You are on page 1of 31

Andreia Chan Gao

Alverca School
1-t - 5-r- 5r-r-
5-r- 5r-r-
-r- /~~ Salvaterra de Magos School
City Museum
Vale de Figueira Station
Sanus Per Aquam
lniv
-r- /~~
Damaia School
5-r- 5r-r-
lniv
1-t - 5-r- 5r-r-
Alverca School
GAGO COUTINHO SECUNDARY SCHOOL (HIGH SCHOOL)
SERLACHIUS MUSEUM GSTA EXTENSION - INTERNATIONAL DESIGN COMPETITION
DR. AZEVEDO NEVES SECUNDARY SCHOOL (HIGH SCHOOL)
VALE DE SANTARM SECONDARY RAILROAD STATION (TRAIN STATION)
VALE DE FIGUEIRA STATION (TRAIN STATION)
NEW RAILROAD STATION OF SANTARM AND ROAD-RAIL INTERFACE (TRAIN STATION)
NATIONAL VETERINARY RESEARCH LABORATORY (LNIV)
SALVATERRA DE MAGOS EB2/3 AND SECUNDARY SCHOOL (HIGH SCHOOL)
CITY MUSEUM - CORE XX AND XXI CENTURY
SANUS PER AQUA - TOMAR CONVENT
REHABILITATIONOF HOUSESIN MONSANTO
P
O
R
T
F
O
L
I
O




D
I
R
E
C
T
O
R
Y
COVER LETTER & RESUME
PULL
Pedestrian routes Vehicles routes Service vehicles routes
Loading and Unloading
Museum Entrance Loading and Unloading
Access
Parking
lll1J1PV1
JOENNIEMI MANOR
lll1J1PV1
JOENNIEMI MANOR
T
A
A
V
E
T
I
N
S
A
A
R
I
JOENNIEMI MANOR
lll1J1PV1
T
A
A
V
E
T
I
N
S
A
A
R
I
lll1J1PV1 lll1J1PV1
Site Plan_1/5000 Facade_1/2000
Diagrams
SERLACHIUS MUSEUM EXTENSION -
INTERNATIONAL DESIGN COMPETITION,
FINLAND, 2011
PROGRAM: Foyer Services, Conference and
Representation Facilities, Restaurant and Kitchen
Facilities, Exhibition Spaces, Collections Treatment and
Storage Facilities, Offices, Conference Room and
Library, Property Management Facilities, Circulations,
Extension of the Exterior Circulation.
BUILDING AREA: 5003,03 m (53,852 sf)
The design of the building extension, works as a
connector between the Melasjarvi Lake, the
Taavetinsaari island and the park, a destination point.
Rather than going to the museum simply to look at art,
visitors are welcomed to engage in artistic discourse
primarily by the architecture of the building itself.
According to the basic assumptions, for some of the
design options taken, the new building is developed
according to a constructive streamlined grid - oriented
in a cross shape by two major circulation axes - the
longitudinal (North - South ) crossing the (East-West)
direction. This cross circulation (interior and exterior)
provides a spatial distribution of the program in all
quadrants (North-East, East / South, South / West and
West / North) where we will insert the implemented
different functional areas. The entrance foyer acts as
the heart of the old and the new building, directing the
visitors along all the museological spaces.
CREDITS: Joo Lcio Lopes Arquitectos, Lda
Joo Lcio Lopes (design architect)
Andreia Gao, Carla Rodrigues, Madalena
Caiado,Mariana Henriques, Rui Cavaleiro
(project team) 106 106.5 107
105
105.5
106
106.5 107
100
100.5
101
101.5
102
102.5
103
103.5
104
105
104.5
105.5
100
100.5
101
101.5
102
102.5
103
103.5
104
104.5
106 106.5 107
105
100
100.5
101
101.5
102
102.5
103
103.5
104
105
104.5
100
100.5
101
101.5
102
102.5
103
104
104.5
105.5
106
106.5 107 105.5
100
100.5
101
101.5
102
102.5
103
103.5
104
105
104.5
106 106.5 107
105
104
104.5
105.5
106.5 107 105.5
100
100.5
101
101.5
102
102.5
103
Plan Level 103,00_1/1000 Plan Level 107,50_1/1000 Plan Level 110,50_1/1000
SERLACHIUS MUSEUM EXTENSION -
INTERNATIONAL DESIGN COMPETITION,
FINLAND, 2011
PROGRAM: Foyer Services, Conference and
Representation Facilities, Restaurant and Kitchen
Facilities, Exhibition Spaces, Collections Treatment and
Storage Facilities, Offices, Conference Room and
Library, Property Management Facilities, Circulations,
Extension of the Exterior Circulation.
BUILDING AREA: 5003,03 m (53,852 sf)
The design of the building extension, works as a
connector between the Melasjarvi Lake, the
Taavetinsaari island and the park, a destination point.
Rather than going to the museum simply to look at art,
visitors are welcomed to engage in artistic discourse
primarily by the architecture of the building itself.
According to the basic assumptions, for some of the
design options taken, the new building is developed
according to a constructive streamlined grid - oriented
in a cross shape by two major circulation axes - the
longitudinal (North - South ) crossing the (East-West)
direction. This cross circulation (interior and exterior)
provides a spatial distribution of the program in all
quadrants (North-East, East / South, South / West and
West / North) where we will insert the implemented
different functional areas. The entrance foyer acts as
the heart of the old and the new building, directing the
visitors along all the museological spaces.
