Details Factory Shed, Building and Plant & Machinery

Particulars
1 LAND

Qty

(Rate ) (Amount (Rs.Lacs)


(Amount
)
(Rs.Lacs) )
50.00

2 Factory Shed & Building Including Boundry Wall

170.00

3 Plant & Machinery


S.S. Tank 50 KL capacity
S.S. Tank 2 KL capacity
S.S. Tank 20 KL capacity
14 Head Hydrojet Washing machine
40 Head Bottle Filling Machine
10 Head R.O.P.P. Cap Sealing Machine
Automatic Bottle Labelling Machine
Extra Conveyor
Inspection Light with table
Installation Cost

3 15.00
2
1.50
6
7.00

Vat @ 4.5%

4 Carrats

25000 200.00

45.00
3.00
42.00
18.00
16.00
10.00
9.00
10.00
0.25
0.75
154.00
7.00

161.00

50.00

5 Electrification & Electric Installation including DG Set

9.70

6 Fire Safety Equipments

3.00

7 Pipe Fitting & Water supply Arrangement (DM Plant)


8 Laboratory Equipment, F&F and other office Equipments

17.00
6.00

466.70
466.70
350.00
200.00
150.00
500.00
666.70

50.00

CMA CONFIGURATION SHEET

1 Total Nos. of Working Days in a Year


340

in a year

2 Turnover per Day (Ton)

Ton/ day

200

1ST YEAR
2ND YEAR
3RD YEAR
4TH YEAR
5TH YEAR
6TH YEAR
7TH YEAR31.03.2019
31.03.2020
3 Nos of Working Days in the Year 340
4 Decimal Places (Common for All)

340

340

340

340

340

340

340

340

AGARWAL DIDWANIA & CO.


Chartered Accountants
PARTICULARS
SALES (MT)
PURCHASE (Qty.in MT)

M/S. CHITIZ METALS & MINERALS TRADING PVT LTD.


PROJECTED PROFIT & LOSS A/C
Rs. in Lacs
1ST YEAR2ND YEAR3RD YEAR4TH YEAR5TH YEAR6TH YEAR7TH YEAR
Proj.
Proj.
Proj.
Proj.
Proj.
Proj.
Proj.
P&L
P&L
P&L
P&L
P&L
P&L
P&L
68000.00 78200.00 89930.00
###
###
###
###
68821.45 78604.00 90394.00
###
###
###
###

1. Gross sales
(i) Domestic sales
#REF!
(ii) Export sales
0.00
Add: other revenue income
0.00
#REF!
Total
2. Less excise duty
0.00
Deduct other items
#REF!
3. Net sales(item 1 - item 2)
4. % age rise (+) or fall (-) in net sales as compared 100.00%
to previous year (annualised)
5. Cost of Purchase
i) Purchase of Goods
(a) Imported
0.00
(b) Indigenous
3785.18
ii) Other Consumables
(a) Imported
0.00
(b) Indigenous
0.00
iii) Transportation
103.23
iv) Direct labour ( Loading & Unloading)
34.41
v) Other expenses
0.00
vi) Depreciation
1.27
3924.09
vii) SUB-TOTAL (i to vi)
viii) Add: Opening stocks-in-process
0.00
ix) Deduct:Closing stocks-in- process
0.00
3924.09
x) Cost of Purchase
xi) Add : Opening stock of finished goods
73.13
xii) Deduct: Closing stock of finished goods
147.90
3849.33
xiii) SUB-TOTAL (Total cost of sales)
6. Selling, general and administrative expenses
7. SUB-TOTAL (5+6)
4 A, Kopalitola Lane, 1st floor, Kolkata-700012
Email: caamit15@gmail.com, Ph No.(033) 30083757

#REF!
#REF! 8259.12 10448.26 13217.74 16719.82
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5161.20 6528.92 8259.12
###
###
###
0.00

0.00

0.00

0.00

0.00

5161.20 6528.92 8259.12


#REF!
26.50% 26.50%

###
26.51%

###
26.51%

###
26.50%

0.00
4755.54

0.00

0.00
6015.72

0.00
7569.11

0.00
0.00
0.00
9620.27 12169.21 15050.10

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
125.77
153.67
186.10
226.98
43.23
54.24
67.20
83.62
0.00
0.00
0.00
0.00
2.86
4.64
7.36
10.70
4927.40 6228.27 7829.77 9941.57
0.00
0.00
0.00
0.00

0.00
0.00
274.76
103.04
0.00
10.13
###
0.00

0.00
0.00
324.36
123.56
0.00
9.59
###
0.00

0.00
0.00
0.00
0.00
4927.40 6228.27 7829.77 9941.57
147.90
187.13
236.72
258.14

0.00
###
326.55

0.00
###
413.05

187.13
236.72
258.14
326.55
4888.17 6178.68 7808.35 9873.16

413.05
###

178.22
###

#REF!
14.72
15.63
16.59
17.70
#REF! 4902.89 6194.31 7824.94 9890.86

18.91
###

19.75
###

AGARWAL DIDWANIA & CO.


Chartered Accountants

PARTICULARS
8. Operating profit before interest (3-7)

M/S. CHITIZ METALS & MINERALS TRADING PVT LTD.


PROJECTED PROFIT & LOSS A/C
Rs. in Lacs
1ST YEAR2ND YEAR3RD YEAR4TH YEAR5TH YEAR6TH YEAR7TH YEAR
Proj.
Proj.
Proj.
Proj.
Proj.
Proj.
Proj.
P&L
P&L
P&L
P&L
P&L
P&L
P&L
#REF!
258.31
334.61
434.18
557.40
728.20
957.63
0.00

0.00

0.00

0.00

0.00

0.00

0.00

#REF!

#REF!

#REF!

45.49

45.50

45.49

#NAME?

#REF!

212.82

289.12

388.69

511.90

682.71

#REF!

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

12. Profit before tax/loss [10 + 11(iii)]

#REF!

212.82

289.12

388.69

511.90

682.71

#REF!

13. Provision for taxes

#REF!

69.49

94.89

128.13

169.24

224.77

#REF!

14. Net profit/loss (12-13)

#REF!

143.33

194.23

260.56

342.66

457.94

#REF!

15. (a) Equity Dividend Paid


(b) Dividend Rate

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

16. Retained profit (14-15)

0.00

143.33

194.23

260.56

342.66

457.94

#REF!

0%

100%

100%

100%

100%

100%

#REF!

9a. Interest on Term Loan


9b. Interest on WC Limit & Bank charges
10. Operating profit after interest (8-9)

11. (i) Add other non-operating income


(a) ..
(b) .
(c) ..
Sub-total (income)
ii) Deduct other non-operating expenses
(a) Startup Expenses Written Off
(b)
(c) .
Sub-total(expenses)
(iii) Net of other non-operating income/expenses

17. Retained profit/Net profit % age


4 A, Kopalitola Lane, 1st floor, Kolkata-700012
Email: caamit15@gmail.com, Ph No.(033) 30083757

AGARWAL DIDWANIA & CO.


Chartered Accountants

PARTICULARS

M/S. CHITIZ METALS & MINERALS TRADING PVT LTD.


PROJECTED BALANCE SHEET AS ON
Rs. in Lacs
1ST YEAR2ND YEAR3RD YEAR4TH YEAR5TH YEAR6TH YEAR7TH YEAR
Proj.
Proj.
Proj.
Proj.
Proj.
Proj.
Proj.
Bal. SheetBal. SheetBal. SheetBal. SheetBal. SheetBal. SheetBal. Sheet

1.Short-term borrowings from banks (incld bills purchased,


discounted & excess borrowings placed on repayment basis)
(i) From applicant bank
#REF!
(ii) From other banks
0.00
(iii) (of which BP & BD)
0.00

#REF!
0.00
0.00

#REF!
0.00
0.00

337.00
0.00
0.00

337.01
0.00
0.00

337.00
0.00
0.00

#NAME?
0.00
0.00

#REF!

337.00

337.00

337.00

337.01

337.00

#REF!

0.00

0.00

0.00

0.00

0.00

0.00

0.00

31.10

39.10

49.40

79.10

100.00

123.70

0.00

4. Advance payments from customers/ deposits from dealers


0.00

0.00

0.00

0.00

0.00

0.00

0.00

#REF!

69.49

94.89

128.13

169.24

224.77

#REF!

6. Dividend Payable

0.00

0.00

0.00

0.00

0.00

0.00

0.00

7. Other statutory liabilities


(due within one year)

0.00

0.00

5.00

5.00

5.00

10.00

11.00

8. Deposits/Instalments of term loans/DPGs/


Debentures, etc. (due within one year)

0.00

0.00

0.00

0.00

0.00

0.00

0.00

10.00

20.00

20.00

20.00

20.00

60.00

35.00

#REF!

128.59

169.29

232.23

294.24

418.47

#REF!

0.00
10. TOTAL CURRENT LIABILITIES (total of 1 to 9 excld
1(iii))465.59

506.29

569.23

631.25

755.47

#REF!

Sub total (A)


2. Short term borrowings from others
3a. Sundry Creditors (Trade)

5. Provision for Taxation

9. Other current liabilities & provisions


(due within 1 yr)(Specify major items)
Sub-total (B)

4 A, Kopalitola Lane, 1st floor, Kolkata-700012


Email: caamit15@gmail.com, Ph No.(033) 30083757

AGARWAL DIDWANIA & CO.


Chartered Accountants

M/S. CHITIZ METALS & MINERALS TRADING PVT LTD.


PROJECTED BALANCE SHEET AS ON

PARTICULARS

Rs. in Lacs
1ST YEAR2ND YEAR3RD YEAR4TH YEAR5TH YEAR6TH YEAR7TH YEAR
Proj.
Proj.
Proj.
Proj.
Proj.
Proj.
Proj.

TERM LIABILITIES:
11. Debentures (not maturing within one year)

0.00

0.00

0.00

0.00

0.00

0.00

0.00

12. Preference Shares (redeemable after one year)

0.00

0.00

0.00

0.00

0.00

0.00

0.00

13. Term Loans (Incl. Intt. Accrued)

0.00

0.00

0.00

0.00

0.00

0.00

0.00

14. Deferred payment credits


(excl instalments due within one year)

0.00

0.00

0.00

0.00

0.00

0.00

0.00

15.Term deposits (repayable after one year)


(Intt. Free, Long term)

0.00

0.00

0.00

0.00

0.00

0.00

0.00

16. Other Term Liabilities

0.00

0.00

0.00

0.00

0.00

0.00

0.00

17. TOTAL TERM LIABILITIES

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
18. TOTAL OUTSIDE LIABILITIES (Item 10 plus item 17)

465.59

506.29

569.23

631.25

755.47

#REF!

NET WORTH
19. Ordinnary share capital

10.00

10.00

10.00

10.00

10.00

10.00

10.00

20. General Reserve

81.00

81.00

81.00

81.00

81.00

81.00

81.00

21. Revaluation Reserve

0.00

0.00

0.00

0.00

0.00

0.00

0.00

22. Other reserves(excluding provisions)

0.00

0.00

0.00

0.00

0.00

0.00

0.00

23. Surplus(+) or deficit(-) in Profit & Loss A/c

0.00

#REF!

#REF!

713.99

1056.65

1514.59

#REF!

23a.Others(specify)

0.00

0.00

0.00

0.00

0.00

0.00

0.00

91.00

350.20

544.43

804.99 1147.65 1605.59

#REF!

24. NET WORTH


25. TOTAL LIABILITIES
4 A, Kopalitola Lane, 1st floor, Kolkata-700012
Email: caamit15@gmail.com, Ph No.(033) 30083757

0.00

815.78 1050.71 1374.22 1778.90 2361.06 #REF!

AGARWAL DIDWANIA & CO.


Chartered Accountants

M/S. CHITIZ METALS & MINERALS TRADING PVT LTD.


PROJECTED BALANCE SHEET AS ON

PARTICULARS

Rs. in Lacs
1ST YEAR2ND YEAR3RD YEAR4TH YEAR5TH YEAR6TH YEAR7TH YEAR
Proj.
Proj.
Proj.
Proj.
Proj.
Proj.
Proj.

CURRENT ASSETS
11.57
26.Cash and bank balances (Cheques & Drafts under collection)

9.63

9.81

7.01

10.17

15.27

15.35

27.Investments (other than long term investments)


(i) Government & other Trustee securities
(ii) Fixed Deposits with banks

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

#REF!

#REF!

#REF!

715.60

905.30

1374.20

#NAME?

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
29.Instalments of deferred receiveables (due within one year)

0.00

0.00

0.00

0.00

0.00

0.00

28.(i) Receiveables other than deferred & exports


(incl Bills purchased and discounted by banks)
(ii) Export Receiveables (incl bills purchased and
discounted by banks)

30.Inventory:
(I) Raw Materials (including stores & other items
used in the process of manufacture)
a) Imported
b) Indigenous

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

(ii) Stock in Process

0.00

0.00

0.00

0.00

0.00

0.00

0.00

(iii) Finished Goods

147.90

187.13

236.72

258.14

326.55

413.05

178.22

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

40.00
31.Advances to suppliers of Raw materials & stores /spares

42.00

45.00

50.00

60.00

40.00

40.00

32.Advance Payment of Taxes

55.42

69.49

94.89

128.13

169.24

224.77

#REF!

33.Other Current Assets

15.00

16.00

20.00

20.00

20.00

15.00

15.00

#REF!

#REF!

943.02 1178.88 1491.26 2082.29

#REF!

(iv) Other consumable stores


Imported
Indigenous

34.TOTAL CURRENT ASSETS (Total of 26 to 33)


4 A, Kopalitola Lane, 1st floor, Kolkata-700012
Email: caamit15@gmail.com, Ph No.(033) 30083757

AGARWAL DIDWANIA & CO.


Chartered Accountants
PARTICULARS

M/S. CHITIZ METALS & MINERALS TRADING PVT LTD.


