BUILDING FOR MRS. LALITHA KUMARAMANGALAM AT NUNGAMBAKKAM, CHENNAI

RECOMMENDED BRAND OF MATERIALS

CEMENT

Ultratech, Coromandel, Texmaco,ACC Madras Cements or any other make approved by the Architect

STEEL

SAIL, TATA, RKKR, or any other make approved by the Architect

ALUMINIUM

Indal,Hindalco,Jindal,Architects incorporated southern Aluminium industrial alucrafts,Metal fab corporation.Ajit india or any other make approved by the Architect

Glass

Saint Gobain, Modi or any other make approved by the architect

Wall Tiles

NITCO, ORIENT, KAJARIA, SOMANY or any other make approved by the Architect

Floor Tiles

NITCO, ORIENT, KAJARIA, SOMANY or any other make approved by the Architect

Page 12 of 12

You might also like