CREDITS: Joo Lcio Lopes Arquitectos, Lda
Joo Lcio Lopes (design architect)
Andreia Gao, Carla Rodrigues, Madalena
Caiado,Mariana Henriques, Rui Cavaleiro
(project team)
Section AA_1/1000
Section BB_1/1000
Section CC_1/1000
Section DD_1/2000
Section EE_1/2000
Section FF_1/2000
NEW RAILROAD STATION OF SANTARM AND
ROAD-RAIL INTERFACE, PORTUGAL, 2006 - 2010
PROGRAM: Passenger areas, food and shopping
areas (cafeteria, shops...), railway operators areas,
REFER area, platforms, interface/outdoor, car silo.
CLIENT: REFER, EPE
BUILDING AREA: 16 000 m (172,223 sf)
INTERFACE AREA: 26 000 m (279,862 sf)
STATUS: Execution Project
The new railroad Station of Santarm and road-rail
interface , was part of the Modernization Project of the
Northern Line (PMLN), sub-troo1.3 Setil
/Entroncamento. The creation of a pedestrian route
connection was proposed due to the proximity
between the new station and the future urban park.
This new territorial reorganization allows a new visual
and physical relationship with this rail infrastructure. So
we opted for a functional layout in which the entry of
passengers is situated at the highest elevation of the
land, on the west side of the station - square - resulting
in a access system that, through the galleries at the
lobby level (57.00), processes the connection between
entries and platforms, in circuits in which the access to
the line, the path is always descending, and in the exit
from the line, the path is always ascending. The car silo
have 3 floors, partially buried and which coverage is
the same share of the station square, this should have
the least visual and environmental possible impact.
MY COLLABORATION: Prior Study, Execution Project
CREDITS: Joo Lcio Lopes Arquitectos, Lda
Joo Lcio Lopes (design architect)
Andreia Gao, Carla Rodrigues, Gemma Villa
Rui Cavaleiro, Talita Abraham (project team) Site Plan_1/2000
57,53
Ground Floor Plan_1/2000
Lower Level 3 Plan _1/2000
Lower Level 1 Plan_1/2000
Lower Level 2 Plan _1/2000
NEW RAILROAD STATION OF SANTARM AND
ROAD-RAIL INTERFACE, PORTUGAL, 2006 - 2010
PROGRAM: Passenger areas, food and shopping
areas (cafeteria, shops...), railway operators areas,
REFER area, platforms, interface/outdoor, car silo.
CLIENT: REFER, EPE
BUILDING AREA: 16 000 m (172,223 sf)
INTERFACE AREA: 26 000 m (279,862 sf)
STATUS: Execution Project
The new railroad Station of Santarm and road-rail
interface , was part of the Modernization Project of the
Northern Line (PMLN), sub-troo1.3 Setil
/Entroncamento. The creation of a pedestrian route
connection was proposed due to the proximity
between the new station and the future urban park.
This new territorial reorganization allows a new visual
and physical relationship with this rail infrastructure. So
we opted for a functional layout in which the entry of
passengers is situated at the highest elevation of the
land, on the west side of the station - square - resulting
in a access system that, through the galleries at the
lobby level (57.00), processes the connection between
entries and platforms, in circuits in which the access to
the line, the path is always descending, and in the exit
from the line, the path is always ascending. The car silo
have 3 floors, partially buried and which coverage is
the same share of the station square, this should have
the least visual and environmental possible impact.
MY COLLABORATION: Prior Study, Execution Project
CREDITS: Joo Lcio Lopes Arquitectos, Lda
Joo Lcio Lopes (design architect)
Andreia Gao, Carla Rodrigues, Gemma Villa
Rui Cavaleiro, Talita Abraham (project team)
Section A_1/2000
Section B_1/2000
Section C_1/2000
Section D_1/2000
Section F_1/2000
Section G_1/2000
Section E_1/2000
Section B_1/200
First Floor Plan Second Floor Plan Ground Floor Plan
Existent
Demolished
New
DR. AZEVEDO NEVES SECUNDARY SCHOOL -
DAMAIA, PORTUGAL, 2008 - 2011
PROGRAM: Standard classrooms, general office/
administration, student center / multipurpose
room,cafeteria, library/resource centre, computer
rooms, workshops,NOC (new oportunities center) and
special education/ dress rooms, fitness room, outdoor
and indoor activities spaces / row of seats with support
spaces/ reception desk.
CLIENT: Parque Escolar, EPE
BUILDING AREA: 11,218 m (120,750 sf)
STATUS: Constructed
The Dr. Azevedo Neves Secondary School was part of
the Modernization Program phase2A of the Parque
Escolar do Ensino Secundrio. As the name itself
indicates, the most important intervention is related to
the introduction of the Block A. This new body that
grabs to the physically existing blocks B and C, is set
around a - patio / plaza - which sees itself as a
structural element of the entire project also connecting
with the main entrance and the street that gives access
to schools. This building consists in its essence, the
Resource Center is structured on two floors (above the
main entrance); and the "Library" and the teachers
break room are located above the access area to the
central courtyard.
