Date: Project Name: Project Number: Spreadsheet Title: Notes:

040909 LBDCIP LBDC Component MRS_Database MRS Rates Database, complied from rates available on Government of Punjab website: http://pportal.punjab.gov.pk/punjabcms/servlet/PunjabCMSServlet?CMDCMS=V_T_DOCS_BROWSER_VIE

Spreadsheet must be saved in C:\MRS_RATES\MRS_DATABASE.xls for links from BoQ spreadsheets to work (otherwise links must be manually updated).
Version v01 v02 v03 v04 v05 Date 4-Sep-09 24-Nov-09 3-Mar-10 13-Apr-10 19-May-10

LBDC Component MRS_Database MRS Rates Database, complied from rates available on Government of Punjab website: http://pportal.punjab.gov.pk/punjabcms/servlet/PunjabCMSServlet?CMDCMS=V_T_DOCS_BROWSER_VIEW&txtDocID=15864&txtVersionID=

eet must be saved in C:\MRS_RATES\MRS_DATABASE.xls rom BoQ spreadsheets to work (otherwise links must be manually updated).
Comments Database setup. Rates for Khanewal 3rd Quarter 2009 added Database refined to provide rates analysis if required. Database for LBDC/ICB-01Engr Est - First Issue Database updated for 2nd Q 2010 rates: Kasur, Okara, Sahiwal, Kahnewal Database for LBDC/ICB-01Engr Est - Final Issue

ROWSER_VIEW&txtDocID=15864&txtVersionID=1&CMDDOCTYPE=1&txtUserID=300

MRS Reference

Description

Unit

N O T US ED

N O T US ED

Rate 4th Rate 4th Rate 1st Rate 1st Quarter 2009 Quarter 2009 Quarter 2010 Quarter 2010 (Kasur) (Okara) (Kasur) (Okara) 6 7 8 9

C-1/1

C-1/1(ICB-02)

C-1/1(ICB-03)

C-1/1(ICB-04)

C-1/15 C-1/16(i-b) C-1/16(ii-e) C-3/2 C-3/4(a) (EW) C-3/4(a)-200 (EW) C-3/4(a)-1000 (EW) C-3/4(a)-1500 (EW) C-3/4(a)-2500 (EW) C-3/4(a)-3000 (EW) C-3/4(a)-3500 (EW) C-3/4(a)-1.0 (EW) C-3/4(a)-1.25 (EW) C-3/4(a)-1.5 (EW) C-3/4(a)-2.75 (EW) C-3/4(a)-3.0 (EW) C-3/4(a)-3.5 (EW) C-3/4(a)500(EW2) C-3/4(a)1000(EW2) C-3/4(a)2640(EW2) C-3/4(a)0.75(EW2) C-3/4(a)-(0.751)(EW2)

2 Carriage of 100 Cft of all material like stone aggregate, spawl, kankar lime (unslaked) surki etc.or 150 Cft of timber by truck or any other means owned by the contractor. Average lead 188 km from quarry premises. Carriage of 100 Cft of all material like stone aggregate, spawl, kankar lime (unslaked) surki etc.or 150 Cft of timber by truck or any other means owned by the contractor. Average lead 220 km from quarry premises. Carriage of 100 Cft of all material like stone aggregate, spawl, kankar lime (unslaked) surki etc.or 150 Cft of timber by truck or any other means owned by the contractor. Average lead 253 km from quarry premises. Carriage of 100 Cft of all material like stone aggregate, spawl, kankar lime (unslaked) surki etc.or 150 Cft of timber by truck or any other means owned by the contractor. Average lead ??? km from quarry premises. Carriage of small consignments weighing up to 5 maunds up to 1000 ft Carriage of consignments job. i) Cooly load for distance:b) Above 5 to 13 Km ii) Carriage of consignments odd jobs. e) Upto three Miles/ 4.8 Km Earth work excavation in ashes, sand and soft soil or silt clearence, undressed lead upto 50 feet. Borrowpit excavation in ordinary soil, undressed:Lead up to 200 ft Lead greater than 200ft and up to 1000 ft Lead greater than 1000ft and up to 1500 ft Lead greater than 1500ft and up to 2500 ft Lead greater than 2500ft and up to 3000 ft Lead greater than 3000ft and up to 3500 ft Lead greater than 3500ft and up to 1.0 miles Lead greater than 1.0 miles and up to 1.25 miles Lead greater than 1.25 miles and up to 1.50 miles Lead greater than 1.50 miles and up to 2.75 miles Lead greater than 2.75 miles and up to 3.00 miles Lead greater than 3.00 miles and up to 3.50 miles Lead up to 500 ft Lead greater than 500ft and up to 1000 ft Lead greater than 1000ft and up to 2640 ft (0.5 mile) Lead greater than 0.5 mile and up to 0.75 mile Lead greater than 0.75 mile and up to 1.0 mile

4 5

100 Cft

2,500.36

2,500.36

100 Cft

100 Cft

100 Cft

Consignment/ 30 M Each Consignment Each Consignment 1000 Cft 1000 Cft 1000 Cft 1000 Cft 1000 Cft 1000 Cft 1000 Cft 1000 Cft 1000 Cft 1000 Cft 1000 Cft 1000 Cft 1000 Cft 1000 Cft 1000 Cft 1000 Cft 1000 Cft 1000 Cft 1000 Cft 1000 Cft 1000 Cft 1000 Cft 1000 Cft 1000 Cft 1000 Cft 1000 Cft 1000 Cft 1000 Cft 3,489.00 3,489.00 1,834.20 2,345.05 2,854.30 3,027.40 3,085.10 3,200.50 3,489.00 3,594.00 3,699.00 4,224.00 4,329.00 4,539.00 1,834.20 2,345.05 2,854.30 3,027.40 3,085.10 3,200.50 3,489.00 3,594.00 3,699.00 4,224.00 4,329.00 4,539.00 77.85 45.95 77.85 45.95

C-3/4(a)-1(EW2) Lead greater than 0.5 mile and up to 1.0 mile C-3/4(a)-(11.5)(EW2) C-3/4(a)-(1.52.0)(EW2) Lead greater than 1.0 mile and up to 1.5 mile Lead greater than 1.5 mile and up to 2.0 mile

C-3/4(a)-2(EW2) Lead greater than 1.0 mile and up to 2.0 miles C-3/4(a)-3(EW2) Lead greater than 2.0 mile and up to 3.0 miles C-3/4(a)-4(EW2) Lead greater than 3.0 mile and up to 4.0 miles C-3/4(a)-5(EW2) Lead greater than 4.0 mile and up to 5.0 miles C-3/4(a)-6(EW2) Lead greater than 5.0 mile and up to 6.0 miles C-3/4(a)(1) Borrowpit excavation in ordinary soil, undressed lead up to 1.0 miles Borrowpit excavation undressed lead upto 100 ft (30 metre) including transportation of earth all types when the total distance covered in item of work is more than 1000 ft, average lead 1 mile Borrowpit excavation undressed lead upto 100 ft (30 metre). a) Ordinary soil Borrowpit excavation undressed lead upto 100 ft (30 metre). a) Ordinary soil Earth work in ordinary soil for embankments lead upto 100ft, including ploughing & mixing with blade grade or disc harrow or other suitable equipment and compaction by mechanical mean at optimum moisture content and dressing to design section complete in all respect (95% to 100% maximum modified AASHO dry density). Earthwork in ordinary soil for embankments lead up to 1.5 mile, including ploughing and mixing with blade grader disc harrow or other suitable equipment, and compaction by mechanical means at optimum moisture content and dressing to designed section, complete in all respects:90% maximum modified AASHO dry density.

C-3/(4,17)

1000 cft

3,489.00

3,489.00

C-3/4(a)-100

1000 cft

1,774.10

1,774.10

C-3/4-a

1000 cft

1,774.10

1,774.10

C-3/5(i)

1000 Cft

2,647.10

2,647.10

1000 Cft

C-3/5(ii)

3,864.65

Page 4 of 17

MRS Reference

Description

Unit

N O T US ED

N O T US ED

Rate 4th Rate 4th Rate 1st Rate 1st Quarter 2009 Quarter 2009 Quarter 2010 Quarter 2010 (Kasur) (Okara) (Kasur) (Okara) 6 7 8 9

2 Earthwork in ordinary soil for embankments lead upto 1.0 mile, including ploughing and mixing with blade C-3/5(ii), gradeor disc harrow or other suitable equipment, and 17(b&c) compaction by mechanical means at optimum moisture content and dressing to designed section, complete in all respects:90% maximum modified AASHO dry density. Earthwork in ordinary soil for embankments lead up to 500ft, including ploughing and mixing with blade grader disc harrow or other suitable equipment, and compaction by mechanical means at optimum C-3/5(ii)-500ft moisture content and dressing to designed section, complete in all respects:90% maximum modified AASHO dry density. Earthwork excavation irrigation channels, drains etc. to design section grade and profile. Excavated material C-3/10(i) disposed of and dresssed within 50 feet in ordinary soil. Earthwork excavation irrigation channels, drains etc. to design section grade and profile. Excavated material C-3/10(i)-100 disposed of and dresssed within 100 feet in ordinary soil. Excavation in irrigation channels, drains , etc to Cdesigned section, grades and profiles, excavated 3/10,16(i),18(b) material disposed off and undressed within 300ft in ordinary soil Excavation in irrigation channels, drains , etc to designed section, grades and profiles, excavated C-3/10,16(i)-250ft material disposed off and dressed within 250ft in ordinary soil Excavation in irrigation channels, drains , etc to designed section, grades and profiles, excavated C-3/10-250ft material disposed off (undressed) within 250ft in ordinary soil C-3/13 (EW) Rehandling of earthwork:C-3/13-250 (EW) Lead up to 250ft C-3/13-1000 Lead greater than 250ft and up to 1000ft C-3/13-2000 Lead greater than 1000ft and up to 2000ft C-3/13-3000 Lead greater than 2000ft and up to 3000ft C-3/13-5280 Lead greater than 3000ft and up to 5280ft (1 mile) C-3/13-7920 Lead greater than 5280ft (1 mile) and up to 7290ft (1.5 (EW) miles) C-3/13(b) Rehandling of earthwork lead upto 50 ft C-3/13(b)-100ft Rehandling of earthwork lead upto 100 ft C-3/13Rehandling of earthwork lead up to 500ft C-3/13Rehandling of earthwork lead up to 1000ft 1000(MINOR) C-3/15(i) Filling watering ramming earth under floors with surplus earth from foundation etc. Filling watering ramming earth under floors with new earth excavated from outside lead upto one chain (30m). Extra for every 100 ft. (30 m) additional lead or part thereof :i) for earthwork soft, ordinary, hard and very hard. Dressing and levelling of earthwork to designed section (spoil bank), complete in ordinary or hard soil. Excavation in foundation of building, bridges and other structures, including dagbelling, dressing, refilling around 17.1 to 17.5 structure with excavated earth, watering and rammiing lead upto one chain (30 m) and lift upto 5 ft. (1.5 m) (a) in sand, ashes or loose soil Excavation in foundation of building, bridges and other structures including dagbelling, dressing, refilling around structure with excavated earth,watering and ramming lead upto one chain (30m) and lift upto 5 ft.(1.5 m) in ordinary soil. Compaction of earthwork power road roller including ploughing, mixing, moisturing earth to optimum moisture contents in layers etc. complete 95% to 100% maximum modified AASHO dry density. Compaction of earthwork power road roller including ploughing, mixing, moisturing earth to optimum moisture contents in layers etc. complete 90% maximum modified AASHO dry density. Extra for wet earthwork Extra for slush or Daldal including dewatering Berm cutting upto 100 ft lead including dressing Ploughing and levelling borrow pits up to 3 feet depth. Earthwork excavation in open cutting for sewers and manholes as shown in drawings including shuttering and timbering, dressing to correct section and dimensions according to templates and levels, and removing surface water, in all types of soil except shingle, gravel and rock:i) 0 ft. to 7.0 ft. (0 to 2.10 m) depth Cutting and removing trees within a distance of 100 ft. (30 m) upto 2 ft. (760 mm) girth. Cutting and removing trees within a distance of 100 ft. (30 m) above 2 ft. to 6 ft. (760 to 1800 mm) girth. Uprooting stump and removing within 100 ft. (30 m) from 2 ft. to 6 ft. (600 to 1800 mm) girth. Jungle clearance and removing with in 100 ft. Uprooting sarkanda growth and disposal within 100 ft. Earthwork in excavation of drains, irrigation channels through excavator / drag lines in all kind of soil and conditions (dry, wet slush, daldal and under water) including its disposal and prepartion of working pad for operation of machinery.

