You are on page 1of 31

Essar Steel Limited

Clean Steel Making Initiatives in DRI / EAF process


at

Essar Steel Limited, India


1

Essar Steel Limited


Strategically Located Asset Base

New Delhi

Ba iladila
0 km 613 m

Slu r r y p ip e lin e ro u te
Ben eficia tion Pla nt
W ater Pu mping Statio n

H Y-G RADE P EL LE TS LIM IT ED

R ly L ine
Slack Flo w Stn .

M a in Pu m p in g Station

W ater L in e
113 km 496 m 100 km 434 m

Slack Flow Stn.

180km 696 m

B oost er St n.

205km 91 m

Pellet p lan t

Jamnagar Hazira
Largest concentration of steel users in India

V alve st n .

267km 0m ts

Mumbai

Kirandul Visakhapatanam
Pellet Plant at Visakhapatnam

Essar Steel Complex at Hazira Close to major steel consumers At the landfall point of natural gas All power supply located close to operations of steel complex 2

Port based plant with dedicated pellet handling facilities Close to one of the richest iron ore content mines

Essar Steel Limited


Content

Existing Plant Process Flow Existing Plant Initiatives Future Plant Process Flow Future Plant Initiatives

Essar Steel Limited (4.6 MTPA)


Material Flow Chart

Essar Steel Limited


Raw Material

Mining - Iron ore: Bailadila, India Pelletization - Iron fines: Vishakhapatnam, India Iron ore mix
Calibrated lump ore (10% - 20%) Pellets (80% - 90%)

Iron content: 66%


5

Essar Steel Limited


HBI Plant

5 Modules of capacity 5.5 MTPA Input


Pellets + Ore: Natural Gas: Calorific value: 1.5 Ton / Ton 285 Nm3 / Ton 8700 to 8800 Kcal / Nm3

Output
Cold HBI: Hot DRI:
6

40% 60%

Essar Steel Limited


HBI Plant - Process Flow
FEED B USTL E
GAS

ENRICHMENT OXYGEN N.G. INJECTION

REFORMED
GAS

BASIS: PRODUCTION RATE TYPICAL METALLISATION CARBON CONTENT FL UE


GAS

100 tph 93% 1.20%

TOP GAS

MIDREX-HBI PROCESS FLOW DIAGRAM


MAIN
A IR

FLUE GAS TO THE VENT

CARBU. N.G. NA TURAL GA S INPUT

HOT
D IS C H A R G E B OTTOM S EAL GAS P R OC ES S GAS TOP GAS F UE L

PROCESS GAS

PROCESS NA TURA L GA S

FEED GA S

FL UE GAS

COLD HBI

HOT DRI

Essar Steel Limited


Electric Arc Furnace

4 DC Electric Arc furnaces Capacity: 150 Tons per heat (each furnace) Input (175 Tons)
Metallic: HBI (36%), Hot DRI (60%), Scrap (4%) Fluxes: Lime, Dolime Electrical Energy: ~ 515 KWH per Ton

Tap to tap time = 60 minutes


8

Essar Steel Limited


Steel Making Plant - Process Flow
DC- ULTRA HIGH POWER EAF
GRAPHITE ELECTRODE ROOF CENTRE WATER COOLED ROOF CARBON INJECTOR FUMES FUMES EXTRACTION SYSTEMS WATER COOLED PANEL FOAMY SLAG OXYGEN INJECTOR CO BUBBLES BOTTOM ELECTRODE SIDE & BOTTOM REFRACTORY EBT

Clean Development Mechanism

Joseph Priestly, 1771

Essar Steel, 2008

Environment: A key Driver


10

Clean Development Mechanism The Kyoto Protocol to the convention on Climate Change has developed a Clean Development Mechanism (CDM) Facilitates developing countries to trade Certified Emission Reduction (CER) with the developed countries w.e.f. 16th Feb. 2005 CER corresponds to the extent of reduction in emission of six Green House Gases (GHG) mainly carbon dioxide and methane
11

Existing Plant - CDM Projects 1. Hot Direct Reduced Iron 2. Power generation from SMP flue gases 3. 19 MW HBI power plant 4. Digitized walking beam type reheating furnace 5. Installation of Top Burners, Sinter Plant
12

Existing Plant - CDM Projects


Hot Direct Reduced Iron

Collection and transportation done by specially designed containers

13

Existing Plant - CDM Projects


Hot Direct Reduced Iron
cont.