MY COLLABORATION: Execution Project, Technical
Assistance
CREDITS: Joo Lcio Lopes Arquitectos, Lda
Joo Lcio Lopes (design architect)
Andreia Gao, Gemma Villa, Madalena
Caiado, Mariana Henriques, Talita Abraham
(project team)
CIRCULATIONS SPECIFIC USES EDUCATION UNITS Site Plan
DR. AZEVEDO NEVES SECUNDARY SCHOOL -
DAMAIA, PORTUGAL, 2008 - 2011
PROGRAM: Standard classrooms, general office/
administration, student center / multipurpose
room,cafeteria, library/resource centre, computer
rooms, workshops,NOC (new oportunities center) and
special education/ dress rooms, fitness room, outdoor
and indoor activities spaces / row of seats with support
spaces/ reception desk.
CLIENT: Parque Escolar, EPE
BUILDING AREA: 11,218 m (120,750 sf)
STATUS: Constructed
The Dr. Azevedo Neves Secondary School was part of
the Modernization Program phase2A of the Parque
Escolar do Ensino Secundrio. As the name itself
indicates, the most important intervention is related to
the introduction of the Block A. This new body that
grabs to the physically existing blocks B and C, is set
around a - patio / plaza - which sees itself as a
structural element of the entire project also connecting
with the main entrance and the street that gives access
to schools. This building consists in its essence, the
Resource Center is structured on two floors (above the
main entrance); and the "Library" and the teachers
break room are located above the access area to the
central courtyard.
MY COLLABORATION: Execution Project, Technical
Assistance
CREDITS: Joo Lcio Lopes Arquitectos, Lda
Joo Lcio Lopes (design architect)
Andreia Gao, Gemma Villa, Madalena
Caiado, Mariana Henriques, Talita Abraham
(project team)
Roof Plan_1/2000 First Floor Plan_1/2000 Ground Floor Plan_1/2000
Section 1
Section 2
Section 3
Section 4
1
1 2
2
4
3
4
3
Section AA_1/1000
Section BB_1/1000
Section CC_1/1000
Section DD_1/1000
Section EE_1/200
A
B C
A
G
B
C
D
H
Circulations
Specific Uses
Education Units
Sports
Demolition Plan
SALVATERRA DE MAGOS EB2/3 AND SECUNDARY
SCHOOL, PORTUGAL, 2008 - 2011
PROGRAM: Teaching activities of the 2nd cycle,
laboratories, arts,regular classes for the 3rd cycle and
secondary education,gymnasium, general office /
administration, teachers and staff break room, student
center/multipurposeroom, cafeteria, library/
resource centre,computers rooms, workshops, NOC
(new opportunities center) and special education, new
body of dress rooms, and reception desk.
CLIENT: Parque Escolar, EPE
BUILDING AREA: 11,800 m (127,014 sf)
STATUS: Constructed
The Salvaterra de Magos School EB2 / 3and
Secondary was part of the Modernization Program
phase2A of the Parque Escolar do Ensino
Secundrio. The major objective of this proposal is to
ensure a balanced way of joining two contiguous but
separate schools physically andfunctionally, the
EB2/3 Antonio Lopes andthe ES/EB3of
Salvaterra de Magos, by developing a comprehensive
approach. A new multi-purpose school building is
added totheschool core that will be physically closer
to the existing blocks A and G. The new building is
situatedaroundtwo- courtyards/plazas- of
different dimensions that are the structural element of
the whole project also linking with the main entrance
and the street that provides access to school.
MY COLLABORATION: Prior Study, Execution Project,
Technical Assistance
CREDITS: Joo Lcio Lopes Arquitectos, Lda
Joo Lcio Lopes (design architect)
Andreia Gao, Carla Rodrigues, Rui Cavaleiro
Victor (project team)
35m
15
5
0
35m
15
5
0
R u a P r o f . N a t r c i a A s s u n o
R u a E n g . J o s H e n r i q u e L i n o
E s t r a d a N a c i o n a l 1 1 8
B a i r r o d a C h e s a l
20 0 100
35m
1
5
5
0
Site Plan_1/2000 First Floor Plan_1/2000 Ground Floor Plan_1/2000
SALVATERRA DE MAGOS EB2/3 AND SECUNDARY
SCHOOL, PORTUGAL, 2008 - 2011
PROGRAM: Teaching activities of the 2nd cycle,
laboratories, arts,regular classes for the 3rd cycle and
secondary education,gymnasium, general office /
administration, teachers and staff break room, student
center/multipurposeroom, cafeteria, library/
resource centre,computers rooms, workshops, NOC
(new opportunities center) and special education, new
body of dress rooms, and reception desk.
CLIENT: Parque Escolar, EPE
BUILDING AREA: 11,800 m (127,014 sf)
STATUS: Constructed
The Salvaterra de Magos School EB2 / 3and
Secondary was part of the Modernization Program
phase2A of the Parque Escolar do Ensino
Secundrio. The major objective of this proposal is to
ensure a balanced way of joining two contiguous but
separate schools physically andfunctionally, the
EB2/3 Antonio Lopes andthe ES/EB3of
Salvaterra de Magos, by developing a comprehensive
approach. A new multi-purpose school building is
added totheschool core that will be physically closer
to the existing blocks A and G. The new building is
situatedaroundtwo- courtyards/plazas- of
different dimensions that are the structural element of
the whole project also linking with the main entrance
and the street that provides access to school.