4 5

1000 Cft

4,270.50

4,270.50

1000 Cft

2,799.60

1000 Cft

2,080.30

2,080.30

2,080.30

2,080.30

1000 Cft

2,110.35

2,110.35

1000 Cft

2,047.00

2,047.00

1000 Cft

1000 Cft

1000 Cft 1000 Cft 1000 Cft 1000 Cft 1000 Cft 1000 Cft 1000 Cft 1000 Cft 1000 Cft 1000 Cft 1000 Cft 1,320.00 887.05 887.05 887.05 917.10 887.05 917.10

C-3/15(ii)

1000 Cft

2,691.95

C-3/16 (i)-100

1000 Cft

60.10

60.10

C-3/18(b)

1000 Cft

C-3/21(a)

1000 Cft

2,333.75

2,333.75

C-3/21(b)

1000 Cft

2,740.30

2,740.30

2,740.30

2,740.30

C-3/25(i)

1000 Cft

C-3/25(ii) C-3/26 C-3/27 C-3/33(b) C-3/35 (i)

1000 Cft 1000 Cft 1000 Cft 1000 Cft Acres

560.10

560.10

598.00 887.05 2,027.50 2110.35

598.00 887.05 2,027.50 2110.35 633.60

633.60

633.60

633.60

C-3/42(i)

1000 Cft

2,377.55

C-3/45(a) C-3/45(b) C-3/46 C-3/47 (a) C-3/48

Each Each Each 1000 Sft 100 Sft 63.35 30.40 63.35 30.40

384.10 745.80 475.20 63.35 30.40

384.10 745.80 475.20 63.35 30.40

C-3/52

1000 Cft

1,435.00

1,435.00

Page 5 of 17

MRS Reference

Description

Unit

N O T US ED

N O T US ED

Rate 4th Rate 4th Rate 1st Rate 1st Quarter 2009 Quarter 2009 Quarter 2010 Quarter 2010 (Kasur) (Okara) (Kasur) (Okara) 6 7 8 9

2 Earthwork in excavation of drains, irrigation channels through excavator / drag lines in all kind of soil and conditions (dry, wet slush, daldal and under water) including its disposal (dressed) and prepartion of working pad for operation of machinery. Rehandling of earthwork up to a lead of 250ft, excluding dressing. Rehandling of earthwork up to a lead of 200ft, including dressing and levelling of earthwork to designed section, etc. complete. Dismantling dry stone masonry including disposal of material Dismantling dry stone or spawl pitching including disposal of material Dismantling stone in crates b) wire crates including disposal of material Dismantling dry brick masonry including disposal of material Dismantling brick work in lime or cement mortar including disposal of material Dismantling cement concrete plain (Class E, Nominal Ratio 1:4:8) including disposal of material Dismantling cement concrete plain (Class B, Nominal Ratio 1:2:4) including disposal of material Dismantling D.P.C of cement concrete 1 1/2'' thick (40 mm) including disposal of material Dismantling cement concrete reinforced separating reinforcement from concrete cleaning and straightening the same including disposal of dismantled concrete & reinforcement Dismantling R.B roof complete with mud and plaster including separating reinforcement, cleaning and straightening the same including disposal of material. Dismantling plank or wooden including disposal of material. block flooring,etc

4 5

C-3/52 C-3/18

1000 Cft

1,618.55

1,618.55

C-3/13(b) C-3/16 C-3/13(b) C-3/16 C-3/18(b) C-4/1 C-4/4(a) C-4/7(b) C-4/11 C-4/13 C-4/19(a) C-4/19(c) C-4/19(e)

1000 Cft 1000 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 215.40 380.15 633.60 215.40 1,077.10 1,393.90 2,787.85 380.15 215.40 380.15 633.60 215.40 1,077.10 1,393.90 2,787.85 380.15

1,007.25 1,160.75 215.40 380.15 633.60 215.40 1,077.10 1,393.90 2,787.85 380.15 215.40 380.15 633.60 215.40 1,077.10 1,393.90 2,787.85 380.15

C-4/20

100 Cft

4,561.90

4,561.90

4,561.90

4,561.90

C-4/26

100 Sft

633.60

633.60

633.60

633.60

C-4/30

100 Sft

316.80

316.80

316.80

316.80

C-4/31(b)

Disjoining RCC pipes inside the trench and dismantling and removing the pipes from the trench and stacking them outside including disposal of material Dismantling iron work of trusses, sheds, water tanks, etc. excluding cutting of rivets including disposal of material. Dismantling rolled steel beams or iron rails, etc including disposal of material. Dismantling and removing road metalling

Per L.ft

14.80

14.80

14.80

14.80

C-4/37 C-4/38 C-4/45 C-4/48

100 Kg 100 Kg 100 Cft 100 Sft Per No. 100 Cft 100 Cft 2,402.40 6,449.50 2,336.40 6,391.90

459.05 208.00

459.05 196.50

Removing cement or lime plaster including disposal of material Dismantling wooden beams upto 12' (3.65m) length including disposal of material Dry rammed brick or stone ballast, 1 1/2'' to 2'' (40 mm C-6/2 to 50 mm) gauge Cement concrete brick or stone ballast 1 1/2'' to 2'' C-6/3(b) (40mm to 50mm) gauge in foundation and plinth. (b) Class E, 1200 psi Cement concrete brick or stone ballast 1 1/2'' to 2'' C-6/3(d) (40mm to 50mm) gauge in foundation and plinth (d) Ratio 1:6:12 Cement concrete brick or stone ballast 1 " to 2" C-6/3(e) gauge, in foundation and plinth:(e) Ratio 1:6:18 Cement concrete plain including finishing and curing complete (including screening and washing of stone C-6/5(h) aggregate) (h) Class D (2000 psi) Cement concrete plain including placing compacting finishing and curing complete (including screening and C-6/5(i) washing of stone aggregate). (i) Class E (1200 psi) Cement concrete plain including placing compacting finishing and curing complete (including screening and C-6/5(f) washing of stone aggregate). (f) Class B (3000 psi) Providing and laying reinforced cement concrete (including pre-stressed concrete) using coarse sand and screened graded and washed aggregate, in required shape and design, including forms, moulds, C-6/6 shuttering, lifting, compacting, curing, rendering and finishing exposed surface complete (but excluding the cost of steel reinforcement its fabrication and placing in postion,etc) Reinforced cement concrete in roof slab, beams, columns lintels, girders and other structural members C-6/6(a-i)(3) laid insitu or pre-cast laid in position, or pre-stressed members cast in situ complete in all respects. (Class B, 3000 psi) Reinforced cement concrete in slabs of raft /strip foundation base slab of column and retaining walls etc and other structural members other than those C-6/6(a-ii)(3) mentioned in above not requiring form work (i.e horizontal shuttering complete in all respects). (Class B, 3000 psi) Extra labour for work of weirs, rail or road bridges, C-6/14 syphons, and concreting in superstructure Reinforced cement concrete in roof slab, beams, columns lintels, girders and other structural members C-6/6(a-i)(3), Claid insitu or pre-cast laid in position, or pre-stressed 6/14 members cast in situ complete in all respects. (Class B, 3000 psi) Reinforced cement concrete in slabs of raft /strip foundation base slab of column and retaining walls etc C-6/6(a-ii)(3), C- and other structural members other than those mentioned in above not requiring form work (i.e 6/14 horizontal shuttering complete in all respects). (Class B, 3000 psi) C-4/34(a)

79.20 2,402.40 6,357.35

79.20 2,336.40 6,299.75

100 Cft

5,530.80

5,472.00

5,468.40

5,409.60

100 Cft

5,053.20

100 Cft

11,618.90

11,839.70

100 Cft

10,920.00

11,150.40

10,827.85

11,058.25

100 Cft

12,936.00

13,147.20

12,767.05

12,978.25

Per Cft

206.45

208.60

204.80

206.90

Per Cft

156.10

158.25

154.40

156.55

100 Cft

Per Cft

Per Cft

Page 6 of 17

MRS Reference

Description

Unit

N O T US ED

N O T US ED

Rate 4th Rate 4th Rate 1st Rate 1st Quarter 2009 Quarter 2009 Quarter 2010 Quarter 2010 (Kasur) (Okara) (Kasur) (Okara) 6 7 8 9

