SCHEDULE OF WORKS Description

FRAME PHN KHUNG TNG QUT


H s to thnh Hp ng c trnh by gii thch ln nhau v cc n gi chn ng vi bt k u mc trong y s coi nh l bao gm ton b yu cu ca iu kin Hp ng, Yu cu k thut Hp ng v Bn v Hp ng. Nh thu nn k n phn Cng tc ban u trong H s Hp ng ny nh l mt phn khng th tch ri H s Hp ng. Khi lng cung cp trong Bng khi lng cng vic ch dng cho tham kho. Nh thu s c phng thc tnh ton ring lin quan ti cc cng tc s tin hnh. Cc n gi nu trong Bng khi lng cng vic s l cn c cho vic nh gi tt c pht sinh sau ny. Cc n gi c chn tng ng vi bt k yu cu trong phn ny s c cho l m bo ton b yu cu ca phn Tiu ch k thut v Bn v hp ng. Bt k cng tc no khc c tham kho t trong Bn v nhng khng cp c th trn (Nh thu s cung cp u vic chi tit ca nhng cng tc di hng mc ny). CNG TC B TNG B tng ct thp (M250) Ct tr / ct Dm ti tng 1 Dm ti tng 2 Dm mi Sn tng 1 Sn tng 2 Sn mi Cu thang Kt cu khc Ca s cha CNG TC VN KHUN Mt bn v mt di ca dm tng 1

M t
Unit Qty Rate (VND) Amount (VND)

GENERAL
The Document forming the Contract are to be taken as mutually explanatory and the rates inserted against any items herein shall be deemed to cover the complete requirements of the Conditions of Contract, Contract Specifications and Contact Drawings The Contractor is referred to the Preliminaries section of these Contract Documents which forms an integral part of the Contract Documents The Quantities as provided in this Schedule of Works is for reference only. The Contractor shall have their Own measurement with regards to the works to be carried out The unit rates as stated in the Schedule of Works shall from the basis for valuing all variations The rates inserted against any requirements herein shall be deemed to cover the complete requirements of the specifications and Contract Drawings Any other works referred to in the Drawings but not specifically mentioned above (The Contractor shall give a breakdown of these works covered under this item) CONCRETE WORKS Reinforce concrete (M250) Column stumps/columns Beam at 1st floor Beam at 2nd ffoor Roof Beam 1st floor slab 2nd floor slab Roof slab Staircase Sundries Bay window Formwork Sides and soffits of 1st storey beam

G H I J K L M N A B

m3 m3 m3 m3 m3 m3 m3 m3 m3 m2

6.70 13.83

1,644,800 1,644,800

11,020,160 22,744,500

27.93

1,644,800

45,940,416 -

2.45 142.46

1,339,300 103,383

3,281,794 14,727,942

HUNTER225

Page 1

Unit FRAME
C D E F G H I J Sldes and soffits of 1st storey beam Sides and soffits of roof beam Sides and soffits of 1st storey slab Sides and soffits of 2nd storey slab Sldes and soffits of roof slab Sides and soffits of staircase Sides and soffits of bay window Sides of columns Reinforcement High tensile deformed steel reinforcement In beams 12mm Diameter bars 16mm Diameter bars In columns stumps/columns 16mm Diameter bars In slab 10mm Diameter bars In staircase 10mm Diameter bars 12mm Diameter bars FRAME (Cont'd)

Qty

Rate (VND)

Amount (VND)

PHN KHUNG
Mt bn v mt di ca dm tng 2 Mt bn v mt di ca dm mi Mt bn v mt di ca sn tng 1 Mt bn v mt di ca sn tng 2 Mt bn v mt di ca sn mi Mt bn v mt di ca cu thang Mt bn v mt di ca ca s cha Cc mt bn ca ct Ct thp Ct thp chu ko cng cao Trong dm Thanh ng knh 12mm Thanh ng knh 16mm Trong ct tr / ct Thanh ng knh 16mm Trong sn Thanh ng knh 10mm Trong cu thang Thanh ng knh 10mm Thanh ng knh 12mm PHN KHUNG (TIP THEO) CNG TC B TNG (TIP THEO) B tng ct thp (M250) (Tip theo) m2 m2 m2 m2 m2 m2 m2 m2

