24-02-2010 Thiruvananthapuram
CASE STUDY-1
CASE STUDY-1
Consolidated Cost Benefit Analysis of Energy Efficiency Improvement Projects
Sl No 1 2 3 4 5 6 7 8 9 10 11 Projects Investment (Rs)
Installation of 65 T-5 Tube Lights Energy Saving in 63KVA DG Good Kitchen Practices New 10m3, Biogas plant 1500 L Solar water heater for hot water supply for Kitchen
Cost saving(Yearly) (Rs) 92137.50 65380.00 14647.50 157500.00 72450.00 26250.00 63000.00 5901.00 6300.00 14700.00 53151.00 1150623.18
Payback (Months) 2.96 0.92 1.64 11.43 24.84 4.57 0.00 6.10 9.52 0.00 1.83 3.87
Energy saved(Yearly) (KWh) 8775.00 19801.00 1395.00 48837.00 14651.16 2500.00 6000.00 562.00 600.00 1400.00 5062.00 109583.16
22750.00 5000.00 2000.00 150000.00 150000.00 10000.00 0.00 3000.00 5000.00 0.00 8100.00 355850.00
Improving Practices
House
Keeping
Energy Saving in Existing Air Conditioners Reducing Water Pipe line pressure using reducers in Wash Basins
Follow up Training
Activities
and
Total
DRAIN
DRAIN
DRAIN
DRAIN
WATER MOVEMENT
DISH MOVEMENT
DISH MOVEMENT
Particulars Remarks 5000.00 10.50 22750.00 8775.00 92137.50 2.96 SHORT TERM
CASE STUDY-2
CASE STUDY-2
Description Name of Hotel Air Conditioned Area Total Build up area Star Classification Number of guest rooms Contract demand Transformer Capacity Installed generator capacity Installed air conditioned capacity Installed hot water capacity Details Resort 1812.34 m2 3272.34 m2, over a total land space of 25 acres 3 stars 80 rooms 240 kVA 500 kVA 365 kVA, 125 kVA 499.8 kW 32 Solar panels providing 3000 liters hot water
CASE STUDY-2
Average Monthly Energy Consumption
Average Monthly Energy Bill
LPG (kg) 1% Elec (kWh) Elec (kWh) 61% HSD (liters) LPG (kg)
Elec (INR) 71%
Area
Recommendations
Energy Environmental Saving Saving (MWh/year) (tCO2/year) 91.86 0.8665 169.596 0.438 0.0006 2.928 5.676 69.6299 0.6568 128.5538 0.3320 0.0005 2.2194 4.3024
Diesel Generator Kitchen Refrigeration and AC Refrigeration Lighting Toilet Lighting Laundry Tumble Drier Laundry Ironing Building Envelope
Replace with higher efficiency DG Replace stove head and cooking utensils Using VFD Replace incandescent bulb with CFL Installing Occupancy Censor Extend flame nozzle and insulate burning area Install cutoff Double glazing window, increasing set temperature by 2C, adding wall and roof insulations Total
338.2
256.3556
609.5651
462.0503
Current annual energy Energy saved with measures New annual energy Total floor area (m2) EUI
Energy saved with new measures New energy consumption refering to December 2008 New EUI for 72 rooms (90% occ)
609565 kWh/year 50797.08 kWh/month 70021.85 kWh/month 2258.77 kWh/day 31.37 kWh/room/day
CASE STUDY-3
CASE STUDY-3
Description Name of Hotel Air Conditioned Area Total Build up area Star Classification Number of guest rooms Contract demand Transformer Capacity Installed generator capacity Installed air conditioned capacity Installed lighting capacity Installed hot water
Details KTDC 2119.56 m2 3517.24 m2, over a total land space of 5 acres 2 stars 64 rooms 113 kVA 500 kVA 250 kVA, 110 kVA 236 kW 90.5 kW 5.2 kW
LPG 27%
HSD 11%
Elec. 72%
Electrical Index (kWh/m2/yr) Fuel Index (kWh/m2/yr) Energy Index (kWh/m2/yr) Energy Index (kWh/room/day)
280 70
270.56 47.79
Area
Recommendations
Environmental Saving (tCO2/year) 38.8005 57.9597 256.3556 0.1198 8.6321 33.1549 1.6039 9.5788 309.4452