PROJECTED BALANCE SHEET AS ON
Rs. in Lacs
1ST YEAR2ND YEAR3RD YEAR4TH YEAR5TH YEAR6TH YEAR7TH YEAR
Proj.
Proj.
Proj.
Proj.
Proj.
Proj.
Proj.

35. Gross Block


16.46
Add: Additions during the year
0.00
Less: Sales / Adj.
0.00
Cl. Gross Block
16.46
0.00
36. Depreciation to date
16.46
37. NET BLOCK (35-36)
OTHER NON-CURRENT ASSETS
38.Investments/book debts/advances/deposits
which are not Current Assets
(i) a)Investments in subsidiary companies/affiliates
0.00
b)Others
0.00
(ii)Advances to suppliers of capital goods & contractors 0.00
(iii)Deferred receivables
0.00
(iv)Others-Security Deposits
20.00
39.Non-consumables stores & spares
0.00
40.Other non-current assets incldg dues from directors
0.00
20.00
41. TOTAL OTHER NON-CURR.ASSETS
42.Intangible assets(patents,goodwill, prelim. expenses, 0.00
bad/doubtful expenses not provided for, etc.)
36.46
Sub TOTAL
36.46
43. TOTAL ASSETS (34+37+41+42)
DIFFERENCE
36.46
0.00
44. TANGIBLE NET WORTH (24-42)
0.00
45. NET WORKING CAPITAL
[(17+24)-(37+41+42)]
46. Current Ratio
47. Total Outside Liabilities/Tangible Net worth+USD
48. Total Term Liabilities/ Tangible Net Worth
49. ADDITIONAL INFORMATION
(A) Arrears of Deprecialtion
(B) Contingent Liabilities
(I) Arrears of cumulative dividends
(II) Gratuity liabilities not provided for
(III) disputed Tax liabilities
(IV) other liabilities not provide for
4 A, Kopalitola Lane, 1st floor, Kolkata-700012
Email: caamit15@gmail.com, Ph No.(033) 30083757

#DIV/0!
#DIV/0!
#DIV/0!

16.46

51.46

91.46

151.46

226.46

226.46

35.00
0.00
51.46
1.27
47.33

40.00
0.00
91.46
8.77
82.69

60.00
0.00
151.46
16.13
135.34

75.00
0.00
226.46
26.82
199.64

0.00
0.00
226.46
36.95
189.51

0.00
0.00
226.46
46.54
179.92

0.00
0.00
0.00
0.00
20.00
0.00
0.00
20.00

0.00
0.00
0.00
0.00
25.00
0.00
0.00
25.00

0.00
0.00
30.00
0.00
30.00
0.00
0.00
60.00

0.00
0.00
48.00
0.00
40.00
0.00
0.00
88.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00

0.00

0.00

0.00

0.00

67.33
107.69 195.34 287.64
189.51
815.78 1050.71 1374.21 1778.90 2271.80

179.92
#REF!

0.00
350.20
282.86

0.00
544.43
436.73

0.00
804.99
609.65

0.00
1147.65
860.01

-89.26
1605.59
1326.82

#REF!
#REF!
#REF!

1.61
1.33
0.00

1.86
0.93
0.00

2.07
0.71
0.00

2.36
0.55
0.00

2.76
0.47
0.00

#REF!
#REF!
#REF!

INTEREST CALCULATION AND REPAYMENT OF BANK TERM LOAN


(ANNEXURE - E )
Interest @

YEAR

1ST YEAR

15.00%

Opening Repayment
Total
( Closing ) ( Interest ) ( Total )
Balance
Repayment ( Balance )
( )
( Intt. )

I
II
III
IV

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

2ND YEAR I
II
III
IV

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

3RD YEAR I
II
III
IV
4TH YEAR

I
II
III
IV

5TH YEAR

I
II
III
IV

6TH YEAR

I
II
III
IV

7TH YEAR

I
II
III
IV

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Total

0.00

- ( )
-

0.00

- ( )
-

0.00

- ( )
-

0.00

- ( )
-

0.00

0.00

0.00

0.00
-

M/S. CHITIZ METALS & MINERALS TRADING PVT LTD.


COST OF PROJECT
Rs. in Lakh

ParticularsAlready Invested
Investment
upto 31.03.10
Investment
Dur. The Year
upto F.Y. 2011-12
Land & Site Development

0.00

50.00

50.00

Factory Building & Civil work


Plant & Machinery(incl.MFA)
Furniture & Fixture
NWC/Margin Money agst. WC Limit
Total

0.00
0.00
0.00
0.00
0.00

170.00
240.70
6.00
68.94
535.64

170.00
240.70
6.00
68.94
535.64

MEANS OF FINANCE:
The above project would be financed as under: -

Particulars
Existing Arrang. As
Means
per ABS
of Finance
on 31.03.2010
Investment
dur. The dug.
Year F.Y. 11-12
Promoters Capital
0.00
535.64
535.64
Unsecured Loans
0.00
0.00
0.00
Term Loan from Bank/ FI
0.00
0.00
0.00
Subsidy Receivable
0.00
0.00
0.00
Total
0.00
535.64
535.64

NATIONAL BANK
Form - II
Operating Statement
NAME :M/S.
M/S.CHITIZ
CHITIZMETALS
METALS&&MINERALS
MINERALSTRADING
PVT LTD.PVT LTD.
Rs. in Lacs
PARTICULARS
1ST YEAR2ND YEAR3RD YEAR4TH YEAR5TH YEAR6TH YEAR7TH YEAR
Proj.
Proj.
Proj.
Proj.
Proj.
Proj.
Proj.
SALES (MT)
PURCHASE (Qty.in MT)

68000.00 78200.00 89930.00 103420.00


68821.45 78604.00 90394.00 103389.00

1. Gross sales
(i) Domestic sales
#REF!
(ii) Export sales
0.00
Add: other revenue income
0.00
#REF!
Total
0.00
2. Less excise duty
Deduct other items
4080.00
3. Net sales(item 1 - item 2)
4. % age rise (+) or fall (-) in net sales as compared
to previous year (annualised)
5. Cost of Purchase
i) Purchase of Goods
(a) Imported
0.00
(b) Indigenous
3785.18
ii) Other Consumables
0.00
(a) Imported
0.00
(b) Indigenous
0.00
iii) Transportation
103.23
iv) Direct labour ( Loading & Unloading)
34.41
v) Other expenses
0.00
vi) Depreciation
1.27
3924.09
vii) SUB-TOTAL (i to vi)
0.00
viii) Add: Opening stocks-in-process
ix) Deduct:Closing stocks-in- process
0.00
3924.09
x) Cost of Purchase
73.13
xi) Add : Opening stock of finished goods
xii) Deduct: Closing stock of finished goods
147.90
3849.33
xiii) SUB-TOTAL (Total cost of sales)
6. Selling, general and administrative expenses
#REF!
#REF!
7. SUB-TOTAL (5+6)
Chemical & Other Consu. to Value of Prod. #REF!
91.10%
RM Consumption to Value of Prod.
91.10%
RAW M. +Other Cons. TO VALUE OF PRO
0.83%
Direct Labour to Value of Production
2.48%
Power & Fuel
0.00%
Other Manufacturing to Value of Pro.
0.33%
Selling, General to Value of Pro.
4.20%
Operating Profit to Net Sales
4.23%
Operating (Cash) Profit %
4.20%
Profit Before Tax
248.88
Net Profit Per Btl (After Interest, Dep)
#REF!
Selling Price Per Btl (Rs./Btl)
Variable Cost per Ton (Rs./Ton) (Exc. Dep.) 5591.36
Margin per btl
#REF!
Savings per btl after interest but Excluding Dep.
241.81

#REF!
#REF!
0.00
0.00
0.00
0.00
#REF! 6528.92
0.00
0.00
5161.20 6528.92
26.50% 26.50%

0.00
4755.54
0.00
0.00

0.00
6015.72
0.00
0.00

###
###

###
###

###
###

8259.12 10448.26 13217.74 16719.82


0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
8259.12
###
### 16719.82
0.00
0.00
0.00
0.00
8259.12
26.50%

0.00
7569.11
0.00
0.00

###
26.51%

### 16719.82
26.51%
26.50%

0.00
0.00
0.00
9620.27 12169.21 15050.10
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
125.77
153.67
43.23
54.24
0.00
0.00
2.86
4.64
4927.40 6228.27
0.00
0.00
0.00
0.00
4927.40 6228.27
147.90
187.13

0.00
0.00
186.10
226.98
67.20
83.62
0.00
0.00
7.36
10.70
7829.77 9941.57
0.00
0.00
0.00
0.00
7829.77 9941.57
236.72
258.14

0.00
0.00
274.76
324.36
103.04
123.56
0.00
0.00
10.13
9.59
### 15507.61
0.00
0.00
0.00
0.00
### 15507.61
326.55
413.05

187.13
236.72
4888.17 6178.68

258.14
326.55
7808.35 9873.16

413.05
178.22
### 15742.44

14.72
15.63
16.59
17.70
4902.89 6194.31 7824.94 9890.86
#REF!
#REF!
0.00%
0.00%
91.45% 91.45% 91.41% 91.48%
91.45% 91.45% 91.41% 91.48%
0.83%
0.82%
0.81%
0.80%
2.42%
2.34%
2.25%
2.16%
0.00%
0.00%
0.00%
0.00%
0.28%
0.24%
0.20%
0.17%
4.12%
4.43%
4.71%
4.90%
4.18%
4.50%
4.80%
5.00%
4.12%
4.43%
4.71%
4.90%
270.75 319.84
375.95 428.51
#REF!
#REF! 6000.00 6000.00
6215.09 6830.14 7545.28 8255.73
#REF! -830.14 -1545.28 -2255.73
-380.09 -1002.73 -1729.26 -2450.31

18.91
19.75
### 15762.19
0.00%
0.00%
91.47% 91.30%
91.47% 91.30%
0.77%
0.75%
2.07%
1.97%
0.00%
0.00%
0.14%
0.12%
5.17% #REF!
5.24% #REF!
5.17% #REF!
496.95 #REF!
6000.00 6000.00
9070.04 10186.04
-3070.04 -4186.04
-3280.52 #REF!

Depreciation
0.03%
0.05%
0.07%
Total Cost To Sales Value
#REF!
#REF! 94.91%
RM Consumption to Cost of Produ.
96.46% 96.51% 96.59%
Other Consumables to Cost of Prod.
0.00%
0.00%
0.00%
Interest
1.09%
0.87%
0.69%
Total Labour, Salaries & Admnistrative Exp. per
70.20
Ton
73.73
77.29
Raw Material Consumption per Ton of Finished
5500.00
Goods
6050.00 6655.00
Other Consumables Per tone of Finished Goods0.00
0.00
0.00
Power & Fuel Per Ton of Finished Goods
150.00 160.00 170.00
2.840% 2.777% 2.975%

0.09%
0.10%
0.08%
0.06%
94.76% 94.70% 94.53% 94.19%
96.67% 96.77% 96.91% 97.05%
0.00%
0.00%
0.00%
0.00%
0.55%
0.43%
0.34% #REF!
81.05
84.82
88.76
92.79
7321.00 8053.00 8858.00 9744.00
0.00
0.00
0.00
0.00
180.00 190.00
200.00
210.00
3.155% 3.280% 3.465% #REF!

NATIONAL BANK
Form - II
Operating Statement
NAME : M/S. CHITIZ METALS & MINERALS PVT LTD.
Rs. in Lacs
PARTICULARS
1ST YEAR2ND YEAR3RD YEAR4TH YEAR5TH YEAR6TH YEAR7TH YEAR
Proj.
Proj.
Proj.
Proj.
Proj.
Proj.
Proj.
#REF!

258.31

334.61

434.18

557.40

728.20

957.63

0.00

0.00

0.00

0.00

0.00

0.00

0.00

#REF!

#REF!

#REF!

45.49

45.50

45.49

#NAME?

#REF!

#REF!

289.12

388.69

511.90

682.71

#REF!

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

12. Profit before tax/loss [10 + 11(iii)]

#REF!

#REF!

289.12

388.69

511.90

682.71

#REF!

13. Provision for taxes

#REF!

69.49

94.89

128.13

169.24

224.77

#REF!

14. Net profit/loss (12-13)

#REF!

143.33

194.23

260.56

342.66

457.94

#REF!

15. (a) Equity Dividend Paid


(b) Dividend Rate

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

16. Retained profit (14-15)

#REF!

143.33

194.23

260.56

342.66

457.94

#REF!

17. Retained profit/Net profit % age

#REF!

100%

100%

100%

100%

100%

#REF!

8. Operating profit before interest (3-7)


9a. Interest on Term Loan
9b. Interest on WC Limit & Bank charges
10. Operating profit after interest (8-9)
11. (i) Add other non-operating income
(a) Depreciation written back
(b) .
(c) ..
Sub-total (income)
ii) Deduct other non-operating expenses
(a) Prel. Exp W/off
(b)
(c) .
Sub-total(expenses)
(iii) Net of other non-operating income/expenses

NATIONAL BANK
Form - III
Ananlysis of Balance Sheet
NAME : M/S. CHITIZ METALS & MINERALS PVT LTD.
Rs. in Lacs
PARTICULARS
1ST YEAR2ND YEAR3RD YEAR4TH YEAR5TH YEAR6TH YEAR7TH YEAR
Proj.
Proj.
Proj.
Proj.
Proj.
Proj.
Proj.
1.Short-term borrowings from banks (incld bills purchased,
discounted & excess borrowings placed on repayment basis)
(i) From applicant bank
#REF!
(ii) From other banks
0.00
(iii) (of which BP & BD)
0.00

#REF!
0.00

#REF!
0.00

337.00
0.00

337.01
0.00

337.00
0.00

#NAME?
0.00

0.00

0.00

0.00

0.00

0.00

0.00

#REF!

#REF!