2 Providing and casting in situ bored reinforced concrete piles with type C concrete (nominal mix 1: 2: 4 ) , using 10% extra cement in dry mix, and course sand, including all labour and material (except the cost of steel reinforcement and its labour for bending and laying in position, etc. which will be paid separately, including, screening & washing of shingle and curing:i) 18 " (450 mm) dia pile Fabrication of mild steel reinforcement bar cage for R.C.C. bored piles, including cutting, bending, laying in position, welding and fastening, including cost of binding wire and labour charges for binding of steel reinforcement (also includes removal of rust from the bars):(b) deformed bars Providing and fabrication of mild steel reinforcement including cutting bending laying in position making joints and fastenings including cost of binding wire and labour charges for binding of steel reinforcement (also includes removal of rust) deformed bars. Precast cement concrete solid or face blocks (Class B, 3000 psi) including cost of templates. Providing embedding 9" wide 1/4" thick rubber water stopper in construction joint in RCC walls complete in all respects. Filling expansion joints with bitumen. sand & saw dust in ratio 1:2:2 Providing and placing cement sand bitumen joint sealant in ratio (1:2:3),0.5'' wide and 2'' deep Filling expansion joint bitumen sand and saw dust in ratio (1:2:2) 1'' wide , 2'' deep Providing and laying damp proof course of cement concrete (Class B, 3000 psi; using cement, sand and shingle), including bitumen coating :(a) with one coat bitumen and one coat polythene sheet 500 gauge i) 1" thick (40 mm) Pacca brick work in foundation and plinth in Cement sand mortar (Ratio 1:3) Pacca brick work in foundation and plinth in Cement sand mortar (Ratio 1:4) Pacca brick work in ground floor.1:4 Pacca brick work in ground floor.1:5 Pacca brick work in ground floor:i) cement, sand mortar:Ratio 1:6 Pacca brick work other than building up to 10 ft (3m) height in cement sand mortar (Ratio 1:3) Pacca brick work other than building up to 10 ft (3m) height in cement sand mortar (Ratio 1:4) Extra labour for profile and flared walls Supplying and filling sand under floor or plugging of wells. Replacing kallar eaten bricks Dry brick pitching Random,rubble masonry(uncoursed),in foundation and plinth in cement sand mortar Ratio:1:3 First class tile roofing, consisting of 4" (100 mm) earth and 1" (25 mm) mud plaster with Gobri leeping over " (13 mm) thick cement plaster 1:6 with 34 lbs. per %Sft or 1.72 Kg/sq.m hot bitumen coating sand blinded, provided over 2 layers of tiles 12"x6"x1" (300x150x30 mm) laid in 1:6 cement mortar with " (13 mm) thick sand wiched layer of 1:6 cement mortar, including 1:2 cement pointing underside of tiles, complete, including curing, etc. Single layer of tiles 9"x4"x1" laid over 4" earth and 1" mud plaster without Bhoosa, grouted with cement sand 1:3 on top of RCC roof slab, provided with 34 lbs. per % Sft or 1.72 Kg/Sq.m bitumen coating sand blinded. Khuras on roof 2'x2'x4" (600x600x100mm) Cast iron rain water downpipe fixed position, excluding heads and shoes, but including painting and clamps, etc a) 4'' dia (100 mm) cost iron down pipe Cast iron rain water downpipe fixed position, excluding heads and shoes , but including painting and clamps, etc b) 3'' dia (75 mm) cost iron down pipe Rain water down pipe cast iron head fixed in place including cost of clamp hold fast and painting. Shoes,bends or offsets for cast iron rain water down pipe, including fixing and painting Dry brick on edge paving sand grouted I/c preparation of bed by watering ramming and bringing the same to proper camber by 1/2" thick mud plaster. Grouting 4"(113 mm) dry brick work with cement mortar ratio 1: 5 Providing and laying topping of cement (W.C) concrete (Class B, 3000 psi), including surface finishing and dividing in panels:(i) 3"(75 mm) thick Providing and laying topping of cement concrete 1:2:4 including surface finishing dividing into pannels 1" thick. 1" thick mosaic flooring, consisting of " mosaic topping of one part of cement and marble powder in the ratio of 3:1 and two parts of marble chips, laid over 1" thick floor of cement concrete (Class B, 3000 psi) including rubbing and polishing complete.

4 5

C-6/7(i)

Per Rft

848.35

852.10

C-6/8(b)

100 kg

8,158.75

8,169.50

100 Kg 7,338.50 7,350.00 7,507.40 7,518.90

C-6/9(b)

C-6/10 C-6/28 C-6/29 C-6/29(p) C-6/29(f) C-6/33(a-i)

Per Cft Per R.ft 56.50 Per R.ft per Inch width Per R.ft Per R.ft 100 Sft 56.50

107.90 56.50

107.90 56.50

11.55 11.55

11.50 11.50

12.70 12.70

12.65 12.65

2,684.10

2,684.10

C-7/4(i) C-7/4(i)-1:4 C-7/5(i)-1:4 C-7/5(i)-1:5 C-7/5(i)-1:6 C-7/7(i) C-7/7(i)-1:4 C-7/11 C-7/30 C-7/34 C-7/23 C-8/1(d)(i)

100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft Each No. 100 Cft 100 Cft

9,638.50

8,990.50

9,580.90 9,573.35 9,847.10 9,616.20 9,442.70

8,932.90 8,586.60

8,794.70 9,271.70

9,977.30

9,329.30

9,919.70

199.80

199.80

199.80 825.60

199.80 825.60 27.75 6,236.40

28.15

27.75

28.15 6,884.40

100Sft.

C-9/1

7,668.10

100 Sft 3,777.25

C-9/5

C-9/15

Each Per R.ft 172.70 Per R.ft 148.25 Each Each 100 Sft. 255.90 255.90 148.25 172.70

284.25

C-9/20(a)

172.60

172.60

C-9/20(b)

148.20

148.20

C-9/21 C-9/22

377.10 255.90 255.90

C-10/6

C-10/7 C-10/15(i)

100 Sft. 100 Sft

726.50

726.50

3,420.65 100 Sft 2,051.85 100 Sft 5,110.35

C-10/15

C-10/22(a)

Page 7 of 17

MRS Reference

Description

Unit

N O T US ED

N O T US ED

Rate 4th Rate 4th Rate 1st Rate 1st Quarter 2009 Quarter 2009 Quarter 2010 Quarter 2010 (Kasur) (Okara) (Kasur) (Okara) 6 7 8 9

C-10/22(b)

C-10/24 C-10/26

C-10/37

C-10/38

C-10/42(a)

C-10/42(b)

C-11/10(b) C-11/11(b) C-11/7(b) C-11/8(b) C-11/9(b) C-11/10(b) C-11/17 C-11/18(a) C-11/18(b) C-11/23(a)(i)

C-11/23(a)(ii)

C-11/23(a)(iii) C-11/25(iii) C-12/1(a)

C-12/2 (a)

2 1"(40 mm) thick mosaic flooring, consisting of "(13 If glass or marble strips are used mm) mosaic topping of one part of cement and marble for panelling, it will be paid extra as powder in the ratio of 3:1 and two parts of marble chips, per item No. 41 or 42. laid over 1"(25 mm) thick floor of cement concrete (Class B, 3000 psi), including rubbing and polishing complete with finishing :(b) using white cement Providing and laying approved white glazed tiles 1/4" thick. Rubbing and polishing old grit/ mosaic floor, including repairing voids, uneven surface, complete in all respects. White glazed tile (6"x6"x") (6 mm) thick dado jointed in white cement and laid over 1:2 cement sand mortar 3/4" (20mm) thick, including finishing. Coloured glazed tile dado (6"x6"") (6mm) thick in pigment over 1:2 cement, sand mortar 3/4"(20mm) thick, including finishing. Providing and fixing marble strip of any shade for dividing the mosaic flooring into pannels a) Size 1 1/2'' x 3/8'' (40 mm x 10 mm) Providing and fixing marble strip of any shade for dividing the mosaic flooring into pannels a) Size 1 1/2'' x 1/4'' (40 mm x 6 mm) Cement plaster 3/8" (10 mm) thick under soffit of R.C.C. b) 1:3 Cement plaster 1:5 upto 20' (6.00 mm) height:b) " (13 mm) thick Cement plaster (1:3) 1/2'' thick Cement Plaster 1/2'' thick Ratio(1:3) up to 20' height Cement plaster 1:4 upto 20' (6.00m) height " (13mm) thick. Cement plaster 3/8" thick under soffit of RCC roof slab 1:3. Cement pointing 1:2 flush on floors Cement Pointing struck joints on walls (Ratio:1:2) Cement Pointing struck joints on walls (Ratio:1:3) Distempering a) new surface i) one coat Distempering a) new surface ii) two coat Distempering a) new surface iii) three coat White wash 3 coat new surface. Plain wood work sawn, wrought, planed, and fixed in position including cost of nails and screws etc. a) Deodar wood Plain wood work for regulation karries or needles etc including sawing planning wroughting wood and providing and fixing steel parts of karries i.e end strip and rods etc a) Deodar wood First class deodar wood wrought joinery in doors and windows etc. panneled or panneled or glazed, or fully glazed, fixed in position , inccluding chowkat, holdfast, hinges, tower bolts, chocks, rubber stop, cleats/G.I.clamps, handles and chord with hooks, etc. complete (excluding sliding bolt or lock) a) 2'' thick(50mm) First class deodar wood wrought joinery in doors and windows etc. panneled or panneled or glazed, or fully glazed, fixed in position , inccluding chowkat, holdfast, hinges, tower bolts, chocks, rubber stop, cleats/G.I.clamps, handles and chord with hooks, etc. complete (excluding sliding bolt or lock) a) 1 3/4'' thick(45mm) First class deodar wood wrought joinery in doors and windows etc. panneled or panneled or glazed, or fully glazed, fixed in position , inccluding chowkat, holdfast, hinges, tower bolts, chocks, rubber stop, cleats/G.I.clamps, handles and chord with hooks, etc. complete (excluding sliding bolt or lock) a) 1 1/2'' thick(40 mm) First class deodar wood wrought joinery work in wire gauze doors and windows, with 22 SWG G.I. wire gauze, 12x12 meshes per square inches (5 x 5 per cm^2) including iron fittings etc.complete a) deodar wood framing 1 3/4'' (45 mm) thick wire gauze fixed in position i) without springs or spring hinges First class deodar wood wrought joinery work in wire gauze doors and windows, with 22 SWG G.I. wire gauze, 12x12 meshes per square inches (5 x 5 per cm^2) including iron fittings etc.complete a) deodar wood framing 1 3/4'' (45 mm) thick wire gauze fixed in position i) with springs or spring hinges First class deodar wood wrought joinery work in wire gauze doors and windows, with 22 SWG G.I. wire gauze, 12x12 meshes per square inches (5 x 5 per cm^2) including iron fittings etc.complete b) deodar wood framing 1 1/2'' (40 mm) thick wire gauze fixed in position i) without springs or spring hinges

3 100 Sft

4 5

5,525.40

100 Sft 100 Sft

6,843.45 743.50

100 Sft 7,450.65 100 Sft 7,726.40 Per R.ft 5.30 Per R.ft 3.70 100 Sft 1,055.75 100 Sft 100 Sft 100 Sft 100 Sft 1,070.90 960.10 1,070.90 960.10 1,058.90 951.65 908.45 1,055.75 872.65 1,058.90 951.65 3.70 3.70 3.70 5.30 5.30 5.30 7,450.65

100 Sft 100 Sft 100 Sft 100 Sft

719.90 1,015.60 961.75 142.10

719.90 1,015.60 961.75 142.10

713.00 1,008.65 956.55 142.10

713.00 1,008.65 956.55 142.10

100 Sft

196.95

196.95

196.95

196.95

100 Sft 100 Sft Per Cft

251.85

251.85

251.85 100.85

251.85

3,155.25

3,155.25

3,155.25

3,155.25

Per Cft

3,050.45

3,050.45

3,050.45

3,050.45

C-12/7(a)

Per Sft

943.10

943.10

943.10

943.10

C-12/7(b)

Per Sft

880.05

880.05

880.05

880.05

C-12/7(c)

Per Sft

836.45

836.45

836.45

836.45

C-12/12(a)(i)

Per Sft

402.40

402.40

402.40

402.40

C-12/12(a)(ii)

Per Sft

406.30

406.30

406.30

406.30

C-12/12(b)(i)

