DETAIL OF MEASUREMENT

Name of Work- Construction of Causeway and Protection /


Retaining Wall at Pharasu-Mandoli-Chakwali Motar Road.
S.N.
ITEM
1 Excavation in foundation in all
types of soil and rocks i/c all lead
and lift and disposal of surplus
earth as directed by Engineer- in charge.
km 01 HM9-10
km 01 HM9-10
km 02 HM 2-3
km 02 HM 2-3
km 02 HM 3-4
km 02 HM 4-5
Upper side of Causeway Km 01
2

R,R Stone masonary laid dry by


approved quality of stone i/c
supply of all material and its
cartage / lead labour ,T&P etc
.Required for proper completion of
the work.
km 01 HM9-10
km 01 HM9-10
km 02 HM 2-3
km 02 HM 2-3
km 02 HM 3-4
km 02 HM 4-5
Upper side of Causeway Km 01
Below to cause way
In wire crate

NO.

1
1
1
1
1
1
1

1
1
1
1
1
1
1
1
2
1
1
1

R.R stone masonary laid in 1:6


cement mortar, including all type of
materials,
labour,
T&P
etc.
required for proper completion of
work.
km 01 HM9-10
1
Deduction for RR dry
1

1/2
1/2
1/2
1/2
1/2
1/2
1/2

4
1
1
4
1
1
1
1
4
5
5
5

1
4

14.00
16.50
17.50
14.00
18.00
18.00
14.00

1.50
1.63
1.50
1.50
1.50
1.50
1.50

QTY

1.50 15.75
1.50 20.17
2.00 26.25
1.50 15.75
2.00 27.00
2.00 27.00
2.00 21.00
Total 152.92

Remark

Cum

2.75
16.50
17.50
2.75
18.00
18.00
14.00
14.00
3.00
3.00
3.00
3.00

0.95
0.82
1.00
0.95
1.00
0.88
1.00
6.50
1.50
1.50
1.50
1.50

2.40 25.08 (0.65+1.25)/2


3.00 40.34 (0.5+1.13)/2
4.00 70.00
(0.5+1.5)/2
2.40 25.08 (0.65+1.25)/2
4.00 72.00
(0.5+1.5)/2
3.00 47.25 (0.5+1.25)/2
4.00 56.00
(0.5+1.5)/2
0.2
13.65
1.50 54.00
1.50 33.75
1.50 33.75
1.50 33.75
Cum
Total 504.65

14.00
2.75

1.00
0.95

4.00
2.40

56.00
-25.08

(0.5+1.5)/2
(0.65+1.25)/2

km 01 HM9-10
km 02 HM 2-3
Deduction for RR dry
km 02 HM 3-4
km 02 HM 4-5
Upper side of Causeway Km 01
HM 9-10
km 02 HM 2-3
km 02 HM 3-4
km 02 HM 4-5
Upper side of Causeway Km 01
HM 9-10
4

1
1
1
1
1

1
1
4
1
1

16.50
14.00
2.75
18.00
18.00

1.38
1.00
0.95
1.25
1.38

1.50
4.00
2.40
2.00
1.00

34.16
56.00
-25.08
45.00
24.75

(1.13+1.63)/2
(0.5+1.5)/2
(0.65+1.25)/2
(0.5+1.5)/2
(1.25+1.5)/2

1
1
1
1

1
1
1
1

15.00
17.50
18.00
18.00

0.88
1.00
1.00
0.88

4.00
4.00
4.00
3.00

52.50
70.00
72.00
47.25

(0.5+1.25)/2
(0.5+1.5)/2
(0.5+1.5)/2
(0.5+1.25)/2

14.00

1.00

4.00 56.00
Total 218.25

(0.5+1.5)/2
Cum

10

6.50

0.15
Total

9.75
9.75

Cum

0.15
Total

9.75
9.75

Cum

Concrete with 40mm gauge stone


ballast,cement, coarse sand in
proporation of 1:3:6 in foundation
and including supply of all
materials,labour and T&P etc.
required for proper completion of
the work.
In Foundation of Causeway
1

P.C.C. 1:1.5:3 in proportion of


cement, course sand and 16.5mm 20mm gauge stone ballast,
including all shuttering, centring
and binding and of reinforcement,
and including cost of all materials,
labour, T&P etc, required for
proper completion of the work, but
excluding cost of reinforcement.
In causeway at km 1 HM 09-10

10

6.50

6
Hand packed stone filling in back
of R/W i/c cartage & supply of all
material,labour T&Petc. Required
for proper completion of the work
Km 01 Hm 09-10
Km 01 Hm 09-10
km 02 HM 2-3
km 02 HM 3-4
km 02 HM 4-5
Upper side of Causeway Km 01

1
1
1
1
1
1

1/2
1/2
1/2
1/2
1/2
1/2

14.00
16.50
17.50
18.00
18.00
14.00

2.00
2.00
1.50
1.00
2.00
1.00

2.00 28.00
2.00 33.00
2.00 26.25
1.50 13.50
2.00 36.00
2.00 14.00
Total 150.75

Cum

Fixingof G.I. wire crates size (3.00


x 1.50 x 1.50) mtr.with 10 gauge
G.I. wire Mesh size 15 cm. c/c
apart including cartage from
divisional store to site, filling stone
boulders
etc.
including
all
materials, labour and T&P etc.
required for proper completion of
the work.
km 01 HM9-10
km 02 HM 2-3
km 02 HM 2-3
km 02 HM 3-4

2
1
1
1

4
5
5
5
Total

J.E.

A.E.

8.00
5.00
5.00
5.00
23.00

Cum

E.E.