Control Items Vibration & Difrection


Check the wall thickness and stud size Wall clearance hight and stud size shall be corrected Check th dry partition supplier spac

Quality Target (Acceptable Criteria) EX) Saint-Gobain spec thickness CH

Import ant

Time

Checking Method Object

Method

Judgment

Action for deviation from criteria when planning

Consultant/ designe reconfirm

Planning stage Specification Check Delivery Stud, runner size and thickness Measurement

Change the wall thickness or consider reinforcement Reject to receive the wrong materials

*Thickness include the board 12.5mm+LGS75+12.5mm=100 CH=3600


Stud pitch Measurement of the distance stud to stud

Measurment of the space stud to stud as per design spac. India usual600

Photo Installation

Stud to stud distance

Measurement

Shall be adjust require distance

Anchor to the slab Check the anchor distance Vertical alignment of stud Check the Akignment

LGS runner shall be anchored to the concrete slab @900mm Fixing anchor distanceMeasurement Additional anchor shall be installed To adjust with in toralance

LGS stud shall be fixed vertical straightly. Top and bottom diflection toralance =10mm Additional reinforcement shall be installed around the door, window opennings Vertical; Slab to slab, Holizontal; support to support Materials; Steel hollow section 50*50 or wooden box 50*50 Fixing Stud verticalityMeasurement Split bar

Door, window openning reinforcement support.

Photo Planning Installation

Method of statement

Check Visual

Provide support frame

Suppor t frame

LGS

Construction Procedure Sheet I "Prevention of water leak from roof floor"

1/5

LGS

Control Items Switch box/ Piping/ Wiring inside LGS partation wall

Quality Target (Acceptable Criteria) Supporting interval for condit pipe and cable. Outlet box; Metal less than @2.0m Outlet box; Plasticless than @1.5m Also there shall be supported within 30cm from the box connecting portion.

Import ant

Time

Checking Method Object Method of statement

Method

Judgment

Action for deviation from criteria when planning

Consultant/ designe reconfirm

Photo Planning Installation

Measurment Visual

Provide support as per standard.

Considering sound proof, the swith boxes shall not be provided back to back. And the interval between boxes is secured not 150m less than 150mm.

Stud m

Box outlet Inside LGS Partation wall

Fixing board joint

Double board joint shall not be provided same position Photo Planning Shop drawing Check Joint position Visual Re located Gyp. board

Stud

Installation

Joint
Construction Procedure Sheet I "Prevention of water leak from roof floor"

Joint
2/5

Control Items The Details of Gyp. board to board joint treatment

Quality Target (Acceptable Criteria) Board joint shall be smooth finishing with putty work. Joint putty+ super taping+ putty joint putty putty putty

Import ant

Time Installation

Checking Method Object Joint putty with taping

Method

Judgment

Action for deviation from criteria when planning

Consultant/ designe reconfirm

Visual

Taping putty

Gypsum board

Joint treatment among plaster wall and dry wall To prevent the wall crack

Groove line shall be provided among plaster wall and dry wall.
Groove line t=10mm

Plaster wall

Dry wall Crack Groove t=10mm

Planning Installation

Shop drawing Check Plastic or AL Visual channel

Prevention water leaking to the electrcal room Prevention sound leaking to the VIP room

To prevent water leaking to the electrial room To prevent sound leaking to the VIP room Cauking shall be provided to the slab joint t=12mm, w=15mm

Photo Planning Installation

Shop drawing Check Visual Cauling

Provide the cauking

Water drop

(Wash basin) Cauking

(Elect. rm)

Prevention buckling the dry wall coused by structural roof wind vibration.

To prevent buckling the dry wall partation, these are provided the slot hole joint between aditional frame and roof structure(PEB rafter or Jack beam) Cauking shall be provided to the slab joint t=12mm, w=15mm
PEB Rafter or Jack beam

Photo Planning Installation

Shop drawing Check Slot hole joint Welding

Provide loose hole

Water drop

Slot hole joint between additional reinforcement frame and PEB rafter to isolate eachother.
Additional reinforcement frame 50*50 3/5

Construction Procedure Sheet I "Prevention of water leak from roof floor"