JC Electrofields Power System, Inc.

was conceived in response to the need for responsible implementation of electrical systems . A company with diversified interests and resources committed to ensure the provision of current and future electrical needs of its customers through reliable products and services with superior quality and performance. JCE is an Electrical Contractor specializing in electrical systems including design, construction and completion. Conceived in 1997, it has invested years of excellent service and commitment to total customer satisfaction. The group is composed of technical personnel armed with knowledge, special skills and expertise with related experience of engineering practice in their own fields.

OUR MISSION AND COMMITMENT


To identify and to serve the needs of every customer in the most responsible manner with safety as the main consideration Strive for customers satisfaction through excellence in re liable service and superior quality of materials Enhance customers awareness of our commitment to serve their needs and the benefits that theyll gain out of our quality products and services Strengthen our commitment to responsibly attend to our c ustomers needs by constantly updating our personnel skills and expertise to modern technology through exposure to training and development programs.

PRODUCT RANGE AND SERVICES


Plant Electrical Design and Construction. Plant Electrical Maintenance. Electrical Consulting/Billing, Upgrading, Optimization. Specialists in Control Wiring and Motor Controls. PLC Design, Programming and Installation. Automation and Controls. Transmission Lines Design and Construction up to 138 KV. Transformer Rewinding, Conversion, and Servicing up to 50MVA. Specialist in Direct Connection Application for NPC/PSALM via NGCP 69 KV lines through ERC.. Specialist in Power Sub-Station Design and Construction up to 138 KV. Design , Fabrication, and Assembly of LVSG,MVSG up to 34.5 KV. Sub-Station Maintenance and Servicing . Other related products and services.

GOVERNMENT LICENSES & ACCREDITATION:

PARTIAL LIST OF PROJECTS UNDERTAKEN


Subcontracted under Foreign Contractor, Hyosung Corporation for the Luzon Substation Expansion Project 1 (SP09.LSEP1.Lt.0028) of
NATIONAL GRID CORPORATION OF THE PHILIPPINES in particular LAOAG, BANTAY, BAUANG, CRUZ-NA-DAAN, & CABANATUAN SUBSTATIONS

Substation Works Include:


1. LAOAG SUBSTATION
1.1 Installation Works of; a. 50MVA, 115/69- 13.8kV, 3, 60Hz Auto-Transformer 1set b. 115kV Capacitive Voltage Transformer 3 units c. 96kV Surge Arrester 3 units d. 69kV, 1200A, 25kA SF6 Power Circ uit Breaker 3 units e. 69kV, 1200A, 25kA Disconnect Switch 3 units f. 69kV, 1200A:5 Multi Ratio Current Trans former 3 units g. 69kV Inductive Voltage Trans former 6 units h. 115kV & 69kV Tower wit h Complete Electrical Hardwares 1 lot i. Grounding Materials 1 lot j. Power, Control and Instrumentation Cables 1 lot k. Transformer, CV T, DS & Protection Panel 1 lot 1. 2 Test & Commissioning Works of; a. Power Transformer a.1 Insulation Resistance Test a.2 Power Factor Test on each Winding a.3 Power Factor Test on all Bushings a.4 Moisture content and Dielectric Strengt h of Oil b. Circuit Breaker b.1 Insulation Resistance Test b.2 Test of Breaker Timing b.3 Test on secondary wiring insulation b.4 Tests of Gas leakage and dew point (SF6-Type) b.5 Tests of SF6 purity b.6 Checking of SF6 Pressure b.7 Operation Test c. Disconnect Switches c.1 Testing of Insulation Resistance c.2 Measurements of contact resistance c.3 Checking of Operating Mec hanism c.4 Anti condensation (Heater) function d. Current Trans former d.1 Polarity Test d.2 Ratio Test d.3 Excitation Test d.4 Winding Resistance d.5 Insulation Resistance Test d.6 Burden Measurement d.7 Insulation Power Factor e. Voltage Trans formers e.1 Ratio Test e.2 Excitation Test e.3 Winding Resistance e.4 Insulation Test e.5 Burden Measurement e.6 Insulation Power Factor

