You are on page 1of 6

Sowndharya Sundaram +91 8754594166s sowndharya84@yahoo.co.

in

5 years experience in System Verification Testing of various telecom based products. Nearly 11 months of experience in development of java applications using Core Java/Java Swing. Good knowledge and hands-on experience in using design patterns and telecom concepts.

PROFESSIONAL EXPERIENCE

Working as a Senior Project Engineer in Wipro Technologies, Chennai, India, leading a team of four people. (June-2005 to till Date)

ACADEMIC SUMMARY Bachelor of Engineering in Electronics and Communication, Thiagarajar College of Engineering, Madurai. Have a consistent overall academic record of 8.78/10 in under graduate. Have academic record of 97.75 %( District topper) in HSC and 89.9% in SSLC.

TECHNICAL SKILLS SUMMARY Telecom Skills Software Development Technologies Operating System Development Environments PERSONALITY TRAITS Quick learner and self-starter with an ability to rapidly achieve organizational integration. : : : : SONET, DWDM, TDM, Packet Java, Java Swing Windows 98/2000/XP Eclipse 3.2

Assumes job responsibilities and adapts to new methods and technologies. Good communicational skills and excellent interpersonal skills. Eager to learn new things and strives for continued excellence. Innovative approach of problem solving.

PROJECT # 1 Project Name Client Technologies Team Size Role Duration Project Description: The Lambda-Xtreme EPT is engineering and planning tool, which allows a user to design the network based on the traffic flowing through the network. The EPT allows the users to manage the objects and network elements involved in engineering and planning of the network. It is used to design the network equipment configurations and to design traffic services (wavelength routes) through the network. The users of the EPT are Customer Capacity Planning Organizations, Customer Route Planners, Customer and Lucent Network Designers .EPT is used to design the network equipments. The design of the engineering and planning tool involves the determination of wavelength reach and DCM (Dispersion compensation module) and OA (Optical Amplifier selection) and eliminating Repeater sites by concatenating multiple low loss fiber spans. It also involves the techniques like Shortest-path routing of service and 1+1 protection routes to minimize regeneration sites. : : : : : : Lambda-Xtreme EPT 2.1, 3.0, 4.0 Lucent Technologies, USA. DWDM 4 Developer and Tester September 2005 to July 2006.

PROJECT # 2 Project Name Client Technologies Team Size Role : : : : : 1850 TSS-320 EPT 0.1, 1.0 and 2.0 Alcatel-Lucent, USA. DWDM, Packet and TDM 4-5 Senior Project Engineer, with the role of lead tester

in System verification testing of 1850 EPT in Offshore Duration Project Description: The 1850 TSS-320 Engineering and Planning Tool (EPT) is a software application that operates on a windows-based platform and supports the initial design of 1850 TSS-320 based networks and routes as well as incremental additions to existing networks. The 1850 EPT is a multiservice transport platform able to support the mix of traffic. The 1850 TSS-320 EPT supports the following: Aggregation and grooming of packet demands within GbE and 10 GbE packet connections into GbE and 10 GbE line signals using the packet switching capabilities of 1850 TSS-320. : Sep 2006 to Oct 2007.

Aggregation and grooming of TDM demands including line signals created by the packet switching function into SONET/SDH line signals using the TDM capabilities of 1850 TSS-320. Use of different types of carriers namely OC-192, OC-48.

Provides placement and connection of WDM ROADM network elements. Wavelength assignment and routing of packet demands, TDM demands, and WDM demands.

Configuration and pricing of equipment for each NE in the network as well as the total network.

1850 EPT allows for easy comparison of different transport strategies .It designates whether it is economical to transport packet over WDM or TDM over WDM.EPT determines the lowest cost network to support the specified demands.

PROJECT # 3 Project Name Client Technologies Team Size Role : : : : : 1830 PSS-32 EPT 1.0, 1.0.1 and 1.1,2.0 Alcatel-Lucent, USA. DWDM, CWDM 3 Role of a Module leader in charge the System Verification in offshore Duration Project Description: The 1830 PSS-32 Engineering and Planning Tool (EPT) is a software application that operates on a windows-based platform and supports the initial design of 1830 metro networks and routes as well as incremental additions to existing networks. The 1830 product contains transponder and mux-ponder cards that perform more limited service layer aggregation/grooming, without the need for a fabric, and is intended to support network sizes (optical light-paths) ranging from small metropolitan area to 600 km regional size. The WDM layer synthesis focus shifts to design for lowest cost, for the defined network, including the use of non long-haul transponders as appropriate. : Oct 2007 to March 2009.

Roles & Responsibilities in the above projects: Lead tester managing a group of 3-5 people. Primary source of contact for the customer. Interaction with the Design plan and execute the testing cycles. Develop, document, implement, maintain, review and analyze Test

customer on a daily basis and through WSRs.

Plans, Test Scenarios and Test Cases with regard to the user requirement document. Writing test cases for new features from ERS (Engineering Requirements Specification) documents


cases.

Tools Used for Developing test cases and logging the status of

the test cases : Mercury Quality Control(MQC) Initiation and contribution in various Regression cycles. Selection of eligible test cases for various regression cycles. Test case grouping and porting them into existing test plans. Responsible for updating/modifying regression test documents and test Regression result sheet updating, weekly status monitoring, client status

reporting.

Regular Interaction with the customer. Report defects to developers and assist in resolving the defect through

additional testing.

Entering bugs in various DTS (Defect Tracking System named DDTS and Maintenance of testing metrics for each testing activity. Scheduling and conducting the training for the new comers. Involved in initiation and execution of LEAN for one of the modules Have involved in the following Ecube and management activities: Have created tasks for the team members and helped in PDMR generation

Sablime) for different projects and tracking its status and verifications of bugs.

which involves DSM and OA tools.


PROJECT # 4 Project Name Client Technologies Team Size Role Duration Tools Used

APR metrics preparation and charting the data for the team Preparation of PSM metrics data Have involved in the preparation of QIC

: : : : : : :

Netsmart 2000 R4.0,4.1 Fujitsu, USA. SONET,SDH and DWDM 4 Team Lead April 2009 to till date Clearcase DDTS for defect tracking, Test Expert for test status tracking

Netsmart 2000 is a Network Planning and Design Tool (NDPT) that operates on a windows-based platform and supports the initial design of Greenfield and brownfield designs. The planning tool is a deciding factor against deploying Fujitsus 7500 and 9500 network elements which allows the complete evaluation of DWDM equipment features and functions for validation of different traffic demands over a DWDM platform for Greenfield and brownfield network. The product involves the planning and placement of different network elements OADM, ILA, SAS and CDS.The OLC cards including transponder and mux-ponder cards that perform service layer aggregation. The product supports the mixed amplifier designs for 10G and 40G networks.

Personal Information: Name Fathers Name Date of Birth Languages Known Strengths Hobbies : Sowndharya.M : Meenakshi Sundaram.S : 17-Jul-1984. : English, Tamil and Hindi. : Committed, Focused, Assertive, Confident, Self-motivated. : Singing, Playing Veena, Reading Books

DECLARATION I here by assure that all the above furnished details are true to the best of my Knowledge and belief.

Date: 11-Dec-09 Place: Chennai Sowndharya.M

You might also like