MY COLLABORATION: Prior Study, Execution Project,
Technical Assistance
CREDITS: Joo Lcio Lopes Arquitectos, Lda
Joo Lcio Lopes (design architect)
Andreia Gao, Carla Rodrigues, Rui Cavaleiro
Victor (project team)
A
C
B
A
C B
2 0 10
2 0 10
2 0 10
Section AA_1/1000
Section BB_1/1000
Section CC_1/1000
0 10 20m
Ground Floor Plan
Second Floor Plan
First Floor Plan
Social Area |
Cafeteria
Sports Area
Teachers Area |
Administrative Area
Classrooms
Science & technology
Arts
Workshops
NOC -New Opportunities
Center
Library | Multipurpose
Storage / Technical
Areas / Toilets
Existent
Demolished
New
Site Plan
GAGO COUTINHO SECUNDARY SCHOOL,
ALVERCA, PORTUGAL, 2009 -
PROGRAM: Standard and specific use classrooms,
general office / administration, student center /
multipurpose room,cafeteria, library/resource
centre/NOC (new oportunities center) and special
education/ dress rooms, fitness room/ electricity,
mechanical and aeronautics workshops.
CLIENT: Parque Escolar, EPE
BUILDING AREA: 16,066 m (172,932 sf)
STATUS: In Construction
The Gago Coutinho Secondary (High) School was part
of the Modernization Program phase 3 of the Parque
Escolar do Ensino Secundrio. The most important
intervention is related to the introduction of the new
Block ADM. This new body that physically grabs to the
existing blocks B and C, is set around two courtyards /
plazas - which identify themselves as structural
elements of the whole project. The body also links with
the main entrance and the street that gives access to
school. The ADM building, subdivided into A, D and M,
but is a single building for the purpose of space
organization that is situated along the entire Avenue
Vilar Queiroz. Constructive and architectural solutions
were also evaluated to respond to the resolution of
current problems related to: environmental/thermal
performance, safety and accessibility; acoustics;
observed constructive pathologies; building
infrastructure systems reorganization and remodeling.
MY COLLABORATION : Prior Study, Execution Project
CREDITS: Joo Lcio Lopes Arquitectos, Lda
Joo Lcio Lopes (design architect)
Andreia Gao, Carla Rodrigues, Madalena
Caiado, Mariana Henriques, Talita Abraham
(project team)
Roof Plan_1/2000
First Floor Plan_1/2000 Ground Floor Plan_1/2000
Second Floor Plan_1/2000
Ground Floor Plan_1/1000
GAGO COUTINHO SECUNDARY SCHOOL,
ALVERCA, PORTUGAL, 2009 -
PROGRAM: Standard and specific use classrooms,
general office / administration, student center /
multipurpose room,cafeteria, library/resource
centre/NOC (new oportunities center) and special
education/ dress rooms, fitness room/ electricity,
mechanical and aeronautics workshops.
CLIENT: Parque Escolar, EPE
BUILDING AREA: 16,066 m (172,932 sf)
STATUS: In Construction
The Gago Coutinho Secondary (High) School was part
of the Modernization Program phase 3 of the Parque
Escolar do Ensino Secundrio. The most important
intervention is related to the introduction of the new
Block ADM. This new body that physically grabs to the
existing blocks B and C, is set around two courtyards /
plazas - which identify themselves as structural
elements of the whole project. The body also links with
the main entrance and the street that gives access to
school. The ADM building, subdivided into A, D and M,
but is a single building for the purpose of space
organization that is situated along the entire Avenue
Vilar Queiroz. Constructive and architectural solutions
were also evaluated to respond to the resolution of
current problems related to: environmental/thermal
performance, safety and accessibility; acoustics;
observed constructive pathologies; building
infrastructure systems reorganization and remodeling.
MY COLLABORATION : Prior Study, Execution Project
CREDITS: Joo Lcio Lopes Arquitectos, Lda
Joo Lcio Lopes (design architect)
Andreia Gao, Carla Rodrigues, Madalena
Caiado, Mariana Henriques, Talita Abraham
(project team)
Section AA_1/1000
Section BB_1/1000
Section CC_1/1000
Section DD_1/200
A A
B B
C C
D D
3 - PHU - PUBLIC HEALTH UNIT
1 - CORE SUPPORT
2 - AHU - ANIMAL HEALTH UNIT
4 - GTS - GENERAL TECHNICAL
FUNCTIONAL DIAGRAM LEVEL 0
FUNCTIONAL DIAGRAM LEVEL 1 AND 2
FUNCTIONAL DIAGRAM LEVEL 3
FUNCTIONAL DIAGRAM LEVEL -1 AND -2
SUPPORT
LEVEL 1
LEVEL 2
LEVEL 3
LEVEL 0
LEVEL -1
management floor
technical floor of P3 lab
lobby
lab floors
technical floor laboratory
treatment centrals
general technical support,
garages, retail
LEVEL -2
water tanks
P3 lab floor
technical floor of P3 lab
A. MANAGEMENT
B. USA: LABORATORY OF
PATHOLOGY, BACTERIOLOGY,
VIROLOGY, PARASITOLOGY
C. P3. LABORATORY OF VIROLOGY
AND BACTERIOLOGY
UHP: FOOD SAFETY
LABORATORY
management floor
management floor
A
B
C
11.65
30 25.08
32.55
33.29
25
20
31.84
24.55
31.69
35.72
34.66
33.76
33.10
32.08
32.89
38.45
37.11
36.37
32.06
15
31.77
31.66
32.65
30.63
30.29
29.82
38.75
35
31.88
31.46
28.57
30
28.12
35
29.04
15.42
27.23
21.28
30.35
33.47
29.72
34.20
35
40
12.31
20
25
15
31.30
30
36.50
42.54
40.38
36.71
36.82
36.64
36.59
45
27.23
30.35
33.47
29.72
36.24
12.31
41.93
36.80
39.67
35.43
38.35
37.73
34.46
40
41.93
26.43 25
30
25.84
40
35
45
50.40
49.2649.26
50
45.18
45
50.40
48.58
N A T I O N A L V E T E R I N A R Y R E S E A R C H
L ABORAT ORY ( L NI V ) , POR T U GAL , 2 0 1 1
PROGRAM: Body 1 - CoreSupport,General
Technical Support;Body2 - Unit of Animal Health,
Unit of Public Hygiene, General Technical Support;
Body3: Experimental Containment Block Level3.