2. BANTAY SUBSTATION
2.1 Installation Works of; a. 50MVA, 115/69- 13.8kV, 3, 60Hz Auto-Transformer 1set b. 115kV Capacitive Voltage Transformer 3 units c. 96kV Surge Arrester 3 units d. 69kV, 1200A, 25kA SF6 Power Circuit Breaker 3 units e. 69kV, 1200A, 25kA Disconnect Switch 3 units f. 69kV, 1200A:5 Multi Ratio Current Transformer 6 units g. 69kV Inductive Voltage Transformer 6 units h. 15kV Metal Clad Switchgear 1 set i. 115kV & 69kV Tower with Complete Electrical Hardwares 1 lot j. Grounding Materials 1 lot k. Power, Control and Instrumentation Cables 1 lot l. Transformer, CVT, DS & Protection Panel 1 lot 2.2 Test & Commissioning Works of; a. Power Transformer a.1 Insulation Resistance Test a.2 Power Factor Test on each Winding a.3 Power Factor Test on all Bushings a.4 Moisture content and Dielectric Strength of Oil b. Circuit Breaker b.1 Insulation Resistance Test b.2 Test of Breaker Timing b.3 Test on secondary wiring insulation b.4 Tests of Gas leakage and dew point (SF6-Type) b.5 Tests of SF6 purity b.6 Checking of SF6 Pressure b.7 Operation Test c. Disconnect Switches c.1 Testing of Insulation Resistance c.2 Measurements of contact resistance c.3 Checking of Operating Mechanism c.4 Anti condensation (Heater) function d. Current Transformer d.1 Polarity Test d.2 Ratio Test d.3 Excitation Test d.4 Winding Resistance d.5 Insulation Resistance Test d.6 Burden Measurement d.7 Insulation Power Factor e. Voltage Transformers e.1 Ratio Test e.2 Excitation Test e.3 Winding Resistance e.4 Insulation Test e.5 Burden Measurement e.6 Insulation Power Factor

3. BAUANG SUBSTATION
3.1 Installation Works of; a. 100MVA, 230/69-13.8kV, 3, 60Hz Auto-Transformer 1set b. 230kV, 2000A, 40kA SF6 Power Circuit Breaker 3 units c. 230kV Capacitive Voltage Transformer 3 units d. 230kV, 2000A:5 Multi Ratio Current Transformer 6 units e. 230kV, 2000A, 44kA Disconnect Switch 6 units f. 192kV Surge Arrester 3 units g. 72.5kV, 1200A, 25kA Disconnect Switch 6 units h. 72.5kV, 2000A, 25kA SF6 Power Circuit Breaker 1 set i. 72.5kV, 1200A:5 Multi Ratio Current Transformer 3 units j. 230kV & 69kV Steel Tower Structures 1 Gantry k. 230kV & 69kV Complete Electrical Hardwares 1 lot l. Grounding Materials 1 lot m Power, Control and Instrumentation Cables 1 lot n. 15kV Metal Clad Switchgear 1 set o. Transformer, CVT, DS & Protection Panel 1 lot 3.2 Test & Commissioning Works of; a. Power Transformer a.1 Insulation Resistance Test a.2 Power Factor Test on each Winding a.3 Power Factor Test on all Bushings a.4 Moisture content and Dielectric Strength of Oil b. Circuit Breaker b.1 Insulation Resistance Test b.2 Test of Breaker Timing b.3 Test on secondary wiring insulation b.4 Tests of Gas leakage and dew point (SF6-Type) b.5 Tests of SF6 purity b.6 Checking of SF6 Pressure b.7 Operation Test c. Disconnect Switches c.1 Testing of Insulation Resistance c.2 Measurements of contact resistance c.3 Checking of Operating Mechanism c.4 Anti condensation (Heater) function d. Current Transformer d.1 Polarity Test d.2 Ratio Test d.3 Excitation Test d.4 Winding Resistance d.5 Insulation Resistance Test d.6 Burden Measurement d.7 Insulation Power Factor e. Voltage Transformers e.1 Ratio Test e.2 Excitation Test e.3 Winding Resistance e.4 Insulation Test e.5 Burden Measurement e.6 Insulation Power Factor

4. CRUZ-NA-DAAN SUBSTATION
4.1 Installation Works of; a. 100MVA, 230/69-13.8kV, 3, 60Hz Auto-Transformer 1set b. 230kV, 2000A, 44kA Disconnect Switch 3 units c. 230kV Capacitive Voltage Transformer 3 units d. 192kV Surge Arrester 3 units e. 72.5kV, 2000A, 25kA SF6 Power Circuit Breaker 1 set f. 72.5kV, 1200A, 25kA Disconnect Switch 6 units g. 72.5kV, 1200A:5 Multi Ratio Current Transformer 3 units h. 72.5kV Inductive Voltage Transformer 3 units i. 230kV & 69kV Steel Tower Structures 1 Gantry j. 230kV & 69kV Complete Electrical Hardwares 1 lot k. Grounding Materials 1 lot l. Power, Control and Instrumentation Cables 1 lot m.15kV Metal Clad Switchgear 1 set n. 460V Switchboard 1 set o. Transformer, CVT, DS & Protection Panel 1 lot 4.2 Test & Commissioning Works of; a. Power Transformer a.1 Insulation Resistance Test a.2 Power Factor Test on each Winding a.3 Power Factor Test on all Bushings a.4 Moisture content and Dielectric Strength of Oil b. Circuit Breaker b.1 Insulation Resistance Test b.2 Test of Breaker Timing b.3 Test on secondary wiring insulation b.4 Tests of Gas leakage and dew point (SF6-Type) b.5 Tests of SF6 purity b.6 Checking of SF6 Pressure b.7 Operation Test c. Disconnect Switches c.1 Testing of Insulation Resistance c.2 Measurements of contact resistance c.3 Checking of Operating Mechanism c.4 Anti condensation (Heater) function d. Current Transformer d.1 Polarity Test d.2 Ratio Test d.3 Excitation Test d.4 Winding Resistance d.5 Insulation Resistance Test d.6 Burden Measurement d.7 Insulation Power Factor e. Voltage Transformers e.1 Ratio Test e.2 Excitation Test e.3 Winding Resistance e.4 Insulation Test e.5 Burden Measurement e.6 Insulation Power Factor

