M.Sc. Matti Kivel Power Plant Manager R&D Lahti Energia Oy P.O. Box 93 FIN-15141 Lahti Finland Tel. 358 3 823 3240 matti.kivela@lahtienergia.fi
Contact
LAHTI ENERGIA OY
Founded. 1907 Turnover Personnel Electricity Energy Electricity Transfer District heating Steam Natural gas Customer - Electricity - District Heating - Natural Gas - Steam - Disctrict Cooling (Privat company 1.7.1990) 2005 122 235 1 246 1 217 1 259 348 236 86 468 79 752 6 371 335 9 1 2004 125 254 1 518 1 278 1 246 437 238 85 847 79 157 6 206 306 8 1 milj.
GWh GWh GWh GWh GWh kpl kpl kpl kpl kpl kpl
Other 0,5 %
Oil 0,8 %
Coal 49,5 %
FUEL TO PROCESS
60 MW 300 MW 140 MW
Heat Recovery Boiler
130 MW
DISTRICT HEATING
250 MW
POWER
45 MW
Gas Turbine
Cooling water
60 MW Gasifier
Gas flame
Coal
Bottom ash
Fly ash
Natural Gas
REF Reception
Magnetic Separation
EMISSION RAPORT
Component 11% O2 Hg Cd Tl Cd+ Tl Ni As Cu Co Pb Cr Sb Mn V Sn Zn Sb+As+Pb+Cr+Co+Cu+Mn+Ni+V HCl HF Particulates PCDD/F (ng/mn I-TEQ) Referens 1997 g/mn 0,4 1,1 1,1 5,8 2,9 6,2 6,7 5,9 Meas. 1998 g/mn 0,9 0,9 0,9 10,6 7,7 12,3 8,4 9,8 Meas. 2001 g/mn 0,7 0,1 0,1 2 1,4 2,8 0,6 * 2,8 0,3 15 3,5 0,6 11 28,4 24 5 15 0,0007 Meas. 2003 g/mn < 0,2 0,1 < 0,6 0,7 1,6 1,4 2,1 0,2 2,8 3,8 0,7 2,3 1,8 0,7 10,3 16,7 27 0,3 7 < 0,001 Meas. 2004 g/mn 0,01 0,1 <0,05 0,1 1,8 1,5 6,5 0,5 4,8 7 1,8 6,8 2,8 1,2 24,5 59,2 62 0,6 7 0,14 Meas. 2005 g/mn 0,06 0,2 <0,2 0,44 3,2 1,5 7,1 0,7 5,4 3,8 3,8 7,1 3,8 1,2 21,9 36,4 45 1,9 9 < 0,01
41,7 48,8 11 2 13
Ashes
Leachability tests performed for main boiler filter ash and gasifier bottom ash Trace metal leachabilities low Gasifier bottom ash dumped Main boiler filter ash used on construction works (roads, etc.)
Authorities permission required case by case
11 34
11 31
11 38
8 38
20 % 0%
48
Due to interpretation of WI-directive it is nessessery to do someting:(dead line 28.12.2005) continue with clean wood only cleaning of product gas before boiler and have acceptance for it new Power Plant for waste
Inertisointi N2
Suodin
N2 TUOTEKAASUKANAVA
Kaasunjhdytin
Hyry
Vesiquench N2
N2
Inertisointi
Hyry
Gasifier
Fuel 160 MW
Lay out
CONCLUSIONS
This concept offers efficient way to utilize biofuels and recycled refuse fuels utilization of the existing power plant capacity. Only small modifications in the main boiler Low investment and operation costs Low personal cost High efficiency Reduction of CO2-emission (10-15 %) Possible disturbances in the gasifier do not shut down the whole power plant.
Gasifier Building
REF Reception
REF
Wood
Mixed fuel
To Gasifier