Per addendum #1,

this is part of
alternate G-1
Per addendum #1, revise this note to read as follows:
Per addendum #1, Cut-out existing wall to receive plumbing for new sink.
delete this note. In the existing Men's T oilet protect existing RFP panels
and modify for new sink layout. Supplement or replace Per addendum #1, there is only one drawing (PD1).
panels that cannot be reused. Refer to plumbing
drawings for additional information.

Per addendum #1,


delete this note.

New Note #4: Provide treated wood blocking to support new lavatories or lavatory
manufacturer's wall support (per addendum #1).

Alternate G-1

Per addendum #1,


this text is to be
"Renovated Toilet
Rooms

Per addendum #1, insert the word "classroom" between office and area.
This is detail #4.
Per addendum #1,
all FEC labels are
to be revised to
read FE.

Per addendum #1,


all FEC labels are
to be revised to
read FE.
Per addendum #1,
this dimension is to
read 60'.

Per addendum #1,


this dimension is to
read 56'.

Per addendum #1, refer to Sketch 2/SKM02


for layout of ceiling grilles between column
lines A to B and between column lines 1 to 2.
Per addendum #1,
Per addendum #1, 8"
these are to be 22 Ga.
20 Ga. Galvanized
Metal Ceiling Joist @
16" O.C. Refer to
structural drawings for
orientation of joist.

Per addendum #2,


add note to
indicate sealant on
either side of the
tube column.

Per addendum #1,


Per addendum #1, 6" 22 extend this gypsum
Ga. Galvanized Metal board to underside
Studs @ 16" O.C. of ceiling joist.

Per addendum #1, the


gauge of these studs
are to be 22 Ga.

Per addendum #1,


delete the reference to
the 12' 2" dimensions.

Per addendum #1,


these are to be 22 Ga.

Per addendum #1,


rigid insulation to
be secured with "Z"
bars instead of "2"
bars.

Per addendum #1, Paint all exposed existing and new structural steel from
Refer to 2/S1.12 for additional information. the top of supplemental steel frame to the floor level. Existing structural
steel above the new supplemental steel will not be painted.

Per addendum #1,


these are to be 22 Ga.

Per addendum #1,


these are to be 22 Ga.
Per addendum #1, change all references
reading "Existing Conc" to "Gypsum Board".

Per addendum #2, Paint Color to match


Benjamin Moore 1611 (Gray tint).

Per addendum #2,


refer to SK-1 for
the revised layout
of Interior Signage
Type "A".

Per addendum #1, change this not to read


Door Lites refer to Door Schedule for
Glass Types.
Per addendum #1,
relocate the
concrete slab
associated with the
Dust Collector to
this location as
indicated on
Sketch 2/SKM02

Per addendum #1,


remove this note.

Per addendum #1, delete this note and replace with the following: The foundation was designed for an allowable soil bearing
pressure of 3,000 pounds per square foot, based on a geo-technical report prepared by Trigon Engineering Consultants, Inc.
(Trigon Job No. 011-96-103, dated July 1, 1996
Per addendum #2,
the area between
column lines 1 to 2
and between
column line A to E
is Alternate G-1
See page A1.0 for
elevations of this
area and layout
Per addendum #1,
change this to 20".

Per addendum #1,


change this to 25 HP.

For curb detail, see A6.0


Per addendum #1, the dust
collection system is modified
to the layout shown on the
attached sketches SKM01
and SKM02.
Per addendum #1, the dust
collector unit (DCU-1) has
been relocated to the west
side of the building. Revise
the location as indicated on
the attached sketch SKE01.

Per addendum #1, this is to


be changed from 20HP to
25 HP. The fusing shall be
per the nameplate data of
the dust collector.
Per addendum #1, circuits 32, 34,
and 36. Change the circuit breaker
that serves DCU-1 from 60A. /3P to
70A./3P. Change the branch circuit
to: (3) #6, (1) #10G in 1"C.