38.79 132.06

103,383 103,383

4,010,578 13,652,759

K L M N O F

kg kg kg kg kg kg

3,136.72

21,147

66,332,596

1,212.50 176.65 620.59

21,147 21,557 21,147

25,640,763 3,808,062 13,123,759

CONCRETE WORKS (Cont'd)


Reinforce concrete (M250) (Cont'd)

Hinh tensile deformed steel reinforcement (Cont'd) Ct thp chu ko cng cao (Tip theo) A In staircase (Cont'd) 18mm Diameter bars Mild steel reinforcement In beams 6mm Diameter bars In columns 6mm Diameter bars In slab 6mm Diameter bars 8mrn Diameter bars In staircase 6mm Diameter bars 8mm Diameter bars BRICK WORKS Bricks bedded. jointed and pointed in cement motar 1:3 Trong cu thang (Tip theo) Thanh ng knh 18mm Ct thp mm Trong dm Thanh ng knh 6mm Trong ct Thanh ng knh 6mm Trong sn Thanh ng knh 6mm Thanh ng knh 8mm Trong cu thang Thanh ng knh 6mm Thanh ng knh 8mm CNG TC XY GCH Gch xy ln, lin kt v trt mch vi va xi mng 1:3 kg 495.59 21,147 10,480,372

B C D E F G

kg kg kg kg kg kg

371.41 176.65 2,629.86

21,557 21,557 21,557

8,006,557 3,808,062 56,692,626

225.72

21,557

4,865,808

HUNTER225

Page 2

Unit FRAME
H I J To staircase and steps External wall 100mm thick brick walls bedded, jointed and pointed in cement mortar (1:3) 200mm thick brick wails bedded, jointed and pointed in cement mortar {1:3) Internal wall 100mm thick brick walls bedded, jointed and pointed in cement mortar (1 :3) 200mm thick brick walls bedded, jointed and pointed in cement mortar (1:3 ) Sundries To Planter box (200mm thick two-hole brick wall) FLOOR AND WALL FlNISHllMG FLOOR FINISHING Cement and sand screed to receive floor finishes C D E F G H I J K 1st floor 2nd floor Ground floor Roof floor Staircase Granite flooring At the steps Window ledges (External) Non-slip ceramic tiles 300x300 tiles to balcony 400x400mm tiles to terrace EXTERNAL WALL FINISHING 15mm thick cement and sand (1:4) plastering in two coats finished steel trowelled smooth to External brick walls Mastic to external wall Painting in three coats (01 primer coat + 02 finishing coats) to external wall Stone tiles to plinth at externally INTERNAL WALL FINISHlNG 15mm cement and sand (1:4) plasterinq in two coats finished steel trowelled smooth lnternal brick walls Staircases

Qty
1.94 7.55 7.78

Rate (VND)
2,231,700 2,082,400 1,894,500

Amount (VND)
4,319,762 15,712,749 14,734,474

PHN KHUNG
Cu thang v bc thang Tng ngoi Tng gch dy 100mm xy ln, lin kt v trt mch vi va xi mng (1:3) Tng gch dy 200mm xy ln, lin kt v trt mch vi va xi mng (1:3) Tng trong Tng gch dy 100mm xy ln, lin kt v trt mch vi va xi mng (1:3) Tng gch dy 200mm xy ln, lin kt v trt mch vi va xi mng (1:3) Kt cu khc Tng hp trng cy (tng gch 2 l dy 200mm) HON THIN SN V TNG HON THIN SN San va xi mng v ct hon thin sn Tng 1 Tng 2 Tng trt Tng mi Cu thang Lt sn granite Ti cc bc thang B ca s (bn ngoi) Lt gch ceramic chng trt Lt gch 300x300 cho ban cng Lt gch 400x400 cho sn thng HON THIN TNG NGOI Trt va xi mng v ct (1:4) dy 15mm thnh 2 lp ph phng bng bay thp i vi tng gch ngoi Matt vi tng ngoi Sn tng 03 lp (01 lp th v 02 lp hon thin) i vi tng ngoi Lt cho b ngoi HON THIN TNG TRONG Trt va xi mng v ct (1:4) thnh 2 lp ph phng bng bay thp Tng gch bn trong Cu thang m2 m2 m2 m2 m2 m2 m2 m2 m2 162.11 78,900 12,790,400 m3 m2 m2