Per Sft

373.05

373.05

373.05

373.05

Page 8 of 17

MRS Reference

Description

Unit

N O T US ED

N O T US ED

Rate 4th Rate 4th Rate 1st Rate 1st Quarter 2009 Quarter 2009 Quarter 2010 Quarter 2010 (Kasur) (Okara) (Kasur) (Okara) 6 7 8 9

2 First class deodar wood wrought joinery work in wire gauze doors and windows, with 22 SWG G.I. wire gauze, 12x12 meshes per square inches (5 x 5 per cm^2) including iron fittings etc.complete b) deodar wood framing 1 1/2'' (40 mm) thick wire gauze fixed in position i) with springs or spring hinges First class deodar wood wrought joinery work in wire gauze doors and windows, with 22 SWG G.I. wire gauze, 12x12 meshes per square inches (5 x 5 per cm^2) including iron fittings etc.complete c) G.I wire gauze 22 SWG, 12 X 12 meshes per square inch, (5 x 5 in cm^2) fixed to chowkat, with 3/4'' (20 mm) thick deodar wood strip and screws First class deodar wood wrought joinery work in wire gauze doors and windows, with 22 SWG G.I. wire gauze, 12x12 meshes per square inches (5 x 5 per cm^2) including iron fittings etc.complete d) G.I wire gauze 22 SWG 12 X 12 meshes per square inch, (5 x 5 meshes in cm^2) fixed to chowkat, with 1/2'' (13 mm) strip on separate frame of deodar wood 2'' x 2'' (50mm x 5 mm) Providing and fixing mild steel chowkat of doors, windows C window, etc. including hold fast, making and threading holes for hinges, etc, complete. M.s. angle iron 1"x1"x1/4" welded with M.S.flate 2"x1/4". Providing and fixing sliding bolts to doors 12" long. Providng and fixing approved quality mortice lock. Providing and fixing wooden box type wardrobe 22" (550 mm) deep including " (20 mm) thick boxing and shelves, hanger rods, hard board back drawers, brass fittings,locking arrangements, handles, internal bolts, shoe rods, etc. including three coats of enamel paint:ii) Deodar wood boxing, and deodar wood shelves and leaves, etc. Providing and fixing 1" thick solid flush door shutter sterling or equivalent with commercial ply (5mm) thick on both sides double pressed and deodar wood lipping 1" x 3/8" around shutter including chromium plated fitting, iron hinges with aluminium kick plate 22 SWG on both sides & finger plate complete in all respect. Providing and fitting curtain railing to doors and windows, comprising of TOSO - elite japan made superior type of railing or equivalent, fixed over 4'' x 3/4'' (100mm x 20 mm) deodar wood strip, including painting Painting doors and windows, any type i) first coat Painting doors and windows, any type ii) each subsequent coat Painting new surface; a)Preparing surface and painting corrugated surface,patent ,roofing ,etc (3 coats) i) Priming coat Painting new surface; a)Preparing surface and painting corrugated surface,patent ,roofing ,etc (3 coats) ii) each subseqent coat of paint Painting 3 coats new surface doors and windows, any type. Bitumen coating to plastered or cement concrete surface ii) 14 lbs per 100 Sft (6.35 Kg per Sq.m) Writing letters or figures ,per letter, per inches (25 mm) height Painting distance marks for white ground and black lettering on both sides Preparing surface and painting with emulsion paint (3 Coat) Painting surface and painting with water proof coloured cement finish, like duracem, buxcem, or other finishes with similar specification, on walls,etc. a) new surface i) 1st coat Painting surface and painting with water proof coloured cement finish, like duracem, buxcem, or other finishes with similar specification, on walls,etc. a) new surface i) 2nd and subsequent coat Providing and applying weather shield paint of approved quality on external surface of building including preparation of surface , application of primer complete in all respects a) new surface i) 1st coat Providing and applying weather shield paint of approved quality on external surface of building including preparation of surface , application of primer complete in all respects a) new surface ii) 2 coats Formation dressing and preparing sub grade in bed Formation dressing and preparing sub grade in slope Cement plaster 1 1/2'' thick ratio 1:6 in bed Cement plaster 1 1/2'' thick ratio 1:6 on slope Brick lining 9''x4 1/2''x3'' in 1:3 cement sand mortar in bed Brick lining 9''x4 1/2''x3'' in 1:3 cement sand mortar on slope

4 5

C-12/12(b)(ii)

Per Sft

375.50

375.50

375.50

375.50

C-12/12(c)

Per Sft

125.20

125.20

125.20

125.20

C-12/12(d)

Per Sft

338.80

338.80

338.80

338.80

C-12/14(a)

Per Sft

95.25

C-12/18(ii) C-12/21

Each Each

124.00 176.00

C-12/25(ii)

Per Sft.

734.75

C-12/50

Per Sft.

279.65

C-12/53

Per Rft

108.40

108.40

108.40

108.40

C-13/4(i) C-13/4(ii)

100 Sft 100 Sft

331.65 251.80

331.65 251.80

331.65 251.80

331.65 251.80

C-13/5(a-i)

100 Sft

435.20

435.20

435.20

435.20

C-13/5(a-ii)

100 Sft

290.30

290.30

290.30

290.30

C-13/5 C-13/9(ii) C-13/10 C-13/18 C-13/31(a&b)

100 Sft 100 Sft 1 No Each 100 Sft 404.90 5.70 403.35 5.70

431.60 435.95 5.70 358.70 434.40 5.70 358.70

C-13/32(a-i)

100 Sft

199.40

199.40

199.40

199.40

C-13/32(a-ii)

100 Sft

C-13/32A(a)(i)

100 Sft

726.10

726.10

726.10

726.10

C-13/32A(a)(ii)

100 Sft

358.70

358.70

358.70

1,084.80

C-14/1(a) C-14/1(b) C-14/5(a) C-14/5(b) C-14/9(a) C-14/9(b)

100 Sft 100 Sft 100 Sft 100 Sft 100 Cft 100 Cft

296.20 406.55 1,239.30 1,418.85 10,948.80 11,410.80

296.20 406.55 1,239.30 1,418.85

296.20 406.55 1,224.35 1,403.85 10,891.20 11,353.20

296.20 406.55 1,224.35 1,403.85 10,243.20 10,705.20

Page 9 of 17

MRS Reference

Description

Unit

N O T US ED

N O T US ED

Rate 4th Rate 4th Rate 1st Rate 1st Quarter 2009 Quarter 2009 Quarter 2010 Quarter 2010 (Kasur) (Okara) (Kasur) (Okara) 6 12,936.00 13,366.30 1,808.40 1,731.85 1,272.50 80.90 7 13,147.20 13,577.50 1,808.40 1,731.85 1,272.50 80.90 8 12,767.05 13,197.35 1,808.40 1,731.85 1,272.50 80.90 9 12,978.25 13,408.55 1,808.40 1,731.85 1,272.50 80.90

1 C-14/10(a)(i) C-14/10(b)(i) C-15/3 C-15/4 C-15/5 C-16/4(a)

2 Cement concrete lining using washed screened and graded stone aggregate (Class B, 3000 psi) on level Cement concrete lining using washed screened and graded stone aggregate (Class B, 3000 psi) on slope Driving steel piles, 25' to 30'.(7.5 to 9 m) Driving steel piles,more than 15' (4.6 m) and less than 25' (7.5 m) Driving steel piles, 15' (4.5 m) and under. Supplying and filling jute bags 4 to 5 cft (0.11 to 0.14 cum) capacity with sand or earth , sewing and stacking , in dry. Supplting and filling new jute bags 4 to 5 cft (0.11 to 0.14 cu.m) capacity, with sand or earth, sewing and laying in position,under water Carriage of new jute bags 4 to 5 Cft capacity filled with sand or earth up to 4 chains. Providing and weaving G.I wire netting for wire crates with G.I wire of approved size complete 4" mesh (8 SWG wire) Providing and weaving G.I. wire netting for wire crates, with G.I. wire of approved size (including siding and partition to make crate):a) 6" (150 mm) mesh ii) 10 SWG wire Supply and dumping Stones or Boulders at site, without boat, including handling of materials within three chains (excluding carriage) Supplying and Filing stones in wire crates including sewing crates (excluding cost of crates). Providing and laying stone pitching / filling dry hand packed as filling behind retaining walls or in pitching and appron (excluding carriage) Providing and laying stone pitching with hammer dressed stones on surface, laid in courses Providing and laying stone pitching for top layer on slope (exluding carriage) Providing and laying stone pitching for top layer on level (excluding carriage) Grouting stone pitching or appron,etc Cement,sand mortar 1:3 Cutting and supplying unsharped pegs 4.0 ft long 3'' to 6'' dia with in one mile lead Sharpening one end of 4.0' long pegs 3'' to 6'' dia Driving pegs 4.0' ft long 3'' to 6'' dia below the available bed /ground Tying pegs with munj patha ban (one line including tying around the pegs Cutting and supplying brush wood from canal plantation or private owners lead with in one mile and wattling between stakes and intertwining (thickness of wattled brush 1' average) Staking with Bamboo from market and bushing from canal plantation or private source (royalty of brushwood to be paid to Forest Department or cost to private owner, if and when required):Supplying Bamboos 8'-1" to 10.0' (2.46 to 3.05 m) long, 2" to 5" (63 m to 125 mm) dia. Supplying Bamboos 10'-1" to 12.0' (3.07 to 3.66m) long, 2" to 5" (63 to 125 mm) dia. Supplying Bamboos 12'-1" to 14.0' (3.68 to 4.27m) long, 2" to 5" (63 to 125 mm) dia. Supplying Bamboos 14'-1" to 16.0' (4.3 to 4.9m) long, 2" to 5" (63 to 125 mm) dia. Supplying Bamboos 16'-1" to 20' (4.9 to 6.10 m) long, 2" to 5" (63 to 125 mm) dia. Sharpening one end of 8'-1" to 10.0' (2.46 to 30.5m) long Bamboos, 2" to 5" (63 to 125 mm) dia. Sharpening one end of 10'-1" to 12.0' (3.07 to 3.66 m) long Bamboos, 2" to 5" (63 to 125 mm) dia. Sharpening one end of 12'-1" to 14.0' (3.68 to 4.27m) long Bamboos, 2" to 5" (63 to 125 mm) dia. Sharpening one end of 14'-1" to 16.0' (4.3 to 4.9m) long Bamboos, 2" to 5" (63 to 125 mm) dia. Sharpening one end of 16'-1" to 20' (4.9 to 6.10 m) long Bamboos, 2" to 5" (63 to 125 mm) dia. iii) Driving Bamboos 8'-1" to 10.0' (2.46 to 3.05 m) long 2" to 5" (63 to 125 mm) dia, driven 2.5' (750mm) below the available bed or ground (average). Driving Bamboos 10'-1" to 12.0' (3.07 to 3.66 m) long 2" to 5" (63 to 125 mm) dia, driven 2.75' (840 mm) below the available bed or ground (average). Driving Bamboos 12'-1" to 14.0' (3.68 to 4.27 m) long 2" to 5" dia, driven 3.5' (1.07 mm) below the available bed or ground (average). Driving Bamboos 14'-1" to 16.0' long (4.30 to 4.90m) 2" to 5" (63 to 125 mm) dia, driven 4' (1.20 m) below the available bed or ground (average). Driving Bamboos 16'-1" to 20' long (4.9 to 6.10 m) 2" to 5" (63 to 125 mm) dia, driven 4' (1.20 m) below the available bed or ground (average). Tying Bamboos 2" to 5" (63 to 125 mm) dia with Munj, Patha Ban, two lines, including tying around the Bamboos. Tying Bamboos 2" to 5" (63 to 125 mm) dia with S.W.G. No. 10 wire, two lines, including tying around the Bamboos and third tie around the top end only. Tying Bamboos 2" to 5" (63 to 125 mm) dia with Per chain Per 30 M S.W.G. No. 10 wire, two lines, including tying around the Bamboos and third tie around the top end only.