Capacity of Vessel: 90 Ton Hot DRI Temperature: 675 oC Vessel Travel distance: 1 Km Designed in-house (patented) Charged through EAF top
14

Existing Plant - CDM Projects


Hot Direct Reduced Iron
cont.

Introduce the Hot DRI along with hot briquetted iron into the electric arc furnace Energy saving upto 100 KWH / Ton liquid steel Reduced emission by saving electrical energy CO2 Reduction = 237,683 CER per annum

15

Existing Plant - CDM Projects


Hot Direct Reduced Iron
cont.

Project is expected to fetch financial benefit to the company Project is being pursued in consultation with M/s Ernest & Young Project Methodology has been successfully submitted to UNFCCC

16

Existing Plant - CDM Projects


Hot Direct Reduced Iron
cont.

UNFCCC Website

17

Existing Plant - CDM Projects


Power generation from SMP flue gases

Initial proposal has been received from Transparent Energy Systems Looking for Technology CO2 Reduction = 359,345 CER per annum

18

Existing Plant - CDM Projects


19 MW HBI Power plant

Power generation from HBI module hot gases Temperature of Hot gases = 350 to 400 oC Contract signed by HBI with ECL and Essar Engineering Centre CO2 Reduction = 82,126 CER per annum

19

Existing Plant - CDM Projects


Reheating furnace

Digitized walking beam type reheating furnace Saving in energy consumption as compared to conventional furnace CO2 Reduction = 10,080 CER per annum

20

Existing Plant - CDM Projects


Installation of Top Burners, Sinter Plant

Side fired burners are replaced by new energy efficient top burners CO2 Reduction = 3,962 CER per annum Already implemented

21

Future Plant - Essar Steel Hazira Limited


Product Flow Chart
Corex 2 Modules 1.74 MTPA (Hot metal)

Blast Furnace 1.74 MTPA (Hot metal)

Mod VI 1.7 MTPA (DRI)

SMP 4.63 MTPA (Liquid Steel)

CSP 3.55MTPA

Slab Caster 1.03 MTPA

Coils

Slabs

22

Future Plant - CDM Projects 1. Use of Hot metal from Corex 2. Use of Corex gas 3. Compact Steel plant (CSP) 4. Top gas pressure Recovery Turbine (TRT) for Blast furnace 5. Blast furnace gas utilization
23

Future Plant - CDM Projects


Use of Hot Metal

Hot metal from COREX to EAF Nos 2 & 3 Liquid charge : 35% Reduction in energy rate: 120-130 KWH/Ton

24

Future Plant - CDM Projects


Use of Corex gas

Natural Gas to be replaced by Corex gas Energy savings in HBI, Lime plant, Dolime plant and other various projects CO2 Reduction = 1,643,137 CER per annum

25

Future Plant - CDM Projects


Compact Steel plant (CSP)

Thin continuous strip to be heated from 900 950 oC to 1100 oC as against from ambient temperature CO2 Reduction = 45,258 CER per annum

26

Future Plant - CDM Projects


Top gas pressure Reduced Turbine (TRT) for Blast furnace

Exhaust pressure from blast furnace of steel mill to be utilized to produce power CO2 Reduction = 43,224 CER per annum

27

Future Plant - CDM Projects


Blast furnace gas utilization

Exhaust heat from the blast furnace of steel mill to be utilized for process heating CO2 Reduction = 15,966 CER per annum

28

kg CO2/t of liquid steel


1000 1500 2000 2500 500 0

CO2 Emission

Alternative Iron EAF Route

29

1922

BF-BOF
441

100% Scrap

912

50% HI C CDRI 50% HBI 20% HBI+30%PI 50% ITMK3 50% BF HM 50% FASTIRON 50% FASTEEL 50% COREX

991 1320 1198 1507 1085 1041 1880

1259

50% HISMELT

Thank you

30

Essar Steel Limited


Slurry pipe line route
0 km 613 m

Beneficiation Plant, Kirandul


Water Pumping Station

Main Pumping Station

Slack Flow Stn.

Bailadila
Water Line

Rly Line
113 km 496 m 100 km 434 m

Slack Flow Stn.


180km 696 m

Booster Stn.

205km 91 m

Pellet plant

Valve stn.

267km 0mts

Go back
31