1 1.1 1.2 2 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 2.9 2.10 2.11 2.12 2.13 2.14 2.15 2.16 2.17 2.18 2.19 2.20 General......................................................................................................... 3 Slab foundation............................................................................................. 3 Pile foundation ............................................................................................. 3 Foundation overview drawings ..................................................................... 4 REpower MD70, 65m Hub height, DIBt (1995) WZ III, slab foundation ........ 4 REpower MD70, 80m Hub height, DIBt (1995) WZ II, slab foundation ......... 5 REpower MD70, 85m Hub height, DIBt (1995) WZ II, slab foundation ......... 6 REpower MD70, 90m Hub height, DIBt (1995) WZ II, slab foundation ......... 7 REpower MD77, 61.50m Hub height, DIBt (1995) WZ II, slab foundation .... 8 REpower MD77, 85.00m Hub height, DIBt (1995) WZ II, slab foundation .... 9 REpower MD77, 90.00 m Hub height, DIBt (1995) WZ II, slab foundation . 10 REpower MD77, 100 m Hub height, DIBt (2004) WZ II, slab foundation .... 11 REpower MD77, 100 m Hub height, DIBt (2004) WZ II, Pfahlgrndung ..... 12 REpower MM70, 65 m Hub height, DIBt (1995) WZ II, slab foundation...... 13 REpower MM70, 65 m Hub height, DIBt (1995) WZ III, pile foundation ..... 14 REpower MM82, 59 m Hub height, DIBt (1995) WZ III, slab foundation..... 15 REpower MM82, 59 m Hub height, DIBt (1995) WZ III, pile foundation ..... 16 REpower MM82, 80 m Hub height, DIBt (1995) WZ III, slab foundation..... 17 REpower MM82, 80 m Hub height, DIBt (1995) WZ III, pile foundation ..... 18 REpower MM82, 100 m Hub height, DIBt (1995) WZ II, slab foundation.... 19 REpower MM82, 100m Hub height, DIBt (1995) WZ II, pile foundation ..... 20 REpower MM92, 80m Hub height, DIBt (2004) WZ III, slab foundation...... 21 REpower MM92, 80m Hub height, DIBt (2004) WZ III, pile foundation ...... 22 REpower MM92, 100 m Hub height, DIBt (2004) WZ II, slab foundation.... 23

Author: K.Graff Checked: B.Frost Approved: Jan-W. Derksen

SD-0.0-FD.RF-01-B-EN
13.12.2005 Seite 2 von 23

Foundation

General

The foundation design depends on meteorological and operational stresses that influence the wind energy converter, its size and local subsoil properties. Depending on the subsoil properties either a flat or deep foundation will be implemented.

1.1

Slab foundation

Slab foundations are used where subsoil provides good load bearing capacity. The foundation comprises of reinforcing steel (ca. of 300m3) and is concrete . A foundation foundation insert is integrated inthe steel reinforced concrete, this connects the steel tubular tower to the foundation. REpower wind energy converters slab foundations comprise an octagonal slightly sloped foundation slab and a circular steel reinforced base in which the foundation insert is anchored. The foundation slab and base are produced in two concreting stages . Design: on level, compacted soil an approx. 10 cm thick gravel (concrete?) base is laid. The formwork is then positioned on this granular base and then the reinforcing cage is woven. The conduits for subsequent cable laying run between the two reinforcement layers and are laid up to the centre to the foundation section. Prior to concreting the foundation insert must be aligned with a high degree of precision.

1.2

Pile foundation

In the case of subsoil with poor load bearing capacity (e.g. bogs or marshes) pile foundations are implemented. Several prefabricated steel reinforced concrete piles are driven deep into the ground by means of a pile driver ram. The pile heads are then capped and the exposed pile reinforcing is integrated in the pile head slab. As a rule, the pile head slab is cross-shaped, the piles are located in groups at the ends of the cross.

