You are on page 1of 3

1/3

DOCUMENT NAME

GBOIP to PCU POOLING

DOCUMENT NUMBER

2/3

GBOIP TO PCU POOLLING

PURPOSE

This description outlines the step by step process involved in implementing GBOIP to PCU POOLING as requested by the RF team. The process described is intended for all Nokia systems.. SCOPE

This procedure requires minimal human interference in handling PCU POOLING given by the RF (circle) team, provided that the data sent from circle for converting GBOIP to PCU Pooling is correct and in the required format.

CATEGORY

Activity type : Outage

Shift type:

TOOLS USED

Reflection.

TEAMS INVOLVED

GNSC-CM, RF

PRE CHECK

Check for the mandatory fields in Standard CR Template for if any of the mandatory fields is not duly filled, CR should not be taken for execution Check the data received from authorized RF engineer for correctness & all essential data. If the CR is not approved by Functional Manager/ CR form is not duly filled, CR should not be taken for execution. STEP 1: Check for any incorrect or missing values in the data given by circle. STEP 2: Check if BSC name specified matches with BSC C-NUM specified STEP 3: Check the BSC ID, BCSU,PCU,PSEI,NSVLI and IP details are correct or not. STEP 4: Take valid fallback. STEP 5: Take necessary Pre-Check logs.

3/3

STEP 6: Check BCSU status, NSEI status, ZQRI ,ZQKB and BVCI status. STEP 7: Check whether the BSC having appropriate PCU CARD (PCU2D). STEP 7: Check whether the BSC having Valid License. (PCU2) STEP 8: Check for BSC configuration (Symmetric or Assymetric)

GBOIP to PCU POOLING

STEP 1: Disable GENA for the all sectors attached in the particular PSEI. STEP 2: Delete the NSVLI using ZFXH command. STEP 3: Delete the PSEI Using ZFXE command. STEP 4: Check ZQKB output if IP changes are required Delete the static route by using ZQKA command.(if no changes required dont delete the IP configuration). STEP 5: Check ZQRI; output if changes required delete the IP configuration by using ZQRG command.(If no changes required Dont delete the IP configuration). STEP 6: Create ZQRI IP by using ZQRN command (use the new IP details provided by the RF team). STEP 7: Create static route by using ZQKC command (use new IP details provided by the RF team). STEP 8: Skip the above two steps if no changes required in the existing IP configuration. STEP 9: Create the new PSEI by using ZFXA command (use the master BCSU, PCU combination). STEP 10: Create the NSVLI by using ZFXK command after creating it check PING response of SGSN. STEP 11: Attach all the BCSU, PCU combination with the Main PSEI. STEP 12: Enable GENA for one BTS and check the BVCI status (WO-EX). STEP 13: Create the Re-routing using ZQKC command (depends upon the circle Check with RF team.) STEP 14: Enable GENA for all sectors and check the BVCI status. STEP 15: Check the PING response of all the BCSU, PCU combination. STEP 16: Execute the DAP reallocation command (ZFXF:P).

POST CHECK STEP 1: Check the WO state of all the BCSU, PCU combination STEP 2: Check the BVCI state and GENA state of all the BTS. STEP 3: Compare the ZEEL output with old log. STEP 4: Inform to the Drive Test team for call test.