3 100 Cft 100 Cft 100 Sft 100 Sft 100Sft. Per Bag

4 5

C-16/4(b)

Per Bag

95.55

95.55

95.55

95.55

C-16/6(a,b)

100 No

1,037.90

1,039.10

C-16/13 (b-iii)

100 Sft

2,737.10

2,737.10

2,737.10

2,737.10

C-16/13(a-ii)

100 Sft

1,414.20

C-16/15(a) C-16/19 (i) C-16/27 C-16/28 C-16/29(a) C-16/29(b) C-16/32(a) C-16/41(a-i) C-16/41(a-ii) C-16/41(a-iii) C-16/41(a-iv)

100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100Sft 100 Nos 100 Nos 100 Nos Per chain of one row Per chain of one row 661.60 306.25 428.75 53.50 661.60 306.25 428.75 53.50 1,475.75 1,371.90 2,854.80 2,419.20 2,260.80 1,475.75 1,371.90 2,854.80 2,419.20 2,260.80

950.40 1,475.75 1,371.90 2,854.80 2,419.20 2,260.80 2,740.25 661.60 306.25 428.75 53.50

950.40 1,475.75 1,371.90 2,854.80 2,419.20 2,260.80 2,740.25 661.60 306.25 428.75 53.50

C-16/41(a-v)

706.90

706.90

706.90

706.90

C-16/42

C-16/42 (a-i) C-16/42 (b-i) C-16/42 (c-i) C-16/42 (d-i) C-16/42 (e-i) C-16/42 (a-ii) C-16/42 (b-ii) C-16/42 (c-ii) C-16/42 (d-ii) C-16/42 (e-ii)

100 Nos 100 Nos 100 Nos 100 Nos 100 Nos 100 Nos 100 Nos 100 Nos 100 Nos 100 Nos

6,600.00 10,200.00 10,800.00 12,000.00 12,600.00 428.75 490.00 551.25 612.50 735.00

6,600.00 10,200.00 10,800.00 12,000.00 12,600.00 428.75 490.00 551.25 612.50 735.00

C-16/42 (a-iii)

100 Nos

811.55

811.55

C-16/42 (b-iii)

100 Nos

880.20

880.20

C-16/42 (c-iii)

100 Nos

1,007.40

1,007.40

C-16/42 (d-iii)

100 Nos

1,119.35

1,119.35

C-16/42 (e-iii)

100 Nos Per Chain of one row Per Chain of one row

1,343.25

1,343.25

C-16/42 (a-iv)

81.80

81.80

C-16/42 (b-iv)

769.10

769.10

C-16/42 (c-iv)

Per Chain of one row

769.10

769.10

Page 10 of 17

MRS Reference

Description

Unit

N O T US ED

N O T US ED

Rate 4th Rate 4th Rate 1st Rate 1st Quarter 2009 Quarter 2009 Quarter 2010 Quarter 2010 (Kasur) (Okara) (Kasur) (Okara) 6 7 8 769.10 9 769.10

1 C-16/42 (d-iv)

C-16/42 (e-iv)

2 Tying Bamboos 2" to 5" (63 to 125 mm) dia with Per Chain Per 30 M S.W.G. No. 10 wire, two lines, including tying around Bamboos and third tie around the top end only. Tying Bamboos 2" to 5" (63 to 125 mm) dia with Per Chain Per 30 M S.W.G. No. 10 wire, two lines, including tying around Bamboos and third tie around the top end only. Cutting and supplying brushwood from canal plantation or private source, lead within one mile (1.6 Km), and wattling between stakes and intertwining (thickness of wattled brushwood 1.0' (300 mm) average). Cutting and supplying brushwood from canal plantation or private source, lead within one mile (1.6 Km), and wattling between stakes and intertwining (thickness of wattled brushwood 1.0' (300 mm) average). Cutting and supplying brushwood from canal plantation or private source, lead within one mile (1.6 Km) and wattling between stakes and intertwining (thickness of wattled brushwood 1.0' (300 mm) average). Cutting and supplying brushwood from canal plantation or private source, lead within one mile (1.6 Km) and wattling between stakes and intertwining (thickness of wattled brushwood 1.0' (300 mm) average). Cutting and supplying brushwood from canal plantation or private source, lead within one mile (1.6 Km) and wattling between stakes and intertwining (thickness of wattled brushwood 1.0' (300 mm) average).

3 Per Chain of one row

4 5

Per Chain of one row

769.10

769.10

C-16/42 (a-v)

Per Chain of one row

2,264.80

2,264.80

C-16/42 (b-v)

Per Chain of one row

2,782.90

2,782.90

C-16/42 (c-v)

Per Chain of one row

3,270.60

3,270.60

C-16/42 (d-v)

Per Chain of one row

3,773.90

3,773.90

C-16/42 (e-v)

Per Chain of one row

4,748.80

4,748.80

Cutting and supplying brushwood from canal plantation C-16/43 & C-1/13 or from any other source (including carriage), approved by the Engineer, within ten miles (16 km). C16/41(a.i+a.ii+a.ii i) C16/41(b.i+b.ii+b.ii i) C16/41(c.i+c.ii+c.iii ) C16/41(d.i+d.ii+d.ii i) C16/41(e.i+e.ii+e.iii ) C16/42(a.i+a.ii+a.ii i) C16/42(b.i+b.ii+b.ii i) C16/42(c.i+c.ii+c.iii ) C16/42(d.i+d.ii+d.ii i) C16/42(e.i+e.ii+e.iii ) C-16/44 C-16/42 (a-iv) C-17/2(a) C-17/2(b) C-17/2(c) C-17/2(d) C-17/2(e) C-17/2(f) C-17/6(a) C-17/9(a) Cutting, supplying, sharpening and driving Pegs 3.5' (1.07m) long, 3" to 6" (75 to 150 mm) dia (driven, on average, 2.00' (600mm) below the available bed or ground) Cutting, supplying, sharpening and driving Pegs 4.0' (1.20m) long, 3" to 6" (75 to 150 mm) dia (driven, on average, 2.00' (600mm) below the available bed or ground) Cutting, supplying, sharpening and driving Pegs 5.0' (1.50m) long, 3" to 6" (75 to 150 mm) dia (driven, on average, 2.00' (600mm) below the available bed or ground) Cutting, supplying, sharpening and driving Pegs 6.0' (1.80m) long, 3" to 6" (75 to 150 mm) dia (driven, on average, 2.00' (600mm) below the available bed or ground) Cutting, supplying, sharpening and driving Pegs 6.1' to 8.0' (1.85 to 2.45m) long, 4" to 8" (100 to 2000 mm) dia (driven, on average, 2.00' (600mm) below the available bed or ground) Cutting, supplying, sharpening and driving Bamboos 8'1" to 10.0' (2.46 to 3.05 m) long, 2" to 5" (63 m to 125 mm) dia. (driven, on average, 2.50' (750mm) below the available bed or ground) Cutting, supplying, sharpening and driving Bamboos 10'-1" to 12.0' (3.07 to 3.66m) long, 2" to 5" (63 to 125 mm) dia. (driven, on average, 2.75' (840mm) below the available bed or ground) Cutting, supplying, sharpening and driving Bamboos 12'-1" to 14.0' (3.68 to 4.27m) long, 2" to 5" (63 to 125 mm) dia. (driven, on average, 3.50' (1.07m) below the available bed or ground) Cutting, supplying, sharpening and driving Bamboos 14'-1" to 16.0' (4.3 to 4.9m) long, 2" to 5" (63 to 125 mm) dia. (driven, on average, 4.00' (1.20m) below the available bed or ground) Cutting, supplying, sharpening and driving Bamboos 16'-1" to 20' (4.9 to 6.10 m) long, 2" to 5" (63 to 125 mm) dia. (driven, on average, 4.00' (1.20m) below the available bed or ground) Filling brush wood only, thoroughly packed. Tying Bamboos 2" to 5" (63 to 125 mm) dia with Munj, Patha Ban, two lines, including tying around the Bamboos. Dismantling outlet old types, such as K.G.O's orifice etc. Dismantling outlet APM or OF up to 2.0 Dismantling outlet APM or OF from 2.1 ft to 3 ft Dismantling outlet APM or OF above 3 ft Dismantling outlet tail cluster bifurcation Dismantling outlet tail cluster trifurcation Construction watching & removing bund for outlet built in running water up to 3.0 ft depth Extra labour in fixing APM or OF outlet blocks,including dressing of bricks a) for channel depth of 5.0 ft (1.5 m) Extra labour in fixing APM or OF outlet blocks,including dressing of bricks b) for channel depth of 4.0 ft (1.2 m) Extra labour in fixing APM or OF outlet blocks,including dressing of bricks c) for channel depth of 3.0 ft (900 mm) Extra labour in fixing APM or OF outlet blocks,including dressing of bricks d) for channel depth of 2.0 ft (600 mm) Extra labour in fixing APM or OF outlet blocks,including dressing of bricks e) for channel depth of less than 2.0 ft (600 mm) Hoisting and Placing R.C. slab or stone in position on outlets or W.C. culverts

100 cft

423.80

423.80

100 Nos

100 Nos

100 Nos

100 Nos

100 Nos

100 Nos

100 Nos

100 Nos

100 Nos

100 Nos 100 cft Per Chain of one row Each Each Each Each Each Each Each Each 792.00 1,056.00 1,320.00 792.00 1,056.00 1,267.20 786.75 792.00 1,056.00 1,320.00 792.00 1,056.00 1,267.20 786.75 792.00 1,056.00 1,320.00 792.00 1,056.00 1,267.20 784.80 792.00 1,056.00 1,320.00 792.00 1,056.00 1,267.20 784.80 126.70 81.80 126.70 81.80

C-17/9(b)

Each

607.20

607.20

605.30

605.30

C-17/9

Each

499.50

499.50

497.55

497.55

C-17/9(d)

Each

412.35

412.35

410.90

410.90

C-17/9(e) C-17/13

Each Each

325.15 214.70

325.15 214.70

324.20 214.70

324.20 214.70

Page 11 of 17

MRS Reference

Description

Unit

N O T US ED

N O T US ED

Rate 4th Rate 4th Rate 1st Rate 1st Quarter 2009 Quarter 2009 Quarter 2010 Quarter 2010 (Kasur) (Okara) (Kasur) (Okara) 6 7 8 42.25 9 42.25