337.00

337.00

337.01

0.00

0.00

0.00

0.00

0.00

0.00

0.00

31.10

39.10

49.40

79.10

100.00

123.70

0.00

4. Advance payments from customers/ deposits from dealers0.00

0.00

0.00

0.00

0.00

0.00

0.00

#REF!

69.49

94.89

128.13

169.24

224.77

#REF!

6. Dividend Payable

0.00

0.00

0.00

0.00

0.00

0.00

0.00

7. Other statutory liabilities


(due within one year)

0.00

0.00

5.00

5.00

5.00

10.00

11.00

8. Deposits/Instalments of term loans/DPGs/


Debentures, etc. (due within one year)

0.00

0.00

0.00

0.00

0.00

0.00

0.00

10.00

20.00

20.00

20.00

20.00

60.00

35.00

#REF!

128.59

169.29

232.23

294.24

418.47

#REF!

433.52
10. TOTAL CURRENT LIABILITIES (total of 1 to 9 excld
1(iii)) 465.59

506.29

569.23

631.25

755.47

#REF!

Sub total (A)


2. Short term borrowings from others
3a. Sundry Creditors (Trade)

5. Provision for Taxation

9. Other current liabilities & provisions


(due within 1 yr)(Specify major items)
Sub-total (B)

337.00 #NAME?

NATIONAL BANK
Form - III
Ananlysis of Balance Sheet
NAME : M/S. CHITIZ METALS & MINERALS PVT LTD.
Rs. in Lacs
PARTICULARS
1ST YEAR2ND YEAR3RD YEAR4TH YEAR5TH YEAR6TH YEAR7TH YEAR
Proj.
Proj.
Proj.
Proj.
Proj.
Proj.
Proj.
TERM LIABILITIES:
11. Debentures (not maturing within one year)

0.00

0.00

0.00

0.00

0.00

0.00

0.00

12. Preference Shares (redeemable after one year)

0.00

0.00

0.00

0.00

0.00

0.00

0.00

13. Term Loans (Incl. Intt. Accrued)

0.00

0.00

0.00

0.00

0.00

0.00

0.00

14. Deferred payment credits


(excl instalments due within one year)

0.00

0.00

0.00

0.00

0.00

0.00

0.00

15.Term deposits (repayable after one year)


(Intt. Free, Long term)

0.00

0.00

0.00

0.00

0.00

0.00

0.00

16. Other Term Liabilities

0.00

0.00

0.00

0.00

0.00

0.00

0.00

17. TOTAL TERM LIABILITIES

0.00

0.00

0.00

0.00

0.00

0.00

0.00

433.52
18. TOTAL OUTSIDE LIABILITIES (Item 10 plus item 17)

465.59

506.29

569.23

631.25

755.47

#REF!

NET WORTH
19. Share Capital

10.00

10.00

10.00

10.00

10.00

10.00

10.00

20. General Reserve

81.00

81.00

81.00

81.00

81.00

81.00

81.00

21. Revaluation Reserve

0.00

0.00

0.00

0.00

0.00

0.00

0.00

22. Other reserves(excluding provisions)

0.00

0.00

0.00

0.00

0.00

0.00

0.00

#REF!

259.20

453.43

713.99

1056.65

1514.59

#REF!

0.00

0.00

0.00

0.00

0.00

0.00

0.00

#REF!

350.20

544.43

804.99 1147.65 1605.59

#REF!

23. Surplus(+) or deficit(-) in Profit & Loss A/c


23a.Others Subsidy Receivable
24. NET WORTH
25. TOTAL LIABILITIES

640.38

815.78 1050.71

1374.22 1778.90 2361.06 #REF!

NATIONAL BANK
Form - III
Ananlysis of Balance Sheet
NAME : M/S. CHITIZ METALS & MINERALS PVT LTD.
Rs. in Lacs
PARTICULARS
1ST YEAR2ND YEAR3RD YEAR4TH YEAR5TH YEAR6TH YEAR7TH YEAR
Proj.
Proj.
Proj.
Proj.
Proj.
Proj.
Proj.
CURRENT ASSETS
11.57
26.Cash and bank balances (Cheques & Drafts under collection)

9.63

9.81

7.01

10.17

15.27

15.35

27.Investments (other than long term investments)


(i) Government & other Trustee securities
(ii) Fixed Deposits with banks

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

#REF!

#REF!

#REF!

715.60

905.30

1374.20

#NAME?

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
29.Instalments of deferred receiveables (due within one year)

0.00

0.00

0.00

0.00

0.00

0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

28.(i) Receiveables other than deferred & exports


(incl Bills purchased and discounted by banks)
(ii) Export Receiveables (incl bills purchased and
discounted by banks)

30.Inventory:
(I) Raw Materials (including stores & other items
used in the process of manufacture)
a) Imported
b) Indigenous

0.00
0.00

(ii) Stock in Process

0.00

0.00

0.00

0.00

0.00

0.00

0.00

(iii) Finished Goods

147.90

187.13

236.72

258.14

326.55

413.05

178.22

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

31.Advances to suppliers of Raw materials & stores /spares40.00

42.00

45.00

50.00

60.00

40.00

40.00

32.Advance Payment of Taxes

55.42

69.49

94.89

128.13

169.24

224.77

#REF!

33.Other Current Assets

15.00

16.00

20.00

20.00

20.00

15.00

15.00

#REF!

#REF!

#REF!

1178.88 1491.26 2082.29

#REF!

(iv) Other consumable stores


Imported
Indigenous

34.TOTAL CURRENT ASSETS (Total of 26 to 33)

NATIONAL BANK
Form - III
Ananlysis of Balance Sheet
NAME : M/S. CHITIZ METALS & MINERALS PVT LTD.
Rs. in Lacs
PARTICULARS
1ST YEAR2ND YEAR3RD YEAR4TH YEAR5TH YEAR6TH YEAR7TH YEAR
Proj.
Proj.
Proj.
Proj.
Proj.
Proj.
Proj.
35. Gross Block
16.46
Add: Additions during the year
0.00
Less: Sales / Adj.
0.00
Cl. Gross Block
16.46
1.27
36. Depreciation to date
15.19
37. NET BLOCK (35-36)
OTHER NON-CURRENT ASSETS
38.Investments/book debts/advances/deposits
which are not Current Assets
(i) a)Investments in subsidiary companies/affiliates
0.00
b)Others
0.00
(ii)Advances to suppliers of capital goods & contractors/WIP 0.00
(iii)Deferred receivables (Book Debts other than Current Assets)
0.00
(iv)Others-Security Deposits
20.00
39.Non-consumables stores & spares
0.00
40.Other non-current assets incldg dues from directors
0.00
20.00
41. TOTAL OTHER NON-CURR.ASSETS
0.00
42.Intangible assets(patents,goodwill, prelim. expenses,
bad/doubtful expenses not provided for, etc.)
Sub TOTAL
43. TOTAL ASSETS (34+37+41+42)
DIFFERENCE DEFICIT/(SURPLUS)
44. TANGIBLE NET WORTH (24-42)
45. NET WORKING CAPITAL
[(17+24)-(37+41+42)]
46. Current Ratio
47. Total Outside Liabilities/Tangible Net worth+USD
48. Total Term Liabilities/ Tangible Net Worth
49. ADDITIONAL INFORMATION
(A) Arrears of Deprecialtion
(B) Contingent Liabilities
(I) Arrears of cumulative dividends
(II) Gratuity liabilities not provided for
(III) disputed Tax liabilities
(IV) other liabilities not provide for

16.46
35.00
0.00

51.46
40.00
0.00

91.46
60.00
0.00

151.46
75.00
0.00

226.46
0.00
0.00

226.46
0.00
0.00

51.46
4.13
47.33

91.46
8.77
82.69

151.46
16.13
135.34

226.46
26.82
199.64

226.46
36.95
189.51

226.46
46.54
179.92

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00
20.00
0.00
0.00
20.00
0.00

0.00
0.00
25.00
0.00
0.00
25.00
0.00

30.00
0.00
30.00
0.00
0.00
60.00
0.00

48.00
0.00
40.00
0.00
0.00
88.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

195.34 287.64
189.51
1374.21 1778.90 2271.80

179.92
#REF!

35.19
#REF!

67.33 107.69
#REF! 1050.71

0.00
#REF!
#REF!

0.00
350.20
#REF!

0.00
544.43
436.73

0.00
804.99
609.65

0.00
1147.65
860.01

-89.26
1605.59
1326.82

#REF!
#REF!
#REF!

#REF!
#REF!
#REF!

#REF!
1.33
0.00

1.86
0.93
0.00

2.07
0.71
0.00

2.36
0.55
0.00

2.76
0.47
0.00

#REF!
#REF!
#REF!

NATIONAL BANK
Form - III
Ananlysis of Balance Sheet
NAME : M/S. CHITIZ METALS & MINERALS PVT LTD.
SUMMARY
PARTICULARS
1ST YEAR2ND YEAR3RD YEAR4TH YEAR5TH YEAR6TH YEAR7TH YEAR
Proj.
Proj.
Proj.
Proj.
Proj.
Proj.
Proj.
(A)LIQUIDITY RATIO
1- Current Ratio
Current Assets/Current Liabilities

#REF!

#REF!

1.86

2.07

2.36

2.76

(B)SOLVENCY RATIOS
2- Solvency Ratio
= Net Tangible Assets/Total Outside Liab.

#REF!

#REF!

2.08

2.41

2.82

3.01 #REF!

#REF!

0.00

0.00

0.00

0.00

0.00 #REF!

#REF!
N.A.

0.00
N.A.

0.00
N.A.

0.00
N.A.

0.00
N.A.

0.00 #REF!
N.A.
N.A.

30.00

30.00

30.00

31.62

31.63

(C)EFFICIENCY RATIOS
(i) Financial Management Ratios
3- Debt Equity Ratio
= (Total outside Debt /NET WORTH)
4- Quasi Debt Equity ratio
5- Fixed Assets Coverage Ratio
= (Net fixed Assets/Long,Medium term debts)
6- Debtors Turnover Ratio
= Outstanding Debtors x 365
Credit Sales
7- Creditors Turnover Ratio (No. of days)
= Outstanding Debtors x 365
Credit Purchases
(ii)Material Management Ratio
8- Raw Material Turnover Ratio (Number of Days)
=
Raw material on hand x 330
Raw material consumed during the year
9- Process Stock Turnover Ratio (Number of Days)
= Process of Stock on hand x 330
Cost of goods sold during the year
10-Finished Goods Turnover Ratio (Number of Days)
= Finished Goods on hand x 330
Cost of goods sold during the year
11-Assets Turnover Ratio
=
Sales
Net Operating Assets

#NAME?

#NAME? #REF!

#REF!

#REF!

#REF!

37.95 #REF!

#REF!

#REF!

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

12.68

12.63

12.64

10.91

10.91

10.93

3.74

#REF!

#REF!

78.95

61.03

52.34

69.75

92.93

PARTICULARS

(iii)
PROFITABILITY RATIOS
12-Gross profit ratio (Gross profit/Gross sales )
13-Net profit ratio (Net Profit/net Sales)
14-Operating Profit (Operating Profit/Net Sales)
15-Return On Investment (EBIT)/Net Operating Assets
OTHER RATIOS
### PAID UP CAPITAL
### T N W
### Total Outside Liabilities /TNW
### Net Sales/Total Tangible Assets
### PBT/ Total Tangible Assets
### POA(PBT/TTA)(NET SALES)%
### Operating Cost/Net Sales %
### Assessed Bank Finance
### Inventory + Receivables /Net Sales(In Days)
### Inventory + Receiveables
### PBDIT
### PBDIT/Intt. (Times)
### ROCE(%) PBDIT/Total Assets
### Total Current Assets
### Other Current Liab.
### Working Capital Gap
### NWC
### Bank Finance/Current Assets%
### NWC /Total Current Assets%
### Sundry Crs. To Total Current Assets %
### Other Current Liabilities /Total Current Assets%
### Chargable Assets(Inclusive Debtors)
### Less: Sundry Creditors
### Net Chargeable Current Assets
### Loan Installemnt Repaid / Repayable
### Interest Paid / Payable
### Sub-Total
### Total Purchases

1ST YEAR2ND YEAR3RD YEAR4TH YEAR5TH YEAR6TH YEAR7TH YEAR


Proj.
Proj.
Proj.
Proj.
Proj.
Proj.
Proj.

5.68%
5.35%
5.44%
#REF!
2.78%
2.97%
#REF!
#REF!
4.43%
#REF! 545.72% 404.65%

5.55%
5.61%
5.73%
5.90%
3.15%
3.28%
3.46% #REF!
4.71%
4.90%
5.17% #REF!
320.82% 279.20% 384.25% 532.26%

10.00

10.00

10.00

10.00

10.00

10.00

10.00

#REF!
#REF!
#REF!
#REF!

350.20
1.33
#REF!
#REF!

544.43
0.93
6.21
27.52%

804.99
0.71
6.01
28.28%

1147.65
0.55
5.87
28.78%

1605.59
0.47
5.82
30.05%

#REF!
#REF!
#REF!
#REF!

#REF!

#REF!

179654%

233608%

300663%

397211%

#REF!

95.29% 95.10%
337.00
337.01
43.03
43.03
973.74 1231.85
441.54
568.10
9.71
12.49
32.13% 31.94%
1178.88 1491.26
232.23
294.24
946.65 1197.02
609.65
860.01
28.59% 22.60%
51.71% 57.67%
6.71%
6.71%
12.99% 13.03%
1043.74 1311.85
79.10
100.00
964.64 1211.85
0.00
0.00
45.49
45.50
45.49
45.50
#NAME? #NAME?

94.83%
337.00
49.35
1787.25
738.33
16.23
32.50%
2082.29
418.47
1663.82
1326.82
16.18%
63.72%
5.94%
14.16%
1842.25
123.70
1718.55
0.00
45.49
45.49
#NAME?