5. CABANATUAN SUBSTATION
5.1 Installation Works of; a. 300MVA, 230/69-13.8kV, 3, 60Hz Auto-Transformer 1set b. 230kV Capacitive Voltage Transformer 3 units c. 192kV Surge Arrester 3 units d. 230kV & 69kV Bus Works 2 Gantry e. 230kV & 69kV Complete Electrical Hardwares 1 lot f. Grounding Materials 1 lot g. Power, Control and Instrumentation Cables 1 lot h. Fire Protection System of 300MVA Transformer 5.2 Test & Commissioning Works of; a. Power Transformer a.1 Insulation Resistance Test a.2 Power Factor Test on each Winding a.3 Power Factor Test on all Bushings a.4 Moisture content and Dielectric Strength of Oil b. Voltage Transformers b.1 Ratio Test b.2 Excitation Test b.3 Winding Resistance b.4 Insulation Test b.5 Burden Measurement b.6 Insulation Power Factor

Subcontracted under Foreign Contractor, Hyosung Corporation for the Luzon Substation Expansion Project 2 (SP11.LSEP2.Lt.0067) of
NATIONAL GRID CORPORATION OF THE PHILIPPINES in particular SANTIAGO SUBSTATION 1. SANTIAGO SUBSTATION
5.1 Installation Works of; a. 230kV, 2000A, 40kA SF6 Power Circuit Breaker 3 units b. 230kV, 2000A, 44kA Disconnect Switch 6 units c. 230kV, 2000A:5 Multi Ratio Current Transformer 6 units d. 192kV Surge Arrester 3 units e. 230kV & 69kV Bus Works 2 Gantry f. 230kV & 69kV Complete Electrical Hardwares 1 lot g. Grounding Materials 1 lot h. Power, Control and Instrumentation Cables 1 lot 5.2 Test & Commissioning Works of; a. Circuit Breaker b.1 Insulation Resistance Test b.2 Test of Breaker Timing b.3 Test on secondary wiring insulation b.4 Tests of Gas leakage and dew point (SF6-Type) b.5 Tests of SF6 purity b.6 Checking of SF6 Pressure b.7 Operation Test b. Disconnect Switches c.1 Testing of Insulation Resistance c.2 Measurements of contact resistance c.3 Checking of Operating Mechanism c.4 Anti condensation (Heater) function

JCE PROJECTS UNDERTAKEN:


1. Elegant Chemical Alloy Corp.
Address: Villanueva Phivedoc. Misamis Oriental Scope of Work: (A) Design & Construction of 50 MVA Substation 138 KV/69KV/3.3KV including repair and supply of 69 KV OCB & Switchgear (B) Design and Construction of Smelting Plant Electrical Systems Contact Person: Mr. Tony Tiu, Owner / 088-5670180 2. Zamcelco ( Sub-contracted under Lin Man Power ) Address: Zamboanga City Scope of Work: (A) Design & Construction of 41 MVA Substation 69 KV/13.2KV (B) Construction of 69 KV Transmission Lines, 5kms (C) Construction of 20MVA Substation, Assembly of Gas Insulated Switchgear 13.2kV

3. Melters Steel Corp.


Address: San Simon, Pampanga Scope of Work: (A) Design & Construction of 35 MVA Substation 69 KV/34.5KV (B) Design & Construction of 31 MVA Substation 69 KV/34.5KV (C) Processing of ERC Approval for 69kV Direct Connection. (D) Design & Construction of 69kV Transmission & 34.5kV Distribution Lines. Contact Person: Mr. Ricardo Lim / 09175217070

4. NorthStar Mall
Address: Ilagan, Isabela Scope of Work: A.) Design & Construction of 10MVA, 69kV/13.2kV Sub-Station B.) Design & Construction of 3x1.5MVA, 13.2kV-230/380V Sub-Station C.) Design & Construction of 69kV Transmission Lines, 800m D.) Construction of 13.2 kV Switchgear E.) Processing of ERC Approval for 69kV Direct Connection. Contact Person: Ms. Janet Tan, President