K A B

m2 m2 m2

13.79 57.58 0.92

1,223,600 1,373,100 2,231,700

16,874,239 79,059,665 2,057,030

6.67 6.72 59.53

1,296,300 332,400 424,600

8,643,988 2,233,728 25,276,438

L M N O

m2 m2 m2 m2

362.56 483.79 362.56 9.84

53,500 39,000 36,600 1,348,800

19,396,693 18,867,810 13,269,513 13,272,192

A B

m2 m2

642.32 132.06

44,300 93,900

28,454,687 12,400,434

HUNTER225

Page 3

Unit FRAME
WATERPROOFING Wateroofinq laid on concrete all in accordance with the drawings and specifications Horizontal covering on balcony Horizontal covering on concrete flat roof Horizontal covering on concrete flat roof gutter Horizontal covering on concrete flat roof terrace Wateroofing by slab pipe with Bentonite 2519 (KR) Vertical covering on balcony Vertical covering on bay window roof ALUMINIUM WORKS Aluminium scroll door Supply and installation of scroll overall size 2900x3200mm complete with all necessary ironmongeries etc all as specification and drawings

Qty

Rate (VND)

Amount (VND)

PHN KHUNG
CHNG THM Lp chng thm c t ln b tng ty theo bn v v yu cu k thut Lp ph ngang cho ban cng Lp ph ngang cho mi phng b tng Lp ph ngang cho mng mi phng b tng Lp ph ngang cho mi phng sn thng b tng Chng thm ng xin sn bng Bentonite 2519 (KR) Lp ph ng cho ban cng Lp ph ng cho mi ca s cha CNG TC NHM KNH Ca cun nhm Cung cp v ci t ca cun hon thin vi tng kch thc 2900x3200mm gm tt c ph tng st cn thit v.v... nh trong yu cu k thut v bn v Gia cng lp t mi knh cng lc khung thp hnh, dn Pergolar bng thp hnh CNG TC ST Tay vn cho ban cng Cung cp v ci t tay vn inox hon thin vi tt c ph tng st cn thit, knh cng lc, rnh lin kt v.v... nh trong yu cu k thut v bn v H THNG M&E H THNG IN Item 1.00 16,500,000 16,500,000

C D E F G H I

m2 m2 m2 m2 cn m2 m2

4.80 13.80 54.60 4.85 1.00 3.20 1.85

145,500 145,500 145,500 145,500 515,070 145,500 145,500

698,400 2,007,900 7,944,300 705,675 515,070 465,600 269,175

m2 m2

12.28 6.68

2,414,600 2,414,600

29,651,288 16,117,455

METAL WORKS Handrail for balcony Supply and installation of inox handrail complete with all necessary ironmongeries, tempered glass, embedded channel etc all as specification and drawings. M&E SYSTEM ELECTRICAL SYSTEM

m2

24.35

3,379,700

82,309,214

Supply and installation of Electricity Supply Mains and Cung cp v lp t H thng Cp in Chnh v ng ng telecom lead-in pipes c/w accessories and associated truyn thng dn vo vi ph tng v cc cng tc lin quan works (detailed to the Engineer's approvaI) (chi tit theo s chp thun ca Gim st) Cung cp v lp t ng dy dn truyn cho in thoi, internet v h thng truyn hnh cp Cung cp v lp t h thng ni t hon thin cho cng tc lp t in Hon tt vic kim tra v dn truyn h thng in Hon tt bn v thi cng, bn v hon cng, cc hng dn bo qun v vn hnh. Cung cp v lp t cp cho h thng in nng lng v chiu sng

Supply and installation conduit only for telephone, internet, television cab system Supply and installation of complete earthing system for C the electrical installation Complete testing and commissioning of electrical D system Complete working drawings, as-built drawings, E operation and maintenance manuals Supply and installation cable for lighting and power F.1 electrical system B

Item Item Item Item Item

1.00 1.00 1.00 1.00 1.00

4,342,600 -

4,342,600 -

HUNTER225

Page 4

Unit FRAME
Supply and installation equipment for lighting and F.2 power electrical system lighting and power electrical system (Excluding) Supply and installation gas conduit and equipment for F.3 aircondition system (Excluding) PLUMBING SYSTEM Supply and installation of underground pipe works G complete with all excavation, bacfill, benching, compaction. connection, fitting, etc. Supply and installation of connection between septic H to the revelant service mains I Installation of complete septic tank J K L