Author: K.Graff Checked: B.Frost Approved: Jan-W. Derksen

SD-0.0-FD.RF-01-B-EN
13.12.2005 Seite 3 von 23

Foundation

2
2.1

Foundation overview drawings


REpower MD70, 65m Hub height, DIBt (1995) WZ III, slab foundation

Concrete volume: Reinforcing steel:

276 m3 22 070 kg

Subject to modification without notice!

Author: K.Graff Checked: B.Frost Approved: Jan-W. Derksen

SD-0.0-FD.RF-01-B-EN
13.12.2005 Seite 4 von 23

Foundation

2.2

REpower MD70, 80m Hub height, DIBt (1995) WZ II, slab foundation

Concrete volume: Reinforcing steel:

215 m3 27 339 kg

Subject to modification without notice!

Author: K.Graff Checked: B.Frost Approved: Jan-W. Derksen

SD-0.0-FD.RF-01-B-EN
13.12.2005 Seite 5 von 23

Foundation

2.3

REpower MD70, 85m Hub height, DIBt (1995) WZ II, slab foundation

Concrete volume: Reinforcing steel:

252 m3 32 350 kg

Subject to modification without notice!

Author: K.Graff Checked: B.Frost Approved: Jan-W. Derksen

SD-0.0-FD.RF-01-B-EN
13.12.2005 Seite 6 von 23

Foundation

2.4

REpower MD70, 90m Hub height, DIBt (1995) WZ II, slab foundation

Concrete volume: Reinforcing steel:

310 m3 32 864 kg

Subject to modification without notice!

Author: K.Graff Checked: B.Frost Approved: Jan-W. Derksen

SD-0.0-FD.RF-01-B-EN
13.12.2005 Seite 7 von 23

Foundation

2.5

REpower MD77, 61.50m Hub height, DIBt (1995) WZ II, slab foundation

... Homologation expired on 05.11.2005. It will be extended shortly

Author: K.Graff Checked: B.Frost Approved: Jan-W. Derksen

SD-0.0-FD.RF-01-B-EN
13.12.2005 Seite 8 von 23

Foundation

2.6

REpower MD77, 85.00m Hub height, DIBt (1995) WZ II, slab foundation

Concrete volume: Reinforcing steel:

252 m3 32 350 kg

Subject to modification without notice!

Author: K.Graff Checked: B.Frost Approved: Jan-W. Derksen

SD-0.0-FD.RF-01-B-EN
13.12.2005 Seite 9 von 23

Foundation

2.7

REpower MD77, 90.00 m Hub height, DIBt (1995) WZ II, slab foundation

Concrete volume: Reinforcing steel:

310 m3 32 864 kg

Subject to modification without notice!

Author: K.Graff Checked: B.Frost Approved: Jan-W. Derksen

SD-0.0-FD.RF-01-B-EN
13.12.2005 Seite 10 von 23

Foundation

2.8

REpower MD77, 100 m Hub height, DIBt (2004) WZ II, slab foundation

Concrete volume: Reinforcing steel:

333 m3 41 666 kg

Subject to modification without notice!

Author: K.Graff Checked: B.Frost Approved: Jan-W. Derksen

SD-0.0-FD.RF-01-B-EN
13.12.2005 Seite 11 von 23

Foundation

2.9

REpower MD77, 100 m Hub height, DIBt (2004) WZ II, Pfahlgrndung

Concrete volume: Reinforcing steel:

302 m3 49 361 kg

Subject to modification without notice!

Author: K.Graff Checked: B.Frost Approved: Jan-W. Derksen

SD-0.0-FD.RF-01-B-EN
13.12.2005 Seite 12 von 23

Foundation

2.10 REpower MM70, 65 m Hub height, DIBt (1995) WZ II, slab foundation

Concrete volume: Reinforcing steel:

250 m3 28 809 kg

Subject to modification without notice!

