Station: Date of Inspection Checking of Proper parameters adjustment Checking of of Evaluator of track parameters and resetting devices of EJB unit
Axle counter No
Condition of fittings of signal post Voltage & Condition of and sealing of Proper cutrrent of relay and other unit with Condition Cleanliness adjustment of LED signal fittings inside Signal No gasket of earth of LED Unit Current regulator aspect signal location.
Point No
nspection
Take Event and Error log report for the system in the Maintenance VDU a)Ensure the rigid connectivity of ring earth to the EI system & the earth value is less than 1ohm. b)Observe the SPD of all input and out put connections for any burning or damage
Condition & functioning of boom,pedestal,lock Angle of post , winch ,lever Interlocking booms in LC Gate frame,wire, insulator Effectiveness Condition with station Opened and No & KM and other of boom Condition of road signals and Functioning Gate closed No mechanical fittings locking of hooter signals panel of EKT telephone conditions
PREVENTIVE MAINTENANCE CHECK LIST FOR IPS Station: Sr Type of Check No 1 Description of maintainance work to be carried out Remarks
a)Switch off the SMPS Modules and after 4Hrs take the voltage reading of cells( The Individual Measurements cell voltage should not fall below 1.9V and specific gravity should not be less than 1200 ) of Battery b)Then switch on the SMPS Modules and see that all modules are on and all are equally sharing the load .i.e, their voltage and current should be same Main supply Checking of Earth connection Check the main AC input supply .It should be 150 to 275v. a)Ensure the rigid connectivity of earth to the all modules of all the panels of the IPS system & earthing of the armour of power cables b)Observe the SPD of all input and out put connections for any burning or damage a)Check that all the modules in the SMPS ,ACDP & DCDP Panels are properly inserted & are in correct state and all normal indications on modules are available
2 3
Visual b)Physically check and ensure that wiring,fuses etc are in order and cable entry holes are properly Inspection and plugged to avoid lizards,rats etc in all panels and modules of the system.. cleaning c)Check the Cleanliness of the total IPS system and its pheripherals and ensure that they are free of dust and dirt Checking the Check one by one all functions by operating the buttons on key board on the DSCA Module and functioning of ensure that all are functioning properly& proper indications are displayed on the LCD Screen and DSCA Module ensure that all voltage limits are adjusted properly. a) Observe that all normal indications are available on all modules b)Check the no of SMPS Modules in use .It should be in (N+I ) configuration. c)Check that with the SMPS Modules switched on , all the DC Load should work on it d)Check the voltage of each module & keep voltage setting for float and boost to same value within 0.1V e) Check with SMPS modules switch OFF, all load should work on battery. f) Take the measurements of Input AC Voltage/Current & Out put DC Voltage/Current g) Check that all the cooling fans are in working order. a) Observe that all normal indications are available on all modules b)Check the auto change over in IPS
SMPS Panel
c)Check the lightening and surge protection devices in the panel d) Check the input voltage to Inverter display unit and ensure that both the inverters are in AC Distrtibution working order. 7 Panel e) Check the input voltage to CVT on display unit and ensure that CVT is in working order f) Conduct the automatic load transfer test by switching off the inverters one by one and ensure that the load is transferring to CVT when both the inverters are switched off.
g) Check the out put voltage of all signal /track transformer modules and ensure that all transformer modules are in working order. Sr Type of Check No Description of maintainance work to be carried out a) Observe that all normal indications are available on all modules b)Check the no of DC-DC Converter Modules in use for each circuit .It should be in (N+I ) configuration. And ensure that all converter modules are in working order. 8 DC Distrtibution c) Check the input DC voltage( It shall be within 98--138V) Panel d)Check the out put voltage of each DC-DC Converter module. e)Check the DC under voltage across terminal point .It should be 98V.Check the DC over voltage across terminal point .It should be 138V a) Observe that all normal indications are available on the Remote Alarm Panel In the SM Room 9 Remote Alarm b)Physically check and ensure that wiring,fuses etc are in order in the panel Panel c)Check and ensure that thedifferent alarms and indications on the panel are all functioning as per the specified conditions . Remarks
10
Sr No 1
Directive Check that all the normal indications are available in the panel . b)Physically check and ensure that the panel surface and the interior is clean and wiring inside panel is in order .Cable entry holes are properly plugged to avoid lizards,rats etc into the panel and all dominos with their components are in proper position Ensure that proper sealing and locking arrangement of the panel and the emergency operation buttons
Remarks
Check that all the indications in the panel are in correct correspondence with the panel operations and train operations at the station. 4 Conduct all emergency opeartions like emergency route release , signal cancellation ,emergency point operation , calling on signal operation etc on the panel and check the counter readings and tally them with the number recorded in the register.
Check the change over between PC &Panel and ensure that all operations are possible from both PC and Panel Ensure the rigid connectivity of earth to the Panel.
FAS Check
Sr No 1 2
Checked or not
Main Objectives of Inspection 1) To Check the quality of maintenace of gears and to take necessary steps for its improvement 2) To check the condition of the gear/equipment and to take necessary preventive steps for its repair/renewal 3) To check the safe working of the gear /system and to take necessary steps for the improvement of safety standard 4) To utilize the data available in records and datalogger for the identification cause of failures and to initiate remedial measures 5) To identify problems where assistence of other departments is needed and to convey the same to relavant officials for early solution of the problem 6) To counsel the maintenace staff of the station for the improvement of their technical knowledge/skills and safety awareness.
Track circuits 3 Point machines 4 Axle counters (Analog& SSDAC) 5 Inrerlocked LC Gates 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Signal Posts,locations and LED units Block instruments and their interlocking with signals Operating cum Indication Panel & VDU EI System &Maintenance VDU IPS and backup battery Crank handles & telephone at location Siding point Data logger Local/AT/DG Power supply at station including change over arrangement Relay rooms and goomties Earthing arrangement of different equipment Condition of cable insulation Station records , maintenance registers & approved drawings SWR of the station Any other item checked