5. RJS Commodities Inc.


Address: Talavera, Nueva Ecija Scope of Work: (A) Design & Construction of 5 MVA Substation 69 KV/13.2 KV (B) Design & Construction of 3kms. 69 KV Transmission Lines (C) Processing of ERC Approval for 69kV Direct Connection. (D) Supply & Installation of 3 - 3x100 kVAR Capacitor Bank Contact Person: Mr. Ramon Syson

6. NEECO 1
Address: Nueva Ecija Scope of Work: (A) Design & Construction of 69kV Gantry & Tower Structures. (B) Sub Contracted under Pazifik Power Inc. for assembly of 20MVA, 69kV/13.2kV Substation Equipment & Switchgear. Contact Person:

7. Northwest Steel (Sub-contracted under New San Jose Builders, Inc.)


Address: Pulilan, Bulacan Scope of Work: (A) Consultancy & Supervision for the Rehabilitation of the whole Rolling Mill Plant Automation & Control System (B) Supply & Construction of 7.5MVA, 69kV/2.4kV Substation Contact Person: Engr. Nicholas Borgonia, Project Manager

8. Builders Steel Corp.


Address: Lawang Bato, Valenzuela City Scope of Work: (A) Servicing of 6 MVA Substation, 34.5kV/2.4kV Contact Person: Ms. Barbara Tiu, Owner / 02 4454170-75

9. Continental Steel Mfg. Corp.


Address: Bo. Lingunan, Valenzuela City Scope of Work: (A) Servicing of 6 MVA Substation, 34.5kV/2.4kV (B) Consultancy & Supervision for the Rehabilitation of the whole Rolling Mill Plant Automation & Control System (C) Upgrading of Mill Motor Control System Contact Person: Mr. Andrew King, Manager / 02-2928585 or 02-2932029

10. Quanta Paper Corp.


Address: Mabalacat, Pampanga Scope of Work: (A) Design & Construction of 6 MVA, 69kV/13.2kV Substation (B) Design & Construction of 69kV Incoming Transmission Line (C) Processing of ERC & NGCP approval for 69kV Direct Connection.

11. Falcon Metal Corp.


Address: San Bartolome, Quezon City Scope of Work: (A) Servicing of 5 MVA Substation, 34.5kV/2.4kV (B) Construction of 1 MVA Substation Contact Person: Mr. Eddie Go, Owner / 02-9394411 or 02-9390502

12. Centerra Ice Plant


Address: San Simon, Pampanga Scope of Work: (A) Design & Construction of 4 MVA, 69kV/480V Substation (B) Design & Construction of 69kV Incoming Transmission Line (C) Processing of ERC & NGCP approval for 69kV Direct Connection.

13. Real Steel Corp.


Address: San Simon, Pampanga Scope of Work: (A) Design & Construction of 10 MVA, 69kV/13.2kV Substation (B) Design & Construction of 69kV Incoming Transmission Line (C) Processing of ERC & NGCP approval for 69kV Direct Connection. Contact Person:

14. MJBJ Hatchery


Address: Diffun, Quirino Province Scope of Work: (A) Design & Construction of 3.75 MVA, 69kV/13.2kV Substation (B) Design & Construction of 69kV Incoming Transmission Line (C) Processing of ERC & NGCP approval for 69kV Direct Connection.

15. Bicol La Suerte Copra Mill


Address: Labo, Camarines Norte Scope of Work: (A) Design & Construction of 1.5 MVA, 69kV/460V Substation (B) Design & Construction of 69kV Incoming Transmission Line (C) Processing of ERC & NGCP approval for 69kV Direct Connection.

16. DMCI-Palawan Plant


Address: Irawan, Puerto Princesa City, Palawan Scope of Work: (A) Supply, Installation, and Testing Commissioning of 5.0 MVA, 460V/13.2kV Substation. (B) Supply, Installation and Testing Commissioning of 69kV Switchyard Equipment (CT, VT, PCB-SF6, DS, LA in particulars). (C) Design and Fabrication of 69kV Steel Structures.