#REF!
#REF!
#REF!
#REF!
967.23
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
0.00
#REF!
0.00
#REF!
#REF!
#NAME?

#REF!
#REF! 95.57%
#REF!
#REF!
337.00
#REF!
#REF!
43.23
#REF!
611.33
773.32
#REF!
261.17
339.25
#REF!
#REF!
7.46
#REF!
#REF! 32.29%
#REF!
#REF!
943.02
#REF!
128.59
169.29
#REF!
#REF!
773.73
#REF!
#REF!
436.73
#REF!
#REF! 35.74%
#REF!
#REF! 46.31%
#REF!
#REF!
5.24%
10.81% 11.96% 12.71%
538.20
669.33
838.32
31.10
39.10
49.40
507.10
630.23
788.92
0.00
0.00
0.00
#REF!
#REF!
45.49
#REF!
#REF!
45.49
#NAME? #NAME? #NAME?

COMPARATIVE STATEMENT OF CURRENT ASSETS & CURRENT LIABILITIES


NATIONAL BANK
Form - IV
Ananlysis of Balance Sheet
NAME : M/S. CHITIZ METALS & MINERALS PVT LTD.
Rs. in Lacs
PARTICULARS
1ST YEAR2ND YEAR3RD YEAR4TH YEAR5TH YEAR6TH YEAR7TH YEAR
Proj.
Proj.
Proj.
Proj.
Proj.
Proj.
Proj.
A. Current Assets
1) Raw material including stores &
other items use in the process of
manufacture
a)Imported
months consumption
b)Indigenous
months consumption
2) Other consumable spares
a)Imported
months consumption
b)Indigenous
months consumption
(3) Stocks-in-process
Months cost of production
4) Finished goods
Months cost of sales
5) (i) Receivables other than deferred & exports
(incld bills purchased and discounted by banks)
Months Domestic sales :
Excluding deferred Payment sales

0.00
-

0.00
-

0.00
0.00

0.00
-

0.00
0.00

0.00
-

0.00
0.00

0.00
-

0.00
0.00

0.00
-

0.00
0.00

0.00
-

0.00
0.00

0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
#DIV/0! #DIV/0! #DIV/0!
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
#DIV/0! #DIV/0! #DIV/0!
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
147.90
187.13
236.72
258.14
326.55
413.05
178.22
0.46
0.46
0.46
0.40
0.40
0.40
0.14
#REF!
#REF!

6). Export receivables(incld. bills purchased and


discounted by banks)

#REF!
0.99

536.60
0.99

715.60
1.04

905.30
1.04

1374.20 #REF!
1.25

#REF!

0.00

0.00

0.00

0.00

0.00

0.00

0.00

7). Advances to suppliers of raw materials & stores/spares40.00

42.00

45.00

50.00

60.00

40.00

40.00

8) .Other current assets inclusive cash and bank balaces


(specify major items)

81.99

95.12

124.70

155.14

199.41

#REF!

#REF!

943.02

9) TOTAL CURRENT ASSETS

255.04 #REF!

1178.88 1491.26 2082.29 #REF!

NATIONAL BANK
Form -IV
COMPARATIVE STATEMENT OF CURRENT ASSETS
Ananlysis of Balance Sheet
& CURRENT LIABILITIES
NAME : M/S. CHITIZ METALS & MINERALS PVT LTD.
Rs. in Lacs
PARTICULARS
1ST YEAR2ND YEAR3RD YEAR4TH YEAR5TH YEAR6TH YEAR7TH YEAR
Proj.
Proj.
Proj.
Proj.
Proj.
Proj.
Proj.
B CURRENT LIABILITIES
10 a) Creditors for purchase of raw materials, stores
other than borrowing for working capital
(holding in Months)

11) Statutory Liabilities


12) Other current liabilities
(Specify major items) Curr .Loan Inst.
Short-term borrowings from banks
(incld unsecured loans dividend, instalments of
public deposits, debetures etc.
13) TOTAL CURRENT LIABILITIES
To agree with sub total B
Form III

31.10
#NAME?

39.10
#NAME?

49.40
#REF!

79.10
#REF!

100.00
#REF!

123.70
#REF!

10.00

0.00
0.00

0.00

0.00

5.00

5.00

5.00

11.00

#REF!

89.49

114.89

148.13

189.24

284.77 #REF!

#REF!

337.00

337.00

337.00

337.01

337.00 #REF!

#REF!

465.59

506.29

569.23

631.25

755.47 #REF!

NATIONAL BANK
COMPUTATION OF MAXIMUM PERMISSIBLE BANK
FORM V
FINANCE FOR WORKING CAPITAL
Ananlysis of Balance Sheet
NAME : M/S. CHITIZ METALS & MINERALS PVT LTD.
PARTICULARS

Rs. in Lacs

1ST YEAR 2ND YEAR 3RD YEAR 4TH YEAR5TH YEAR6TH YEAR7TH YEAR
Proj.

Proj.

Proj.

Proj.

Proj.

Proj.

Proj.

#REF!

#REF!

943.02

1178.88

1491.26

2082.29 #REF!

#REF!

128.59

169.29

232.23

294.24

418.47 #REF!

3. Working capital gap (WCG) (1 - 2)

#REF!

#REF!

773.73

946.65

1197.02

1663.82 #REF!

4. Min. stipulated net working capital

#REF!

#REF!

235.75

294.72

372.81

520.57 #REF!

#REF!

#REF!

436.73

609.65

860.01

1326.82 #REF!

6. Item 3 - item 4

#REF!

#REF!

537.97

651.93

824.20

1143.25 #REF!

7. Item 3 - item 5

#REF!

#REF!

337.00

337.00

337.01

337.00 #REF!

8. Maximum permissible bank finance

#REF!

#REF!

337.00

337.00

337.01

337.00 #REF!

0.00

0.00

0.00

0.00

0.00

1. Total current asset


(9) in form IV )
2. Other current liabilities
( other than bank borrowing )
(14 of form IV)

i.e. 25% of WCG / 25% of local current assets


the case may be depending upon the method
of lending being applied
(export receivable to be exluded under both method)
5. Actual/ Projected net working capital
(45 in form III)

( item 6 or 7) whichever is less


9. Excess borrowinng representing
short fall in NWC

0.00

0.00

NATIONAL BANK
FORM VI FUNDS FLOW STATEMENT
Form -VI
AS PER BALANCE SHEET AS AT
Ananlysis of Balance Sheet
NAME : M/S. CHITIZ METALS & MINERALS PVT LTD.
Rs. in Lacs
PARTICULARS
1ST YEAR2ND YEAR3RD YEAR4TH YEAR5TH YEAR6TH YEAR7TH YEAR
Proj.
Proj.
Proj.
Proj.
Proj.
Proj.
Proj.
1. SOURCES :
a) Net Profit (after tax)
b) Depreciation
c) Increase in Capital
d) Increase in Term Liabilites
(Including public deposits)
e) Increase in Reserves
f) Increase in Term Loan
g) Decrease in
1. Fixed Assets
2. Other non current assets
3. Others (Intangible Assets)
g) TOTAL

115.86
1.27
10.00
0.00

143.33
2.86
0.00
0.00

194.23
4.64
0.00
0.00

260.56
7.36
0.00
0.00

342.66
10.70
0.00
0.00

81.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00
0.00
208.13

0.00
0.00
0.00
146.19

0.00
0.00
0.00
198.87

0.00
0.00
0.00
267.92

0.00
0.00
0.00
353.36

0.00
0.00
88.00
0.00
0.00
0.00
556.07 #REF!

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00 #REF!
0.00
0.00

16.46
20.00
0.00
0.00
0.00
36.46

35.00
0.00
0.00
0.00
0.00
35.00

40.00
5.00
0.00
0.00
0.00
45.00

60.00
35.00
0.00
0.00
0.00
95.00

75.00
28.00
0.00
0.00
0.00
103.00

171.67

111.19

153.87

172.92

250.36

4. Increase / Decrease in Current assets


#REF!
Details given below
5. Increase / Decrease in Current Liabilities
#REF!
other than bank borrowings
6. Increase / Decrease in WCG
#REF!
7. Net surplus (+) Deficit (-) Difference of ( 3 - 6 ) -336.99
8. Increase / Decrease in bank borrowings
#REF!

143.26

194.57

235.86

312.38

#REF!

40.70

62.94

62.01

124.23 #REF!

#REF!
0.00
0.00

153.87
0.00
0.00

172.92
0.00
0.00

250.37
-0.01
0.01

466.80 #REF!
89.27 #REF!
-0.01 #REF!

2. USES
a) Net Loss
b) Decrease in Term Liabilities
(Including public deposits)
c) Increase in
1. Fixed Assets
2. Increase in Non Current Assets
3. Others (Intangible Assets)
d) Accumulated Loss
e) Dividend payments
f) Total
3. LONG TERM SURPLUS / DEFICIT (1 - 2)

457.94 #REF!
10.13
9.59
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

556.07 #REF!
591.03

-2082.29

BUILD UP OF NET CURRENT ASSETS


NATIONAL BANK
Form - III
Analysis of Balance Sheet
NAME : M/S. CHITIZ METALS & MINERALS PVT LTD.
Rs. in Lacs
PARTICULARS
1ST YEAR2ND YEAR3RD YEAR4TH YEAR5TH YEAR6TH YEAR7TH YEAR
Proj.
Proj.
Proj.
Proj.
Proj.
Proj.
Proj.

Current Assets
Raw Material
Indigenous
(holding in Months)
Imported
(holding in Months)
Finished Goods
(holding in Months)
Stock in Process
Receivables
(holding in Months)
Other Assets
Cash & Bank
Consumables
Advance to Suppliers
Others
TOTAL
Current Liabilities
Sundry Creditors
(holding in months)
Others
Advance from customers
Others
Loan Instalment Repayable within 12 M
TOTAL

0.00
0.00

0.00
0.00

0.00
-

0.00
0.00

0.00
-

0.00
0.00

0.00
-

0.00
0.00

0.00
-

0.00
0.00

0.00
-

0.00
0.00

0.00
-

0.00
-

147.90
187.13
236.72
258.14
326.55
413.05
178.22
0.46
0.46
0.46
0.40
0.40
0.40
0.14
0.00

0.00

0.00

0.00

0.00

0.00

0.00

#REF!
#REF!
536.60
715.60
905.30 1374.20 #REF!
#REF!
0.99
0.99
1.04
1.04
1.25
#REF!

11.57
0.00
40.00
70.42

9.63
0.00
42.00
85.49

9.81
0.00
45.00
114.89

#REF!

#REF!

943.02

7.01
0.00
50.00
148.13

10.17
0.00
60.00
189.24

15.27
15.35
0.00
0.00
40.00
40.00
239.77 #REF!

1178.88 1491.26 2082.29 #REF!

31.10
39.10
49.40
79.10
100.00
123.70
0.00
#NAME? #NAME? #REF!
#REF!
#REF!
#REF!
0.00
#REF!
89.49
114.89
148.13
189.24
284.77 #REF!
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#REF! 128.59 164.29
227.23 289.24
408.47 #REF!

NATIONAL BANK
Form - III
COMPUTATION OF DEBT SERVICE COVERAGE RATIO
Analysis of Balance Sheet
NAME : M/S. CHITIZ METALS & MINERALS PVT LTD.
PARTICULARS

Rs. in Lacs
1ST YEAR2ND YEAR3RD YEAR4TH YEAR5TH YEAR6TH YEAR7TH YEAR
Proj.
Proj.
Proj.
Proj.
Proj.
Proj.
Proj.

Inflow:
Net Profit after tax
Depreciation
Amortization of Exp.
Interest on Term Loan
Sub-Total (a)

#REF!
1.27
0.00
0.00
#REF!

143.33
2.86
0.00
0.00
146.19

194.23
4.64
0.00
0.00
198.87

260.56
7.36
0.00
0.00
267.92

342.66
10.70
0.00
0.00
353.36

Out Flow:
Loan instalments
Interest on Term Loan
Sub-Total (b)

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

Gross DSCR [Cash accruals/ Loan Instalments]

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Net DSCR (a) / (b)

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Average Gross DSCR

#REF!

Average Net DSCR

#REF!

457.94 #REF!
10.13
9.59
0.00
0.00
0.00
0.00
468.07 #REF!

Annexure - 8
(Rs. in Lacs)

M/S. CHITIZ METALS & MINERALS TRADING PVT LTD.


MARGIN MONEY FOR WORKING CAPITAL
Year
Cap. Utilization

HOLDING #NAME? #NAME?


PERIOD #NAME? #NAME?

#NAME?
HOLDING
#NAME?
#NAME?
PERIOD
#NAME?

#NAME? #NAME? HOLDING #NAME?


#NAME? #NAME? PERIOD #NAME?

Production in Btl
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
A. CURRENT ASSETS:
(DAYS)
(DAYS)
1 FINISHED GOODS
14
147.90
187.13
236.72 12
258.14
326.55
413.05
4
2 RECEIVABLES (INDEGENOUS SALES)30
#REF!
#REF!
#REF! 25
715.60
905.30 1374.20
4
Sub-Total (A)
#REF!
#REF!
#REF!
973.74 1231.85 1787.25
B. OVERHEADS:
1. LOADING & UNLOADING
2. ADMN.AND MISC EXP.*
Sub-Total (B)

2.80
#REF!
#REF!

3.60
1.20
4.80

C. WORKING CAPITAL (A+B)

#REF!

#REF!

D. LESS: SUNDRY CREDITORS


1. FOR RAW MATERIAL
3
2 FOR PACKING MAT. & OTHERS CON.
Sub-Total (D)

31.10
0.00
31.10

E. WORKING CAPITAL GAP (C-D)


F. MARGIN MONEY (MINIMUM)
ITEM NO (A)- 1
ITEM NO. (A) -2
ITEM NO (B)
Sub-Total (F)

30
30

4.50 15
1.30 15
5.80

G. BANK BORROWINGS (E - F)
INTEREST ON BANK BORROWINGS
13.50%

178.22
#NAME?
#NAME?

