You are on page 1of 5

Richard L. Offitto 55 Overlook Drive a Farmingville, New York 11738 a (631) 846-3108 EMAIL: ro13deac4@westpost.

net Experience Americon Construction Inc. New York, NY Sr. Project Manager 2/10-1/11 a Direct all Subcontractors on site while assuming Project Managers role assumin g full responsibility for 11 Million dollar build out for Nomura Securities larg est expansion in North America. Work included UPS, EPS, and Chilled Water Infras tructure Risers to support 120K Square Feet of trading floor. Entire floor infra structure replaced to support over 150 Trader Positions. Floor included new Food Service by Restaurant Associates. Work completed in 4.5 Months. a H&M Clothing store renovation that included 11 Phases while store remained ope n for business. 60 Days into project store became highest grossing store in coun try while construction phases were all in progress. Project included New Escalat or, associated steel framing and platform modifications, upgrades to all existin g elevators a Review and qualify all bid proposals, close out with purchasing of subcontract or and issuing base contract PO a Run all client meetings and issue associated weekly meeting minutes a Buy-out all change order costs, including base contracts with sub-contractors a Right-up all new RFPas a Review and manage all change orders, RFIas and submittal logs for all projects a Lead Generation and Business Development produced account relationship status with Deutsche Bank Trust Company Americas & Commerce Bank a All project close-out requirements a Review requisitions with ownership for approval and payment a General Condition forecast and management

CJS BUILDERS New York, NY Sr. Project Manager 2/08-2/10 a Manage operations for $30 million dollar General Contractor/Construction Manag ement firm a Review and qualify all bid proposals a Run all client meetings a Issue weekly client meeting minutes a Execute all purchasing a Buy-out all change order costs, including base contracts with sub-contractor a Right-up all new RFPas a Review and Manage all change orders, RFIas and submittal logs for all projects a Lead Generation and Business Development a All project close-out requirements a Review requisitions with ownership for approval and payment IBEX Construction New York, NY General Superintendent/Project Manager 3/07-2/08 a Responsible for all coordination and logistics of a 38 million dollar renovati on, located at 650 Sixth Avenue, New York, New York a Run weekly subcontractor meetings a Update master schedule, including all milestone dates a Integrate directly with clients and conduct weekly client meetings a Provide value engineering that meets budget requirements a Compile monthly requisitions and submit for approval

a Approve all subcontractor requisitions for payment a Manage logistics plan and phasing a Delegate project responsibilities and oversee and manage Assistant Superintend ents a Directly coordinate all field conditions with Architect, Mechanical Engineer a s well as Structural Engineer a Track all long lead items Bernsohn & Fetner, LLC New York, NY Senior Project Manager 9/05- 3/07 a Coordinate all pre-construction logistics for Calvin Kleinas NYC Residence a Provide value engineering that meets budget requirements a Oversee and manage multiple projects a Coordinate all submittals for all projects a Oversee all construction details a Execute presentations for future projects a Compile monthly requisitions and submit for approval a Integrate directly with clients and conduct weekly client meetings a Approve all subcontractor requisitions for payment Turner Construction Company New York, NY Project Superintendent 9/02 - 9/05 a Engineer all aspects of project with monthly reports. a Shop drawing / Submittal management. a Develop milestone construction schedules. a Align scope with budget and provide value engineering if required. a Investigate existing conditions. a Financial Management. a Schedule all trades for AOL Time Warner Project at Columbus Circle and NYU Bro wn a Oversee and direct all coordinated MEP drawings for field installation. a Track and submit all asbuilts with O&M. Schedule all demonstrations with clien t before turnover. a Dry run all presentations with project team before interview. a Manage Logistics plan / phasing. a Integrate Mock-up installations for client approval. a Identify all long lead items. James E. Fitzgerald, Inc. New York, NY Project Superintendent 12/01 - 9/02 a Run entire construction project by maintaining all building rules and regulati ons for Paul Weiss Project @ 1285 6th avenue. a Set up construction schedules. a Maintained the subcontractors to the scheduled end date. a Coordinate with Architects and Engineers regarding field conditions. a Run weekly subcontractors meeting. a Created, set-up and maintained job site paperwork system. Lehr Construction Corporation New York, NY Project Superintendent 6/93 - 12/01 a Set up construction schedules/long lead sheets. a Maintained the subcontractors to the scheduled end date. a Coordinate with Architects and Engineers regarding field conditions. a Run entire construction project by maintaining all building rules and regulati ons. a Write change orders/request for estimates as required during course of project . a Assist Project Managers in all change order meetings detailing scope of work. a Run weekly subcontractors meetings. a Monitor any changes to original bid documents. a Close out all punch-list items with sign off from Architects and Engineer. a Present all close out documentation.

Lehr Construction Corporation New York, NY Project Superintendent 6/93 - 12/01 a Schedule upcoming construction events with subcontractors. a Monitor project development during ongoing construction. a Work with Architects and Engineers issuing sketches/bulletins. a Follow up on completion of all work directed by change orders. a Set up all client meeting documentation including sub info. a Maintain all contract documentation representing complete history. a Responsible for all prints and distribution to the subs. a Update tracking tools for easy monitoring of construction progress. Diamond Era Construction, Inc. Brooklyn, NY Business Manager 6/89 - 6/93 a Responsible for laying out, set-up and coordination of jobs for high-end resid ential projects. a Structuring contracts for all new phases of projects. a Responsible for all estimates. a Completed progress reports. a Setup and Developed all new accounts Education NYC DOB 4HR Supported Scaffold User January 2010 NYC DOB Approved 16HR Suspended Scaffold Training January 2010 Asbestos Allied Trades January 2010 Ladder Safety May 2005 How to Read and Analyze Financial Statements May 2005 US Department of Labor Occupational Safety & Health Certified CPR and First Aid July 2004 Site Safety Managers - 40-Hour Course March 2004 Mold Awareness and Moisture Control May 2004 OSHA Certification - 30-Hour Course June 2004 Kingsborough Community College, New York May 1990 Skills Expedition Software, Suretrak, Word, Excel and Microsoft Project REFERENCES COMPANY CONTACT TELEPHONE NUMBER Island Acoustics Doug Weber (631) 220-0270 Art In Construction Stephen Balser (917) 939-0752 Rimi Woodcraft Anthony Rizzo (718) 824-3900 (914)260-8730 Dal Electric Salvatore Dalessio (718) 437-7176