1 C-17/15(a)

2 Removing pipe outlet, refilling earth and puddling. Providing and laying sub-base course of stone product of approved quality and grade, including placing, mixing, spreading and compaction of sub-base material to required depth, camber, grade to achieve 100% maximum modified AASHO dry density, including carriage of all material to site of work except gravel and. aggregate.ii) Crushed stone aggregate. Providing and laying base course of crush stone aggregate of approved quality and grade, including placing, mixing, spreading and compaction of base material to required depth, camber, grade to achieve 100% maximum modified AASHO dry density, including carriage of all material to site of work except gravel and. aggregate. Providing and laying road edging of 3" (75 mm) wide and 9" (225 mm) deep brick on end, complete in all respects. Providing and laying bituminous priming coat using 10 lbs kerosene oil and 10 lbs binder per 100 Sft or 0.5 kg kerosene and 0.5 kg binder per square merter Providing and laying bituminous tack coat, using 10 lbs. of bitumen per 100 Sft (0.49 Kg of bitumen per sq.m.) Providing surface treatment to roads including supply of bitumen and bajri/crushed stone aggregate of approved quality, including cleaning of road surface, heating and spraying bitumen, spreading bajri and rolling with road roller (including its operation cost, fuel and hire charges etc) etc complete including carriage of all materials to site of work, except bajri/crushed stone aggregate for which supply within 3 miles is included in the rate (3 coats) Providing and laying plant premixed bituminous carpet including compaction and finishing to required camber, grade and density (3% bitumen) Providing and laying plant premixed bituminous carpet including compaction and finishing to required camber, grade and density (5% bitumen) Providing R.C.C. railing on bridges, as per standard drawing. Providing and fixing G.I. pipe railing, as per standard drawing Providing and fixing rubber bearing pad at site of work. Providing and fitting glazed earthen ware water closet European type, excluding seat and cover i) White Providing and fitting glazed earthen ware water closet European type, excluding seat and cover ii) coloured Providing and fixing, double seat and cover only i) bakelite Providing and fixing, double seat and cover only ii) plastic Providing and fitting glazed earthen ware water closet, squatter type (Orisa pattern), combined with foot rest i) White Providing and fitting glazed earthen ware water closet, squatter type (Orisa pattern), combined with foot rest ii) Coloured Providing and fitting glazed earthen wear wash hand basson 22"x16" including bracket set waste pipe and waste coupling etc white with padistral. Providing and fitting glazed earthen ware wash hand basin 56x40 cm (22"x16") including bracket set, waste pipe and waste coupling etc.complete with pedestal. Providing and fixing stainless steel sink with drain board, size 120 cm x 60 cm(48'' x 24'') including bracket set, waste pipe and waste coupling Providing and fitting glazed earthen ware low down flushing cistern 13,63 litres (3 gallons) capacity, including bracket set, copper connection, etc Providing and fitting plastic made low down flushing cistern 3 gallon capacity including bracket set copper connection etc complete white. Providing and fixing chromium plated toilet paper holder. Providing and fixing, chromium plated towel rail i) 60 cm (24'') long, 2 cm (3/4'') dia Providing and fixing, chromium plated towel rail ii) 50 cm (20'') long, 1.5 cm (1/2'') dia Providing and fixing looking glass 55 cm x 40 cm (22'' x 16'') size, and 5 mm thick, first quality Providing and fixing glass shelf 24"x5" with 5mm thick glass with chromium plated brackets and railing . Providing and fitting i) Plastic soap dish Providing and fitting ii) Plastic toilet paper holder Providing and fitting iii) Plastic towel rail Providing and fitting iv) Plastic shelf 60 cm x 13 cm (24'' x 5'') with bracket and railing Providing and fixing chromium plated pillar- cock, heavy. i) 2 cm (3/4'') Providing and fixing chromium plated pillar- cock, heavy. i) 1.5 cm (1/2'')

3 Rft.

4 5

C-18/3(a)(ii)

100 Cft

2,082.60

2,082.60

C-18/4(a)

100 Cft

3,440.40

3,440.40

C-18/5

per Rft

15.55

C-18/6

100 Sft

652.65

651.10

699.45

697.85

C-18/7

100 Sft

368.45

366.90

C-18/8/(a) Ist Coat (ii), 2nd Coat (ii) and 3rd Coat

100 Sft

2,598.60

2,598.60

C-18/10(i)

C-18/10(v) C-18/12 C-18/13 C-18/15 C-19/1(i)

Per inches thickness per 100 Sft Per inches thickness per 100 Sft Per Rft Per Rft. of 3 rows of pipes Cu.inch Each

2,265.75

2,277.05

2,426.65

2,437.95

745.60 482.00 15.60 1,799.25 1,801.20 1,797.70

747.45 482.00 15.60 1,799.65

C-19/1(ii) C-19/2(i) C-19/2(ii)

Each Each Each

1,950.45 302.35 206.35

1,952.40 302.35 206.35

1,948.90 302.35 206.35

1,950.85 302.35 206.35

C-19/3(i)

Each

998.65

998.65

998.45

998.45

C-19/3(ii)

Each

1,178.65

1,178.65

1,178.45

1,178.45

C-19/6(i)

No.

2,164.20

C-19/6(ii)

No.

2,310.60

C-19/7

Each

3,990.65

3,990.65

3,990.25

3,990.25

C-19/11(ii)

Each

1,173.95

C-19/12(ii) C-19/17 C-19/18(i) C-19/18(ii) C-19/19 C-19/20(i) C-19/22(i) C-19/22(ii) C-19/22(iii) C-19/22(iv)

No. No. Each Each Each No Each Each Each Each 135.35 186.45 204.45 382.35 135.35 186.45 204.45 382.35 318.55 258.55 332.85 318.55 258.55 332.85

929.15 357.95 318.55 258.55 332.85 311.05 135.30 186.35 204.35 382.30

1,103.15 357.95 318.55 258.55 332.85 311.05 135.30 186.35 204.35 382.30

C-19/23(i) C-19/23(ii)

Each Each

494.95 652.15

494.95 652.15

494.95 652.15

494.95 652.15

Page 12 of 17

MRS Reference

Description

Unit

N O T US ED

N O T US ED

Rate 4th Rate 4th Rate 1st Rate 1st Quarter 2009 Quarter 2009 Quarter 2010 Quarter 2010 (Kasur) (Okara) (Kasur) (Okara) 6 7 8 162.55 294.55 308.95 374.95 1,450.30 322.00 308.95 374.95 1,450.30 322.75 308.95 374.95 1,450.30 321.35 294.55 308.95 374.95 1,450.30 322.10 9

1 C-19/24(ii) C-19/26(ii) C-19/28(i) C-19/28(ii) C-19/29 C-19/33(i)

2 Providing and fixing chromium plated stop cock heavy 1.5 cm (") Providing and fixing chromium plated bib cock 1/2" dia. Providing and fixing chromium plated shower rose i) 1.5 cm x 10 cm (1/2'' x 4'') Providing and fixing chromium plated shower rose ii) 2 cm x 15 cm (3/4'' x 6'') Providing and fixing, chromium plated mixing valve, for wash hand basin,sink or shower Providing and fixing, floor trap of cast iron, including concrete chamber all round, and C.I.grating i) 10 cm x 5 cm (4'' x 2'') Providing and fixing, floor trap of cast iron, including concrete chamber all round, and C.I.grating ii) 10 cm x 7.5 cm (4'' x 3'') Providing and fitting ''P'' trap i) 10 cm (4'') of cast iron Providing and fitting ''P'' trap ii) 10 cm (4'') glazed Providing and fitting 10cm (4") gully trap, including cement concrete, cost of PVC grating 15x15 cm (6"x6") and masonry chamber 30x30 cm (12"x12"). Providing and fitting, cast iron soil pipe with i) lead caulked, yarn joint a)10 cm (4'') i/d Providing and fitting, cast iron soil pipe with i) lead caulked, yarn joint b) 5 cm (2'') i/d Providing and fitting, cast iron soil pipe with ii) cement caulked joint a)10 cm (4'') i/d Providing and fitting, cast iron soil pipe with ii) cement caulked joint b) 5 cm (2'') i/d Providing and fitting cast iron specials, such as tee bend, collar,cross, etc plain type i) Lead caulked joint Providing and fitting cast iron specials, such as tee bend, collar,cross, etc plain type ii) cement caulked joint Supply and fitting of cast iron manhole cover with frame, etc complete i) 30 cm (12'' ) dia Supply and fitting of cast iron manhole cover with frame, etc complete i) 45 cm (18'' ) dia Supply and fitting of cast iron manhole cover with frame, etc complete iii) 60 cm (24'' ) dia Providing and fixing waste pipe of PVC i) 3 cm (1 1/4'') Providing and fixing waste pipe of PVC i) 4 cm (1 1/2'') Providing and fixing flushing bend of PVC 1/1/2" dia. Providing and laying RCC pipe (12'' i/d) sewer mould with cement concrete (Class A, 4000 psi), conforming to ASTM specification OK-C-76-79 Class ii wall B including carriage of pipe from factory to site of work lowering in trenches to correct alignment and grade joining with rubber ring, cutting pipees where necessary ,testing etc, complete Providing and laying RCC pipe (15'' i/d) sewer mould with cement concrete (Class A, 4000 psi), conforming to ASTM specification OK-C-76-79 Class ii wall B including carriage of pipe from factory to site of work lowering in trenches to correct alignment and grade joining with rubber ring, cutting pipees where necessary ,testing etc, complete Providing and laying RCC pipe, moulded with cement concrete (Class A, 4000 psi) with spigot socket or collar joint, etc. including cost of reinforcement, conforming to BS 5911 Part 1: 1981, Class "L" including carriage of pipe from factory to site of work,lowering in trenches to correct alignment and grade, jointing, cutting pipes where necessary, finighing and testing, etc., complete 6" dia Providing and laying RCC pipe, moulded with cement concrete (Class A, 4000 psi) with spigot socket or collar joint, etc. including cost of reinforcement, conforming to BS 5911 Part 1: 1981, Class "L" including carriage of pipe from factory to site of work,lowering in trenches to correct alignment and grade, jointing, cutting pipes where necessary, finighing and testing, etc., complete 9" dia Boring for tubewell in all types of soil except shingle and rock, from ground level to 100ft (30m) depth, including sinking and withdrawing of casing pipe, complete. 4" dia Providing and installing PVC strainer BSS Class "D" in tubewell bore hole, including sockets and solvent, etc. complete 2" dia Providing and installing PVC Bail/End plug, in tubewell bore hole. 2"dia Providing and installing M.S blind pipe socketed/welded chap joint,M.S reducer (where necessary in tube well bore 2hole including jointing/welding with strainer etc complete 3'' Dia PVC pipe with BSS Class "B" in tubewell bore hole, including sockets and solvents and jointing with strainer, etc complete Bath Rooms

3 Each No. Each Each Each Each

4 5

C-19/33(ii) C-19/34(i) C-19/34(ii) C-19/35

Each Each Each Each

322.00 400.80 94.80

322.75 401.00 95.00

321.35 400.65 94.65 481.55

322.10 400.80 94.80

C-19/36(i)(a)

Per ft

181.90

181.90

181.90

181.90

C-19/36(i)(b)

Per ft

86.00

86.00

86.00

86.00

C-19/36(ii)(a)

Per ft

116.25

116.25

116.25

116.25

C-19/36(ii)(b)

Per ft

75.30

75.30

75.30

75.30

C-19/38(i)

Kg

134.15

134.15

134.15

134.15

C-19/38(ii)

Kg

99.15

99.15

99.05

99.05

C-19/39(i)

Each

159.25

159.25

159.25

159.25

C-19/39(ii)

Each

802.45

802.45

802.45

802.45

C-19/39(iii) Replacement C19/3(i) Replacement C19/3(ii) Replacement C19/4(ii)

Each Each Each No.