5.50
1.40
6.90

6.90
1.50
8.40

8.50
1.60
10.10

#REF!

980.64

1240.25

1797.35

#NAME?

39.10
0.00
39.10

49.40
0.00
49.40

79.10
0.00
79.10

100.00
0.00
100.00

123.70
0.00
123.70

0.00
0.00
0.00

#REF!

#REF!

#REF!

901.54

1140.25

1673.65

#NAME?

#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
4.80
#REF!

100.93
#REF!
5.80
#REF!

124.89
432.75
6.90
564.54

177.99
616.85
8.40
803.24

#REF!

#REF!

#REF!

337.00

337.01

337.00

#NAME?

#REF!

#REF!

#REF!

45.49

45.50

45.49

#NAME?

%
20.00%
25.00%
###

15
15

#NAME?

10.20
1.60
11.80

%
257.15 25.00%
1069.40 40.00%
10.10 100.00%
1336.65

#NAME?
#NAME?
11.80
#NAME?

EXCESS LIMIT ADJUSTMENT SYSTEM


MARGIN MONEY
ITEM NO (A)- 1 To 6

#REF!

#REF!

#REF!

52

65

83

83

#NAME?

ITEM NO. (A) -7

#REF!

#REF!

#REF!

179

226

344

344

#NAME?

ITEM NO (B)

#REF!

10

10

12

#REF!

#REF!

#REF!

237

300

436

436

#REF!

ACTUAL COMPUTED LIMIT

#REF!

#REF!

#REF!

664

840

1237

1237 #VALUE!

EXCESS/ LIMIT ADJUSTED

#REF!

#REF!

#REF!

#REF!

503

900

#REF! #VALUE!

SUITABLE FIGURE OF LIMIT


(ADJUSTABLE FIGURE)
FRACTION:
REVISION OF MARGIN

#REF!
#REF!

#REF!
-1.00
#REF!

#REF!

54

73

113

175

#REF!

#REF!

#REF!

68

152

254

391

726

726

#REF!

#REF!

#REF!

205

327

503

900

900

#REF!

Annexure-1

Details of Purchase, Sales & Closing Stock


1ST YEAR 2ND YEAR 3RD YEAR 4TH YEAR 5TH YEAR 6TH YEAR 7TH YEAR
PARTICULARS
Turnover Per Year (Ton)

Proj.

Proj.

Proj.

Proj.

Proj.

Proj.

Proj.

68000.00

78200.00

89930.00 103420.00 118933.00 136773.00 157289.00

#REF!
6050.00

#REF!
6655.00

#REF!
7321.00

#REF!
8053.00

9664.00
8858.00

10630.00
9744.00

ii.

Proejcted Selling Price/Ton Rs.


6000.00
Proejcted Purchase Price/Ton 5500.00
Rs.
Opening Stock of Finished Product:
Quantity in MT
1,867.55
Value Rs. in Lacs
73.13

2689.00
147.90

3093.00
187.13

3557.00
236.72

3526.00
258.14

4055.00
326.55

4663.00
413.05

3.
i.

Purchase :
Purchase (Qty.in MT)

ii.

Value of Purchase (Rs. in Lacs)

1.
2.
i.

4.
a.

5.
i.
ii.

68821.45

78604.00

3785.18

4755.54

68000.00
#REF!

78200.00
#REF!

Closing Stock of Finished Product:


Quantity in MT
2689.00
Value Rs. in Lacs
147.90
Cl. Stock Holding Period (Days)
14

3093.00
187.13
14

Sales of Goods:
Sales @ 4% VAT
Quantity in MT
Sales Value (Rs.in Lacs )

90394.00 103389.00 119462.00 137381.00 154455.00


6015.72

7569.11

9620.27

12169.21

15050.10

89930.00 103420.00 118933.00 136773.00 157289.00


#REF!
8259.12 10448.26 13217.74
16719.82

3557.00
236.72
14

3526.00
258.14
12

4055.00
326.55
12

4663.00
413.05
12

1829.00
178.22
4

(CALCULATION OF WAGES & SALARIES )

S. No

PARTICULARS

(<<< Year endig 31st March >>> )


1ST YEAR 2ND YEAR 3RD YEAR 4TH YEAR 5TH YEAR 6TH YEAR 7TH YEAR

Production in MT

#NAME?
Const Period

(I)

Annexure-5B

#NAME?

#NAME?

#NAME?

#NAME?

#NAME?

#NAME?

#NAME?

(DIRECT LABOUR: )

###Wages (As per Annexure- )

(TOTAL DIRECT LABOUR )

34.41

43.23

54.24

67.20

83.62

103.04

123.56

34.41

43.23

54.24

67.20

83.62

103.04

123.56

(II) SELLING & ADMINISTRATIVE OVERHEADS**

6.00
)
### (Salaries of Adminstrative Department

6.60
7.26
7.99
8.79
9.67
10.64
0.25
0.28
0.31
0.34
0.37
0.41
0.45
0.50
)
0.55
0.61
0.67
0.74
0.81
0.89
### (Travelling, Vehicle Running and Main.
0.30
0.33
0.36
0.40
0.44
0.48
0.53
### (Office and General Exps )
0.50
etc. )
0.55
0.61
0.67
0.74
0.81
0.89
### (Professional fee for Legal Advisors, CA
#REF!
#REF!
#REF!
0.26
0.33
0.41
0.00
### (Insurance# )
0.20
0.22
0.24
0.26
0.29
0.32
0.35
### (Other Administrative Expenses )
6.00
6.00
6.00
6.00
6.00
6.00
6.00
### (Rent of Godown )
Total Selling & Administrative Overheads
#REF!
15
16
17
18
19
20
Note: 1.*The Factory Salaries & Wages have been calculated assuming an annual
10.00%
increase
(Including
of
Administrative Salaries)
2. #The amount of Insurance Exp. has been calculated on the total value
0.10%
of inventory
per annum
@
3. **The Selling & Administrative Overheads have been projected having
10.00%
an increase
thereof
of (except Administrative Salaries)
### (Postage, Phones, Printing etc )

(CALCULATION OF DEPRECIATION )

Annexure - 6
(Rs. Lacs)

(
RATE OF

DEP. )

Sr. No.
1

PARTICULARS
(OPENING GROSS BLOCK )
(Inverter & Battery )
(Printer )
(Weigh Bridge )
(Motor bike )
(Stock Bed & Boundary Wall )
(Computer )
(Total Gross Block )

(<<<

Year endig 31st March

>>> )

1ST YEAR 2ND YEAR 3RD YEAR 4TH YEAR 5TH YEAR 6TH YEAR 7TH YEAR
0.34
0.10
2.50
0.62
12.64
0.27
16.46

0.34
0.10
2.50
0.62
12.64
0.27
16.46

0.34
0.10
2.50
0.62
47.64
0.27
51.46

0.34
0.10
2.50
0.62
87.64
0.27
91.46

0.34
0.10
2.50
0.62
147.64
0.27
151.46

0.34
0.10
2.50
0.62
222.64
0.27
226.46

0.34
0.10
2.50
0.62
222.64
0.27
226.46

(ADDITIONS, MODIFI. & UPGRADATION )


(Inverter & Battery )
(Printer )
(Weigh Bridge )
(Motor bike )
(Stock Bed & Boundary Wall )
(Computer )
- )
(Total Additions, Modifications & Upgradation

35.00
35.00

40.00
40.00

60.00
60.00

75.00
75.00

(CLOSING GROSS BLOCK: )


(Inverter & Battery )
(Printer )
(Weigh Bridge )
(Motor bike )
(Stock Bed & Boundary Wall )
(Computer )
(Total Closing Gross Block )

0.34
0.10
2.50
0.62
12.64
0.27
16.46

0.34
0.10
2.50
0.62
47.64
0.27
51.46

0.34
0.10
2.50
0.62
87.64
0.27
91.46

0.34
0.10
2.50
0.62
147.64
0.27
151.46

0.34
0.10
2.50
0.62
222.64
0.27
226.46

0.34
0.10
2.50
0.62
222.64
0.27
226.46

0.34
0.10
2.50
0.62
222.64
0.27
226.46

(Opening Depreciation - Co. Law - WDV )


(Inverter & Battery )
0.010
(Printer )
0.003
(Weigh Bridge )
0.082
(Motor bike )
0.004
(Stock Bed & Boundary Wall )
0.028
(Computer )
0.053
(Total Opening Depreciation )
0.18

0.06
0.02
0.42
0.16
0.66
0.14
1.45

0.10
0.03
0.71
0.28
3.01
0.19
4.31

0.13
0.04
0.96
0.37
7.24
0.22
8.95

0.16
0.05
1.17
0.43
14.26
0.24
16.31

0.18
0.05
1.36
0.48
24.68
0.25
27.00

0.21
0.06
1.52
0.52
34.58
0.26
37.13

(Depreciation for the Year - Co. Law - SLM )


(Inverter & Battery )
0.05
(Printer )
0.01
(Weigh Bridge )
0.34
(Motor bike )
0.16
(Stock Bed & Boundary Wall )
0.63

0.04
0.01
0.29
0.12
2.35

0.03
0.01
0.25
0.09
4.23

0.03
0.01
0.21
0.06
7.02

0.03
0.01
0.18
0.05
10.42

0.02
0.01
0.16
0.04
9.90

0.02
0.01
0.14
0.03
9.40

(Computer )

0.08

0.05

0.03

0.02

0.01

0.01

0.00

(Depreciation for the Year )

1.27

2.86

4.64

7.36

10.70

10.13

9.59

(Depreciation for the Year - Income Tax )


(Inverter & Battery )
0.05
(Printer )
0.01
(Weigh Bridge )
0.35
(Motor bike )
0.09
(Stock Bed & Boundary Wall )
1.20
(Computer )
0.06
1.76
(Depreciation for the Year )

0.04
0.01
0.29
0.07
1.08
0.03
1.53

0.03
0.01
0.25
0.06
0.97
0.01
1.34

0.03
0.01
0.21
0.05
0.88
0.00
1.18

0.02
0.01
0.18
0.04
0.79
0.00
1.05

16.46

51.46

91.46

151.46

1.27

4.13

8.77

16.13

(Gross Block )

(Accumulated Depreciation )

0.01
0.18
(0.01)
-

0.01
0.16
(0.01)
-

0.18

0.16

226.46

226.46

226.46

26.82

36.95

46.54

Note: 1. *In the F.Y. 2010-11, the amount of Prel. & Prel. Exp. has been projected to be Capitalized in the following manner:

Block Assets

Original Value as on
31.03.12

Land & Site Development


Factory Building & Civil work
Plant & Machinery
Furniture & Fixture
Total

Amt. Capitalized on
31.03.12

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

SUMMARY OF PREL. & PRE-OPERATIVE EXPENSES:


Pre-Operative Expenses
Intt. During Construction Period
Pre-Operative Expenses

0.00
0.00

Total Pre-Operative Expenses

0.00

Total Value after


Capitalization
0.00
0.00
0.00
0.00
0.00

VALUATION OF STOCK IN PROCESS

Annexure - 6A

Year
Cap. Utilization

#NAME?
#NAME?

#NAME?
#NAME?

#NAME?
#NAME?

#NAME?
#NAME?

#NAME?
#NAME?

#NAME?
#NAME?

#NAME?
#NAME?

Production in MT

#NAME?

#NAME?

#NAME?

#NAME?

#NAME?

#NAME?

#NAME?

1.

COST OF RAW MATERIAL

#NAME?

#NAME?

#NAME?

#NAME?

#NAME?

#NAME?

#NAME?

2.

COST OF CONSUMABLES

#NAME?

#NAME?

#NAME?

#NAME?

#NAME?

#NAME?

#NAME?

3.

COST OF POWER & FUEL

#NAME?

#NAME?

#NAME?

#NAME?

#NAME?

#NAME?

#NAME?

TOTAL COST OF S.I.P.

#NAME?

#NAME? #REF!

#REF!

#REF!

#REF!

#REF!

Annexure - 9

(REPAYMENT SCHEDULE WITH INTEREST CALCULATIONS )


((Rs.Lacs) )

Sr.
1

PARTICULARS

(<<<

Year endig 31st March

>>> )

1ST YEAR 2ND YEAR 3RD YEAR 4TH YEAR 5TH YEAR 6TH YEAR 7TH YEAR
(Term Loan sought )
(Opening Balance )
0.00
0.00
0.00
0.00
0.00
0.00
0.00
(Sanctions / disbursements during the year
0.00
)
(-- )
(-- )
(-- )
(-- )
(-- )
(-- )
0.00
0.00
0.00
0.00
0.00
0.00
0.00
(Less : Repayment during the year )
0.00
0.00
0.00
0.00
0.00
0.00
0.00
(Closing balance )
0.00
0.00
0.00
0.00
0.00
0.00
0.00
(Interest on term loan @ 15.00% ) 0.00
3 Months

0.00

0.00

0.00

0.00

0.00

0.00

CALCULATION OF INCOME TAX

PARTICULARS

(Annexure - 10 )
Rs. Lacs
(<<< Year endig 31st March >>> )
1ST YEAR 2ND YEAR 3RD YEAR 4TH YEAR 5TH YEAR 6TH YEAR 7TH YEAR

Profit as per Profit & Loss A/c


Add : Depreciation as per Co. Law

#REF!
1
#REF!
Less : Depreciation as per Income tax
2
#REF!
Less : Any deductions
(-- )
Business Income (A)
#REF!
Losses Brought forward, if any
Less: Income during current year
Total Income
Less : Deduction u/s 80IC
Assessable Income
Rate of Income Tax
Calculated Income Tax
MAT Calculation
Book Profit
MAT Rate
MAT Amount
Amount of Income Tax

#REF!
3
216
2
214
(-- )
214

289
5
294
1
292
(-- )
292

389
7
396
1
395
(-- )
395

512
11
523
1
522
(-- )
522

683 #REF!
10
693 #REF!
693 #REF!
(-- )
(-- )
693 #REF!