CLIENT: INRB, I.P. / LNIV - OEIRAS
AREA: 10,246 m (110,287sf)
STATUS: Basic Project
LNlvnewfacilities are locatedin the groundsof the
currentNationalAgronomic Stationin Oeiras,
belonging to theold Quinta de Recreio do Marques de
Pombal. This intervention isguided byacontext of
"single building", whichseeks totake this realityand
somehow transform it. The building may
haveasimplifiedreading of a set consisting
generallyof three interconnected functionalbodies.
Passive systems were also implemented (bioclimatic),
to minimizethe consumptionofelectricityand water
- recycling andreuse,such asbioclimaticfacades,
asystem for capturing rainwater on the roof,
geothermal heat pumpfor pre-heating/cooling
systems,HvAC, implementation of photovoltaic
panels. Toimprove the sustainabilityof the building
an extensivegreen roof was created and panels to
producehot water were implemented as well, among
others.
MY COLABORATION: Basic Project
CREDITS: Joo Lcio Lopes Arquitectos, Lda
Joo Lcio Lopes (design architect)
Andreia Gao, Gemma Villa, Mariana
Henriques, Rui Cavaleiro, Talita Abraham
(project team)
TRF
33.47
29.72
40
36.59
33.47
29.72
36.24
37.73
40
35
45
49.26
49.26
3 9 . 5 0
3 9 . 5 0
38.50
3 7 . 5 0
36.50
40.00
42.50
40.00
42.50
45.00
40.00
42.50
4 0 . 0 0
4 2 . 5 0
42.00
43.50
45.00
48.00
Site Plan_1/2000
Roof Plan_1/1000
Third Floor Plan_1/1000
First Floor Plan_1/1000
Second Floor Plan_1/1000
Ground Floor Plan_1/1000
Lower Level 1 Plan_1/1000 Lower Level 2 Plan _1/1000
N A T I O N A L V E T E R I N A R Y R E S E A R C H
L ABORAT ORY ( L NI V ) , POR T U GAL , 2 0 1 1
PROGRAM: Body 1 - CoreSupport,General
Technical Support;Body2 - Unit of Animal Health,
Unit of Public Hygiene, General Technical Support;
Body3: Experimental Containment Block Level3.
CLIENT: INRB, I.P. / LNIV - OEIRAS
AREA: 10,246 m (110,287sf)
STATUS: Basic Project
LNlvnewfacilities are locatedin the groundsof the
currentNationalAgronomic Stationin Oeiras,
belonging to theold Quinta de Recreio do Marques de
Pombal. This intervention isguided byacontext of
"single building", whichseeks totake this realityand
somehow transform it. The building may
haveasimplifiedreading of a set consisting
generallyof three interconnected functionalbodies.
Passive systems were also implemented (bioclimatic),
to minimizethe consumptionofelectricityand water
- recycling andreuse,such asbioclimaticfacades,
asystem for capturing rainwater on the roof,
geothermal heat pumpfor pre-heating/cooling
systems,HvAC, implementation of photovoltaic
panels. Toimprove the sustainabilityof the building
an extensivegreen roof was created and panels to
producehot water were implemented as well, among
others.
