PRELIMINARY PROJECT ORGANIZATION CHART and JOB DESCRIPTION CO-GENERATION PLANT OF --------------------------------------------------PROJECT

Conceptual and Detailed Design Equipments Specification Bidding preparation/ evaluation Technical Review Drawing/Documentation Control Manufacturer Quality control and Factory Test Technical supported to project site,Procurement,Testing. Liasoining with Concerned Parties. Engineering Progress Report.

Contract management Claims & Change Orders Overall Schedulling Control Report Liasoining with Concerned Parties General affare

Steering Management Committee

Overall Project Management Verification and Problem Solving Overall Cost Control Overall Schedulling Control Overall Quality Control Liasoining with Concerned Parties/Venders Reported to Steering Mangement Committee

Project Director Asst. Project Director


Project Coordinater Consultant/Advisor

Commissioning & Testing ( see commissioning organization chart)


Commissioning and Test Procedure Responsible for Commissioning and Test activities Test Judgement Trainning Safety Controlling during Commissioning and Test Documentation, O & M Manuals Liasoining with concerned parties Commissioning and Test Progress Report The commissioning & Testing Teams will be appointed by The Steering Management Committee.

Design/ Engineering

Finace and Cost Controlling

Purchesing & Logistics

Permit and Licence

Construction & Quality Control

Warehouse & Inventory Control

Cost and Budgetary Control Cash Flow analysis Accounting Application for Finacing i.e. Billing,Claim,Payment.B/G, L/C,etc.

Permit/ Licence BOI, MOI,EIA,CDM, PPA (with PEA) Insurance Others Department related to

Checking& Receiving matherials Maintianing matherials in good condition Inventory control activities Liasoining with concerned Parties Hand over all matherials, Tools, Spares Part to Plant.

Purchesing activities (Both Domestic & International) Bidding,Venders,Tender Document,Inquiries,Contract negotiation Contracting,Expediting,Inspection etc. Shipping& Logistics,Packing,Delivery,Loading,Custom Clearance, Tax and duties,Shipping Agent,Transportation etc. Purcurement progress Report.

Project site Management General administrative service for site activities Responsiblefor construction/ supervision erection work Quality Control Plan,Qualities Assurance Verification and Ploblem solving for site activities Shop Drawing / Asbuilt Drawing Site Regulation and Control Safety Regulation and Control Liasoining with concerned parties Construction/ Erection Progress Report Site Clearing, Closed The site

PRELIMINARY PROJECT ORGANIZATION CHART CO-GENERATION PLANT -----------------------------------------PROJECT

Steering mangement Committee

Project director

Consultant/Advisor

Design & Engineering

Purchesing and Logistics

Financial and Cost controlling

Licence/Permit

Project Coordinater

Construction & Quality Control

Mechanical Engineer (BOP)

HT/LT Engineer

Civil Engineer

International Purchesing

Financial

Licence/Permit

Project Scheduling

Mech. Engineer (Stationary)

Mech. Engineer (Rotating)

Electrical Engineer

I&C Engineer

Civil Engineer

Safety Engineer

Warehouse& Inventory Control

Boiler Engineer

I&C Engineer

Architect

Local Purchesing

Accounting

Contract Management

Senior Technician

Senior Technician

Senior Technician

Senior Technician

Senior Technician

Senior Technician

Warehouse Officer

T/G Engineer

Local Purchesing Logistics/Shipping

Claims & Change Orders

Senior Technician

Technician Inspector

Technician Inspector

Local Purchesing Technician Inspector

Technician Inspector

Safety Inspector

Construction Matherials

process Engineer

Technician

Safety Inspector

Tool & Spare parts

Technician Inspector Venders/Supplier Drafting and Documentation Venders/ Suppliers Security General Affare Drafting and Documentation

Bidding & Evaluation

Documentation & Drawing Control

Third Party Insperction (NDT)

Officers/Clerk

Documentation &Drawing

Draftmans

Draftmans

Security Guards

Workers

PRELIMINARY COMMISSIONING ORGANIZATION CHART CO-GENERATION PLANT OF ----------------------------------------------------------- PROJECT

Steering Mangement Committee

Commissioning Coordinater

Third Party

Coordinator Team

Boiler Commisioning

T/G Commisioning

Water Treatment Commisioning

Electrical & Control Commisioning

Safety

Tool & Spare Parts

Commissioning Staff

Commissioning Staff

Commissioning Staff

Commissioning Staff

Commissioning Staff

Commissioning Staff

Commissioning Staff

Commissioning Staff

Commissioning Staff

Commissioning Staff

Commissioning Staff

Commissioning Staff

Commissioning Staff