1,355.20 35.20 41.20

1,355.20 35.20 41.20

1,355.20 35.20 41.20

1,355.20 35.20 41.20 39.95

C-21/3(i)

R.ft

290.50

290.50

276.50

276.50

C-21/3(ii)

R.ft

C-21/1(ii)

R.ft

99.85

C-21/1(iii)

R.ft

179.40

179.40

C-23/1(b)

Per Rft of bore

45.90

C-23/12 C-23/13(ii)

Per Rft Each

74.25 59.75

C-23/14(b)

1 R.ft

251.00

251.00

251.00

251.00

C-23/15(a)

Per ft

98.50

Page 13 of 17

MRS Reference

Description

Unit

N O T US ED

N O T US ED

Rate 4th Rate 4th Rate 1st Rate 1st Quarter 2009 Quarter 2009 Quarter 2010 Quarter 2010 (Kasur) (Okara) (Kasur) (Okara) 6 7 8 9

1 C-23/16 C-23/16(c) C-23/16(a) C-23/16(b) C-23/16(e) C-23/22 C-23/22(iii)(a) C-23/22(iii)(b) C-23/22(iii)(a) C-23/26(b)

2 Providing and installing P.V.C. blind pipe, B.S.S. Class `D', in tubewell bore hole, including sockets and solvents and jointing with strainer, etc. complete. 2" dia 1-1/4" dia 1-1/2" dia 4" dia Providing and laying cutting jointing testing, and disinfecting G.I pipe line in trenches with flanged joints usin G.I pipe of BSS 1387-1967 complete in all respects including special and valves 1/2" dia G.I pipe. 3/4" dia G.I pipe. Providing G.I pipe 1/2" dia for hanging ceiling fans Providing and laying cutting jointing testing, and disinfecting PVC pipe line of BSS with B class working pressure pipe in trenches compelet in all respects 4" dia. Supply and erection of PVC pipe for wiring recessed in walls, including inspection boxes, pull boxes, hooks, cutting jharries, and repairing surface, etc., complete with all specials.20mm i/d Supplying and errectionof PVC pipe for wiring on surface including clamps, inspection boxes, pull boxes bend, Ts, repariing surface etc complete with all respect specials 20mm inside dia . Supply and erection of single core PVC insulated copper conductor cables, in prelaid PVC pipe/M.S. conduit/G.I pipe/wooden strip batten/wooden casing an capping/G.I. wire/trenches (rate for cables only):a) 250/440 volts, PVC insulated: 3/0.74 mm (3/0.029") b) 250/440 volts, PVC insulated:3/0.91 mm (3/0.036") c) 250/440 volts, PVC insulated:7/0.74 mm (7/0.029") Supply and erection of single core PVC insulated, PVC sheathed copper conductor 250/440 volts grade cable (BSS-2004), in prelaid PVC pipes/M.S. conduit/GI pipe/wooden strip batten/wooden casing and capping/trenches, etc. (rate for cable only). 3/0.74 mm (3/0.029") 7/0.74 mm (7/0.029") 7/1.12 mm (7/0.044") 7/1.63 mm (7/0.064") Supplying and erection of MS sheet box of 16 SWG, 10 cm (4") deep with 4.75mm thick (3/16") bakelite sheet top, for recessed wiring, including making holes for regulators, seitches, plugs, etc 4" x 4" 9" x 4" 8" x 10" Supplying and erection of teakwood board 3/4" thick. 10" x 12". Supplying and erection of teakwood board 3/4" thick. 7" x 4". Supplying and erection of teakwood board 3/4" thick. 9" x 4". Supply and erection of wall type/pole type bracket, with double cover water tight reflector, flexible wire and brass bolder. Supplying and erection of call bell 220-250 volts fixed on teak wood board 7"x4". Supplying and erection of bell push open type without flexible wire Supplying and erection of ceiling rose backlite Supplying and erection of Switches piano type Supplying and erection of wall socket with 3 pin 5amp Supplying and erection of 3 pin 10-15 Amp wall socket open type. Supply and erection of 3 pin switch and plug combined recessed type 15 Amp Supplying and errection of cut out bakelite open type Supplying and errection of button holder Supplying and errection of tube lights including rod, chocks , starter with frameflexible wire including connection from ceiling rose etc complete. Single rod 40watt with one chock and one starter Supplying and errection of Girder clamp hcok 5/8" with Ms plate 1x1/4 " with bolts and nut for hanging ceiling fans Supply and erection of roof suspension hook of MS plate 75x40x13mm with 16mm hook complete with bolts, nuts and fixing with cement concrete (Class D, 2000 psi). Supply and erection of house service pipe Henley (GI pipe water quality) or pole type, 2" dia, erected to install insulated over head line, include shackle insulator for holding insulated wire and straining devices for bearer wire and other accessories etc. complete. Supplying and errectionof street light pole bracket 30 mm G I pipe 2 m long complete with 2No. Pole clump Supplying and erection of pole mounted street light, holders, shade and glass, etc, for fitting 125/250 watt mecuary per lamp excluding cost of lamps (ii) Philips design Supplying and fitting of mercury paper lamp with chock set (i) 125 watt lamp

4 5

Per ft Per ft Per ft Per ft

70.50 40.05 48.10 239.25

1 R.ft 1 R.ft R.ft R.ft

52.30 67.80

52.30 67.80 52.30 130.15

C-24/3(ii)

R.ft

23.30

C-24/4(iii)

R.ft

17.85

C-24/10(a)

C-24/10(a)(i) C-24/10(a)(ii) C-24/10(a)(iii)

R.ft R.ft R.ft

6.30 8.20 10.85

C-24/11

C-24/11(i) C-24/11(iii) C-24/11(v) C-24/11(vi) C-24/14 C-24/14(i) C-24/14(iii) C-24/14(iv) C-24/17(iv) C-24/17(i) C-24/17(ii) C-24/26 C-24/28 C-24/29 C-24/30 C-24/31(ii) C-24/33 C-24/35(i) C-24/36(II) C-24/38(i) C-24/39(i) C-24/43(ii)

R.ft R.ft R.ft R.ft

7.05 11.60 23.15 44.60

Each Each Each No. No. No. Each No. No. No. No. No. No. No. No. No. No.

90.40 157.40 238.95 96.40 47.85 64.65 325.65 188.85 171.20 19.85 20.70 61.80 19.85 20.70 61.80 24.20 84.00 24.20 21.20 477.85 21.20 477.85

C-24/45

No.

125.85

C-24/48

Each

444.20

C-24/54

R.ft

181.60

C-24/63

No.

666.35

C-24/64

No.

2,925.20

C-24/65

No.

941.20

Page 14 of 17

MRS Reference

Description

Unit

N O T US ED

N O T US ED

Rate 4th Rate 4th Rate 1st Rate 1st Quarter 2009 Quarter 2009 Quarter 2010 Quarter 2010 (Kasur) (Okara) (Kasur) (Okara) 6 7 8 9

C-24/68

C-24/83

C-25/9

C-25/11

C-25/(9&11)

C-25/44

C-26/7 C-26/8 C-26/35(b) C-26/37 Rates Analysis

2 Earthing of iron clad/aluminum switches, etc. with GI wire N 8 SWG in GI pipe 15mm dia ("), recessed or on surface of wall and floor, complete with 1.5 metre long GI pipe, 50mm (2") dia with reducing socket 4 to 5 metre below ground level and 2 metre away from building plinth. Erection of ceiling fan alongwith regulator (all sizes), including carriage from local Railway Station/Store to site of work, electric wire/cable for suspension rod and board connection, and cutting, threading on the rod, where necessary. Small iron work such as gusset plate knees bends stirrups straps rings etc including cutting drilling riveting handling assembling and fixing but excluding erection in position Erection and fitting in position iron trusses, staging of water Tanks etc Small iron work such as gusset plates, knees, bends, strirrups, straps, rigs, etc. including cutting, rivetting, handeling, assembling and fixing; but including erection in position. Providing and fixing windows consisting of M.S box section frame 2"x1" leaves frame 1"x1" box section frame for glazing 3/8"x3/8" using 16SWG sheet 'U' shaped rubber supported with 1"x1/8" M.S. flate for fixing 3/16" thick glass panes M.S. box section "x" of 16SWG for fixing 24 SWG wire gauze on outer side by means of 3/4" x 1/8" M.S flate and screws including grill of M.S. flat "x1/8" of r 1/4"x1/4" square bar with independent frame of 'x" box section of 16 SWG i/c all C.P. fitting and painting 3 coats complete in all respect. Fixing enamelled iron gauge flush with masonry including cost of hooks Placing boundary pillars in position, including digging pits Bailing out water by pump. Supplying and laying polythene sheet, over D.P.C. under floors and on roofs etc. 500 gauge (0.005") thick

4 5

Job

2,544.85

Each

124.90

100 Kg

9,951.15

9,951.15

9,951.15

9,951.15

100 Kg

306.05

306.05

306.05

306.05

100 Kg

10,257.20

10,257.20

Per Sft

328.45

Per L. ft Each 1000 Cft Sft

52.10 29.90

52.10 29.90

52.10 29.90 223.45 1.80

52.10 29.90 223.45 1.70

Providing and installing Steel Sheet Piling (ArcelorRate Analysis(sp) AU14, ESC-EU14, or equivalent section) complete in all respects as per Drawings and Specifications. Rate Providing and installing 4" dia PVC pipe rain water analysis(pvc4'') outlet for bridge with all accessories etc. complete. Providing and laying graded bajree 1/8'' to 1/2'' gauge Rate(bajri-L-1) including carriage, on level Providing and laying graded bajree 1/8'' to 1/2'' gauge Rate(bajri-S-1) including carriage, on slope Providing and laying graded bajree 1/2'' to 2'' gauge Rate(bajri-L-2) including carriage, on level Providing and laying graded bajree 1/2'' to 2'' gauge Rate(bajri-S-2) including carriage, on slope Providing and laying graded bajree 2'' to 3'' gauge Rate(bajri-L-3) including carriage, on level Providing and laying graded bajree 2'' to 3'' gauge Rate(bajri-S-3) including carriage, on slope Rate Providing and fixing PVC water stopper 9" wide with 3 Analysis(ws) bulbs and 3/8" thick Rate Providing and installing 3" dia G.I. (5mm thick) pipe for Analysis(gp3'') bridge with all accessories etc. complete. Rate Providing and installing 6" dia G.I. (5mm thick) pipe for Analysis(gp6'') bridge with all accessories etc. complete. Rate Providing and installing 8" dia MS (5mm thick) blind Analysis(msb) pipe with all accessories etc. complete. Rate Providing and installing 1" dia PVC pipe for bridge with analysis(pvc1'') all accessories etc. complete. Providing & casting in situ bored reinforced concrete piles with concrete (Class B, 3000 psi), using 10% extra cement in dry mix, and course sand, including all Rate labour and material (except the cost of steel analysis(p&c) reinforcement and its labour for bending and laying in position etc. which will be paid separately) including screening and washing of shingle and curing. 30" dia pile. Providing and fixing 1.25" dia G.I. pipe (medium Rate quality) with grease filled for contraction/expansion Analysis(gp1.25'') joint. Rate Providing and fixing 2" dia G.I. pipe medium quality Analysis(gp2'') (gauge well) Rate Providing and fixing 1.5" dia G.I. pipe medium quality Analysis(gp1.5'') (gauge well) Providing and filling cement, sand and bitumen joint Rate analysis(js) sealant of ratio 1:2:3, in expansion joint of 1'' wide and 1" deep. Rate analysis(Liner) Rates Analysis (Gates) Providing and installing 1/4" thick mild steel permenent casing 30" internal dia for piles (including carriage). Designing, manufacturing and installation of Gate Equipment with all accessories including erection & maintenance tools