(-- )
#REF!
#REF!
0.00
#REF!
32.45%
#REF!

214
214
0.00
214.16
32.45%
69.49

(-- )
292
292
0.00
292.42
32.45%
94.89

(-- )
395
395
0.00
394.87
32.45%
128.13

(-- )
522
522
0.00
521.55
32.45%
169.24

(-- )
(-- )
693
#REF!
693 #REF!
0.00
0.00
692.66
#REF!
32.45%
32.45%
224.77 #REF!

#REF!
20.01%
#REF!

213
20.01%
42.58

289
20.01%
57.85

389
20.01%
77.77

512
20.01%
102.42

683 #REF!
20.01%
20.01%
136.59 #REF!

#REF!

69

95

128

169

225

10

#REF!

Annexure-5A

SALARY & WAGES:


ADMN. SALARIES:
Particulars
1. Computer operator
4.Accounts Manager
6. Guard
7. Peon

Nos. of Person Salary/Month


(Rs.)
2
1
2
1

6000
15000
4000
4000
Total per month

Amount
(Rs.)
12000
15000
8000
4000
39000

Annual Salary
468000
Add: Amenities @
30% 140400
Total Annual Salary Rs. ###
Say Rs.

6.00 Lacs

Annexure - 11
M/S. CHITIZ METALS & MINERALS TRADING PVT LTD.
PROJECTED CASH FLOW STATEMENT
(Rs. in Lacs)
SOURCES OF FUNDS
1ST YEAR
2ND YEAR
3RD YEAR
4TH YEAR
5TH YEAR
6TH YEAR
7TH YEAR
Proj.
Proj.
Proj.
Proj.
Proj.
Proj.
Proj.

1 Cash Accruals (viz. Net Profit


Before taxation(item H of
Annexure III) to which shall be
added interest(item F of
AnnexureIII)

#REF!

#REF!

#REF!

434.18

557.40

2 Increase in Share Capital


Equity / Preference

10.00

0.00

0.00

0.00

0.00

0.00

0.00

3 Depreciation

1.27

2.86

4.64

7.36

10.70

10.13

9.59

4 Increase in long term


Loans / Debentures

0.00

0.00

0.00

0.00

0.00

0.00

0.00

5 Increase in deferred Payment


Increase in Bank Borrowings

0.00

0.00

0.00

0.00

0.00

0.00

0.00

81.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
0.00

0.00
0.00

0.00

0.00
0.00

0.00

0.00

0.00

#REF!

0.00

0.00

0.00

0.01

0.00 #REF!

9 Decrease in F.A./non curr. assets 0.00


Decrease in Prel. Expenses
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

#REF!

#REF!

40.70

62.94

62.01

0.00

#REF!

#REF!

#REF!

0.00

0.00 #VALUE!

12 Capitalization of Prel. & Pre-op Exp.0.00

0.00

0.00

0.00

0.00

0.00

6 Increase in Reserves
7 Increase in Unsecured
Loans / Deposits
8 Increase in Bank Borrowings
for Working Capitals

10 Other's (specify) Increase in


Current Liabilities
11 Decrease in Current Assets

Total Sources

728.20 #VALUE!

88.00
0.00

0.00
0.00

124.23 #REF!

0.00

742.56 293.24 379.95 504.48 630.12 950.56 #REF!

Annexure - 11
M/S. CHITIZ METALS & MINERALS TRADING PVT LTD.
PROJECTED CASH FLOW STATEMENT

(Rs. in Lacs)
1ST YEAR
2ND YEAR
3RD YEAR
4TH YEAR
5TH YEAR
6TH YEAR
7TH YEAR
APPLICATION OF FUNDS
Proj.
Proj.
Proj.
Proj.
Proj.
Proj.
Proj.

1 Premilinary and Pre-operative


Expenses

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2 Increase in Capital
Expenditure

16.46

35.00

40.00

60.00

75.00

0.00

0.00

3 Increase in Current Assets

#REF!

#REF!

#REF!

#REF!

309.22

4 Decrease in Term Loans


Decrease in Bank Borrowings

0.00
#REF!

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.01

0.00
0.00

5 Decrease in Other Term liabilities 0.00


facilities
Decrease in Current Liab.
#REF!
6 Increase in Investments
0.00

0.00

0.00

0.00

0.00

0.00

0.00

#REF!
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

7 Interest

#REF!

#REF!

#REF!

45.49

45.50

8 Taxation
Increase in Deffered Tax Liab.

55.42

69.49

94.89

128.13

169.24

0.00

0.00

0.00

0.00

0.00

0.00

0.00

20.00

0.00

5.00

35.00

28.00

0.00

0.00

9 Dividend (Amount & Rates)


10 Increase in non current assets

Total Dispositions

Opening Balance

Net Surplus (A-B)

Closing Balance

585.93 #VALUE!

45.49 #NAME?
224.77 #REF!

730.99 295.18 379.77 507.28 626.96 856.20 #REF!

0.00

11.57

9.63

9.82

7.02

10.17 104.53

11.57

(1.94)

0.18

(2.80)

3.16

94.36 #REF!

11.57

9.63

9.82

7.02

10.17 104.53 #REF!

M/S. CHITIZ METALS & MINERALS TRADING PVT LTD.


PROJECTED BALANCESHEET AT A GLANCE
PARTICULARS

1ST YEAR 2ND YEAR3RD YEAR4TH YEAR5TH YEAR6TH YEAR 7TH YEAR

Sources of Funds:
A.
B.
C.
D.
E.
F.

Proprietors Capital
Unsecured Deposits
Reserve & Surplus
DGGR
Term Loan from Bank
Other Term Liabilities

10.00
81.00
#REF!
0.00
0.00
0.00

10.00
0.00
259.20
0.00
0.00
0.00

10.00
81.00
453.43
0.00
0.00
0.00

10.00
81.00
713.99
0.00
0.00
0.00

10.00
81.00
1056.65
0.00
0.00
0.00

Total (A+B+C+D)

#REF!

269.20

544.43

804.99

1147.65

15.19
#REF!
433.52
#REF!
20.00

47.33
#REF!
465.59
#REF!
20.00

82.69
#REF!
506.29
#REF!
25.00

135.34
1178.88
569.23
609.65
60.00

199.64
1491.26
631.25
860.01
88.00

#REF!

#REF!

#REF!

804.99

1147.65

Uses of Funds:
A. Fixed Assets (Net Block)
B. Total Current Assets
Less: Current Liabilities
Net Current Assets
C Non Current Assets
Total (A+B+C)

10.00
10.00
81.00
81.00
1514.59 #REF!
0.00
0.00
0.00
0.00
0.00
0.00
1605.59

91.00

189.51
179.92
2082.29 #REF!
755.47 #REF!
1326.82 #REF!
0.00
0.00
1516.33 #REF!

Annexure - 12

M/S. CHITIZ METALS & MINERALS TRADING PVT LTD.


CALCULATION OF DSCR

PARTICULARS

Rs. in Lacs
1ST YEAR2ND YEAR
3RD YEAR
4TH YEAR
5TH YEAR
6TH YEAR
7TH YEAR
8TH YEAR
Proj.
Proj.
Proj.
Proj.
Proj.
Proj.
Proj.
Proj.

Inflow:
Net Profit after tax
Depreciation
Amortization of Exp.
Interest on Term Loan
Sub-Total (a)

#REF!
1.27
0.00
0.00
#REF!

143.33
2.86
0.00
0.00
146.19

194.23
4.64
0.00
0.00
198.87

260.56
7.36
0.00
0.00
267.92

342.66
10.70
0.00
0.00
353.36

457.94
10.13
0.00
0.00
468.07

0.00
9.59
0.00
0.00
9.59

0.00
8.82
0.00
0.00
8.82

Out Flow:
Loan instalments
Interest on Term Loan
Sub-Total (b)

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

Gross DSCR [Cash accruals/ Loan Instalments]


0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Net DSCR (a) / (b)

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Average Gross DSCR

#REF!

Average Net DSCR

#REF!

Annexure - 13

M/S. CHITIZ METALS & MINERALS TRADING PVT LTD.


CALCULATION OF PAY-BACK PERIOD
Cost of Project
Sl.

51.46 Lacs
1ST
YEAR

Year

1. Inflow:
Profit after Tax
#REF!
Add: Depreciation
1.27
Amortization of Exp.
0.00
Interest on TL
0.00
Total Cash Inflow
#REF!
2. Outflow:
Renovation Overhauling, Modification &
0.00
Upgradation of Plant/ Civil Work in Phased Manner
3. Net Cash Inflow (1)-(2)
#REF!
Cumlative Cash Inflow (Net)

#REF!

So, the Pay Back Period is

Amt. In lacs

2ND
YEAR

3RD
YEAR

4TH
YEAR

5TH
YEAR

6TH
YEAR

7TH
YEAR

143.33
2.86
0.00
0.00
146.19

194.23
4.64
0.00
0.00
198.87

260.56
7.36
0.00
0.00
267.92

342.66
10.70
0.00
0.00
353.36

457.94
10.13
0.00
0.00
468.07

#REF!
9.59
0.00
0.00
#REF!

0.00

40.00

60.00

75.00

0.00

0.00

146.19

158.87

207.92

278.36

468.07

#REF!

#REF!

422.20

630.12

908.47

###

#REF!

#REF! Years, OR

#REF! Months

CALCULATION OF IRR
Amt. In lacs
Years

Total Cash Inflow (Item 3 above) (A)


Cost of Project
% IRR

{ (A)/(B)x100 }

Average IRR

(B)

1ST
YEAR

2ND
YEAR

3RD
YEAR

4TH
YEAR

5TH
YEAR

6TH
YEAR

7TH
YEAR

#REF!

146.19

198.87

267.92

353.36

468.07

#REF!

16.46

51.46

91.46

151.46

226.46

226.46

226.46

#REF!

###

###

###

###

###

#REF!

#REF!

Annexure - 14

M/S. CHITIZ METALS & MINERALS TRADING PVT LTD.


BREAK EVEN POINT
Year
Capacity Utilization

1ST YEAR 2ND YEAR 3RD YEAR 4TH YEAR 5TH YEAR 6TH YEAR 7TH YEAR
#NAME?

#NAME?

#NAME?

#NAME?

#NAME?

#NAME?

#NAME?

Production During the Year (Qty in Mt.)

68821.45

78604.00

90394.00 103389.00 119462.00 137381.00 154455.00

Value of Production

3785.18

4755.54

6015.72

7569.11

9620.27

12169.21

15050.10

VARIABLE EXPENSES
3785.18

4755.54

6015.72

7569.11

9620.27

12169.21

15050.10

34.41

43.23

54.24

67.20

83.62

103.04

123.56

103.23

125.77

153.67

186.10

226.98

274.76

324.36

Consumable Stores

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Other Manufacturing Exp.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

#REF!

#REF!

#REF!

45.49

45.50

45.49

#NAME?

14.18

14.81

Raw Material
Labour & Wages
Power & Fuel

Interest on Working Capital


Selling, General & Adm.Exp (75%)

#REF!

11.04

11.72

12.44

13.28

#REF!

#REF!

6280.84

7880.34

9989.66

Depreciation

1.27

2.86

4.64

7.36

10.70

10.13

9.59

Interest on Term Loan

0.00

0.00

0.00

0.00

0.00

0.00

0.00

#REF!

3.68

3.91

4.15

4.42

4.73

4.94

#REF!

6.54

8.55

11.51

15.12

14.86

14.53

#REF!

#REF!

-265.12

-311.23

-369.38

#REF!

#REF! #REF!

Total B
C

12606.68 #REF!

FIXED EXPENSES/SEMI FIXED

Selling, General & Adm. Exp (25%)


Total C

D Contribution = Sales- Var. cost

-437.47 #REF!

D=A-B

Break Even Capacity:


B.E.P.= Fixed Exp / Cont * CAP. UTI / 100

#REF!

#REF!

#REF!

#REF!

BEP= C / D * CAP. UTI / 100

Cash Fixed Exp. (Item C - Dep.)

#REF!

Cash B.E.P.

#REF! #REF!

#REF!

#REF!

#REF!

#REF!

#REF!

B.E.P. in Qty (E*Prod.dug.year/Cap.Uti.)

#REF! #REF!

#REF!

#REF!

#REF!

#REF!

#REF!

H B.E.P. Value

#REF!

3.68

-137.87

3.91

-194.07

4.15

-279.81

4.42

-393.67

4.73

4.94

-413.29 #REF!

Working Capital Pattern

100%

90%

80%

70%

%age

60%

NWC%
Other Current Liabilities%
Sundry Creditors%
Bank Finance%

50%

40%

30%

20%

10%

0%

1ST YR

2ND YR

3RD YR

4TH YR
Year

5TH YR

6TH YR

7TH YR

TOTAL OUTSIDE LIABILITIES/ TANGIBLE NET WORTH

1800.00

1600.00

1400.00

1200.00

Rs. in Lacs

1000.00

800.00

600.00

400.00

200.00

0.00
1ST YR

2ND YR

3RD YR

4TH YR

YEAR

5TH YR

6TH YR

7TH YR

DEBT SERVICE COVERAGE

500.00
468.07

450.00

400.00
353.36

Amount in Lacs

350.00

300.00
267.92

250.00
198.87

200.00
146.19

150.00
117.13

100.00

50.00

0.00

0.00

1ST YR

0.00

2ND YR

0.00

3RD YR

0.00

4TH YR

0.00

5TH YR

0.00

6TH YR

YEAR

Total Cash Inflow

Total Loan obligation

9.59

0.00

7TH YR

IMPORTANT DATA FOR CHART


1ST YR 2ND YR 3RD YR 4TH YR 5TH YR 6TH YR 7TH YR
Raw materials
Other Consumables
Power and fuel
Direct labour (Factory wages & salary)
Other mfg. expenses
Depreciation

3785.18 4755.54 6015.72 7569.11 9620.27


0.00
0.00
0.00
0.00
0.00
103.23 125.77 153.67 186.10 226.98
34.41
43.23
54.24
67.20
83.62
0.00
0.00
0.00
0.00
0.00
1.27
2.86
4.64
7.36
10.70

###
0.00
274.76
103.04
0.00
10.13

###
0.00
324.36
123.56
0.00
9.59

#REF!
Selling, general and administrative expenses
Interest on Term Loan
Interest on W/C
Net Profit

14.72
15.63
16.59
17.70
18.91
19.75
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#REF! #REF! #REF!
45.49
45.50
45.49
###
#REF! 143.33 194.23 260.56 342.66 457.94 #REF!

