You are on page 1of 2

Estimation of Construction cost of Residential Buildings

Area Sq. m.

75

Apply to 30-300 Sq m
Apply up to 100 sq.m
Load Bearing str.
For Four Story
For Single
Rate Analysis For Double Rate Analysis
RCC Frame
Rate Analysis
super
sub
23630
59075
22425
56062.5
11180
27950
12.05
52998
11.42
50226
13.3
1.52
65190.4
1283.5
44922.5
1342.75
46996.25
3384
382.88
131840.63
28.25
9887.5
22.6
7910
26.7
2.7
10288.25
12.99
3247.5
13.14
3285
21.38
5.32
6672.5
12.38
4331.25
6.41
2241.75
1.16
0.05
425.25

Materials

Unit

Rate

Bricks
Cement
Steel
Sand
20mm
40mm

No.
tone
kg
cum
cum
cum

2.5
4400
35
350
250
350

Brick Aggr

cum

600

7.65

4587

3.78

2268

1.6

Tiber Frame and Shutter


Timber Shuttering
Ballies
Lime
surkhi
Bitumen
Glass
Primer
Paint
Stone rubble

cum
cum
m
quintal
cum
kg
sqm
lt
lt
cum

32000
32000
15
220
33
20
120
15
20
600

1.66
0.32
37.8
10.53
3.53
128.7
4.07
5.1
8.37

52960
10080
567
2315.5
116.49
2574
488.4
76.5
167.4

1.66
0.32
37.8
5.31
1.77
64.85
4.07
5.1
8.37

52960
10080
567
1167.1
58.41
1297
488.4
76.5
167.4

1.61
0.65
65.09
4.65
0.75
26.92
4.14
5.14
8.31

Days
Days
Days
Days
Days

250
300
200
250
150

128.13
79.8
66.75
9.18
389.68

957.6

0.05
2.76

2.4

51520
22320
1017.75
1021.9
24.75
538.3
496.8
77.03
166.1
1440

Labour
Mason
Carpenter
Painter
Blacksmith
Mazdoor

Water supply , plumbing , drains


electrical wiring (20%)

20%-->
No. of Storey
Total Cost

32031.25
23940
13350
2293.75
58451.25
378460.29
75692.06
1
454152.35

126.13
80.55
6.68
16.55
401.25

31531.25
24165
1335
4137.5
60187.5
357207.56
71441.51
2
857298.14

123.25
120.75
6.75
58.28
402.55

1.73
3.75

25.73

31243.75
37350
1350
14568.75
64241.25
470701
94140.2
4
2259364.8

Estimation of Construction cost of Residential Buildings


Area Sq. m.

80

Apply to 30-300 Sq m
Load Bearing str.
For Single
Rate Analysis For Double Rate Analysis

Materials

Unit

Rate

Bricks
Cement
Steel
Sand
20mm
40mm

No.
tone
kg
cum
cum
cum

2.5
4000
35
350
250
350

24760
12.81
1390
30.6
13.87
13.1

61900
51240
48650
10710
3467.5
4585

23500
12.14
1452.6
24.48
14.03
6.78

58750
48560
50841
8568
3507.5
2373

Brick Aggr

cum

600

8.21

4926

4.06

2436

Tiber Frame and Shutter


Timber Shuttering
Ballies
Lime
surkhi
Bitumen
Glass
Primer
Paint
Stone rubble

cum
cum
m
quintal
cum
kg
sqm
lt
lt
cum

32000
32000
15
220
33
20
120
15
15
600

1.75
0.34
40.32
11.25
3.79
137.88
4.39
5.44
8.91

56000
10752
604.8
2475
125.07
2757.6
526.8
81.6
133.65

1.75
0.34
40.32
5.67
1.9
69.44
4.39
5.44
8.91

56000
10752
604.8
1247.4
62.7
1388.8
526.8
81.6
133.65

Days
Days
Days
Days
Days

250
250
150
200
150

134.8
85.72
71.2
9.52
413.52

33700
21430
10680
1904
62028
388677.02

132.8
86.52
7.12
17.92
425.8

33200
21630
1068
3584
63870
369185.25

Labour
Mason
Carpenter
Painter
Blacksmith
Mazdoor

Water supply , plumbing , drains


electrical wiring (20%)

15%-->
No. of Storey
Total Cost
per Sq Ft

58301.55
1
446978.57
595.97

55377.79
2
849126.08

You might also like