Per metric tonne Per Rft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft Per Rft Per Rft Per Rft Per Rft Per Rft Per Rft 4,285.20 4,388.70 4,285.20 4,388.70 4,285.20

350,000.00 78.77 4,215.16 4,336.60 4,215.16 4,336.60 3,975.16 4,096.60 305.28 261.00 577.80 1,029.24 13.25

350,000.00 78.77 4,215.16 4,336.60 4,215.16 4,336.60 3,975.16 4,096.60 305.28 261.00 577.80 1,029.24 13.25

2,010.86

2,010.86

Rft Per Rft Per Rft Per Rft

227.05 158.40 116.40 7.05

227.05 158.40 116.40 7.05

Per Rft

3,962.21

3,962.21

Per Sft

25,030.98

25,030.98

Providing and fixing enameled steel plate gauge 4" Rate Analysis(eg) wide 1/8" thick (including painting and lettering) Rates Analysis (DIV-OP) Rate Analysis (DW 29+500) Rate Analysis (DW 65+000) Rate Analysis (DW 111+800) Rate Analysis (HR-ICB01) Monitoring and maintenance of temporary diversion channel Care and Handling of Water including Dewatering Care and Handling of Water including Dewatering Care and Handling of Water including Dewatering Care and Handling of Water including Dewatering

Per Rft

261.16

261.16

Lump Sum Lump Sum Lump Sum Lump Sum Lump Sum

1,620,000

1,620,000

11,030,000.00 11,030,000.00 6,810,000.00 7,420,000.00 5,900,000.00 6,810,000.00 7,420,000.00 5,900,000.00

Page 15 of 17

MRS Reference

Description

Unit

N O T US ED

N O T US ED

Rate 4th Rate 4th Rate 1st Rate 1st Quarter 2009 Quarter 2009 Quarter 2010 Quarter 2010 (Kasur) (Okara) (Kasur) (Okara) 6 7 8 445,022.04 9

1 Rate Analysis (DW-PlugBund) Rate Analysis (DWCattleGhats) Rates Analysis (G-DIS) Rates Analysis (G-DIS) ICB-02 Rates Analysis (G-DIS) ICB-03 Rates Analysis (MF-RD) Rate Analysis (MF-RB) Rate Analysis (MF-PG) Rate Analysis (MF-DB)

2 Care and Handling of Water including Dewatering Care and Handling of Water including Dewatering Dismantling of steel gates, including carriage and loading/unloading to stockpile area at Renala SubDivisional office (lead up to 40km). Dismantling of steel gates, including carriage and loading/unloading to stockpile area in vicinity of Sahiwal Canal Colony (lead up to 50 km). Dismantling of steel gates, including carriage and loading/unloading to stockpile area in vicinity of Khanewal Canal Colony (lead up to 50 km). Providing & installing RD Markers complete in all respect as per drawings and specifications Providing & installing Road Barrier complete in all respect as per drawings and specifications Providing & installing Pillar Gauge complete in all respect as per drawings and specifications Providing & installing Data Boards complete in all respect as per drawings and specifications Arranging and performing load tests on bored in situ RCC piles for loads up to 2.5 times the design load, or up to a maximum of 360 tons, including complete setup, providing and installing loading arrangement, instrumentation and performing test according to standards, and as specified and approved by the Engineer Arranging and performing load tests on bored in situ RCC piles for loads up to 2.5 times the design load, or up to a maximum of 240 tons, including complete setup, providing and installing loading arrangement, instrumentation and performing test according to standards, and as specified and approved by the Engineer Arranging and performing load tests on bored in situ RCC piles for loads up to 2.5 times the design load, or up to a maximum of 120 tons, including complete setup, providing and installing loading arrangement, instrumentation and performing test according to standards, and as specified and approved by the Engineer Care and Handling of Water including Dewatering Care and Handling of Water including Dewatering Care and Handling of Water including Dewatering Care and Handling of Water including Dewatering Care and Handling of Water including Dewatering Care and Handling of Water including Dewatering Care and Handling of Water including Dewatering Care and Handling of Water including Dewatering Care and Handling of Water including Dewatering

3 Lump Sum Lump Sum per 100kg

4 5

491.53

491.53

per 100kg

per 100kg 1 No 1 No 1 No 1 No 154.48 153,099.74 10,471.09 4,871.37 154.48 153,099.74 10,471.09 4,871.37

Rates Analysis (Pile Test DRB)

Per Test

500,000.00

500,000.00

Rates Analysis (Pile Test VRB)

Per Test

Rates Analysis (Pile Test FB)

Per Test

Rate Analysis (DW 260+500) Rate Analysis (DW 287+255) Rate Analysis (DW 330+850) Rate Analysis (DW 355+388) Rate Analysis (DW 393+254) Rate Analysis (DW 432+305) Rate Analysis (DW 463+350) Rate Analysis (DW 495+700) Rate Analysis (DW-PlugBund ICB02) Rate Analysis (DW-CattleGhats ICB02) Rate Analysis (HR-ICB02)

Lump Sum Lump Sum Lump Sum Lump Sum Lump Sum Lump Sum Lump Sum Lump Sum Lump Sum

Care and Handling of Water including Dewatering

Lump Sum

Care and Handling of Water including Dewatering

Lump Sum

Rate Analysis (DW-PlugBund Care and Handling of Water including Dewatering ICB03) Rate Analysis (DW-CattleGhats Care and Handling of Water including Dewatering ICB03) Rate Analysis (HR-ICB03) Rate Analysis (DW 528+850) Rate Analysis (DW 572+800) Rate Analysis (DW 602+800) Rate Analysis(3 Ply) Care and Handling of Water including Dewatering Care and Handling of Water including Dewatering Care and Handling of Water including Dewatering Care and Handling of Water including Dewatering Providing and laying asphalt felt (3 ply) at site of work Providing APM or OF machine (small iron work such as gusset plate knees bends strip straps rings etc) including cutting drilling riveting excluding erection in position Supply and erection of ceiling fan 56" Supply and erection of Exhaust fan 12" plastic body approved quality. Supply and erection of panel box 16" x 22" including 60ATP lancher 3 pole for carring 12 No. 16 to 20 Amp for out going i.e. Volt Meter light switch etc.

Lump Sum

Lump Sum

Lump Sum Lump Sum Lump Sum Lump Sum Sq.M

Market Rate M.Rate(C.fan) M.Rate(E.fan)

Each No. No.

12,000.00

12,000.00

12,000.00 2,000.00 1,300.00

12,000.00 2,000.00 1,300.00

M.Rate(P.Box)

No.

14,000.00

14,000.00

Providing and fixing at site of work wall shower M.Rate(wws) including shower, rod, stop cock etc. complete. Providing and fixing at site of work Golamatic pump M.Rate(G.Pump) size 1-1/4" x 1" coupled with electric motor 1 HP complete. Providing and fixing at site super tuff water tank 200 M.Rate(ST.tank) gallon capacity complete.

No. No. No.

4,200.00 13,000.00 11,000.00

4,200.00 13,000.00 11,000.00

Page 16 of 17

MRS Reference

Description

Unit

N O T US ED

N O T US ED

Rate 4th Rate 4th Rate 1st Rate 1st Quarter 2009 Quarter 2009 Quarter 2010 Quarter 2010 (Kasur) (Okara) (Kasur) (Okara) 6 7 8 9,000.00 600.00 1,100.00 9 9,000.00 600.00 1,100.00 5,000.00 9,000.00 2,000.00 3,000.00 4,000.00 10,000.00 120,000.00 45,000.00 65,000.00 50,000.00 30,000.00 60,000.00 1,126,281.00 6.30 3,200.00 800.00 2,400.00 6,000.00 4,000.00 1,600.00 1,200.00 2,400.00 8,000.00 4,000.00 32,000.00 3,200.00 800.00 2,400.00 6,000.00 4,000.00 1,600.00 1,200.00 2,400.00 8,000.00 4,000.00 32,000.00

1 M.Rate(Giezer) Material Rates (06.007) MR MR-1 MR-2 MR-3 MR-4 MR-5 MR-6 MR-7 MR-8 MR-9 MR-10 MR-11 MR-12 MR-13 MR-14 MR-15 MR-16 MR-17 MR-18 MR-19 MR-20 MR-21 MR-22 MR-23 MR-24 MR-25

2 Providing and fitting at site of work electric giezer 20 gallon capacity complete. Supply of sand local Deduct for credit for retrivable stone from diversion channel. Providing and fixing plastic made storage tank (500 gallons or as specified by the Engineer) Providing and fixing Pumping set for water (as specified by the Engineer) Supplying and errectionof main switch Supplying and errection of ceiling fan 56 inch . Supplying pedestal fan. 24 inch Supplying air cooler. Supplying Generator 20HP of reputable brand as approved by the Engineer, with all acessories and fittings complete in all respects. Supplying UPS (Un-interruptible Power Supply) with Battries. Providing and fixing A/C 2 ton (quality to be specified and approved by the Engineer) Providing double bed (quality to be specified by Engineer) Providing Sofa Set (quality to be specified by the Engineer) Providing chairs and table (quality, number and type to be specified by the Engineer) Internal plus external development as specified by the engineer Supplying flexible wire 2376. Desk with lockable drawers (quality to be specified and approved by the Engineer) Office chair (quality to be specified and approved by the Engineer) Office table (quality to be specified and approved by the Engineer) Large conference table with 8 No. chairs (quality to be specified and approved by the Engineer) Shelf unit 1m wide by 4 shelves (quality to be specified and approved by the Engineer) Notice board 1m high x 2m wide (quality to be specified and approved by the Engineer) First aid kit (quality to be specified and approved by the Engineer) Fire extinguisher (quality to be specified and approved by the Engineer) Gas cooker (quality to be specified and approved by the Engineer) Kitchen Utensils (quality to be specified and approved by the Engineer) Refrigarator (large) (quality to be specified and approved by the Engineer)

3 No. 100 Cft 100 Cft No Set No. No. No. No. No. No. No. No. No. No. Job No. No No No No No No No No No No No

4 5

Page 17 of 17