SR.

No
1 2 3 4 5 7 6 7 8 9 10 11 12

Module
Production Production Production Production Production Production Process Process Process Quality Quality Drum management Drum management

13

Production

14

Production

15

Production (Item code Generation)

15

Production (Item code Generation)

16 17

Production Production

17

Production

18 19 20 21 22 23 24 25 26

Production Quality Process Quality Quality Quality Quality Production Production

27 28 29 30 31 32 33 34 35 36 35 36

Maintainence Production Quality Production Quality Production Production Production Process Quality Process Process

37

Production

38 39 40 41

Production logistics logistics finance

Issue/Problem

Planning sheet does not contains necessary details, Also it contains more details which may lead to confusion for the shop floor workers Eg:Size,color etc. have to declare seperately agai order to print in the planning sheet Multiple production orders in one planning sheet for one machine is not possible In length control item the reservation only by the exact quantity of length. (Neither with less nor with more quantity, Also not with multiple quantities) It is not possible to consume the length control item without reservation Display inventory of deviation item is not separated from on hand inventory Capturing of order number with the production entry(Eg: Exp No:) and view report based on the export number The reel numbers are not available in the production entry If the item is defined as length control, then the length should be entered in the control length only Tag generation for individual reels with the details.(To check details) Quality units measurement not able to enter in the specified format. Eg: 1 X 10^13. Quality assosciation is not possible based on the size x color configuration, which is possible declared at the item declaration Drum capacity is calculated by an inbuilt formula. Not able to change as per our needs or changes Multiple drums produced at a time of same drum type will not be able to view or edit individually

Item 1(Non length control in FG) Consumes Item 2(Length control) Consumes Item 3 (Non length control) If production order for Item 1 is estimated, the (BOM) production order for Item 2 and Item 3 will not be autogenerated. But if production order for Item 2 is estimated then it will automatically creates the orders in the BOM chain till the next length control item. Planning order quantity will not be able to alter after the production starts entry Product Line - House Wire, Industrial wire Product Type - Superex, Ratnaflex

Selection code - Special, Normal, Export Commodity code - PVC Ins. HV Ind. Cable 1100V,G.I. Wire, PVC Compound Weight - Weight of single coil Packaging Definitions - No. of coils in 1 Cartoon Size & Color combination specified in the item code is not available to attach Quality Assosciation

Length control in FG will generate batch number for every report as finished. If length controlled for specific 90 mtrs, then 90 mtrs X 1 nos will generate 1000 batch number currently. But we need batch number for multiple pieces Whether combination of Size X Color X Length is possible in case of FG. Eg: FD/SX - 1.00 X RD X 90mtr 1.00 X RD X 180mtr 1.00 X BK X 90mtr 1.00 X BK X 180mtr 1.50 X RD X 90mtr 1.50 X BK X 180mtr 1.50 X BK X 90mtr 1.50 X BK X 180mtr When a production order is auto generated from FD to all its input stages and some transaction happened in lower stages and the primary order is reset then all the sub orders will be vanished from the system. But material stock will not reset. For the same test if we want to take the average of multiple readings as final is not possible. For that we have to add no. of new tests with same parameters How to accept from multiple basket input for one reel. Whether it will consider same input batchs if its quantity is not finished Is it possible to accept any symbols such as in units place Quality test report need as per our old (format). Order quantity show in quarentine order module. Quality test certificate as per sampling base.(first sample test ) need as per our requirement. It is not able to add multiple process in same machine simultaneously. The quantity of production order is not able to edit once the production is started

No specific module for the maintainence Reel,drum & basket number option is not available in production process Quality check has to be done for every coil in length control item. Very lengthy process. In duplication or copying of item details the size & color details are not copying Calibration of instrument and its record entry is not possible in the system

Item once defined as length control will not be able to change after any transaction done. Flexibility should be provided to use in both way Unit is not displayed in all places along with the quantity. Eg: Production order, Inventory, Quarentine order etc. There is no functionality to accept the parameters like OD,CD,Die size, Tip Size etc. Also it should be printed in the planning sheet Tag generation is not possible after production entry It is not possible to generate multiple type of quality test report for the same item Scrap reporting in production order wise is not possible. The job card is not available for posting in the job card from the production order

Whenever a production order is created and changed the quantity, the inventory will be affected twice. Also the 2 quarentine order wi be generated. Eg : If Production order is created for qty 10, Then it is increased to 25 in created status itself. Then 2 entries with quantities 10 and 15 will be viewed as ordered in inventory. Also 2 Quarentine orders and Quality orders for same quantities is generated even the picking and report as finished are done in once. Currently there is no option for item to item transfer. We have to make rework production order and entry on the same. can not create the purchase order from blanket order release can not create the purchase order from RFQ. reference price adjustment in purchase order & sales order.

Comments from Rahul


Requires Customization Requires Customization Will use Manual Picking list Will be made available Workaround will be provided Workaround will be provided Will be made available Need to Discuss Customization Required Workaround will be provided Uniq Item code need to be defined. Requires Customization Need Details

Active issue in Bug Track

Follow Standard Process

Customization Required

Customization Required

Uniq Item code need to be defined. Need to Discuss

Auto Create combination facility can be used to achieve this

*LCI = Length Controlled Item, Active Issue in Bug Track Not Possible Need to Discuss Resolution provided. Customization Required Customization Required Customization Required Requires more details Not recommended

Customization Required Will be made available Need to Discuss Not Possible Customization Required Resolution provided. Resolution provided. Requires more details Customization Required Not Possible Resolution provided. Follow Standard MPS

Follow Standard Process Active Issue in Bug Track Active Issue in Bug Track Active Issue in Bug Track