(646) 772-4302 Combined Resources Dennis Eatz (516) 777-1159 United AC Richard Veltri (917) 992-7442 Petrocelli Electric Michael Spatola (718) 752-2250 Forest Electric Thomas Olsen (917) 417-8375 Champion Metal/Glass Ali Ghahremani (631) 831-5701 Sergias Images, Inc. Lou Sergi (718) 935-0002 Lab Plumbing Peter Bisso (212) 246-9690 Par Sprinkler Bob Nock (516) 903-2436 Commodore Construction Kenny Badree (917) 417-7073 Cirocco & Ozzimo Constructing Greg Ozzimo (631) 847-0185 Nelson Air Device Corp. Michael Wood (917) 572-9423 Sol Rubin Painting Larry Rubin (631) 454-2500 Cooper Plastering Jim Cooper (917) 939-0457 Brennan Brothers John Brennan (718) 549-7860 Nastasi & Associates Inc. Don Cornell (516) 746-1800 Island Diversified Mike McGrath (631) 953-6990 (631) 774-3987 Niclin Builders Al Frank (917) 468-1472 ARCHITECTS/ENGINEERS John Francis Borrelli John Borrelli (212) 685-7354 Gensler Scott Cameron (212) 492-1400 EYP Dan Lutz (917) 981-6000 Frank Visconti Visconti Architecture (914) 241-1871 TPG Architecture, LLP George Rosa (212) 768-0800 Lakhani & Jordan Engineers, P.C. John Lonergan (212) 338-9020 Specht Harpman Amy Lopez (212) 239-1150 EXT. 17 Polise Engineering Bill Polise (212) 645-1002 Alan Gaynor & Company, P.C. Michael Esposito (212) 334-0900 PERSONAL REFERENCES Calvin Klein, President, CEO Calvin Klein Studios (212) 633-2211 Anthony Calicchio IBEX Construction, Operations Manager (917) 881-1343 John Esposito, Personal Assistant Calvin Klein Studios (212) 633-2211 (917) 254-5331 Dave Gramlich, Client Representative David Letterman (914) 276-0611 (203) 241-9096 David Spector, President, CEO David Spector and Associates (212) 869-8200 (917) 754- 6732 Charles Russo, Account Executive LEHR Construction (212) 353-1160 Cyril Grant, Account Executive Turner Construction (646) 302-5850 Frank Suchak, Project Manager Turner Construction (646) 235-4282 James DiBenedetto, Facilities Manager Wilson, Elser, Moskowitz, Edelman & Dicker LLP (212) 490-3000 Peter Pritchard, President/CEO Pritchard Industries, INC. (212) 382-2295 Robert Lowry, Chief Information Officer, Vice President Royal Health Care (212) 808-4775 Steven B. Oppen, Regional Manager,

Administrative Services New York/Connecticut Region Howard Hughes Medical Instit ute Office of Administrative Services (212) 327-7925 Alfred NG, Project Manager for NYU Construction and Planning Department NYU Genomic Lab Ren ovations 7th & 8th floors. (212) 998-1404 Amy Iselin Henry, Residential Owner 1001 Park Avenue Renovation (212) 744-2174 John Fitzgerald, Project Manager James E. Fitzgerald (212) 921-8700 Robert Cavolino, Owner CAVCO Roofing (917) 682-3066 Kimberly Winter, Property Manager, One Lincoln Plaza Ogden Cap Properties, LLC ( 212) 579-1909 Thommy Carr, Foreman Combined Resources H ( 631) 751- 4748 C (516) 805-8731

PROJECTS a Calvin Klein Residence, 176 Perry Street Floors 13-16 a Grand Street Guild, 460 Grand Street (600 Unit Conversion with Full Exterior R estoration under Local Law 11 and New Maintenance Building with complete Landsca ping upgrade). Total value 68 Million. a 650 6th Avenue, 68 Unit Conversion with New Roofing System, additional level t o building for Penthouse and complete Exterior Restoration. Total value 39 Milli on. a Chase World Headquarters, 270 Park Avenue (Branch Modification). a Lee Jeans Showroom, 25 West 39th Street a One Lincoln Lobby Renovation a 14 Penn Plaza, Bathroom and Corridor Renovations a Royal Health Care, 521 Fifth Avenue a AOL Time Warner Center Floors 18-21 a NYU Genomic Lab Renovation 7th floor a NYU Genomic Lab Renovation 8th floor a Disney Store, 5th Ave a MTA, 2 Broadway floors 12-14 / 16-19 a WEMED, 150 East 42nd Street a Grubb & Ellis, 1177 Avenue of the Americas a Paul Weiss, 29th floor Audio/Visual Conference Center/ Cafeteria a Paul Weiss 21st floor a UBS Financial Services a Nautica Flagship Store, 50 Rockefeller Center a Victoria Flagship Store

You might also like