17. Altima Empire Steel Corp.


Address: San Simon, Pampanga Scope of Work: (A) Design & Construction of 12.5 MVA, 69kV/13.2kV Substation (B) Design & Construction of 69kV Incoming Transmission Line (C) Processing of ERC & NGCP approval for 69kV Direct Connection. Contact Person:

18. Universal Steel Smelting Co. Inc.


Address: Balintawak, Quezon City Scope of Work: (A) Servicing of 5 MVA Substation (B) Design, Assembly, Installation of Plant Electrical and Automation Systems Contact Person: Engr. Edwin Chao,Plant Mgr. /02-3610919or02-3637081 to 82

19. Zest-O Corp. (Subcontracted under Double Share Ent. )


Address: Canlubang, Laguna Scope of Work: (A) Supply & Construction of 3 MVA & 1 MVA Substation Contact Person: Mr. Celso Sebastian, Owner / 0917-3210523

20. Albay Trading & Rice Mill


Address: Pili, Albay Scope of Work: (A) Design & Construction of 3 MVA, 69kV/13.2kV Substation (B) Design & Construction of 69kV Incoming Transmission Line (C) Processing of ERC & NGCP approval for 69kV Direct Connection. Contact Person:

21. Grande Steel Corporation


Address: Dampol 2ndB, Pulilan, Bulacan Scope of Work: A.) Design & Construction of 2.5 MVA Substation, 13.2kV/3.3kV B.) Construction of 13.2kV Distribution Line Contact Person:

22. Kabayan Ice Plant and Cold Storage


Address: Candelaria, Zambales Scope of Work: (A) Design & Construction of 2 MVA Substation 69 KV/460V (B) Construction of 69 KV Transmission Lines (C) Processing of ERC approval Contact Person: Mrs. Jing Santos, Owner / 047-2377317

23. HCH Wood Corporation


Address: Tagoloan, Phividec, Misamis Oriental Scope of Work: (A) Design, Construction & Installation of 2MVA, 69kV/240V Substation (B) Supply of 69 KV OCB & Switchgear Contact Person: Ms. Jenifer Sabenacio, AGM / (08822)74-2881

24. Philippine Recyclers Inc.


Address: Marilao, Bulacan Scope of Work: (A) Rewinding/Remanufacturing of 2 MVA Transformer & Construction of Substation Contact Person: Engr. Conrad Mendoza, Manager / 044-7112262

25. Solid Jade Corp.


Address: Bo. Bagbag, Quezon City Scope of Work: (A) Design & Construction of 1 MVA Substation, 34.5kV/460V Contact Person: Benjie / 09186369970

26. Purity Ice Plant and Cold Storage


Address: Labo, Camarines Norte Scope of Work: (A) Supply & Construction of 1 MVA Substation 69kV-277/480V Contact Person: Mr. Jaime Rabo, Owner / 02-247095

27. Unicorn Metal Corp.


Address: Punturin, Valenzuela City Scope of Work: (A) Design & Installation of 1.6 MVA Substation 34.5kV/2.4kV Contact Person: Mr. Edward Chua, Owner / 02-4329002

28. Southside Homeowners Association Inc.


Address: Jusmag, Fort Bonifcaio, Taguig City Scope of Work: (A) Supply & Construction of 1 MVA Substation 34.5kV/240V Contact Person: Mrs. Virginia Santos, President / 0917-8573352

29. Farmers Milling & Supply Inc.


Address: Panit-an Capiz Scope of Work: (A) Rewinging, Remanufacturing and Supply of 1 MVA Transformer & Supply of Accessories Contact Person: Mr. Thomas Moskal, Owner / 036-6340793

30. Top Lite Corporation


Address: Lawang Bato, Valenzuela City Scope of Work: (A) Turn key Project for the Design, Construction, Commissioning, Operational turnover of Rolling / Bar Mill Plant.

31. 21st Century Steel


Address: Bo. San Juan, Taytay, Rizal Scope of Work: (A) Supervision & Consultancy for the Rehabilitation of Mill Motors, DC Control System (B) Rehab & Repair of 34.5 KV Distribution Systems

32. Dragon Asia Rolling Mill


Address: Valenzuela City Scope of Work: (A) Design, Assembly, Commissioning of Plant Electrical and Automation Systems Contact Person: Mr. Tony L. Co, Owner / 029831758-60

33. Grand Asia Metal Corp.


Address: Bagbaguin, Valenzuela City Scope of Work: (A) Design, Assembly, Supply, Installation & Commissioning of Plant Automation Systems Contact Person: Mr. Julian Pua, VP / 02-9377920

34. Coto Mines


Address: Masinloc, Zambales Scope of Work: (A) Rehabilitation of 69 KV Transmission Lines (B) Design & Assembly of Generator Synchronizing Panel

35. White Rock Hotel


Address: Subic, Zambales Scope of Work: (A) Design & Construction of 13.2 Distribution Feeders (B) Design & Construction of Wavepool Machineries and Automation Contact Person: Mr. George Lorenzana, President

36. Malamig Park Resort


Address: Bustos, Bulacan Scope of Work: (A) Design & Construction of 13.2 Distribution Lines (B) Installation of 3x100kVA Transformer Bank (C) Design & Construction of Wavepool Machineries and Automation Contact Person: Mr. Paterno Buensuceso, Manager