MY COLABORATION: Basic Project
CREDITS: Joo Lcio Lopes Arquitectos, Lda
Joo Lcio Lopes (design architect)
Andreia Gao, Gemma Villa, Mariana
Henriques, Rui Cavaleiro, Talita Abraham
(project team)
Water Tank Reserve
and Forwarding
Tubes of Water Collection
Water Infiltration in humus
Rainwater
Less Electricity Consumption (HVAC)
Lower Thermal Losses and Gains (winter / summer)
Effect of Direct Rainy seasons
Water Tank Reserve
Irrigation
Buried Network
Water Infiltration in humus
Dry seasons
Pumped to the roof
Sun Rays
Layer of humus
Dissipation of the Solar Radiation
COOLING SEASON (Summer)
(outside temperature)
Air Inlet
Open Lower Windows
New Air Inlet
(Open lower grille)
Addicted Air Outlet
(Open Superior Window)
Chimney Effect Between the
Mass of air heated by the sun
Solar protections
Sun Rays
Lower blinds
Air outlet
Open Superior Window
South Solar Chimney North Solar Chimney
T
h
e
rm
a
l M
a
s
s
the Two Facades
T
h
e
rm
a
l M
a
s
s
Heating season (winter)
South Solar Chimney North Solar Chimney
T
h
e
rm
a
l M
a
s
s
(the outside temperature)
Air Inlet
Greenhouse Between the Two Facades
Mass of air heated by the sun
Solar protections
New Heated Air Inlet
( Open Lower Windows)
Addicted Air Outlet
(Open upper grilles)
Air outlet
Open Lower Windows
Open Superior Window
Sun Rays
Raised Blinds
T
h
e
rm
a
l M
a
s
s
Environmental Energy Performance Environmental Energy Performance
Environmental Energy Performance
Section AA_1/1000
Section BB_1/1000
Section CC_1/1000
A
B
C
A
B
C
RUA HUMBERTO DELGADO
RUA DA LIBERDADE
RuA A ESTAA0
R u A A S E R R A A 0
R U A D E C A D I M A
RUA DA RIBEIRA GRANDE
RUA DA RIBEIRA GRANDE
RUA 25 DE ABRIL
Site Plan_1/2000
VALE DE SANTARM SECONDARY RAILROAD
S T A T I O N , P O R T U G A L , 2 0 0 6 - 2 0 1 0
PROGRAM: Passenger areas, platforms, "Kiss and
ride" and "park and ride", shelter for passengers, upper
walkay.
CLIENT: REFER, EPE
BUILDING & PLATFORMS AREA: 2,036.45 m
(21,920 sf)
STATUS: Execution Project
Following the fire that destroyed the building of the
current Vale de Santarm secondary railroad station, it
became necessary to reformulate the solution
presented above, it was concluded to be more
beneficial to opt for the demolition of the existing
building. The new Vale de Santarm secondary railroad
station, was part of the Modernization Project of the
Northern Line (PMLN), sub-troo1.3 Setil
/Entroncamento. The conception of the solution
considered the location conditions and accessibility of
the station, the spaces available for intervention and
the existing rail infrastructure, as well as, its relationship
to the need for implementation of the interface features
("Kiss and ride" and "park and ride") and the crossing
the railway line is through the upper walkway, with
stairs and elevator to comply with the regulatory
conditions of accessibility of disabled users. To
replaced the current Passenger Building, it is solely
proposed the existence of a hollow waiting and shelter
area for passengers - although covered by a metal
frame portico.
MY COLABORATION: Prior Study, Execution Project
CREDITS: Joo Lcio Lopes Arquitectos, Lda
Joo Lcio Lopes (design architect)
Andreia Gao, Carla Rodrigues, Gemma Villa
Rui Cavaleiro, Talita Abraham (project team)
V A L E D E S A N T A R M
V A L E D E S A N T A R M
Section DD_1/500
VALE DE SANTARM SECONDARY RAILROAD
S T A T I O N , P O R T U G A L , 2 0 0 6 - 2 0 1 0
PROGRAM: Passenger areas, platforms, "Kiss and
ride" and "park and ride", shelter for passengers, upper
walkay.
CLIENT: REFER, EPE
BUILDING & PLATFORMS AREA: 2,036.45 m
(21,920 sf)
STATUS: Execution Project
Following the fire that destroyed the building of the
current Vale de Santarm secondary railroad station, it
became necessary to reformulate the solution
presented above, it was concluded to be more
beneficial to opt for the demolition of the existing
building. The new Vale de Santarm secondary railroad
station, was part of the Modernization Project of the
Northern Line (PMLN), sub-troo1.3 Setil
/Entroncamento. The conception of the solution
considered the location conditions and accessibility of
the station, the spaces available for intervention and
the existing rail infrastructure, as well as, its relationship
to the need for implementation of the interface features
("Kiss and ride" and "park and ride") and the crossing
the railway line is through the upper walkway, with
stairs and elevator to comply with the regulatory
conditions of accessibility of disabled users. To
replaced the current Passenger Building, it is solely
proposed the existence of a hollow waiting and shelter
area for passengers - although covered by a metal
frame portico.
MY COLABORATION: Prior Study, Execution Project
CREDITS: Joo Lcio Lopes Arquitectos, Lda
Joo Lcio Lopes (design architect)
Andreia Gao, Carla Rodrigues, Gemma Villa
Rui Cavaleiro, Talita Abraham (project team)
Section EE_1/500
Section FF_1/500
Section AA_1/1000
Section BB_1/1000
Section CC_1/1000
Roof Plan_1/500 Ground Floor Plan_1/500
Rua da Eslao
Rua da Eslao
Roof Plan_1/500 Site Plan 1/2000
VALE DE FIGUEIRA STATION, PORTUGAL, 2006 -
2010
PROGRAM: Passenger areas, technical areas,
platforms, "Kiss and ride" and "park and ride", shelter
for passengers, upper walkway.