Year
TOL
TNW
TOL/TNW

1ST YR 2ND YR 3RD YR 4TH YR 5TH YR 6TH YR 7TH YR


433.52 465.59 506.29 569.23 631.25 755.47 #REF!
#REF! 350.20 544.43 804.99 1147.65 1605.59
###
#REF!
1.33
0.93
0.71
0.55
0.47 #REF!

Year

1ST YR 2ND YR 3RD YR 4TH YR 5TH YR 6TH YR 7TH YR


#REF! #REF! 35.74% 28.59% 22.60% 16.18% #REF!
#REF! #REF! 5.24% 6.71% 6.71% 5.94% #REF!
10.81% 11.96% 12.71% 12.99% 13.03% 14.16% #REF!
#REF! #REF! 46.31% 51.71% 57.67% 63.72% #REF!
#REF! #REF!
###
###
###
### #REF!

Bank Finance%
Sundry Creditors%
Other Current Liabilities%
NWC%

Year
Total Cash Inflow
Total Loan obligation

1ST YR 2ND YR 3RD YR 4TH YR 5TH YR 6TH YR 7TH YR


#REF! 146.19 198.87 267.92 353.36 468.07
9.59
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Diagram Showing Cost & Profitability


Net Profit 3%

Interest on W/C 1%

Depreciation 0%
Power and fuel 2%

Raw materials 93%

Sensitivity Analysis
A sensitivity Analysis has been carried out as per following without changing any other parameter:Case A- 5% increase in the cost of Raw Material.
Case B- 10% increase in the cost of Raw Material.
Case C- Reducing the sales price by 5%.
Case D- Reducing the sales price by 10%.
Case A- 5% increase in the cost of Raw Material
1ST YEAR2ND YEAR3RD YEAR4TH YEAR5TH YEAR6TH YEAR 7TH YEAR31.03.2019
31.03.2020
PARTICULARS
Proj.
Proj.
Proj.
Proj.
Proj.
Proj.
Proj.
Proj.
Proj.
Installed Capacity
68000.00 78200.00 89930.00
###
Actual Production (Qty.in MT)
68821.45 78604.00 90394.00
###
#NAME? #NAME? #NAME? #NAME?
% Capacity utilization
1. Gross sales
#REF!
#REF!
#REF! 8259.12
(i) Domestic sales
0.00
0.00
0.00
0.00
(ii) Export sales
Add: other revenue income
0.00
0.00
0.00
0.00
Total
#REF!
5161.20 6528.92 8259.12
0.00
0.00
0.00
0.00
2. Less excise duty
Deduct other items
#REF!
5161.20 6528.92 8259.12
3. Net sales(item 1 - item 2)
100.00% 100.00%
26.50%
26.50%
4. % age rise (+) or fall (-)
in net sales as compared to prev.year (annualised)
5. Cost of sales
i) Raw materials (including stores and other
items used in the process of manufacture)
0.00
0.00
0.00
0.00
(a) Imported
3974.48
4993.34 6316.52 7947.61
(b) Indigenous
ii) Other Consumables
0.00
0.00
0.00
0.00
(a) Imported
0.00
0.00
0.00
0.00
(b) Indigenous
iii) Power and fuel
103.23
125.77
153.67
186.10
34.41
43.23
54.24
67.20
iv) Direct labour (Factory wages & salary)
0.00
0.00
0.00
0.00
v) Other mfg. expenses
1.27
2.86
4.64
7.36
vi) Depreciation
vii) SUB-TOTAL (i to vi)
4113.39 5165.20 6529.07 8208.27
0.00
0.00
0.00
0.00
viii) Add: Opening stocks-in-process
0.00
0.00
0.00
0.00
ix) Deduct:Closing stocks-in- process
4113.39 5165.20 6529.07 8208.27
x) Cost of Production
73.13
147.90
187.13
236.72
xi) Add : Opening stock of finished goods
147.90
187.13
236.72
258.14
xii) Deduct: Closing stock of finished goods
xiii) SUB-TOTAL (Total cost of sales)
4038.63 5125.97 6479.48 8186.85
6. Selling, general and administrative expenses
#REF!
14.72
15.63
16.59
#REF! 5140.69 6495.11 8203.44
7. SUB-TOTAL (5+6)
Case A- 5% increase in the cost of Raw Material

PARTICULARS
8. Operating profit before interest (3-7)
9. Interest on Term Loan

###
###
#NAME?

### 157289.00
### 157289.00
### 154455.00 #NAME? #NAME?
#NAME?
#NAME? #NAME? #NAME?

10448.26 13217.74
0.00
0.00
0.00
0.00
10448.26 13217.74
0.00
0.00

16719.82 #NAME?
0.00
0.00
0.00
0.00
16719.82
#REF!
0.00 #NAME?

10448.26 13217.74
26.51%
26.51%

16719.82
26.50%

#REF!
#REF!

#REF!
#REF!

0.00
0.00
10101.27 12777.71

0.00 #NAME?
15802.60 #NAME?

#NAME?
#NAME?

0.00
0.00
0.00
0.00
226.98
274.76
83.62
103.04
0.00
0.00
10.70
10.13
### 13165.63
0.00
0.00
0.00
0.00
### 13165.63
258.14
326.55
326.55
413.05
### 13079.13
17.70
18.91
### 13098.04

#NAME?
0.00
0.00
#REF!
#NAME?

0.00
0.00
0.00
0.00 #NAME? #NAME?
324.36 #NAME? #NAME?
123.56
135.92
149.51
0.00 #NAME? #NAME?
9.59
8.82
8.82
16260.11
#REF!
#REF!
0.00
0.00
#REF!
0.00
#REF!
#REF!
16260.11 #REF!
#REF!
413.05
178.22 #NAME?
178.22 #NAME? #VALUE!
16494.94 #REF!
#REF!
19.75 #REF!
#NAME?
16514.69 #REF!
#REF!

1ST YEAR2ND YEAR3RD YEAR4TH YEAR5TH YEAR6TH YEAR 7TH YEAR31.03.2019


31.03.2020
Proj.
Proj.
Proj.
Proj.
Proj.
Proj.
Proj.
Proj.
Proj.
#REF!

20.51

33.81

55.68

76.40

119.70

0.00

0.00

0.00

0.00

0.00

0.00

205.13 #VALUE!
0.00

0.00

#REF!
0.00

9a. Interest on WC Limit

#REF!

#REF!

#REF!

45.49

45.50

45.49

#NAME? #NAME?

#NAME?

10. Operating profit after interest (8-9)

#REF!

#REF!

-11.68

10.19

30.90

74.21

#REF! #VALUE!

#REF!

11. (i) Add other non-operating income


(a)
(b)
(c)
Sub-total (income)

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

12. Profit before tax/loss [10 + 11(iii)]

#REF!

-24.98

-11.68

10.19

30.90

74.21

#REF! #VALUE!

#REF!

13. Provision for taxes

#REF!

0.00

0.00

3.07

9.30

22.33

#REF!

#REF!

#REF!

14. Net profit/loss (12-13)

#REF!

#REF!

-11.68

7.12

21.60

51.88

#REF! #VALUE!

#REF!

15. (a) Equity Dividend Paid


(b) Dividend Rate

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

16. Retained profit (14-15)

#REF!

#REF!

0.00

7.12

21.60

17. Retained profit/Net profit % age

#REF!

#REF!

0.00%

100.00% 100.00%

Add: Depriciation
Cash Accruals

1.27
#REF!

2.86
-22.12

4.64
-7.04

(ii) Deduct other non-operating expenses


(a)
(b)
(c)
Sub-total(expenses)
(iii) Net of other non-operating income/expenses

7.36
14.48

10.70
32.30

0.00
0.00

0.00
0.00

51.88

#REF! #VALUE!

#REF!

100.00%

#REF! #VALUE!

#REF!

9.59
#REF!

8.82
#REF!

10.13
62.01

0.00
0.00

8.82
#REF!

Case B- 10% increase in the cost of Raw Material.


1ST YEAR2ND YEAR3RD YEAR4TH YEAR5TH YEAR6TH YEAR 7TH YEAR31.03.2019
31.03.2020
PARTICULARS
Proj.
Proj.
Proj.
Proj.
Proj.
Proj.
Proj.
Proj.
Proj.
Installed Capacity
Actual Production (Qty.in MT)
% Capacity utilization
1. Gross sales
(i) Domestic sales
(ii) Export sales
Add: other revenue income
Total
2. Less excise duty
Deduct other items
3. Net sales(item 1 - item 2)
4. % age rise (+) or fall (-)
in net sales as compared to prev.year (annualised)
5. Cost of sales
i) Raw materials (including stores and other
items used in the process of manufacture)
(a) Imported
(b) Indigenous
ii) Other Consumables
(a) Imported
(b) Indigenous
iii) Power and fuel
iv) Direct labour (Factory wages & salary)
v) Other mfg. expenses
vi) Depreciation
vii) SUB-TOTAL (i to vi)
viii) Add: Opening stocks-in-process
ix) Deduct:Closing stocks-in- process
x) Cost of Production
xi) Add : Opening stock of finished goods
xii) Deduct: Closing stock of finished goods
xiii) SUB-TOTAL (Total cost of sales)
6. Selling, general and administrative expenses
7. SUB-TOTAL (5+6)

68000.00 78200.00 89930.00


68821.45 78604.00 90394.00
#NAME? #NAME?
#REF!

###
###
#REF!

###
###
#REF!

### 157289.00
### 157289.00
### 154455.00 #NAME?
#REF!
#REF!
#REF! #NAME?
#REF!

#REF!
0.00
0.00
#REF!
0.00

#REF!
0.00
0.00
5161.20
0.00

#REF!
0.00
0.00
6528.92
0.00

8259.12 10448.26 13217.74


0.00
0.00
0.00
0.00
0.00
0.00
8259.12 10448.26 13217.74
0.00
0.00
0.00

16719.82 #NAME?
0.00
0.00
0.00
0.00
16719.82
#REF!
0.00 #NAME?

#REF!
100.00%

5161.20
100.00%

6528.92
26.50%

8259.12 10448.26 13217.74


26.50% 26.51%
26.51%

16719.82
26.50%

#REF!
#REF!

#REF!
#REF!

4163.70
0.00

5231.09
0.00

6617.29
0.00

8326.02 10582.30 13386.13


0.00
0.00
0.00

16555.11 #NAME?
0.00 #NAME?

#NAME?
#NAME?

0.00
0.00
103.23
34.41
0.00
1.27
4302.61
0.00
0.00
4302.61
73.13
147.90
4227.85
#REF!
#REF!

0.00
0.00
125.77
43.23
0.00
2.86
5402.95
0.00
0.00
5402.95
147.90
187.13
5363.72
14.72
5378.44

0.00
0.00
153.67
54.24
0.00
4.64
6829.84
0.00
0.00
6829.84
187.13
236.72
6780.25
15.63
6795.88

0.00
0.00
186.10
67.20
0.00
7.36
8586.68
0.00
0.00
8586.68
236.72
258.14
8565.26
16.59
8581.85

0.00
0.00
0.00
0.00
226.98
274.76
83.62
103.04
0.00
0.00
10.70
10.13
### 13774.05
0.00
0.00
0.00
0.00
### 13774.05
258.14
326.55
326.55
413.05
### 13687.55
17.70
18.91
### 13706.46

0.00
0.00
324.36
123.56
0.00
9.59
17012.62
0.00
0.00
17012.62
413.05
178.22
17247.45
19.75
17267.20

0.00
#NAME?
#NAME?
135.92
#NAME?
8.82
#REF!
0.00
#REF!
#REF!
178.22
#NAME?
#REF!
#REF!
#REF!

#NAME?
0.00
0.00
#REF!
#NAME?

0.00
#NAME?
#NAME?
149.51
#NAME?
8.82
#REF!
#REF!
#REF!
#REF!
#NAME?
#VALUE!
#REF!
#NAME?
#REF!

Case B- 10% increase in the cost of Raw Material.


1ST YEAR2ND YEAR3RD YEAR4TH YEAR5TH YEAR6TH YEAR 7TH YEAR31.03.2019
31.03.2020
PARTICULARS
Proj.
Proj.
Proj.
Proj.
Proj.
Proj.
Proj.
Proj.
Proj.
#REF!

-217.24

-266.96

-322.73

-404.63

-488.72

0.00

0.00

0.00

0.00

0.00

0.00

9a. Interest on WC Limit

#REF!

#REF!

#REF!

45.49

45.50

10. Operating profit after interest (8-9)

#REF!

#REF!

-312.45

-368.22

11. (i) Add other non-operating income


(a)
(b)
(c)
Sub-total (income)

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00

12. Profit before tax/loss [10 + 11(iii)]

8. Operating profit before interest (3-7)

-547.38 #VALUE!
0.00

0.00

45.49

#NAME? #NAME?

#NAME?

-450.13

-534.21

#REF! #VALUE!

#REF!

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

#REF!

