TESTS TO BE CARRIED OUT ON EQUIPMENTS 1.

Switchyard Equipment: The name plates of all Equipment in the Switchyard will be checked with the SLD provided by the client. This also includes checking of earthing connection to the body of the equipment and proper connection, tightness of all connection, as per drawing provided 2. Control and Relay Panel: The Cubicle will be checked with the approved drawings. Checking of earthing connection to the body of the panel with earth. Checking connection and tightness of all connections as per approved drawing for relays, meters, switches. Continuity checking for all the equipments for its terminal to its respective Junction / Marshalling boxes and from junction / marshalling box to the CRP. 3. Current Transformer : The Following test will be carried on the CT a. Insulation Resistance test b. Polarity test c. Ratio Test d. Winding Resistance only of PS class core e. Knee Point voltage only of PS class core 4. Potential Transformer : The Following test will be carried on the PT a. Insulation Resistance test b. Polarity test c. Ratio Test 5. Breaker : The Following test will be carried on the Breaker a. Insulation Resistance test b. Contact Resistance test c. Breaker Operational Test d. Primary Injection and tripping of breaker e. Relay Testing. f. Functional check of indicating lamps and indicating meters 6. Isolator : The Following test will be carried on the Isolator a. Insulation Resistance test b. Contact Resistance test c. Isolator Earth rod continuity test c. Isolator Operational Test ..2/-

..2.. 7. Lightning Arrestor : The Following test will be carried on the LA a. Insulation Resistance test b. Surge Counter operational test 8. Transformer : The Following test will be carried on the Transformer a. Insulation Resistance test b. Ratio test on All Taps at Reduced Voltage c. Open Circuit Magnetizing Current test at Reduced Voltage d. Winding Resistance test on Normal Tap e. Magnetic Balance test at Reduced Voltage f. Vector Group test at Reduced Voltage g. Control Checks of Tripping by Auxilary Relays 9. Earth Resistance test of Earth pits and Earth continuity of HT Breaker, Transformers,CT,PT,Isolators,B.P.,Panels 10. Cable Testing a. IR Value b. Continuity Check 11. HT Panel The Following test will be carried on the 11 KV Panel I. Tests carried out on CTs : a. Insulation Resistance test. b. Polarity test. c. Ratio Test. II. Tests carried out on PTs : a. Insulation Resistance test. b. Polarity test. c. Ratio Test. III. Test carried out on Breakers : a. Insulation Resistance test. b. Contact Resistance test. c. Breaker Operational check. d. Primary Injection and tripping of breaker. e. Relay Testing. f. Functional check of indicating lamps and indicating meters. ><><><><><><><><><

You might also like