37. GALILEE GARDEN RESORT


Address: Bustos, Bulacan Scope of Work: (A) Design & Construction of 13.2 Distribution Lines (B) Supply & Installation of 3x50kVA Transformer Bank (C) Supply & Installation of 2x75kVA, 1x100kVA, & 1x167kVA Transformer (D) Design & Construction of Wavepool Machineries and Automation

38. MKK Steel Corp.


Address: Bo. Lingunan, Valenzuela City Scope of Work: (A) Supply and Installation of Capacitor Banks, 34.5 KV Contact Person: Engr. Danny Anonuevo, Manager / 02-2928042

39. Legacy Steel Corp.


Address: Pasig City Scope of Work: (A) Supply & Installation of Capacitor Banks, 34.5 KV

40. MBP Star Corp.


Address: Valenzuela City Scope of Work: (A) Supply & Construction of First Private Pole, 34.5 KV Contact Person: Mr. Ax gaw, Manager / 02-4454107

41. Lunar Steel Corp.


Address: Pasig City Scope of Work: (A) Emergency Repair of Rolling Mill Motor Control & Switchgear

42. Midland Steel Corp.


Address: Cainta, Rizal Scope of Work: Testing & Servicing of 750kVA Transformer

43. CDO Foodsphere, Inc.


Address: Paso De Blas, Valenzuela City Scope of Work: A.) Rehabilitation of Electrical System B.) Supply & Installation of Nema 4X Panel (2000A), 200kVA & 2x100kVA Transformer (Dry Type) Contact Person:Mr. Jerico Tugade

44. CDO Foodsphere, Inc.


Address: Malvar, Batangas Scope of Work: A.) Servicing of 10MVA, 69kV/13.2kV Substation B.) Servicing of 3 x 2MVA & 2 x 1MVA Distribution Transformer C.) Supply & Installation of 3- 6x100 kVAR Capacitor Bank Contact Person:

45. La Suerte Rice Mill


Address: Aurora, Isabela Scope of Work: A.) Assembly & Installation of Generator Synchronizing Panel B.) Repair/Rewinding of 1100kW, 480V AC Generator Contact Person:

46. Family Choice/Golden Season Grains Center


Address: Cabatuan, Isabela / Luna, Isabela Scope of Work: A.) 13.2kV Black Start Generator Synchronizing Panel B.) 4000A Low Voltage Switchgear Wiring and Assembly Contact Person: Mr. Leoncio M. Tan,President

47. Oliver Rice Mill


Address: Talavera, Nueva Ecija Scope of Work: A.) Design and Construction of 13.2 KV Distribution Line, 2.5km B.) Supply & Installation of 1500kVA, 13.2kV/460V Transformer Contact Person:

48. Math Breeder Corp.


Address: Balagtas, Bulacan Scope of Work: (A) Design and Construction of 13.2 KV Distribution Systems Contact Person: Mr. Miguelito Hizon

49. Philippine Recyclers Inc.


Address: Marilao, Bulacan Scope of Work: (A) Installation of Main Feeder Lines for Scrubber Plant

50. Corfarm Piggery, Inc.


Address: Pandi, Bulacan Scope of Work: A.) Construction of 13.2kV Distribution Line B.) Supply & Installation of 3x100kVA, 13.2kV/230V Transformer Bank Contact Person: Mr. Miguelito Hizon, President

51. Maxima Agro. Corp.


Address: Pandi, Bulacan Scope of Work: A.) Construction of 13.2kV Distribution Line B.) Supply & Installation of 6x75kVA, 13.2kV/240kV Transformer Bank. C.) Supply & Installation of 3x167kVA, 13.2kV/240kV Transformer Bank. Contact Person: Mr. Miguelito Hizon, President

52. Everest Plastic Containers Industry, Inc.


Address: Meycuayan, Bulacan Scope of Work: A.) Upgrading of 3-3x333kVA, 34.5kV/240V Transformer Bank B.) Construction of First Private Pole, 34.5kV Dist. Line Contact Person: Mr. Lito Tan, President

53. REMS Synthetic Inc.


Address: Meycauayan Bulacan Scope of Work: (A) Design & Construction of 2-3x333kVA, 34.5kV/240V Transformer Bank Contact Person: Mr. Benito Sy / 09175326016

54. Flexible Packaging Product Corp.


Address: Lawang Bato, Valenzuela City Scope of Work: A.) Upgrading of 4x1.5MVA,34.5kV/240V Power Transformer B.) Construction of First Private Pole, 34.5kV Dist. Line Contact Person:

55. Calypso Plastic Corp.


Address: Mapulang Lupa, Valenzuela City Scope of Work: A.) Upgrading of 5x1.5MVA,34.5kV/240V Power Transformer B.) Construction of First Private Pole, 34.5kV Dist. Line Contact Person:

56. Tubo Star Steel MFG. Corp.


Address: Lawang Bato, Valenzuela City Scope of Work: A.) Supply & Installation of 3x167kVA, 34.5kV/240V Transformer Bank B.) Construction of First Private Pole, 34.5kV Contact Person: Engr. Robert Nery, Superintendent

57. Styrotech Corporation


Address: Meycuayan Bulacan Scope of Work: A.) Supply & Installation of 3-3x333kVA, 34.5kV/240V Transformer Bank B.) Construction of First Private Pole &34.5kV Distribution System Contact Person:

58. Gilvan Packaging Corporation


Address: Paso De Blas, Valenzuela City Scope of Work: A.) Supply & Installation of 2-3x333kVA, 34.5kV/240V Transformer Bank B.) Construction of First Private Pole, 34.5kV Contact Person: Mr. Jun Yao

59. Aztec Construction


Address: Cogeo, Rizal Scope of Work: A.) Supply & Installation of 3x333kVA, 34.5kV/240V Transformer Bank B.) Construction of 34.5kV Distribution Line & First Private Pole Contact Person: Mr. Kenneth Cham, President

60. JR Plastic
Address: San Pedro, Laguna Scope of Work: A.) Supply & Installation of 3-3x333kVA, 34.5kV/240V Transformer Bank B.) Construction of 34.5kV Distribution Line & First Private Pole Contact Person:

61. Plastic Plus Manufacturing Inc.


Address: Cavite Economic Zone, Rosario, Cavite Scope of Work: A.) Supply & Installation of 1-3x333kVA, 34.5kV/240V Transformer Bank B.) Construction of 34.5kV First Private Pole Contact Person:

62. Haitima Clark Corporation


Address: Clark Economic Zone, Clark, Pampanga Scope of Work: A.) Recondition & Installation of 1000kVA, 13.8kV/460V and 2000kVA, 13.8kV/230kV Transformer B.) Construction of 34.5kV First Private Pole Contact Person:

63. Sun World Corporation


Address: Guiguinto, Bulacan Scope of Work: A.) Installation of 2-3x333kVA, 34.5kV/240V Transformer Bank B.) Construction of First Private Pole &34.5kV Distribution System C.) Design & Supply of 1600A, 240V Main Distribution Panel. Contact Person:

64. Mega Prime Packaging Industrial Corp.


Address: Sta. Maria, Bulacan Scope of Work: A.) Installation of 3x333kVA, 34.5kV/240V Transformer Bank B.) Construction of First Private Pole &34.5kV Distribution System Contact Person:

65. Rizal Poultry & Livestock Association Inc


Address: Lipa City, Batangas Scope of Work: A.) Supply & Installation of 3x75kVA, 13.2kV/240V Transformer Bank B.) Construction of First Private Pole & 13.2kV Distribution System Contact Person:

66. Laguna Continental Tamamura Phils.


Address: Sta. Rosa, Laguna Scope of Work: A.) Supply & Installation of 3x167kVA, 34.5kV/240V Transformer Bank B.) Construction of First Private Pole &34.5kV Distribution System

67. RJS Commodities Inc. Isabela Plant


Address: Ramon, Isabela Scope of Work: (A) Supply & Construction of 1.5 MVA Substation 13.2kV/460V (B) Design & Construction of 13.2kV Distribution Lines. Contact Person: Mr. Ramon Syson

PARTIAL PICTURES OF UNDERTAKEN PROJECTS

NGCP - CABANATUAN SUBSTATION


300MVA, 230/69-13.8kV ELECTRICAL WORKS

NGCP - LAOAG SUBSTATION


50MVA, 115/69-13.8kV ELECTRICAL WORKS

NGCP - BANTAY SUBSTATION


50MVA, 115/69-13.8kV ELECTRICAL WORKS

NGCP - BAUANG SUBSTATION


100MVA, 230/69-13.8kV ELECTRICAL WORKS

NGCP CRUZ NA DAAN SUBSTATION


100MVA, 230/69-13.8kV ELECTRICAL WORKS

MELTERS STEEL CORP.


35MVA, 69/34.5kV SUBSTATION

MELTERS STEEL CORP.


31.5MVA, 69/34.5kV SUBSTATION

ZAMBOANGA ELECTRIC COOPERATIVE (ZAMCELCO)


2 X 20MVA, 69/13.2kV SUBSTATION

ZAMBOANGA ELECTRIC COOPERATIVE (ZAMCELCO)


2 X 20MVA, 69/13.2kV SUBSTATION

NUEVA ECIJA ELECTRIC COOPERATIVE INC. (NEECO-1)


20MVA, 69/13.2kV SUBSTATION

NORTHSTAR MALL
10MVA, 69/13.2kV SUBSTATION

10MVA, 69/13.2kV SUBSTATION

CDO BATANGAS

QUANTA PAPER CORPORATION


7.5MVA, 69/13.2kV SUBSTATION

NORTHWEST STEEL
7.5MVA, 69/2.4kV SUBSTATION

RJS COMMODITIES
5 MVA, 69/13.2kV SUBSTATION

CENTERRA ICE PLANT


4 MVA, 69/480kV SUBSTATION

KABAYAN ICE PLANT


2 MVA, 69/480kV SUBSTATION

NORTHSTAR MALL
69kV TRANSMISSION LINE CONSTRUCTION

QUANTA PAPER CORPORATION


69kV TRANSMISSION LINE CONSTRUCTION

69kV TRANSMISSION LINE CONSTRUCTION

MELTERS STEEL CORP.

