Ivory Coast

Drive-test
& benchmarking
Scope of Work

Table of contents
1.

GENERAL INFORMATION ............................................................... 3

2.

GENERAL REQUIREMENTS OF THE PROJECT............................ 3

2.1

Implementation of the project .................................................................................. 3

2.2

Project Duration ........................................................................................................ 3

2.3

Project Scope ............................................................................................................ 3

3.

PROCESS ........................................................................................ 3

4.

SCOPE OF WORK ........................................................................... 3

4.1

Drive test Measurements .......................................................................................... 3

4.1.1 Drive test Area............................................................................................................................ 3


4.1.2 Drive test verification after antenna modification for coverage comparison ...................... 4

4.2

Coverage Benchmarking with other Operators ...................................................... 4

4.2.1 Benchmark Area ........................................................................................................................ 4

5.

Share of Responsabilities ................................................................. 4

Copyright 2010 Nokia Siemens Networks.


All rights reserved.

2/4

1. GENERAL INFORMATION
This service item Field Drive Test for Optimization is a general service item not
belonging to any project packages as such. It gives a description of what is
required for drive testing.
The scope of work includes the following:



Drive test Measurements


Coverage Benchmarking with other GSM operators

2. GENERAL REQUIREMENTS OF THE PROJECT


2.1

Implementation of the project


NSN requires the Supplier have the capacity in terms of hardware and software tools
resources, technical expertise, manpower resources and financial means to proceed
to the required drive-testing campaign.

2.2

Project Duration
The project duration is 6 months maximum.

2.3

Project Scope
The activities will cover the all country. List of Roads, Cities, Localities and Towns
will be provided.

3. PROCESS




NSN will provide the inputs (Roads, Localities, and Cities)


Drive test measurements will be performed to verify the coverage in the area. At the same time,
benchmarking with other operators will be performed simultaneously.
Another Drive test will be performed after implementation of changes either in antenna
configuration or parameter configuration in order to improve the coverage.

4. SCOPE OF WORK
4.1

Drive test Measurements

Drive test Area





NSN will provide the Roads, Cities, localities, and towns to be measured
Drive test route will be approved by NSN

Copyright 2010 Nokia Siemens Networks.


All rights reserved.

3/4

Drive test verification after antenna modification for


coverage comparison


4.2

Drive test will follow same route as before modification

Coverage Benchmarking with other Operators

Benchmark Area




List of Benchmark Areas will be provided


Benchmark route will be approved by NSN
Coverage Benchmark with three operators

5. Share of Responsabilities
The following table describes the Share of Responsibility between Nokia Siemens Networks
and the Subcontractor.
R - Indicate the responsibility

Issue

Nokia
Siemens
Networks

Testing methodology
Drive test route
Vehicle( including Field measurement tools1, fuel,
driver, technician,)
SIM cards & related costs
Access to sites
Drive test measurement report (logfiles)

Subcontractor

R
R
R
R
R
R

like TEMS, Agilent, Nemo, etc

Copyright 2010 Nokia Siemens Networks.


All rights reserved.

4/4