Air Conditioning Refrigeration and AC Building Envelope Backdoor Lighting Domestic Hot Water Production Diesel Generator Pump Kitchen
Turn off AC in unoccupied room Using VFD Double glazing window, increasing set temperature by 2C, adding wall and roof insulations Replace T12 with T5 fluorescent tubes Installation of solar water heater
Replace with higher efficiency DG Relocate treated sewage water storage tank Replace stove head and cooking utensils Total
Energy saved with new measures New energy consumption refering to December 2008 New EUI for 57 rooms (90% occ)
408239 kWh/year 34019.92 kWh/month 50423.69 kWh/month 1626.57 kWh/day 28.54 kWh/room/day
Current annual energy Energy saved with measures New annual energy Total floor area (m2) EUI
CASE STUDY-4
BASELINE DATA Sl No 1 2 3 4 4 Particulars Products/ Services Average energy Consumption (Electricity) Energy cost per annum (Electricity) Total Energy Cost Annual (Electricity+LPG+HSD) Previous energy efficiency measures Description CLUB ACTIVITIES 536286 KWh/Annum 3440973 Rs /Annum 5687898.47 Rs /Annum NA
1 2 3 5
ENERGY BILL ANALYSIS KSEB CONNECTION TYPE 11KV, HT-1V CONTRACT DEMAND 240 KVA AVERAGE BILLING DEMAND 200 KVA ANNUAL ENERGY 536286 KWh CONSUMPTION (KSEB) ANNUAL DIESAL 4305L CONSUMPTION TOTAL ANNUAL ENERGY 81.88 MToE CONSUMPTION
Consolidated Cost Benefit Analysis of Energy Efficiency Improvement Projects Projects Investment (Rs) Installation of 172 T-5 Tube Lights Over Hauling 160KVA DG Repairing Biogas Plant New 15m3, Biogas plant for Club Kitchen,1,2 1500 L Solar water heater for hot water supply for Kitchen 44 T-5 lamps in Shuttle Court Energy saving at Lighting load by using voltage optimizer Installing Air Curtain in PS Hall Installing/Repairing Door Closers and use of double glazed glasses for partition Adjusting Thermostat to 24oC Reducing Water Pipe line pressure using reducers in Wash Basins Follow up Activities and Training On line energy monitoring and Management system Solar Lighting System for Street Lighting Total 77400.00 15000.00 15000.00 150000.00 300000.00 75000.00 75000.00 30000.00 201000.00 0.00 15000.00 5000.00 80000.00 215000.00 1265400.00 Cost saving(Yearly) (Rs) 97541.00 21000.00 94500.00 157500.00 51800.00 159880.00 140070.00 42000.00 51656.00 123975.00 15225.00 6852.00 116642.00 19031.00 1121857.60 Payback (Months) 9.52 8.57 1.90 11.43 69.50 5.63 6.43 8.57 46.69 0.00 11.82 8.76 8.23 135.57 21.48 Energy saved(Yearly) (KWh) 13454.00 7325.58 29302.00 48837.00 12567.00 14000.00 19320.00 5793.00 7125.00 17100.00 2100.00 600.00 9156.00 2625.00 192379.58
Energy saving at Lighting load by using voltage optimizer Description At night a load study has been taken and total lighting load drawing at night is around 30KW. There is a separate lighting feeder can be provided/ or arranged for the lighting applications. The average phase wise voltage at the facility is 241 V. For operating the lighting system is 200 to 210V. If the voltage is reduced to this range a considerable energy consumption can be reduced. The reduction is luminance level for this adjustment is very less compared to the saving achieved. A saving of 10 % can be achieved byInstall a voltage optimizer in the lighting feeder
FINANCIAL ANALYSIS SL No Description 1 Investment 2 Savings (in Rs) 3 Savings (in KWh) 4 Pay Back