Author: K.Graff Checked: B.Frost Approved: Jan-W. Derksen

SD-0.0-FD.RF-01-B-EN
13.12.2005 Seite 13 von 23

Foundation

2.11 REpower MM70, 65 m Hub height, DIBt (1995) WZ III, pile foundation

Concrete volume: Reinforcing steel:

230 m3 37 286 kg

Subject to modification without notice!

Author: K.Graff Checked: B.Frost Approved: Jan-W. Derksen

SD-0.0-FD.RF-01-B-EN
13.12.2005 Seite 14 von 23

Foundation

2.12 REpower MM82, 59 m Hub height, DIBt (1995) WZ III, slab foundation

Concrete volume: Reinforcing steel:

311 m3 33 073 kg

Subject to modification without notice!

Author: K.Graff Checked: B.Frost Approved: Jan-W. Derksen

SD-0.0-FD.RF-01-B-EN
13.12.2005 Seite 15 von 23

Foundation

2.13 REpower MM82, 59 m Hub height, DIBt (1995) WZ III, pile foundation

Concrete volume: Reinforcing steel:

275 m3 37 165 kg

Subject to modification without notice!

Author: K.Graff Checked: B.Frost Approved: Jan-W. Derksen

SD-0.0-FD.RF-01-B-EN
13.12.2005 Seite 16 von 23

Foundation

2.14 REpower MM82, 80 m Hub height, DIBt (1995) WZ III, slab foundation

Concrete volume: Reinforcing steel:

311 m3 33 073 kg

Subject to modification without notice!

Author: K.Graff Checked: B.Frost Approved: Jan-W. Derksen

SD-0.0-FD.RF-01-B-EN
13.12.2005 Seite 17 von 23

Foundation

2.15 REpower MM82, 80 m Hub height, DIBt (1995) WZ III, pile foundation

Concrete volume: 275 m3 Reinforcing steel: 37 165 kg

Subject to modification without notice!

Author: K.Graff Checked: B.Frost Approved: Jan-W. Derksen

SD-0.0-FD.RF-01-B-EN
13.12.2005 Seite 18 von 23

Foundation

2.16 REpower MM82, 100 m Hub height, DIBt (1995) WZ II, slab foundation

Concrete volume: 314 m3 Reinforcing steel: 38 240 kg

Subject to modification without notice!

Author: K.Graff Checked: B.Frost Approved: Jan-W. Derksen

SD-0.0-FD.RF-01-B-EN
13.12.2005 Seite 19 von 23

Foundation

2.17 REpower MM82, 100m Hub height, DIBt (1995) WZ II, pile foundation

Concrete volume: 295 m3 Reinforcing steel: 41 207 kg

Subject to modification without notice!

Author: K.Graff Checked: B.Frost Approved: Jan-W. Derksen

SD-0.0-FD.RF-01-B-EN
13.12.2005 Seite 20 von 23

Foundation

2.18 REpower MM92, 80m Hub height, DIBt (2004) WZ III, slab foundation

Concrete volume: Reinforcing steel:

339 m3 34 948 kg

Subject to modification without notice!

Author: K.Graff Checked: B.Frost Approved: Jan-W. Derksen

SD-0.0-FD.RF-01-B-EN
13.12.2005 Seite 21 von 23

Foundation

2.19 REpower MM92, 80m Hub height, DIBt (2004) WZ III, pile foundation

Concrete volume: Reinforcing steel:

342 m3 44 675 kg

Subject to modification without notice!

Author: K.Graff Checked: B.Frost Approved: Jan-W. Derksen

SD-0.0-FD.RF-01-B-EN
13.12.2005 Seite 22 von 23

Foundation

2.20 REpower MM92, 100 m Hub height, DIBt (2004) WZ II, slab foundation

Concrete volume: Reinforcing steel:

375 m3 46 635 kg

Subject to modification without notice!

Author: K.Graff Checked: B.Frost Approved: Jan-W. Derksen