Qty

Rate (VND)

Amount (VND)

PHN KHUNG
Cung cp v lp t thit b cho h thng in v chiu sng (loi tr) Cung cp v lp t ng ng dn ga v thit b cho h thng iu hnh (loi tr) H THNG NC Cung cp v lp t h thng ng ngm hon thin bao gm cng tc o, p, vt bc, m, kt ni, lp t, v.v... Cung cp v lp t kt ni gia b t hoi vi cc ng ng dch v chnh Hon thin b t hoi Item Item 1.00 -

1.00 u t thc hin Ch

Item Item Item Item Item Item

1.00 1.00 1.00 1.00

31,858,200 6,853,200

31,858,200 6,853,200 -

Supply and installation of complete water storage tank Cung cp v lp t hon thin b cha nc Supply and installation of complete surface drainage system Complete working drawings, as-built drawings, operation and maintenance manuals Supply and installation equipment for sanitary wares system (Excluding) FRAME (Cont'd) ANY OTHERS WORKS Any others works referred to in the Drawings or Specifications but not Specifically mentioned above (The Contractor shall give a breakdown of thew works covered under this items) Waterproofing to planter box Supply and install stainless steel handrail to terrace Plastering to beams, ceilings. Concrete to lintels and stiffener (M250) Reinforcement to lintels and stiffener Formwork to lintels and stiffener Reinforcemet to bay windows Concrete to low floors (M150) External joint (10x20mm) Mastic to internal wall External manholes and septic tanks Excavation, back fill and removed excavated soil Driving cajeput-pile (D=80mm, L=4m) Lean concrete (M150) Cung cp v lp t hon thin h thng thot nc mt Hon tt bn v thi cng, bn v hon cng, cc hng dn bo qun v vn hnh. Cung cp v lp t thit b cho trang thit b v sinh (loi tr) PHN KHUNG (TIP THEO) CC CNG TC KHC Bt k cng tc no khc c tham kho t trong Bn v nhng khng cp c th trn (Nh thu s cung cp u vic chi tit ca nhng cng tc di hng mc ny). Chng thm cho hp trng cy Cung cp v lp t tay vn thp khng r cho sn thng Trt dm, trn B tng cho lanh t v vng (M250) Ct thp cho lanh t v vng Cppha cho lanh t v vng Ct thp cho ca s cha B tng cho sn thp (M250) Mi ni ngoi (10x20mm) Matt vi tng trong Hm t hoi v h ga ngoi o, p v lp t o ng cc c trm (D=80mm, L=4m) B tng t xi mng (M150)

A 1 2 3 4 5 6 7 8 9 10 1 2 3

m2 m m2 m3 kg m2 kg m3 m m2 m3 m m3

3.56 6.80 142.46 0.15 15.75 1.20 0.21 0.90 -

145,500 283,000 68,000 1,356,000 21,520 10,394,100 21,520 956,000 44,800

517,980 1,924,400 9,687,280 203,400 338,940 12,472,920 4,519 860,400 -

HUNTER225

Page 5

Unit FRAME
Concrete to manholes (M250) 200mm thick brick wall Plastering to wall Formwork Reinforcement Underground water tank (detail drawing) 1 Excavation, back fill and removed excavated soil 2 Driving cajeput-pile (D=80mm, L=4m) 3 Lean concrete (M150) 4 Concrete to water tank (M250) 5 Cement and sand screeding 6 Ceramic tile 300x300mm 7 Plastering to wall 8 Waterstop (PVC Waterstop V20) 9 Formwork 10 Reinforcement 4 5 6 7 8

Qty

Rate (VND)

Amount (VND)
-

PHN KHUNG
B tng cho h ga (M250) Tng gch dy 200mm Trt tng Vn khun Ct thp B nc ngm (bn v thit k chi tit) o, p v lp t o ng cc c trm (D=80mm, L=4m) B tng t xi mng (M150) B tng cho b nc (M250) San va xi mng v ct Lt gch ceramic 300x300mm Trt tng Waterstop (PVC Waterstop V20) Vn khun Ct thp m3 m2 m2 m2 kg m3 m m3 m3 m2 m2 m2 m m2 kg

HUNTER225