ZAMBOANGA ELECTRIC COOPERATIVE (ZAMCELCO)


69kV TRANSMISSION LINE CONSTRUCTION

CENTERRA ICE PLANT


69kV TRANSMISSION LINE CONSTRUCTION

MELTERS STEEL CORP.


6-2400kVAR, 34.5kV CAPACITOR BANK

JR PLASTIC
3 3X333kVA, 34.5kV/139V-277V TRANSFORMER BANK

REMS SYNTHETIC INC.


2 3X333kVA, 34.5kV/139V-277V TRANSFORMER BANK

PLASTIC PLUS MANUFACTURING INC.


3X333kVA, 34.5kV/277V-480V TRANSFORMER BANK

CORFARM PIGGERY INC.


3X100kVA, 13.2kV/139V-277V TRANSFORMER BANK AND 13.2kV FIRST PRIVATE POLE

MALAMIG PARK RESORT


3X100kVA, 13.2kV/139V-277V TRANSFORMER BANK AND 13.2kV DISTRIBUTION LINE

MAXIMA AGRO CORP.


2 - 3X75kVA, 13.2kV/139V-277V TRANSFORMER BANK AND 13.2kV FIRST PRIVATE POLE

ZAMBOANGA ELECTRIC COOPERATIVE (ZAMCELCO)


15kV GAS INSULATED SWITCHGEAR ASSEMBLY

CDO-BATANGAS PLANT
13.2kV DISTRIBUTION PANEL SERVICING

NORTHWEST STEEL CORP.


ROLLING MILL PLANT AUTOMATION

NUEVA ECIJA ELECTRIC COOPERATIVE INC. (NEECO-1)


PROTECTION & FEEDER CONTROL ASSEMBLY

NORTHSTAR MALL
13.2kV, 1250A SF6 SWITCHGEAR DESIGN & ASSEMBLY

GOLDEN SEASON GRAIN CENTER INC.


4000A, 220V LOW VOLTAGE SWITCHGEAR DESIGN & ASSEMBLY

GOLDEN SEASON GRAIN CENTER INC.


13.2kV, 1250A VCB SWITCHGEAR DESIGN & ASSEMBLY

LA SUERTE RICE MILL


GENERATOR SYNCHRONIZING PANEL DESIGN & ASSEMBLY

MALAMIG PARK RESORT


WAVEPOOL CONTROL PANEL DESIGN & ASSEMBLY

TRANSFORMER CONVERSION
3.0MVA, 34.5kV/480V(Y)/277V TO 3.0MVA, 69kV/3.3kV

LA SUERTE RICE MILL


1100kW, 480V(Y), 1650A AC GENERATOR REWINDING

MELTERS STEEL CORP.


5x37kW, 9x28kW, 2x22kW, & 3x19kW AC MOTOR REWINDING

PICTURES OF TESTING INSTRUMENT

CIRCUIT BREAKER TIMER TEST SET CBT-6P

CAPACITANCE & DISSIPATION FACTOR TEST SET CDF-12A

TRANSFORMER OIL DIELECTRIC TESTER

RELAY TEST SET REL-200

TRANSFORMER WINDING RESISTANCE METER TRM-10P

AUTOMATIC TRANSFORMER RATIO TESTER ATRT-01B

TRANSFORMER IMPEDANCE ANALYZER TEST SET TRZ-10

RELAYING CT TEST SET ACT-200

TRANSFORMER TURNS RATIOMETER TTR-3000

GROUNDING TESTER 3150

HIGH VOLTAGE INSULATION TESTER K3125

MEDIUM & LOW VOLTAGE INSULATION TESTER MIT310

MARKER TUBE PRINTER LM-390A

PICTURES OF TOOLS AND EQUIPMENTS

CABLE PULLER EQUIPMENT AND CABLE UNCOILER

SHAPER & LATHE MACHINE

IRON JAW WORKER

TRANSFORMER OIL DEGASIFIER

HYDRAULIC CRIMPER

ELECTRICAL BUCKET TRUCK

BOOM TRUCK

5-Tonner TRUCK CRANE

POWER TALE GATE TRUCK

6 WHEELER FORWARD TRUCK