CLIENT: REFER, EPE
BUILDING & PLATFORMS AREA: 2,299.35m
(24,750 sf)
STATUS: Execution Project
The conception of the solution considered the location
conditions and accessibility of the station, the spaces
available for intervention and the existing rail
infrastructure, as well as, its relationship to the need for
implementation of the interface features ("Kiss and ride"
and "park and ride") and the crossing of the railway line
that is through the upper walkway, with stairs and
elevator to comply with the regulatory conditions of
accessibility of disabled users. Taking advantage of the
fact of having to build this infrastructure, and given that
the top floor of the passenger building also needs an
accessibility for the disabled, located along the upper
walkway, is now proposed in order to serve that floor.
A portico structure linking these two elements -
Building Passenger and Pedestrian Overpass is also
introduced. As previously mentioned, the current
passenger space will be recovered and intervened,
which is a global intervention on the ground floor -
designed as a whole to the technical building -; and
the upstairs part - will be in rough - with the perspective
of a possible use of that space by external services of
REFER.
MY COLLABORATION: Prior Study, Execution Project
CREDITS: Joo Lcio Lopes Arquitectos, Lda
Joo Lcio Lopes (design architect)
Andreia Gao, Carla Rodrigues, Gemma Villa
Rui Cavaleiro, Talita Abraham (project team)
Rua da Eslao Rua da Eslao
VALE DE FIGUEIRA
VALE DE FIGUEIRA
VALE DE FIGUEIRA
Section A_1/1000
Section B_1/1000
Section C_1/1000
Section D_1/1000 Section G_1/500
Section F_1/500
Section E_1/500
First Floor Plan_1/500 Ground Floor Plan_1/500
VALE DE FIGUEIRA STATION, PORTUGAL, 2006 -
2010
PROGRAM: Passenger areas, technical areas,
platforms, "Kiss and ride" and "park and ride", shelter
for passengers, upper walkway.
CLIENT: REFER, EPE
BUILDING & PLATFORMS AREA: 2,299.35m
(24,750 sf)
STATUS: Execution Project
The conception of the solution considered the location
conditions and accessibility of the station, the spaces
available for intervention and the existing rail
infrastructure, as well as, its relationship to the need for
implementation of the interface features ("Kiss and ride"
and "park and ride") and the crossing of the railway line
that is through the upper walkway, with stairs and
elevator to comply with the regulatory conditions of
accessibility of disabled users. Taking advantage of the
fact of having to build this infrastructure, and given that
the top floor of the passenger building also needs an
accessibility for the disabled, located along the upper
walkway, is now proposed in order to serve that floor.
A portico structure linking these two elements -
Building Passenger and Pedestrian Overpass is also
introduced. As previously mentioned, the current
passenger space will be recovered and intervened,
which is a global intervention on the ground floor -
designed as a whole to the technical building -; and
the upstairs part - will be in rough - with the perspective
of a possible use of that space by external services of
REFER.
MY COLLABORATION: Prior Study, Execution Project
CREDITS: Joo Lcio Lopes Arquitectos, Lda
Joo Lcio Lopes (design architect)
Andreia Gao, Carla Rodrigues, Gemma Villa
Rui Cavaleiro, Talita Abraham (project team)
A
A
'
REHABILITATION OF HOUSES IN MONSANTO
-Idanha-a-Nova - BEIRA BAIXA, PORTUGAL, 2005 -
2011
PROGRAM: Terraces, bedrooms, living room, kitchen,
library, games room, garage.
CLIENT: Eng vitor Castel-Branco Campos
BUILDING AREA: 400 m (4,305 sf)
STATUS: Constructed
Rehabilitation project - the junction of two houses of
the same owner in the village's urban center.
MY COLLABORATION : Technical Assistance
CREDITS: Joo Lcio Lopes Arquitectos, Lda
Joo Lcio Lopes (design architect)

S ANU S P E R A QU A , T OMA R CONV E NT ,
P O R T U G A L , 2 0 0 8
SEMINAR FAUTL: VI International Seminar of
Architecture - Architecture and Cosmology
WORKSHOP
Water Of The Templars: The Convent and Aqueduct,
Thermal Program
The team responsible for coordinating the
workshop consisted of: Jorge Cruz Pinto, Hugo
Cantone, Antonello Monaco, Jorge Oseki, Mariagrazia
Leonardi, Andrea Rosario Cristelli e Pedro Cabrito.
Part of the workshop took place in Tomar, more
precisely at the Convent of Christ and consisted in an
open program from the interpretation of the Convent of
Christ, where the design was the tool of representation
analysis, of which the theme was water, geometry and
space. The proposed architecture should be based on
a hypothesis of a program of uses that respects the
spirit of the place and aim to reuse the aqueduct which
is currently disabled; and the presence of water as a
functional element of revitalization. The title of our work
was the Sanus Per Aquam, that is, we made a proposal
for a Spa, so we took the cisterns of the Convent of
Christ to create our Spa. In terms of the program we
have: Pools caledarium, tepidarium, frigidarium,
Turkish bath, sauna, Jacuzzi pool, biological pool,
massage rooms, services, restrooms, shower and
locker rooms. The skylights were used for natural
lighting to caledarium, the old irrigation system for the
gardens was turned into a water mirror, and the tanks
were converted into swimming pools.
TEAM: Andreia Chan Gao, ngelo Branquinho and
Marta Dabraio
Site Plan_1/5000
CI TY MUSEUM_ CORE XX AND XXI CENTURY,
L I S B O N , P O R T U G A L
PROGRAM: Public areas, service areas, technical
areas, parking areas.