-262.73

-312.45

-368.22

-450.13

-534.21

#REF! #VALUE!

#REF!

13. Provision for taxes

#REF!

0.00

0.00

0.00

0.00

0.00

#REF! #VALUE!

#REF!

14. Net profit/loss (12-13)

#REF!

-262.73

-312.45

-368.22

-450.13

-534.21

#REF! #VALUE!

#REF!

15. (a) Equity Dividend Paid


(b) Dividend Rate

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

16. Retained profit (14-15)

#REF!

0.00

0.00

0.00

0.00

17. Retained profit/Net profit % age

#REF!

0.00%

0.00%

0.00%

Add: Depriciation
Cash Accruals

1.27
#REF!

2.86
(259.87)

4.64
(307.81)

7.36
(360.86)

9. Interest on Term Loan

(ii) Deduct other non-operating expenses


(a)
(b)
(c)
Sub-total(expenses)
(iii) Net of other non-operating income/expenses

0.00

#REF!

0.00
0.00

0.00
0.00

0.00
0.00

0.00

#REF! #VALUE!

#REF!

0.00%

0.00%

#REF! #VALUE!

#REF!

10.70
(439.43)

10.13
(524.08)

9.59
#REF!

8.82
#REF!

8.82
#REF!

Case C- Reducing the sales price by 5%.


PARTICULARS
Installed Capacity
Actual Production (Qty.in MT)
% Capacity utilization
1. Gross sales
(i) Domestic sales
(ii) Export sales
Add: other revenue income
Total
2. Less excise duty
Deduct other items
3. Net sales(item 1 - item 2)
4. % age rise (+) or fall (-)
in net sales as compared to prev.year (annualised)
5. Cost of sales
i) Raw materials (including stores and other
items used in the process of manufacture)
(a) Imported
(b) Indigenous
ii) Other Consumables
(a) Imported
(b) Indigenous
iii) Power and fuel
iv) Direct labour (Factory wages & salary)
v) Other mfg. expenses
vi) Depreciation
vii) SUB-TOTAL (i to vi)
viii) Add: Opening stocks-in-process
ix) Deduct:Closing stocks-in- process
x) Cost of Production
xi) Add : Opening stock of finished goods
xii) Deduct: Closing stock of finished goods
xiii) SUB-TOTAL (Total cost of sales)
6. Selling, general and administrative expenses
7. SUB-TOTAL (5+6)

1ST YEAR2ND YEAR3RD YEAR4TH YEAR5TH YEAR6TH YEAR 7TH YEAR31.03.2019


31.03.2020
Proj.
Proj.
Proj.
Proj.
Proj.
Proj.
Proj.
Proj.
Proj.
68000.00 78200.00 89930.00
68821.45 78604.00 90394.00
#NAME? #NAME? #NAME?
#REF!
0.00
0.00
#REF!
0.00
#REF!
100.00%

#REF!
0.00
0.00
5161.20
#REF!

#REF!
0.00
0.00
6528.90
#REF!

###
###
#NAME?

###
###
#NAME?

###
157289.00
### 157289.00
###
154455.00 #NAME?
#REF!
#NAME?
#NAME? #NAME? #NAME?

8259.10 10448.30 13217.70


0.00
0.00
0.00
0.00
0.00
0.00
8259.10 10448.30 13217.70
0.00
0.00
0.00

16719.80 #NAME?
0.00
0.00
0.00
0.00
16719.80
#REF!
0.00 #NAME?

#REF! 6202.46 7846.15 9925.89 12556.82 15883.81


100.00%
#REF!
26.50% 26.51%
26.51%
26.50%

3785.18
0.00

4755.54
0.00

6015.72
0.00

7569.11
0.00

9620.27 12169.21
0.00
0.00

0.00
0.00
103.23
34.41
0.00
1.27
3924.09
0.00
0.00
3924.09
73.13
147.90
3849.33
#REF!
#REF!

0.00
0.00
125.77
43.23
0.00
2.86
4927.40
0.00
0.00
4927.40
147.90
187.13
4888.17
14.72
4902.89

0.00
0.00
153.67
54.24
0.00
4.64
6228.27
0.00
0.00
6228.27
187.13
236.72
6178.68
15.63
6194.31

0.00
0.00
186.10
67.20
0.00
7.36
7829.77
0.00
0.00
7829.77
236.72
258.14
7808.35
16.59
7824.94

0.00
0.00
0.00
0.00
226.98
274.76
83.62
103.04
0.00
0.00
10.70
10.13
9941.57 12557.13
0.00
0.00
0.00
0.00
9941.57 12557.13
258.14
326.55
326.55
413.05
9873.16 12470.63
17.70
18.91
9890.86 12489.54

#NAME?
0.00
0.00
#REF!
#NAME?

#REF!
#REF!

#REF!
#REF!

15050.10 #NAME?
0.00 #NAME?

#NAME?
#NAME?

0.00
0.00
324.36
123.56
0.00
9.59
15507.61
0.00
0.00
15507.61
413.05
178.22
15742.44
19.75
15762.19

0.00
#NAME?
#NAME?
135.92
#NAME?
8.82
#REF!
0.00
#REF!
#REF!
178.22
#NAME?
#REF!
#REF!
#REF!

0.00
#NAME?
#NAME?
149.51
#NAME?
8.82
#REF!
#REF!
#REF!
#REF!
#NAME?
#VALUE!
#REF!
#NAME?
#REF!

Case C- Reducing the sales price by 5%.


PARTICULARS

1ST YEAR2ND YEAR3RD YEAR4TH YEAR5TH YEAR6TH YEAR 7TH YEAR31.03.2019


31.03.2020
Proj.
Proj.
Proj.
Proj.
Proj.
Proj.
Proj.
Proj.
Proj.
#REF!

#REF!

8.15

21.21

35.02

67.27

0.00

0.00

0.00

0.00

0.00

0.00

9a. Interest on WC Limit

#REF!

#REF!

#REF!

45.49

45.50

10. Operating profit after interest (8-9)

#REF!

#REF!

-37.34

-24.28

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00

12. Profit before tax/loss [10 + 11(iii)]

8. Operating profit before interest (3-7)

121.62 #VALUE!
0.00

0.00

45.49

#NAME? #NAME?

#NAME?

-10.48

21.78

#REF! #VALUE!

#REF!

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

#REF!

-45.24

-37.34

-24.28

-10.48

21.78

#REF! #VALUE!

#REF!

13. Provision for taxes

#REF!

0.00

0.00

0.00

0.00

6.73

#REF!

#REF!

#REF!

14. Net profit/loss (12-13)

#REF!

-45.24

-37.34

-24.28

-10.48

15.05

#REF! #VALUE!

#REF!

15. (a) Equity Dividend Paid


(b) Dividend Rate

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

16. Retained profit (14-15)

#REF!

0.00

0.00

0.00

0.00

15.05

17. Retained profit/Net profit % age

#REF!

0.00%

0.00%

0.00%

0.00%

Add: Depriciation
Cash Accruals

1.27
#REF!

2.86
(42.38)

4.64
(32.70)

7.36
(16.92)

10.70
0.22

9. Interest on Term Loan

11. (i) Add other non-operating income


(a)
(b)
(c)
Sub-total (income)
(ii) Deduct other non-operating expenses
(a) Preliminary Exp. Written Off
(b)
(c)
Sub-total(expenses)
(iii) Net of other non-operating income/expenses

0.00

#REF!

0.00
0.00

0.00
0.00

0.00
0.00

#REF! #VALUE!

#REF!

0.00%

#REF!

#REF!

#REF!

10.13
25.18

9.59
#REF!

8.82
#REF!

8.82
#REF!

Case D- Reducing the sales price by 10%.


PARTICULARS
Installed Capacity
Actual Production (Qty.in MT)
% Capacity utilization
1. Gross sales
(i) Domestic sales
(ii) Export sales
Add: other revenue income
Total
2. Less excise duty
Deduct other items
3. Net sales(item 1 - item 2)
4. % age rise (+) or fall (-)
in net sales as compared to prev.year (annualised)
5. Cost of sales
i) Raw materials (including stores and other
items used in the process of manufacture)
(a) Imported
(b) Indigenous
ii) Other Consumables
(a) Imported
(b) Indigenous
iii) Power and fuel
iv) Direct labour (Factory wages & salary)
v) Other mfg. expenses
vi) Depreciation
vii) SUB-TOTAL (i to vi)
viii) Add: Opening stocks-in-process
ix) Deduct:Closing stocks-in- process
x) Cost of Production
xi) Add : Opening stock of finished goods
xii) Deduct: Closing stock of finished goods
xiii) SUB-TOTAL (Total cost of sales)
6. Selling, general and administrative expenses
7. SUB-TOTAL (5+6)

1ST YEAR2ND YEAR3RD YEAR4TH YEAR5TH YEAR6TH YEAR 7TH YEAR31.03.2019


31.03.2020
Proj.
Proj.
Proj.
Proj.
Proj.
Proj.
Proj.
Proj.
Proj.
68000.00 78200.00 89930.00
###
68821.45 78604.00 90394.00
###
#NAME? #NAME? #NAME? #NAME?

###
###
#NAME?

###
157289.00
### 157289.00
###
154455.00 #NAME?
#REF!
#NAME? #NAME? #NAME? #NAME?

#REF!
0.00
0.00
#REF!
0.00

#REF!
0.00
0.00
4645.10
#REF!

#REF!
0.00
0.00
5876.00
#REF!

7433.20
0.00
0.00
7433.20
0.00

9403.40 11896.00
0.00
0.00
0.00
0.00
9403.40 11896.00
0.00
0.00

15047.80 #NAME?
0.00
0.00
0.00
0.00
15047.80
#REF!
0.00 #NAME?

#REF!
100.00%

4645.10
100.00%

5876.00
26.50%

7433.20
26.50%

9403.40 11896.00
26.51%
26.51%

15047.80
26.49%

#REF!
#REF!

#REF!
#REF!

3785.18
0.00

4755.54
0.00

6015.72
0.00

7569.11
0.00

9620.27 12169.21
0.00
0.00

15050.10 #NAME?
0.00 #NAME?

#NAME?
#NAME?

0.00
0.00
103.23
34.41
0.00
1.27
3924.09
0.00
0.00
3924.09
73.13
147.90
3849.33
#REF!
#REF!

0.00
0.00
125.77
43.23
0.00
2.86
4927.40
0.00
0.00
4927.40
147.90
187.13
4888.17
14.72
4902.89

0.00
0.00
153.67
54.24
0.00
4.64
6228.27
0.00
0.00
6228.27
187.13
236.72
6178.68
15.63
6194.31

0.00
0.00
186.10
67.20
0.00
7.36
7829.77
0.00
0.00
7829.77
236.72
258.14
7808.35
16.59
7824.94

0.00
0.00
0.00
0.00
226.98
274.76
83.62
103.04
0.00
0.00
10.70
10.13
9941.57 12557.13
0.00
0.00
0.00
0.00
9941.57 12557.13
258.14
326.55
326.55
413.05
9873.16 12470.63
17.70
18.91
9890.86 12489.54

0.00
0.00
324.36
123.56
0.00
9.59
15507.61
0.00
0.00
15507.61
413.05
178.22
15742.44
19.75
15762.19

0.00
#NAME?
#NAME?
135.92
#NAME?
8.82
#REF!
0.00
#REF!
#REF!
178.22
#NAME?
#REF!
#REF!
#REF!

#NAME?
0.00
0.00
#REF!
#NAME?

0.00
#NAME?
#NAME?
149.51
#NAME?
8.82
#REF!
#REF!
#REF!
#REF!
#NAME?
#VALUE!
#REF!
#NAME?
#REF!

Case D- Reducing the sales price by 10%.


PARTICULARS

1ST YEAR2ND YEAR3RD YEAR4TH YEAR5TH YEAR6TH YEAR 7TH YEAR31.03.2019


31.03.2020
Proj.
Proj.
Proj.
Proj.
Proj.
Proj.
Proj.
Proj.
Proj.
#REF!

-257.79

-318.31

-391.74

-487.46

-593.54

0.00

0.00

0.00

0.00

0.00

0.00

9a. Interest on WC Limit

#REF!

#REF!

#REF!

45.49

45.50

10. Operating profit after interest (8-9)

#REF!

#REF!

-363.80

-437.23

11. (i) Add other non-operating income


(a)
(b)
(c)
Sub-total (income)

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00

12. Profit before tax/loss [10 + 11(iii)]

8. Operating profit before interest (3-7)

-714.39 #VALUE!
0.00

0.00

45.49

#NAME? #NAME?

#NAME?

-532.96

-639.03

#REF! #VALUE!

#REF!

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

#REF!

-303.28

-363.80

-437.23

-532.96

-639.03

#REF! #VALUE!

#REF!

13. Provision for taxes

#REF!

0.00

0.00

0.00

0.00

0.00

#REF! #VALUE!

#REF!

14. Net profit/loss (12-13)

#REF!

-303.28

-363.80

-437.23

-532.96

-639.03

#REF! #VALUE!

#REF!

15. (a) Equity Dividend Paid


(b) Dividend Rate

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

16. Retained profit (14-15)

#REF!

0.00

0.00

0.00

0.00

17. Retained profit/Net profit % age

#REF!

0.00%

0.00%

0.00%

Add: Depriciation
Cash Accruals

1.27
#REF!

2.86
(300.42)

4.64
(359.16)

7.36
(429.87)

9. Interest on Term Loan

(ii) Deduct other non-operating expenses


(a)
(b)
(c)
Sub-total(expenses)
(iii) Net of other non-operating income/expenses

0.00

#REF!

0.00
0.00

0.00
0.00

0.00
0.00

0.00

#REF! #VALUE!

#REF!

0.00%

0.00%

#REF! #VALUE!

#REF!

10.70
(522.26)

10.13
(628.90)

9.59
#REF!

8.82
#REF!

8.82
#REF!

You might also like