FA-UTL: 2007 / 2008
BUILDING AREA: 7,440.12 m (80,085 sf)
The area of intervention of this project is the area
surrounding the road junction in the "Twin Towers".
The establishment of this museum came in trying to
make the connection to Monsanto by changing the
road system and a green path, where the link is the
building. This proposal consists in the creation of a
new roundabout which develops according to the
topography of the land, a green path with the intention
of connecting the Parque Eduardo VII to Monsanto,
and a museum located within the roundabout that will
be part of a building - the bridge . This, at certain areas
of land will be based on a system of platforms and
tunnels that will connect the existing viaduct, adopting
a pedestrian character, and of leisure, where outdoor
cafes, banks, etc can exist.
The Museum has two exterior parking areas, one for
visitors and another to support it, surrounded by a
large green space that can be used for exhibitions. The
interior space is divided into public areas, service and
technical areas, with the restaurant and cafeteria facing
south, overlooking the Valley of Alcantara, and the
exhibition area to the west overlooking Monsanto. Zinc
and U-Glass will be used for exterior materials.
FACULTY: Joo Lcio Lopes and Joo F. Figueira
A01
D05
B B
D
D
C
C
A A
D05
B B
D
D
C
C
A A
CI TY MUSEUM_ CORE XX AND XXI CENTURY,
L I S B O N , P O R T U G A L
PROGRAM: Public areas, service areas, technical
areas, parking areas.
FA-UTL: 2007 / 2008
BUILDING AREA: 7,440.12 m (80,085 sf)
The area of intervention of this project is the area
surrounding the road junction in the "Twin Towers".
The establishment of this museum came in trying to
make the connection to Monsanto by changing the
road system and a green path, where the link is the
building. This proposal consists in the creation of a
new roundabout which develops according to the
topography of the land, a green path with the intention
of connecting the Parque Eduardo VII to Monsanto,
and a museum located within the roundabout that will
be part of a building - the bridge . This, at certain areas
of land will be based on a system of platforms and
tunnels that will connect the existing viaduct, adopting
a pedestrian character, and of leisure, where outdoor
cafes, banks, etc can exist.
The Museum has two exterior parking areas, one for
visitors and another to support it, surrounded by a
large green space that can be used for exhibitions. The
interior space is divided into public areas, service and
technical areas, with the restaurant and cafeteria facing
south, overlooking the Valley of Alcantara, and the
exhibition area to the west overlooking Monsanto. Zinc
and U-Glass will be used for exterior materials.
FACULTY: Joo Lcio Lopes and Joo F. Figueira Roof Plan_1/1000
First Floor Plan_1/1000
Groud Floor Plan_1/1000
+ 5.00
+ 20.00
+ 10.00
+ 15.00
+ 5.00
+ 20.00
+ 15.00
+ 10.00
+ 20.00
+ 5.00
+ 10.00
+ 15.00
+ 5.00
+ 20.00
+ 10.00
+ 15.00
+ 5.00
+ 20.00
+ 10.00
+ 15.00
+ 5.00
+ 20.00
+ 10.00
+ 15.00
+ 5.00
+ 20.00
+ 10.00
+ 15.00
+ 5.00
+ 20.00
+ 10.00
+ 15.00
Section AA_1/1000
Section CC_1/1000
Section BB_1/1000
Section DD_1/1000
RECOMMENDATION LETTERS
PULL
COLLABORATIONIN THE FOLLOWINGPROJECTS
CIAUD - ResearchCentre on Architecture,Urbanismand Design at the
FacuItyof Architecture of theTechnicaI University of Lisbon (2007/2008)
HeadquartersEdia model
Basebuilding materials
Re-Stone Project
FacadesofCement - Cimenteira do Louro
Hotel Spa - Quinta Praia das Fontes
AdditionaITraining/Seminars (provide by - CIAUD)
Seminar FAUTL - VI International Seminar of Architecture - Architecture
and Cosmology
vllCongress ofNatural Stone - FIMAL - Alentejo International Fairof
Marble
JLLA - Joo Lcio Lopes Arquitectos, Lda (2008/2011)
Pehabilitationof housesin Monsanto-ldanha-a-Nova-Beira Baixa
NewPailroad StationandSantarmroad-railinterface
valeFigueira Station
vale deSantarm Secondary Pailroad Station
Escola Secundria Salvaterra de Magos - High School
Escola Secundria Dr. Azevedo Neves - Damaia - High School
Escola Secundria Gago Coutinho - Alverca do Pibatejo - High School
National veterinary Pesearch Laboratory - Quinta do Marqus - Oeiras
Serlachius Museum Gsta Extension - lnternational Design Competition
Alverca School
1-t - 5-r- 5r-r-
lniv
5-r- 5r-r-
Damaia School
-r- /~~
lniv
Sanus Per Aquam
Vale de Figueira Station
City Museum
Salvaterra de Magos School -r- /~~
5-r- 5r-r-
1-t - 5-r- 5r-r-
Alverca School
Andreia Patrcia Chan Gao__Architect__phone: 207-459-9256 /+351 966 649 608__emaiI: andreia.chan.gao@gmaiI.com__http://issuu.com/andreia.chan.gao

You might also like